SlideShare une entreprise Scribd logo
1  sur  24
BIM Handbook 2nd Ed. p.494-513
                                     CHUCK EASTMAN | PAUL TEICHOLZ |
                                      RAFAEL SACKS | KATHLEEN LISTON




                                     CRUSELL BRIDGE
                                        A Building Model Supports a Wide Variety of
                                    Information, Uses of BIM in the Construction Stage


Hanifah Nebrian Sukma | 201183530
Sitemap
                                               Contents of the presentation




   •    Introduction
   •    BIM Learning Experience
   •    Interoperability
   •    Model Synchronization
   •    BIM Use in the Construction Phase
   •    BIM Lessons Learned
   •    Summary

Picture: BIM HandBook & http://bit.ly/uu7uxF                                  1/22
Introduction
                                                       Crusell Bridge Data: Type & Location




   •     Type: cable-stayed bridge
   •     Consist of two asymmetrical cable-stayed spans: measuring 92 m and 51.5 m
         (the total length is 143.5 m)
   •     Connects the western edge of Jätkasaari with Ruoholahti, Finlandia




Picture: http://bit.ly/rN7656                                                                 2/22
Introduction
                                  Crusell Bridge Data: Project Teams & Timeline




   Project team and basic data:




   Project timeline:




Picture: BIM HandBook                                                             3/22
Introduction
                                                            Crusell Bridge Data: Background




   •     The Crusell Bridge becomes the most prominent bridge in Finland to be
         designed and built using BIM (Building Information Model)
   •     The design is solicited by the owner in a design competition announced in the
         winter of 2001
Picture: http://bit.ly/tbIVKG                                                                 4/22
Introduction
                                                            Crusell Bridge Data: Background




   •     The competition aimed to find a quality bridge solution that would bring out
         the characteristics of the area and take into account the requirements of the
         landscape
   •     Although a British design firm win the competition, the project is awarded to
         the second place winner: WSP Finland
Picture: http://bit.ly/s3ub83                                                                 5/22
Introduction
                                                        Crusell Bridge Data: The Use of BIM




   •     During the design and construction process,the project team implementing
         both BIM technologies and lean construction principles and tools




Picture: http://bit.ly/t3zjlw                                                                 6/22
Introduction
                                                 Crusell Bridge Data: The Use of BIM




   •   This case study focuses on the
       construction stage of the project,
       highlighting two aspects:
   1. The extensive use made of the BIM:
       - For fabrication of steel girders and
       concrete reinforcement
       - For monitoring and management of
       the supply chain of fabricated
       components
       - For formwork and temporary support
       structure design
       - For quality control using laser
       scanning, and
       - For construction planning using 4D
       animation;
   2. The ways in which BIM supported lean
   construction practices, such as its support
   of production management onsite using
   the Last Planner System™.


Picture: http://bit.ly/shKKdS                                                          7/22
BIM Learning Experience
             A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage




   •     The Crusell Bridge project becomes a BIM learning process for everybody
         involved, even for those who had previous experience using BIM, because
         many new solutions and techniques were tried
   •     For the client (City of Helsinki’s public works department), it was first
         bridge project using comprehensive BIM, including time and management
         dimensions




Picture: http://bit.ly/uHuzoU                                                                                 8/22
BIM Learning Experience
             A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage




                                               •   For the designer (WSP Finland) that had
                                                   modeled simpler reinforced concrete
                                                   bridges previously; this bridge with its
                                                   curved geometry, cable-stays, and
                                                   composite structural steel and reinforced
                                                   concrete structure, is significantly more
                                                   complex than what they had experienced
                                                   previously
                                               •   For the contractor (Skanska) this project as
                                                   well was the first bridge modeling, using
                                                   Tekla Structures and made a strategic
                                                   decision to use a model in the construction
                                                   stage as much as possible, including 4D
                                                   planning and modeling temporary
                                                   structures
                                               •   Due to the pioneering nature of the use of
                                                   BIM on a highly sophisticated bridge, the
                                                   main BIM software provider to the
                                                   project, Tekla Corporation, is also involved

Picture: http://bit.ly/rCZ09A                                                                                 9/22
Interoperability
                                                     BIM Application Used for Construction Phase




