USED TECHNOLOGIES ARE :-
 PQC
 DLC
 PCC
 PAVEMENT QUALITY CONCRETE (PQC)
PURPOSE:-
 The purpose of this Quality Plan for Construction ofPavement
Quality Concrete (PQC)is to provide detailed Construction
Methodology, Materials used, Resources deployed.
SCOPE:-
 The Scope of this Segmental Quality Plan/ Methodologyshall covers
the construction of pavement quality concrete insertion of dowel bars,
tie bars in accordance with the requirement of Technical
Specifications and in conformity with the line, grades and cross
sections shown in drawings.
It covers the following activities:
Selection, Testing and Acceptance of all incorporated Materials for
PQC.
Designof Mixes for PQC and Trials, Acceptance etc.
Details of Plant, Equipment / Machinery as required in execution of
PQC.
Batching, Mixing, Transporting, Placing, Finishing and Curing of
Concrete for PQC.
Mechanized Texturing and Curing operation for PQC.
Joint Cutting and application of Joint Sealing compound as approved.
Quality Assurance and Control Checks during operation and post
concreting
DEFINITIONS:-
The words like contract, Contractors, Engineer (Synonymous to
Engineer's representative), Drawing, Employer, Government, Works,
Worksite used in this Quality Plan shall be consideredto have the
meaning as understood from the definitions pertaining Quality
Management System Developedforthe Particular Project.
The following abbreviation shall have the meaning as set forth below:
MORT & H: Ministry of Roads Transport & Highways
NHAI: National Highways Authority of India
BIS:Bureau of Indian standards
QA: Quality Assurance
PQC: Pavement Quality Concrete
MTC: Manufacture's TestCertificate
ITP: InspectionTestPlan
CROSS REFERENCE:-
This Segment Quality Plan should be read in conjunction with the
following documents:
ISO 9001 2000 Quality management system
Contractor Document / Technical Specifications
MoRTH/IS/ASTM/ACI Codes,where applicable
IRC: SP: 57-2000,Guideline on Quality system for roads.
Surveyand Setting out for PQC:
Material Required:
Cement:
Any of the following types of cementmay be used with prior approval
of the Engineer:
(i) Ordinary Portland Cement IS: 269
(ii) Portland Slag Cement IS: 455
(iii) Portland Pozzolana Cement IS:1489
Cement to be used may preferably be obtained in bulk form.It shall be
stored in accordance with stipulations contained in Clause 1014 and shall
be subjected to acceptance test prior to its immediate use.
.
Coarse Aggregate:
Aggregates to be used in the construction of PQC will be Crushed
aggregates .
The aggregate complying IS: 383 will be used.
Max Size of coarse aggregate 25mm as per MoRTH 601.2.3.2
(Fourth Revision : August 2001).
Fine Aggregate:
Clean, natural sand from River Banas form location Triveni 20km form
Ladpura will be used. The material conforming IS:383 is ensured.
The fine aggregate shall consist of clean, natural sand or crushed
stone sand or a combination of the two and shall conform to IS: 383.
Fine aggregate shall be free from soft particles, clay, shale, loam,
cemented particles, mica, organic and other foreign matter. The fine
aggregate shall complywith MoRTH 602.2.4.3.(Fourth Revision:
August 2001).
Water:
Water used for mixing and curing concrete conforming to IS:
456:2000.
In case of PQC During hot weather, water for preparation of
concrete will be taken form water chilling plant.
Admixtures:
Admixture conforming to IS: 6925 and IS: 9103 to improve
workability of concrete or extension of setting time to be done.
Storage of materials :
Aggregates:
Aggregate will be stock piled separately and sufficient distance will
be maintained from each fraction to avoid intermingling.
Storage space must be easy to inspection, removal and restorage
of materials.
Regular testing of aggregate stock pile will be exercised to ensure
required gradation control.
Cement
Bulk cementwill be stored in bulk storage containers having
200MT capacity and the number of such bulkers will be sufficient
to cater to the requirement at site.
Water
Water will be tanks covered at top and cleaned at regular intervals.
The intake of pipe will be enclosed to exclude silt and other solid
materials and there shall be a minimum depth of 0.60 m of water
below the intake at all times.
Proportioningof concrete
Concrete Strength
The pavement concrete should be a class M-40 concrete with a
minimum 28 days compressive characteristic strength of 40 MPa
1. Characteristic flexural strength at 28 days = 4.5 MPa
2. Target mean strength at 28 days = 5.80MPa
3. Water cement ratio =0.45 Maximum
4. Slump as per IS: 1199 =31+/-15 mm
Minimum flexural characteristic strength of 4.5 MPa.
The ration between the 7 & 28 days strengths of 4.5 Mpa.
For each batch
7days (avg.)
The average flexural strengths ( R7) =
28 days (avg.)
R7 to be determined forthree decimal levels.
(Flexural strength of any Six consecutive 7day test result) >4.50+1.65*s
S: Standard deviation of the group.
Workability:
The control of workability will be done by the slump test
Slump will be controlled so that mix is compactedand finished
without undue flow.
The exact slump required at plant and site will be exercised during
trail patch.
Separation Membrane:
Two applications of approved wax-based white �pigmented curing
compound will be applied on DLC.
First coat will be applied immediately after DLC laying and
compactionand the other before start of PQC.
The process of application will be done using mechanical sprayer.
The other parameters will be meeting the additional specification
Clause- A-12.
Preparation of base :
Any visible defects / cracks more than 10mm size to be required by
fine cement concrete mix.
Surface will be made clean of dirt or extraneous material and free
from damage before application compound.
Joints:
The exact location and type of joint to be transferred at site as
mentioned in drawing.
Concrete Penetrometer and testing as per ASTM C 403 will be
used in monitoring setting of concrete / Maturity of concrete and
saw cutting period.
Initial saw cut of 3mm wide , 100mm depthin transverse and
longitudinal directionwill be provided after initial set(approximately
6~8hrs).
Final saw cutting 10~12mm wide ,20~25mm depthwill de provided
after 14days of curing at accommodate joint sealant.
The staggering of transverse joints with reference to the base will
be minimum 0.3m.

