Canadian River
Municipal Water Authority




              CRMWA History & System
              Drought & CRMWA’s Response
              Future Infrastructure Development
2011
                                                                                                              $82 million Mesa water rights purchase

CRMWA Timeline                                                            2010          2011
                                                                                                            Wellfield Expansion (double capacity)

                                                                                   2006
                                                                                                               $50 million new water rights
                                                                                 2005
                                                                                                            $30 million new water rights
                                                                            2001
                                                                                                             Salinity Control Project
                                                              2000        2001
                                                                                                  Completion of John C Williams Wellfield

  40 Years
  900 Billion Gallons
                                                     1990




                                        1980




                               1970
                                        1968
                                                                         Completion of Aqueduct
                                      1965
                                                                        Completion of Dam
                                 1962
                    1960                                            Construction Begins
                               1960
                                                                 CRMWA/BOR Contracts



                        1953
                                                 CRMWA is created by the State Legislature
             1950    1950
                                                           Federal Approval
                    1949
                                               Canadian River Water Users Association


               1940’s
                                                  BOR/Corps Studies
Late 1998




2008
2011
Canadian River Project                                                              Oklahoma
Built by: Bureau of Reclamation
                                                                                     Texas



                                                                                                                 River
                                                                              Lake
                      Conchas                                                 Meredith
                                                                                                    Borger
                      Reservoir
                                  Ute Lake                                                               Pampa
                                                            Canadian

                                                                                         Amarillo




                                             New Mexico
                                                                                           Plainview


                                                          Texas
                                                                  Levelland
                                                                                         Lubbock

                                                                                           Slaton

                                                                                         Tahoka
                                                                   Brownfield
                                                                                     O'Donnell


                                                                                  Lamesa
                                                                                                             0 10 20 30 40 50
                                                                                                               Scale in Miles
Current Groundwater System

 Original Wellfield (JCW) - $83,500,000                                              Roberts

        2005 Bond Issue - $50,000,000
        2006 Bond Issue - $50,000,000
                                                                                                        Hemphill
        2009 Bond Issue - $21,600,000
          Moore                               Hutchinson
        2011 Bond Issue - $81,630,000                                Phase 1-2
_________________________________
                                                                                            Phase 3
                   TOTAL - $286,730,000

                                            Borger




          Potter                                                                 Pampa

                                              Carson                                 Gray               Wheeler

                                                           Wellfield Capacity
                                                           • 46 Production Wells
      Amarillo
                                                           • Estimated Avg Capacity 1,350 gpm
                                                           • 46 miles 54-inch pipe
                                                           • Total well capacity 100,000 acre-feet/yr
                                                           • Pipeline capacity 70,000 acre-feet/yr
                            To Southern Cities
What’s Next?
    If Lake Meredith doesn’t come back “soon”, additional infrastructure to
    produce this new water may be required to fill the original lake water system
    with groundwater.

 Original lake water                                                             Roberts

  system design
  capacity 112 MGD.                                                                            Hemphill
                          Moore                  Hutchinson
 Current groundwater                                                Phase 1-2

  system capacity is                                                                 Phase 3


  64 MGD.                                   Borger
 A second
  groundwater system
  could make the
                          Potter                                                 Pampa
  original lake water
  system whole.                                  Carson                           Gray         Wheeler
 CRMWA Member           Amarillo                         CRMWA II

  Cities would then be
  “drought proof”!

                                    To Southern Cities
Transition from Lake Meredith to Groundwater

 CRMWA’s water supply has
  transitioned from lake water to
  groundwater in just over 10
  years.
 With this current purchase, we
  now have groundwater to last
  well over a century, even under
  drought conditions the entire
  time.
 A major expense but no one had
  to move!