                   Application        Developer                   Purpose
             Tekla Structures v13        Tekla       Basic use onsite—viewing of
                                                     the model, quantity Surveying
             Tekla Structures v15        Tekla       4D simulations and temporary
                                                     structures
                       PERICad           Peri        Modeling formworks

           Reinforcement List v3.1     CELCA         Steel service (reinforcement)
              Trimble RealWorks         Trimble      Comparing surveying results to
                                                     design
                   Vico Control      Vico Software   Preparing master schedule




Source: BIM HandBook                                                                               10/22
Interoperability
                                Information Exchange through File Transfer




Picture: http://bit.ly/t3zjlw                                                11/22
Model Synchronization
                                                                 Synchronization Procedures




   •     Synchronization required not only a technological solution but also a
         management protocol, agreed to by all parties, that stated who was
         allowed to edit what and when




Picture: http://bit.ly/t3zjlw                                                                 12/ 2
BIM Use in the Construction Phase
                                                                            Visualization




   •    The Crusell Bridge is not an extremely large project, but has an interesting
        design and makes excellent use of BIM for a number of construction
        purposes
   •    The 3D model of the project helps different parties to better understand
        the concept and especially the details of the design, forming a common
        mental picture and understanding far more quickly and effectively than
        with traditional drawings

Picture: BIM HandBook                                                                       13/22
BIM Use in the Construction Phase
                                                  Design and Planning of Temporary Structures




   •     The site team decided to thoroughly model all the missing temporary
         structures, including formwork shoring towers and the site tower crane on
         its tracks, directly in the design building model maintained onsite
   •     This provided a better understanding of the structures, enabled
         identification of numerous collisions (clashes), extraction of accurate
         quantities, incorporation of these works into construction schedules, and
         visualization of their sequencing during 4D planning

Picture: http://bit.ly/t3zjlw                                                                   14/ 2
BIM Use in the Construction Phase
                                                                                           Clash Detection




   •    Clash detection was done not only at the end of the design phase between
        steel and concrete parts, but also in the construction phase, incorporating
        additional systems and the temporary structures and formwork
   •    Many clashes in the bridge structure that might only have arisen during
        construction were prevented
   •    This BIM functionality save a large amount of money and prevent many
        problems




           Example of a clash detected between a cable anchor and formwork ties and its resolution

Picture: BIM HandBook                                                                                        15/22
BIM Use in the Construction Phase
                                                             Construction Planning and 4D




   •    The 4D video animations of the schedule were done at the resolution of a
        single day
   •    Thus the team could generate daily visualizations of the project, which
        enabled assessment whether the decisions made during the reverse phase
        scheduling stage of the Last Planner System™ (LPS) meetings were realistic
        in terms of their use of space
   •    The animations also gave everybody a better understanding of which works
        they were agreeing to execute




Picture: BIM HandBook                                                                       16/22
BIM Use in the Construction Phase
                                       Fabrication and Installation of Structural Steel Components




   •     Ruukki reviewed and edited the components in the model as needed to suit
         their fabrication constraints, and then sent the updated model back to the
         structural designers at WSP and to Skanska for approval
   •     WSP then edited the structural steel components in its own
         model, incorporating Ruukki’s comments, and updated the server model
         for all other participants

Picture: http://bit.ly/uOHVKL                                                                        17/22
BIM Use in the Construction Phase
                                     Rebar Detailing, Fabrication, and Installation




                                                •    Modeling the bridge
                                                     reinforcement turn out to
                                                     be more difficult than
                                                     was anticipated
                                                •    Bridges of this type
                                                     (cable stayed) have a
                                                     high density of
                                                     reinforcement and
                                                     complex deck and
                                                     abutment shapes, which
                                                     makes the modeling more
                                                     difficult and time
                                                     consuming than for
                                                     simpler structures
                                                •    Tekla Structures provides
                                                     rebar material takeoffs in
                                                     ASCII, EXCEL, and other
                                                     file formats


Picture: BIM HandBook                                                                 18/22
BIM Use in the Construction Phase
                                                                         Laser Scanning




   •    Skanska employ a surveyor onsite whose task was mainly to control the
        quality of the work and to assist the trade contractors with positioning
   •    Skanska purchase a machine named Trimble® VX™ Spatial Station for use
        onsite to capture coordinates, take images, and combine them




Picture: BIM HandBook                                                                     19/22
BIM Use in the Construction Phase
                                                         BIM Suport for Last Planner System™




   •     Skanska had used the Last Planner System™ (LPS) in their projects for three
         years before the Crusell Bridge project, and have their own specialists who
         train site crews to use it
   •     LPS has two main focuses:
               1. Reliable short-term planning,
               2. Creation and development of a social system onsite.