Contenu connexe

Tendances

Tendances (20)

PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
construction of flexible pavement
construction of flexible pavementconstruction of flexible pavement
construction of flexible pavement
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
road construction
road constructionroad construction
road construction
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORTROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
ROAD CONSTRUCTION(BITUMEN) SUMMER TRAINING REPORT
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
Joints in cc pavements
Joints in cc pavementsJoints in cc pavements
Joints in cc pavements
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavements
 
FLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementFLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid Pavement
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Design and construction of highway (flexible pavement
Design and construction of highway (flexible pavementDesign and construction of highway (flexible pavement
Design and construction of highway (flexible pavement
 

Similaire à 6 pavement quality concrete

Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
Minh Bui Si
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iii
GTVT
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
Siddhartha Bhamidipati
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
Anil Singh
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
Yousef Riad
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
Yousef Riad
 

Similaire à 6 pavement quality concrete (20)

Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
uv_bpm.pdf
uv_bpm.pdfuv_bpm.pdf
uv_bpm.pdf
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
A012550107
A012550107A012550107
A012550107
 
SANDEEP PPT
SANDEEP PPTSANDEEP PPT
SANDEEP PPT
 
Column & beam
Column & beamColumn & beam
Column & beam
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iii
 
Concreting work
Concreting workConcreting work
Concreting work
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
Ready Mix Concrete
Ready Mix ConcreteReady Mix Concrete
Ready Mix Concrete
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
5288PS2i1
5288PS2i15288PS2i1
5288PS2i1
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New Building
 
10 pile foundation_specification
10 pile foundation_specification10 pile foundation_specification
10 pile foundation_specification
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
precast manholes
precast manholesprecast manholes
precast manholes
 

Dernier

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Dernier (20)