Contenu connexe

En vedette

Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayThe Texas Network, LLC
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...The Texas Network, LLC
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)The Texas Network, LLC
 
Managing Rate Impacts of Conservation
Managing Rate Impactsof ConservationManaging Rate Impactsof Conservation
Managing Rate Impacts of Conservation The Texas Network, LLC
 
The Drought’s Affect on Dallas Water Utilities
The Drought’s Affect on Dallas Water UtilitiesThe Drought’s Affect on Dallas Water Utilities
The Drought’s Affect on Dallas Water UtilitiesThe Texas Network, LLC
 
Endangered Species Act: New Threat to Texas and Need for Reform
Endangered Species Act: New Threat to Texas and Need for ReformEndangered Species Act: New Threat to Texas and Need for Reform
Endangered Species Act: New Threat to Texas and Need for ReformThe Texas Network, LLC
 
SAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectSAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectThe Texas Network, LLC
 
2011 drought challenges and plans for city of houston
2011 drought challenges and plans for city of houston2011 drought challenges and plans for city of houston
2011 drought challenges and plans for city of houstonThe Texas Network, LLC
 
City of Conroe Revenue Stability Through Rate Design
City of Conroe Revenue Stability Through Rate DesignCity of Conroe Revenue Stability Through Rate Design
City of Conroe Revenue Stability Through Rate DesignThe Texas Network, LLC
 
Potable Reuse as a New Source of Supply for Gulf Coast Water Authority
Potable Reuse as a New Source of Supply for Gulf Coast Water AuthorityPotable Reuse as a New Source of Supply for Gulf Coast Water Authority
Potable Reuse as a New Source of Supply for Gulf Coast Water AuthorityThe Texas Network, LLC
 
USIBWC Update on the International Waters of the Rio Grande
USIBWC Update on the International Waters of the Rio GrandeUSIBWC Update on the International Waters of the Rio Grande
USIBWC Update on the International Waters of the Rio GrandeThe Texas Network, LLC
 
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...The Texas Network, LLC
 
Colorado River Municipal Water District How the Drought Has Affected Business
Colorado River Municipal Water District How the Drought Has Affected BusinessColorado River Municipal Water District How the Drought Has Affected Business
Colorado River Municipal Water District How the Drought Has Affected BusinessThe Texas Network, LLC
 
Law of the Farm Principles apply to developing potable reuse
Law of the Farm Principles apply to developing potable reuseLaw of the Farm Principles apply to developing potable reuse
Law of the Farm Principles apply to developing potable reuseThe Texas Network, LLC
 
Growth, Drought, and Groundwater in Texas... What are we learning?
Growth, Drought, and Groundwater in Texas... What are we learning?Growth, Drought, and Groundwater in Texas... What are we learning?
Growth, Drought, and Groundwater in Texas... What are we learning?The Texas Network, LLC
 
Lake Granbury Watershed Protection Plan
Lake Granbury Watershed Protection PlanLake Granbury Watershed Protection Plan
Lake Granbury Watershed Protection PlanThe Texas Network, LLC
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT The Texas Network, LLC
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSThe Texas Network, LLC
 

En vedette (20)

Methods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda BayMethods to promote freshwater inflow to East Matagorda Bay
Methods to promote freshwater inflow to East Matagorda Bay
 
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
Evaluating the Relative Cost of Service from Publicly Funded vs. Privately Fi...
 
Texas Drought Over? (But then again…)
Texas Drought Over?  (But then again…)Texas Drought Over?  (But then again…)
Texas Drought Over? (But then again…)
 
Historic Texas Drought Update
Historic Texas Drought UpdateHistoric Texas Drought Update
Historic Texas Drought Update
 
Managing Rate Impacts of Conservation
Managing Rate Impactsof ConservationManaging Rate Impactsof Conservation
Managing Rate Impacts of Conservation
 
The Drought’s Affect on Dallas Water Utilities
The Drought’s Affect on Dallas Water UtilitiesThe Drought’s Affect on Dallas Water Utilities
The Drought’s Affect on Dallas Water Utilities
 
Endangered Species Act: New Threat to Texas and Need for Reform
Endangered Species Act: New Threat to Texas and Need for ReformEndangered Species Act: New Threat to Texas and Need for Reform
Endangered Species Act: New Threat to Texas and Need for Reform
 
SAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination ProjectSAWS - Development of Brackish Groundwater Desalination Project
SAWS - Development of Brackish Groundwater Desalination Project
 
2011 drought challenges and plans for city of houston
2011 drought challenges and plans for city of houston2011 drought challenges and plans for city of houston
2011 drought challenges and plans for city of houston
 
City of Conroe Revenue Stability Through Rate Design
City of Conroe Revenue Stability Through Rate DesignCity of Conroe Revenue Stability Through Rate Design
City of Conroe Revenue Stability Through Rate Design
 
Potable Reuse as a New Source of Supply for Gulf Coast Water Authority
Potable Reuse as a New Source of Supply for Gulf Coast Water AuthorityPotable Reuse as a New Source of Supply for Gulf Coast Water Authority
Potable Reuse as a New Source of Supply for Gulf Coast Water Authority
 
USIBWC Update on the International Waters of the Rio Grande
USIBWC Update on the International Waters of the Rio GrandeUSIBWC Update on the International Waters of the Rio Grande
USIBWC Update on the International Waters of the Rio Grande
 
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...
How the Drought Has Affected Business - Scott Hall, Lower Neches Valley Autho...
 
Colorado River Municipal Water District How the Drought Has Affected Business
Colorado River Municipal Water District How the Drought Has Affected BusinessColorado River Municipal Water District How the Drought Has Affected Business
Colorado River Municipal Water District How the Drought Has Affected Business
 
Law of the Farm Principles apply to developing potable reuse
Law of the Farm Principles apply to developing potable reuseLaw of the Farm Principles apply to developing potable reuse
Law of the Farm Principles apply to developing potable reuse
 
Growth, Drought, and Groundwater in Texas... What are we learning?
Growth, Drought, and Groundwater in Texas... What are we learning?Growth, Drought, and Groundwater in Texas... What are we learning?
Growth, Drought, and Groundwater in Texas... What are we learning?
 
Lake Granbury Watershed Protection Plan
Lake Granbury Watershed Protection PlanLake Granbury Watershed Protection Plan
Lake Granbury Watershed Protection Plan
 
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
RESPONDING TO A WATER SUPPLY CONTAMINATION EVENT
 
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESSSURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
SURFACE WATER ISSUES IN THE GMA 7 JPINT PLANNING PROCESS
 
Civil Works Transformation
Civil Works TransformationCivil Works Transformation
Civil Works Transformation
 

Similaire à Canadian River Municipal Water Authority

San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21San Diego County Water Authority
 
021910 ASCE National Engineers Conference
021910 ASCE National Engineers Conference021910 ASCE National Engineers Conference
021910 ASCE National Engineers Conferenceguest9a37090
 
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...The Texas Network, LLC
 
Bio-economic optimisation of land use to manage natural resources. Ian Hume
Bio-economic optimisation of land use to manage natural resources. Ian HumeBio-economic optimisation of land use to manage natural resources. Ian Hume
Bio-economic optimisation of land use to manage natural resources. Ian HumeJoanna Hicks
 

Similaire à Canadian River Municipal Water Authority (14)

San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
San Diego County's Water Supply - SD Regional EDC Presentation Sept. 21
 
May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E. May 1 Water Talks - Halla Razak, P.E.
May 1 Water Talks - Halla Razak, P.E.
 
Amarillo MLT_Canadian River Municipal Water Authority_Kent Satterwhite
Amarillo MLT_Canadian River Municipal Water Authority_Kent SatterwhiteAmarillo MLT_Canadian River Municipal Water Authority_Kent Satterwhite
Amarillo MLT_Canadian River Municipal Water Authority_Kent Satterwhite
 
NC Chamber Public Policy Meeting
NC Chamber Public Policy MeetingNC Chamber Public Policy Meeting
NC Chamber Public Policy Meeting
 
San Diego County Water Supply 2009-10 Outlook
San Diego County Water Supply 2009-10 OutlookSan Diego County Water Supply 2009-10 Outlook
San Diego County Water Supply 2009-10 Outlook
 