Picture: http://bit.ly/tGhb4E & http://bit.ly/t7v8wM                                           20/22
BIM Lessons Learned
              A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage




   •    Plan using BIM and LPS from the very beginning of the project
   •    Use the model to complement construction management techniques
   •    Use the model synchronization feature to achieve fast information exchanges
   •    Model temporary structures gives a better understanding
   •    Import laser scanning point clouds into the model to check locations and work
        quality is highly effective
   •    Use the model for visualization during LPS planning meeting to improve
        understanding of the product and the process
   •    Involve project partners from outside the site as well as site teams
   •    Ensure participants are commit to upgrade their software tools simultaneously

Source: BIM HandBook                                                                                           21/22
Summary
               A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage




   •    The case clearly illustrates how BIM can be used in a bridge project
   •    The teams’ willingness and openness to using BIM and new management
        methods (LPS) gave all of the parties the opportunity to experience and
        learn from their own failures as well as from their successes




Picture: http://4sq.com/tZ1ifQ                                                                                  22/22
감사합니다




                                 If only one book were to be written
                                 about BIM, it might have “DON’T
                                 PANIC” printed in large uppercase
                                 letters on the front cover.
                                 ~ Peter Zyskowski, Director of
                                 Technical Services & BIM Consultant
                                 at Applied Software
Picture: http://4sq.com/tZ1ifQ   (Quote taken from http://bit.ly/uMbWo6)

Contenu connexe

Tendances

Thesis Portfolio 2020 - The Design Commune
Thesis Portfolio 2020 -  The Design CommuneThesis Portfolio 2020 -  The Design Commune
Thesis Portfolio 2020 - The Design CommuneArYashShetty
 
Apresentação do projeto da Praça das Artes
Apresentação do projeto da Praça das ArtesApresentação do projeto da Praça das Artes
Apresentação do projeto da Praça das ArtesChico Macena
 
East Boston Branch Library Design Presentation
East Boston Branch Library Design PresentationEast Boston Branch Library Design Presentation
East Boston Branch Library Design PresentationBostonPublicLibrary
 
Complexos de cultura, esporte e lazer.
Complexos de cultura, esporte e lazer.Complexos de cultura, esporte e lazer.
Complexos de cultura, esporte e lazer.Nathéssia Marques
 
Select city walk
Select city walkSelect city walk
Select city walkakkipandat
 
Fourth Year Architecture Portfolio
Fourth Year Architecture PortfolioFourth Year Architecture Portfolio
Fourth Year Architecture PortfolioKhadija Mahmoud
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.Mayur Waghulde
 
Escola de Cinema e Fotografia.
Escola de Cinema e Fotografia.Escola de Cinema e Fotografia.
Escola de Cinema e Fotografia.Fellipe Lucas
 
Apresentação TCC - Arquitetura Sacra
Apresentação TCC - Arquitetura SacraApresentação TCC - Arquitetura Sacra
Apresentação TCC - Arquitetura SacraMaycon Del Piero
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)DC Department of General Services
 
Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisahed sohail
 
Vvip circuit house
Vvip circuit houseVvip circuit house
Vvip circuit houseDhvaniR2
 
A case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaA case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaAnkitVishwa
 
Economic and Cultural Aspects to Adaptive Reuse of old buildings
Economic and Cultural Aspects to Adaptive Reuse of old buildingsEconomic and Cultural Aspects to Adaptive Reuse of old buildings
Economic and Cultural Aspects to Adaptive Reuse of old buildingsAmeeshi Goenka
 
Case study auditrium ,,alex and sis
Case study auditrium ,,alex and sisCase study auditrium ,,alex and sis
Case study auditrium ,,alex and sisSispap1
 