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

6 pavement quality concrete

  • 1. USED TECHNOLOGIES ARE :-  PQC  DLC  PCC  PAVEMENT QUALITY CONCRETE (PQC) PURPOSE:-  The purpose of this Quality Plan for Construction ofPavement Quality Concrete (PQC)is to provide detailed Construction Methodology, Materials used, Resources deployed. SCOPE:-  The Scope of this Segmental Quality Plan/ Methodologyshall covers the construction of pavement quality concrete insertion of dowel bars, tie bars in accordance with the requirement of Technical Specifications and in conformity with the line, grades and cross sections shown in drawings. It covers the following activities: Selection, Testing and Acceptance of all incorporated Materials for PQC. Designof Mixes for PQC and Trials, Acceptance etc. Details of Plant, Equipment / Machinery as required in execution of PQC. Batching, Mixing, Transporting, Placing, Finishing and Curing of Concrete for PQC. Mechanized Texturing and Curing operation for PQC. Joint Cutting and application of Joint Sealing compound as approved. Quality Assurance and Control Checks during operation and post concreting
  • 2. DEFINITIONS:- The words like contract, Contractors, Engineer (Synonymous to Engineer's representative), Drawing, Employer, Government, Works, Worksite used in this Quality Plan shall be consideredto have the meaning as understood from the definitions pertaining Quality Management System Developedforthe Particular Project. The following abbreviation shall have the meaning as set forth below: MORT & H: Ministry of Roads Transport & Highways NHAI: National Highways Authority of India BIS:Bureau of Indian standards QA: Quality Assurance PQC: Pavement Quality Concrete MTC: Manufacture's TestCertificate ITP: InspectionTestPlan CROSS REFERENCE:- This Segment Quality Plan should be read in conjunction with the following documents: ISO 9001 2000 Quality management system Contractor Document / Technical Specifications MoRTH/IS/ASTM/ACI Codes,where applicable IRC: SP: 57-2000,Guideline on Quality system for roads. Surveyand Setting out for PQC: Material Required: Cement: Any of the following types of cementmay be used with prior approval of the Engineer:
  • 3. (i) Ordinary Portland Cement IS: 269 (ii) Portland Slag Cement IS: 455 (iii) Portland Pozzolana Cement IS:1489 Cement to be used may preferably be obtained in bulk form.It shall be stored in accordance with stipulations contained in Clause 1014 and shall be subjected to acceptance test prior to its immediate use. . Coarse Aggregate: Aggregates to be used in the construction of PQC will be Crushed aggregates . The aggregate complying IS: 383 will be used. Max Size of coarse aggregate 25mm as per MoRTH 601.2.3.2 (Fourth Revision : August 2001). Fine Aggregate: Clean, natural sand from River Banas form location Triveni 20km form Ladpura will be used. The material conforming IS:383 is ensured. The fine aggregate shall consist of clean, natural sand or crushed stone sand or a combination of the two and shall conform to IS: 383. Fine aggregate shall be free from soft particles, clay, shale, loam, cemented particles, mica, organic and other foreign matter. The fine aggregate shall complywith MoRTH 602.2.4.3.(Fourth Revision: August 2001).
  • 4. Water: Water used for mixing and curing concrete conforming to IS: 456:2000. In case of PQC During hot weather, water for preparation of concrete will be taken form water chilling plant. Admixtures: Admixture conforming to IS: 6925 and IS: 9103 to improve workability of concrete or extension of setting time to be done. Storage of materials : Aggregates: Aggregate will be stock piled separately and sufficient distance will be maintained from each fraction to avoid intermingling. Storage space must be easy to inspection, removal and restorage of materials. Regular testing of aggregate stock pile will be exercised to ensure required gradation control. Cement Bulk cementwill be stored in bulk storage containers having 200MT capacity and the number of such bulkers will be sufficient to cater to the requirement at site. Water Water will be tanks covered at top and cleaned at regular intervals. The intake of pipe will be enclosed to exclude silt and other solid
  • 5. materials and there shall be a minimum depth of 0.60 m of water below the intake at all times. Proportioningof concrete Concrete Strength The pavement concrete should be a class M-40 concrete with a minimum 28 days compressive characteristic strength of 40 MPa 1. Characteristic flexural strength at 28 days = 4.5 MPa 2. Target mean strength at 28 days = 5.80MPa 3. Water cement ratio =0.45 Maximum 4. Slump as per IS: 1199 =31+/-15 mm Minimum flexural characteristic strength of 4.5 MPa. The ration between the 7 & 28 days strengths of 4.5 Mpa. For each batch 7days (avg.) The average flexural strengths ( R7) = 28 days (avg.) R7 to be determined forthree decimal levels. (Flexural strength of any Six consecutive 7day test result) >4.50+1.65*s S: Standard deviation of the group. Workability: The control of workability will be done by the slump test Slump will be controlled so that mix is compactedand finished without undue flow. The exact slump required at plant and site will be exercised during trail patch.
  • 6. Separation Membrane: Two applications of approved wax-based white �pigmented curing compound will be applied on DLC. First coat will be applied immediately after DLC laying and compactionand the other before start of PQC. The process of application will be done using mechanical sprayer. The other parameters will be meeting the additional specification Clause- A-12. Preparation of base : Any visible defects / cracks more than 10mm size to be required by fine cement concrete mix. Surface will be made clean of dirt or extraneous material and free from damage before application compound. Joints: The exact location and type of joint to be transferred at site as mentioned in drawing. Concrete Penetrometer and testing as per ASTM C 403 will be used in monitoring setting of concrete / Maturity of concrete and saw cutting period. Initial saw cut of 3mm wide , 100mm depthin transverse and longitudinal directionwill be provided after initial set(approximately 6~8hrs). Final saw cutting 10~12mm wide ,20~25mm depthwill de provided after 14days of curing at accommodate joint sealant. The staggering of transverse joints with reference to the base will be minimum 0.3m.