Water Supply Update 4/2010
Water Supply Update 4/2010Water Supply Update 4/2010
Water Supply Update 4/2010
 
Water Talks: Investments in Water Reliability
Water Talks: Investments in Water ReliabilityWater Talks: Investments in Water Reliability
Water Talks: Investments in Water Reliability
 
021910 ASCE National Engineers Conference
021910 ASCE National Engineers Conference021910 ASCE National Engineers Conference
021910 ASCE National Engineers Conference
 
ASCE National Engineers Conference - Water Authority
ASCE National Engineers Conference - Water AuthorityASCE National Engineers Conference - Water Authority
ASCE National Engineers Conference - Water Authority
 
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...
Southwestern Division Pacesetters - Transforming the Corps of Engineers Civil...
 
ReTHINK Water - San Diego County Water Authority
ReTHINK Water - San Diego County Water AuthorityReTHINK Water - San Diego County Water Authority
ReTHINK Water - San Diego County Water Authority
 
Bio-economic optimisation of land use to manage natural resources. Ian Hume
Bio-economic optimisation of land use to manage natural resources. Ian HumeBio-economic optimisation of land use to manage natural resources. Ian Hume
Bio-economic optimisation of land use to manage natural resources. Ian Hume
 
Floods and Flows - Augerot and Bach
Floods and Flows - Augerot and BachFloods and Flows - Augerot and Bach
Floods and Flows - Augerot and Bach
 
Water Talks: Introduction
Water Talks: IntroductionWater Talks: Introduction
Water Talks: Introduction
 

Plus de The Texas Network, LLC

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017The Texas Network, LLC
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleThe Texas Network, LLC
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesThe Texas Network, LLC
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Texas Network, LLC
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasThe Texas Network, LLC
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersThe Texas Network, LLC
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Texas Network, LLC
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIThe Texas Network, LLC
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...The Texas Network, LLC
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggThe Texas Network, LLC
 

Plus de The Texas Network, LLC (20)

WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017WHCRWA MUD directors' outreach workshop June 8, 2017
WHCRWA MUD directors' outreach workshop June 8, 2017
 
WHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIPWHCRWA APWA Presentation on CIP
WHCRWA APWA Presentation on CIP
 
WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015WHCRWA Town Hall and Open House 2015
WHCRWA Town Hall and Open House 2015
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” Rule
 
Pass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal ChallengesPass the Salt: Desalination Brine Disposal Challenges
Pass the Salt: Desalination Brine Disposal Challenges
 
Texas Water Development Board Update
Texas Water Development Board UpdateTexas Water Development Board Update
Texas Water Development Board Update
 
Professional Ethics
Professional EthicsProfessional Ethics
Professional Ethics
 
Groundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD PanelGroundwater Management GMA/GCD Panel
Groundwater Management GMA/GCD Panel
 
The Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on ReuseThe Economic Power of Water - GE’s Focus on Reuse
The Economic Power of Water - GE’s Focus on Reuse
 
TWCA Speech – Rep. James Frank
TWCA Speech – Rep. James FrankTWCA Speech – Rep. James Frank
TWCA Speech – Rep. James Frank
 
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in TexasU.S. Army Corps of Engineers Infrastructure Strategies in Texas
U.S. Army Corps of Engineers Infrastructure Strategies in Texas
 
Individual liability for Water Authority Board Members
Individual liability for Water Authority Board MembersIndividual liability for Water Authority Board Members
Individual liability for Water Authority Board Members
 
From Projectile to Pump Station
From Projectile to Pump StationFrom Projectile to Pump Station
From Projectile to Pump Station
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
 
Pecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part IIPecos/Devils River Watershed Projects Part II
Pecos/Devils River Watershed Projects Part II
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
National Floodplain Policy: FFRMS
National Floodplain Policy: FFRMSNational Floodplain Policy: FFRMS
National Floodplain Policy: FFRMS
 
San Antonio Vista Ridge Project
San Antonio Vista Ridge ProjectSan Antonio Vista Ridge Project
San Antonio Vista Ridge Project
 
Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...Finding Balance Between Regulation, Management and Property Rights in the Cen...
Finding Balance Between Regulation, Management and Property Rights in the Cen...
 
Groundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and BraggGroundwater Management in Light of Day and Bragg
Groundwater Management in Light of Day and Bragg
 

Dernier

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Dernier (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 

Canadian River Municipal Water Authority

  • 1. Canadian River Municipal Water Authority CRMWA History & System Drought & CRMWA’s Response Future Infrastructure Development
  • 2. 2011 $82 million Mesa water rights purchase CRMWA Timeline 2010 2011 Wellfield Expansion (double capacity) 2006 $50 million new water rights 2005 $30 million new water rights 2001 Salinity Control Project 2000 2001 Completion of John C Williams Wellfield 40 Years 900 Billion Gallons 1990 1980 1970 1968 Completion of Aqueduct 1965 Completion of Dam 1962 1960 Construction Begins 1960 CRMWA/BOR Contracts 1953 CRMWA is created by the State Legislature 1950 1950 Federal Approval 1949 Canadian River Water Users Association 1940’s BOR/Corps Studies
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 15. 2011
  • 16. Canadian River Project Oklahoma Built by: Bureau of Reclamation Texas River Lake Conchas Meredith Borger Reservoir Ute Lake Pampa Canadian Amarillo New Mexico Plainview Texas Levelland Lubbock Slaton Tahoka Brownfield O'Donnell Lamesa 0 10 20 30 40 50 Scale in Miles
  • 17.
  • 18.
  • 19.
  • 20. Current Groundwater System Original Wellfield (JCW) - $83,500,000 Roberts 2005 Bond Issue - $50,000,000 2006 Bond Issue - $50,000,000 Hemphill 2009 Bond Issue - $21,600,000 Moore Hutchinson 2011 Bond Issue - $81,630,000 Phase 1-2 _________________________________ Phase 3 TOTAL - $286,730,000 Borger Potter Pampa Carson Gray Wheeler Wellfield Capacity • 46 Production Wells Amarillo • Estimated Avg Capacity 1,350 gpm • 46 miles 54-inch pipe • Total well capacity 100,000 acre-feet/yr • Pipeline capacity 70,000 acre-feet/yr To Southern Cities
  • 21. What’s Next? If Lake Meredith doesn’t come back “soon”, additional infrastructure to produce this new water may be required to fill the original lake water system with groundwater.  Original lake water Roberts system design capacity 112 MGD. Hemphill Moore Hutchinson  Current groundwater Phase 1-2 system capacity is Phase 3 64 MGD. Borger  A second groundwater system could make the Potter Pampa original lake water system whole. Carson Gray Wheeler  CRMWA Member Amarillo CRMWA II Cities would then be “drought proof”! To Southern Cities
  • 22. Transition from Lake Meredith to Groundwater  CRMWA’s water supply has transitioned from lake water to groundwater in just over 10 years.  With this current purchase, we now have groundwater to last well over a century, even under drought conditions the entire time.  A major expense but no one had to move!