Tendances (20)

Thesis Portfolio 2020 - The Design Commune
Thesis Portfolio 2020 -  The Design CommuneThesis Portfolio 2020 -  The Design Commune
Thesis Portfolio 2020 - The Design Commune
 
Motel
MotelMotel
Motel
 
Apresentação do projeto da Praça das Artes
Apresentação do projeto da Praça das ArtesApresentação do projeto da Praça das Artes
Apresentação do projeto da Praça das Artes
 
East Boston Branch Library Design Presentation
East Boston Branch Library Design PresentationEast Boston Branch Library Design Presentation
East Boston Branch Library Design Presentation
 
Complexos de cultura, esporte e lazer.
Complexos de cultura, esporte e lazer.Complexos de cultura, esporte e lazer.
Complexos de cultura, esporte e lazer.
 
Select city walk
Select city walkSelect city walk
Select city walk
 
Fourth Year Architecture Portfolio
Fourth Year Architecture PortfolioFourth Year Architecture Portfolio
Fourth Year Architecture Portfolio
 
Forum project
Forum projectForum project
Forum project
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.
 
Escola de Cinema e Fotografia.
Escola de Cinema e Fotografia.Escola de Cinema e Fotografia.
Escola de Cinema e Fotografia.
 
Apresentação TCC - Arquitetura Sacra
Apresentação TCC - Arquitetura SacraApresentação TCC - Arquitetura Sacra
Apresentação TCC - Arquitetura Sacra
 
Suzlon
SuzlonSuzlon
Suzlon
 
Why do we need swimming pool design consultant
Why do we need swimming pool design consultantWhy do we need swimming pool design consultant
Why do we need swimming pool design consultant
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
 
Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsis
 
Vvip circuit house
Vvip circuit houseVvip circuit house
Vvip circuit house
 
A case study of Bihar Museum, Patna
A case study of Bihar Museum, PatnaA case study of Bihar Museum, Patna
A case study of Bihar Museum, Patna
 
Economic and Cultural Aspects to Adaptive Reuse of old buildings
Economic and Cultural Aspects to Adaptive Reuse of old buildingsEconomic and Cultural Aspects to Adaptive Reuse of old buildings
Economic and Cultural Aspects to Adaptive Reuse of old buildings
 
ABTS 4th year pdf
ABTS 4th year pdfABTS 4th year pdf
ABTS 4th year pdf
 
Case study auditrium ,,alex and sis
Case study auditrium ,,alex and sisCase study auditrium ,,alex and sis
Case study auditrium ,,alex and sis
 

En vedette

Sellwood Bridge Right Of Way Presentation 051808
Sellwood Bridge Right Of Way Presentation 051808Sellwood Bridge Right Of Way Presentation 051808
Sellwood Bridge Right Of Way Presentation 051808guest68cb16
 
Fotos com mais de cem anos
Fotos com mais de cem anosFotos com mais de cem anos
Fotos com mais de cem anosArmando Oliveira
 
Picasso les deux femmes nues litho series
Picasso les deux femmes nues litho seriesPicasso les deux femmes nues litho series
Picasso les deux femmes nues litho seriesglennhirsch
 
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UKCable stay bridges, summary of a lecture delivered at Uni of Surrey, UK
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UKDavid Collings
 
cable stayed bridge
cable stayed bridgecable stayed bridge
cable stayed bridgeAkruth Gowda
 
Earthquake Presentation
Earthquake PresentationEarthquake Presentation
Earthquake PresentationRyan Cataga
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 

En vedette (10)

Sellwood Bridge Right Of Way Presentation 051808
Sellwood Bridge Right Of Way Presentation 051808Sellwood Bridge Right Of Way Presentation 051808
Sellwood Bridge Right Of Way Presentation 051808
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
Fotos com mais de cem anos
Fotos com mais de cem anosFotos com mais de cem anos
Fotos com mais de cem anos
 
Bridge facts
Bridge factsBridge facts
Bridge facts
 
Fundamentals of-psc-bridge
Fundamentals of-psc-bridgeFundamentals of-psc-bridge
Fundamentals of-psc-bridge
 
Picasso les deux femmes nues litho series
Picasso les deux femmes nues litho seriesPicasso les deux femmes nues litho series
Picasso les deux femmes nues litho series
 
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UKCable stay bridges, summary of a lecture delivered at Uni of Surrey, UK
Cable stay bridges, summary of a lecture delivered at Uni of Surrey, UK
 
cable stayed bridge
cable stayed bridgecable stayed bridge
cable stayed bridge
 
Earthquake Presentation
Earthquake PresentationEarthquake Presentation
Earthquake Presentation
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 

Similaire à Crusell Bridge

City buildings-silhouettes-and-colors-power point-templates-widescreen
City buildings-silhouettes-and-colors-power point-templates-widescreenCity buildings-silhouettes-and-colors-power point-templates-widescreen
City buildings-silhouettes-and-colors-power point-templates-widescreenSilicon Valley Infomedia Pvt Ltd
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingBDS VirCon
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)Franco Bontempi Org Didattica
 
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Nicholas Macy, CCM, PMP
 
Steel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla StructureSteel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla Structureiesgatetraining
 
Accelerated Bridge Construction( ABC)
Accelerated Bridge  Construction( ABC)Accelerated Bridge  Construction( ABC)
Accelerated Bridge Construction( ABC)varun km
 
Contour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureContour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureKhyati Saggu
 
Keele Station: Preliminary Design Consultation
Keele Station: Preliminary Design ConsultationKeele Station: Preliminary Design Consultation
Keele Station: Preliminary Design ConsultationCrosstown TO
 
Marcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek
 
CloudStack in BT Research
CloudStack in BT ResearchCloudStack in BT Research
CloudStack in BT ResearchShapeBlue
 
Contour crafting and construction automation
Contour crafting and construction automationContour crafting and construction automation
Contour crafting and construction automationappu b
 
Navigating the Future BIM Services and the AEC Industry Trends
Navigating the Future BIM Services and the AEC Industry TrendsNavigating the Future BIM Services and the AEC Industry Trends
Navigating the Future BIM Services and the AEC Industry TrendsMichael William
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningTop BIM Company
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET Journal
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FMBIM User Day
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif
 

Similaire à Crusell Bridge (20)

Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
City buildings-silhouettes-and-colors-power point-templates-widescreen
City buildings-silhouettes-and-colors-power point-templates-widescreenCity buildings-silhouettes-and-colors-power point-templates-widescreen
City buildings-silhouettes-and-colors-power point-templates-widescreen
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and Modelling
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
2015.12.17 kg bim
2015.12.17 kg bim2015.12.17 kg bim
2015.12.17 kg bim
 
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
 
Steel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla StructureSteel and Rebar detailing using Tekla Structure
Steel and Rebar detailing using Tekla Structure
 
Accelerated Bridge Construction( ABC)
Accelerated Bridge  Construction( ABC)Accelerated Bridge  Construction( ABC)
Accelerated Bridge Construction( ABC)
 
Contour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of futureContour Crafting- infrastructural design of future
Contour Crafting- infrastructural design of future
 
Keele Station: Preliminary Design Consultation
Keele Station: Preliminary Design ConsultationKeele Station: Preliminary Design Consultation
Keele Station: Preliminary Design Consultation
 
Marcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdf
 
CloudStack in BT Research
CloudStack in BT ResearchCloudStack in BT Research
CloudStack in BT Research
 
Contour crafting and construction automation
Contour crafting and construction automationContour crafting and construction automation
Contour crafting and construction automation
 
Navigating the Future BIM Services and the AEC Industry Trends
Navigating the Future BIM Services and the AEC Industry TrendsNavigating the Future BIM Services and the AEC Industry Trends
Navigating the Future BIM Services and the AEC Industry Trends
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planning
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station Construction
 
Tekla Global BIM Awards 2015
Tekla Global BIM Awards 2015Tekla Global BIM Awards 2015
Tekla Global BIM Awards 2015
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 