Notes de l'éditeur

  1. CRMWA was created in ‘53 and project construction began in 1960.They finished construction in ‘68 and started delivering water that year. I might note that since that time, we have delivered over 900 billion gallons of lake water. That is nearly a trillion gallons that would have came from the non-renewable Ogallala otherwise. In 2001, we completed the John C. Williams Wellfield and Aqueduct and began delivering groundwater. This project was designed to enhance the quality of the water being delivered by blending 25% groundwater with Meredith water in the pipeline. It has changed significantly in the short period since then. By 2005 it was obvious the Lake was in trouble. We began buying additional groundwater rights and are still doing that today.
  2. This chart tells the story. The black dashed line across the middle is the average inflow in AF/yr over the history of the Lake. One thing that’s different for us compared to most of you is that our drought started in 2001.
  3. In 2001 we broke an all time record for low inflow.
  4. We broke that again in ’02. After ‘02, we did the math to see what the odds were of having 3 record breaking years in a row and it was clear from those results that it just wouldn’t happen.
  5. We broke the record again in ‘03. ‘05 would have been a record breaker if it hadn’t been for 1, 2, & 3. 4 was a little better but still below average.
  6. Then another record breaker in 6
  7. A bad year in 7, slightly better in 8
  8. another record breaker in 9
  9. and nearly again in 10.
  10. Then there was last year. Last year shattered the previous low inflow records. It was so bad that this year is the first year in our history that we don’t expect there to be any surface water available to deliver.
  11. This graph shows the results of this run of bad years. In 2000, we had over 400,000 AF in storage at a depth of over 90’. Today we are under 22,000 AF (about 5% of what we had then) and a depth of just over 30’!
  12. As you know, water quality typically follows storage volume. This is pretty much a mirror image of the storage volume in Meredith. The red line shows the state standard for chlorides and the Lake is now more than 4 times that standard at over 1300 ppm. Our total dissolved solids are over 3400 ppm! I’m not sure anyone would want this water even if we could get to it.
  13. These pictures show visually what has happened to the lake. In the top picture, the lake was about 50’ deep at this mid-point on the Lake. In ‘08, thisisnow the end of the lakeratherthan the mid-point.
  14. This is what it looks like now. I took this picture on a windy day last spring to show the dust blowing where there used to be Lake. I say this is what it looks like now but that isn’t entirely accurate. Later in 11 there was no hint of green to be seen except the trees and this time of year there is no green at all.
  15. This is our original system. We lift the water 800’ from the Lake to Amarillo. Then it’s gravity flow to Lubbock and on to Lamesa. The system has a capacity of 112 MGD or 126,000 AF/yr. In ’01, our Salinity Control and groundwater projects came online. Last year we completed our 1st wellfield expansion. This expansion doubled the well capacity but didn’t change the transmission capacity. We now have about 100,000 AF/yr well capacity with around 70k transmission capacity.
  16. When the drought 1st started, this is what our water rights looked like. At that time we didn’t know the drought had started.
  17. By 2005, it was clear the Lake was in trouble. We purchased around 220,000 acres of high quality, highly productive water rights in 05 & 6. As you can see from this map, all of our acreage was contiguous but not the prettiest layout. Mesa Water was pretty intermingled with ours and if we were to both fully develop there would have been problems.
  18. We closed on the Mesa Water the last business day of ‘11. The map is much prettier now but obviously there are still lots of theses white areas it would make sense for us to have. We are working on those areas now. We are really offering to buy these areas to be fair as much as anything. Nearly all of this is rough ranchland with no irrigation and only windmills for cattle water. Part of our agreement with these landowners is they can’t irrigate or have any commercial use of the water. Only livestock & domestic water and that means no feedlots and only one residence per 160 acres. We think we now own more groundwater than anyone in the nation. Around 26 million AF or 8½ trillion gallons. Under the worst circumstances, this is enough water to last us for 130 years. If the Lake comes back, that life will be much longer.
  19. If the Lake doesn’t come back soon, we’ll need to add another pipeline to get this water to town. We are currently working on a study to see when this additional capacity will be required. Problem is, our member cities have a wide range of needs and abilities. They range in population from 230k to 830! The big end is growing and the small end is shrinking. Our early estimates of adding additional capacity is in the range of $250 million. That would double our groundwater delivery capacity but also double our investment in the project. It will be hard for our Cities to absorb but they may not have any choice depending on what happens with the Lake in the near future. When we add this additional capacity, our Cities will then be drought proof.
  20. These are pictures taken from near where I took the other pictures except these are looking up-stream. Notice the salt cedar in the bottom picture. That‘s all dead now. We’ve sprayed over 24,000 acres of salt cedar in an attempt to increase inflow to Meredith. Now all we need is runoff. We’ve transitioned from surface water to groundwater in a little over 10 years. Our water supply has gone from 100% surface water to 100% groundwater. This has been a huge expense to our population base of ½ million people. The good news is, no one had to move. As I said earlier, we now have enough water to last 130 years under drought conditions the whole time and much longer if and when the Lake comes back.