Dernier

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 

Dernier (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

Crusell Bridge

  • 1. BIM Handbook 2nd Ed. p.494-513 CHUCK EASTMAN | PAUL TEICHOLZ | RAFAEL SACKS | KATHLEEN LISTON CRUSELL BRIDGE A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage Hanifah Nebrian Sukma | 201183530
  • 2. Sitemap Contents of the presentation • Introduction • BIM Learning Experience • Interoperability • Model Synchronization • BIM Use in the Construction Phase • BIM Lessons Learned • Summary Picture: BIM HandBook & http://bit.ly/uu7uxF 1/22
  • 3. Introduction Crusell Bridge Data: Type & Location • Type: cable-stayed bridge • Consist of two asymmetrical cable-stayed spans: measuring 92 m and 51.5 m (the total length is 143.5 m) • Connects the western edge of Jätkasaari with Ruoholahti, Finlandia Picture: http://bit.ly/rN7656 2/22
  • 4. Introduction Crusell Bridge Data: Project Teams & Timeline Project team and basic data: Project timeline: Picture: BIM HandBook 3/22
  • 5. Introduction Crusell Bridge Data: Background • The Crusell Bridge becomes the most prominent bridge in Finland to be designed and built using BIM (Building Information Model) • The design is solicited by the owner in a design competition announced in the winter of 2001 Picture: http://bit.ly/tbIVKG 4/22
  • 6. Introduction Crusell Bridge Data: Background • The competition aimed to find a quality bridge solution that would bring out the characteristics of the area and take into account the requirements of the landscape • Although a British design firm win the competition, the project is awarded to the second place winner: WSP Finland Picture: http://bit.ly/s3ub83 5/22
  • 7. Introduction Crusell Bridge Data: The Use of BIM • During the design and construction process,the project team implementing both BIM technologies and lean construction principles and tools Picture: http://bit.ly/t3zjlw 6/22
  • 8. Introduction Crusell Bridge Data: The Use of BIM • This case study focuses on the construction stage of the project, highlighting two aspects: 1. The extensive use made of the BIM: - For fabrication of steel girders and concrete reinforcement - For monitoring and management of the supply chain of fabricated components - For formwork and temporary support structure design - For quality control using laser scanning, and - For construction planning using 4D animation; 2. The ways in which BIM supported lean construction practices, such as its support of production management onsite using the Last Planner System™. Picture: http://bit.ly/shKKdS 7/22
  • 9. BIM Learning Experience A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage • The Crusell Bridge project becomes a BIM learning process for everybody involved, even for those who had previous experience using BIM, because many new solutions and techniques were tried • For the client (City of Helsinki’s public works department), it was first bridge project using comprehensive BIM, including time and management dimensions Picture: http://bit.ly/uHuzoU 8/22
  • 10. BIM Learning Experience A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage • For the designer (WSP Finland) that had modeled simpler reinforced concrete bridges previously; this bridge with its curved geometry, cable-stays, and composite structural steel and reinforced concrete structure, is significantly more complex than what they had experienced previously • For the contractor (Skanska) this project as well was the first bridge modeling, using Tekla Structures and made a strategic decision to use a model in the construction stage as much as possible, including 4D planning and modeling temporary structures • Due to the pioneering nature of the use of BIM on a highly sophisticated bridge, the main BIM software provider to the project, Tekla Corporation, is also involved Picture: http://bit.ly/rCZ09A 9/22
  • 11. Interoperability BIM Application Used for Construction Phase Application Developer Purpose Tekla Structures v13 Tekla Basic use onsite—viewing of the model, quantity Surveying Tekla Structures v15 Tekla 4D simulations and temporary structures PERICad Peri Modeling formworks Reinforcement List v3.1 CELCA Steel service (reinforcement) Trimble RealWorks Trimble Comparing surveying results to design Vico Control Vico Software Preparing master schedule Source: BIM HandBook 10/22
  • 12. Interoperability Information Exchange through File Transfer Picture: http://bit.ly/t3zjlw 11/22
  • 13. Model Synchronization Synchronization Procedures • Synchronization required not only a technological solution but also a management protocol, agreed to by all parties, that stated who was allowed to edit what and when Picture: http://bit.ly/t3zjlw 12/ 2
  • 14. BIM Use in the Construction Phase Visualization • The Crusell Bridge is not an extremely large project, but has an interesting design and makes excellent use of BIM for a number of construction purposes • The 3D model of the project helps different parties to better understand the concept and especially the details of the design, forming a common mental picture and understanding far more quickly and effectively than with traditional drawings Picture: BIM HandBook 13/22
  • 15. BIM Use in the Construction Phase Design and Planning of Temporary Structures • The site team decided to thoroughly model all the missing temporary structures, including formwork shoring towers and the site tower crane on its tracks, directly in the design building model maintained onsite • This provided a better understanding of the structures, enabled identification of numerous collisions (clashes), extraction of accurate quantities, incorporation of these works into construction schedules, and visualization of their sequencing during 4D planning Picture: http://bit.ly/t3zjlw 14/ 2
  • 16. BIM Use in the Construction Phase Clash Detection • Clash detection was done not only at the end of the design phase between steel and concrete parts, but also in the construction phase, incorporating additional systems and the temporary structures and formwork • Many clashes in the bridge structure that might only have arisen during construction were prevented • This BIM functionality save a large amount of money and prevent many problems Example of a clash detected between a cable anchor and formwork ties and its resolution Picture: BIM HandBook 15/22
  • 17. BIM Use in the Construction Phase Construction Planning and 4D • The 4D video animations of the schedule were done at the resolution of a single day • Thus the team could generate daily visualizations of the project, which enabled assessment whether the decisions made during the reverse phase scheduling stage of the Last Planner System™ (LPS) meetings were realistic in terms of their use of space • The animations also gave everybody a better understanding of which works they were agreeing to execute Picture: BIM HandBook 16/22
  • 18. BIM Use in the Construction Phase Fabrication and Installation of Structural Steel Components • Ruukki reviewed and edited the components in the model as needed to suit their fabrication constraints, and then sent the updated model back to the structural designers at WSP and to Skanska for approval • WSP then edited the structural steel components in its own model, incorporating Ruukki’s comments, and updated the server model for all other participants Picture: http://bit.ly/uOHVKL 17/22
  • 19. BIM Use in the Construction Phase Rebar Detailing, Fabrication, and Installation • Modeling the bridge reinforcement turn out to be more difficult than was anticipated • Bridges of this type (cable stayed) have a high density of reinforcement and complex deck and abutment shapes, which makes the modeling more difficult and time consuming than for simpler structures • Tekla Structures provides rebar material takeoffs in ASCII, EXCEL, and other file formats Picture: BIM HandBook 18/22
  • 20. BIM Use in the Construction Phase Laser Scanning • Skanska employ a surveyor onsite whose task was mainly to control the quality of the work and to assist the trade contractors with positioning • Skanska purchase a machine named Trimble® VX™ Spatial Station for use onsite to capture coordinates, take images, and combine them Picture: BIM HandBook 19/22
  • 21. BIM Use in the Construction Phase BIM Suport for Last Planner System™ • Skanska had used the Last Planner System™ (LPS) in their projects for three years before the Crusell Bridge project, and have their own specialists who train site crews to use it • LPS has two main focuses: 1. Reliable short-term planning, 2. Creation and development of a social system onsite. Picture: http://bit.ly/tGhb4E & http://bit.ly/t7v8wM 20/22
  • 22. BIM Lessons Learned A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage • Plan using BIM and LPS from the very beginning of the project • Use the model to complement construction management techniques • Use the model synchronization feature to achieve fast information exchanges • Model temporary structures gives a better understanding • Import laser scanning point clouds into the model to check locations and work quality is highly effective • Use the model for visualization during LPS planning meeting to improve understanding of the product and the process • Involve project partners from outside the site as well as site teams • Ensure participants are commit to upgrade their software tools simultaneously Source: BIM HandBook 21/22
  • 23. Summary A Building Model Supports a Wide Variety of Information, Uses of BIM in the Construction Stage • The case clearly illustrates how BIM can be used in a bridge project • The teams’ willingness and openness to using BIM and new management methods (LPS) gave all of the parties the opportunity to experience and learn from their own failures as well as from their successes Picture: http://4sq.com/tZ1ifQ 22/22
  • 24. 감사합니다 If only one book were to be written about BIM, it might have “DON’T PANIC” printed in large uppercase letters on the front cover. ~ Peter Zyskowski, Director of Technical Services & BIM Consultant at Applied Software Picture: http://4sq.com/tZ1ifQ (Quote taken from http://bit.ly/uMbWo6)