Installation Instruction
Heat Shrink Termination For Single
Core 12kV Triplex Cable
* PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING *
INDOOR OUTDOOR
ISSUE DATE: 06.06.14
UNITS E3 CROWN WAY CROWN PARK INDUSTRIAL ESTATE RUSHDEN NORTHANTS NN10 6FD
TEL: +44(0) 1933 356758 FAX: +44(0) 1933 413821 E-MAIL:info@shrinkpolymersystems.co.uk
WEB: www.shrinkpolymersystems.co.uk
Use free software on your smart phone to scan the
QR code below to watch an installation video on
single core xlpe medium voltage terminations
General Fitting Instructions
 It is highly recommended that a tool
suitable for the removal of the
semi-conductive screen is used to
provide a reliable discharge free
termination screen point
 Use a propane gas torch with a soft
flame
 Avoid a pencil like blue flame which is
caused by unregulated supply
 Keep the flame on the move to ensure
even shrinkage of all the materials and
also helps to reduce scorching
 Ensure that all components are kept
clean and grease free during
installation
 Allow to cool before applying any
mechanical strain
VOLTAGE
INDOOR
L
OUTDOOR
L
X
12kV 190mm 270mm
LENGTH OF LUG
BARREL + 10%
Remove Outer Cable Sheath:
Glanding
Gland kits are available for Triplex Cables, see kit reference
SPS 1095 and SPS 1197
IMPORTANT NOTICE TO PURCHASER:- Sellers and Manufacturere’s only obligation shall be to replace such quantity of the product proved to be defective. Neither the Seller nor
Manufacturer shall be liable for any injury, loss or damage, direct or consequential, arising out of the use or inability to use the product. Before using, User shall determine the
suitability of the product for his or her intended use and User assumes all risk and liability whatsoever in connection therewith.
Table 1
X
L
60
mm
Fig1
1. Installation
Remove the Outer Cable Sheath to the
dimensions L + X given in Table 1.
Remove any fillers before cleaning and
de-greaseing the Cable Sheath below.
2. Screen Treatment
Copper Wire Screen
Apply one turn of the Red Mastic Sealant
Tape at a point 30mm below the sheath
cut (Fig 2).
Bend back the Copper Wires and press
them into the Tape. Apply one more turn
of Red Mastic Tape over this point. The
Wires should be twisted together and
Bonded to a suitable earth point.
3. Conductive Layer Treatment
Extruded Conductive Layer
Remove the Conductive layer using a
suitable Tool to the dimensions shown in
Fig 3. Avoid scoring and damage to the
Primary Insulation.
Note:- The Screen should be removed
leaving a cleanly cut end. Do not roughen
the Insulation with Emery Cloth.
4. Apply Stress Relief Tape
Remove the release paper, stretch and
wrap the Yellow Stress Tape (TS31785Y)
around the end of each Core Screen by
approx 10mm onto the Primary Insulation
and 15mm on to the Semi Conductive
layer.
Fig 2
Fig 3
30mm
PRIMARY
INSULATION
RED
MASTIC
40mm
YELLOW
STRESS
TAPE
Fig 4
10
15
5. Stress Control Tubes
Position the Stress Control Tubes so that
they cover the Earth connection point and
the Conductive Screen end. However do
not extend past this point onto the Outer
Cable Sheath.
Shrink the Tubes one at a time starting
from the bottom. Ensure the tubes are
wrinkle free and have an even wall
thickness.
6. Installing Cable Lugs
The Cable should be cut to dimension L+X
as given in Table 1. Remove the Insulation
at X and install the Lug using the
appropriate method.
Preheat each Lug and wrap two layers of
Red Sealant Tape over the Lug barrel and
extend onto the Insulation by approx
10mm. Ensure the Tape is applied as
shown. Important:- use more tape to
build up the diameter to ensure tube
recovers upon it and creates a moisture
seal.
Fig 5
Fig 6
Fig 7
STRESS CONTROL TUBES
L + X
RED SEALANT TAPE
X
7. Installing Anti-Track Tube
Position the Anti-Track Tubes so that they
overlap the Earth connection point and
outer Cable Sheath by 60mm as shown in
Fig 8.
Shrink the Tubes starting from the bottom
towards the top. Keep the flame on the
move to ensure an even wall thickness.
User may trim the Tubes at the Lug end
with a sharp knife if necessary.
8. Indoor Terminations
Anti-Track Rain Sheds are not required on
Indoor Terminations.
Clearance Dimensions
Minimum clearances should be observed
for phase to phase and phase to ground
from top of Stress Tubes:-
Phase to Phase = 20mm
Phase to Ground = 20mm
Top of Stress Control Tube to bottom of
Lug Barrel = 50mm
9. Outdoor Terminations
Anti-Track Sheds should be fitted starting
from the bottom up as per the dimensions
given in Fig 10.
Two Sheds per phase are fitted, see Fig 9.
Positioning of Sheds
The first Shed should be fitted at a
distance of 200mm from the lower edge of
the Anti-Track Tube to the edge of the
Shed. All subsequent Sheds should be
fitted at a distance of 80mm from edge to
edge.
Note:- It is advisable not to position
Sheds at the top of the Stress Control
Tubes. Re-position if necessary.
Fig 8
Fig 9
Fig 10
ANTI-TRACK TUBE
60mm
80mm
200mm
Reverse Connection
If a Termination is to be mounted for
connection above the equipment i.e in the
reverse position, Sheds should be
installed through 180º.
10. Cable Bending Radius
If required The Cable can be heated to
approximately 70ºC to enable a bend to
be introduced. See Fig 12 showing the
bending radius.
Fig 11
Fig 12
D
Min Bending Radius r=15xD

Contenu connexe

En vedette

3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...Thorne & Derrick International
 
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Thorne & Derrick International
 
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...Thorne & Derrick International
 
Charles Endirect CEL Street Lighting Cut-outs & Isolators
Charles Endirect CEL Street Lighting Cut-outs & Isolators Charles Endirect CEL Street Lighting Cut-outs & Isolators
Charles Endirect CEL Street Lighting Cut-outs & Isolators Thorne & Derrick International
 
Cable Heating - Straightening & Relaxation Of High Voltage HV Cables
Cable Heating - Straightening & Relaxation Of High Voltage HV CablesCable Heating - Straightening & Relaxation Of High Voltage HV Cables
Cable Heating - Straightening & Relaxation Of High Voltage HV CablesThorne & Derrick International
 

En vedette (7)

3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
 
Lucy Lighting Street Lighting Electrical Catalogue
Lucy Lighting Street Lighting Electrical CatalogueLucy Lighting Street Lighting Electrical Catalogue
Lucy Lighting Street Lighting Electrical Catalogue
 
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
Winterisation - Arctic Offshore & Maritime Heating Solutions - Thermon Heat T...
 
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...
3M Medium Voltage Cable Terminations, 5kV–46kV, 2013 Electrical Product Catal...
 
Charles Endirect CEL Street Lighting Cut-outs & Isolators
Charles Endirect CEL Street Lighting Cut-outs & Isolators Charles Endirect CEL Street Lighting Cut-outs & Isolators
Charles Endirect CEL Street Lighting Cut-outs & Isolators
 
Cable Heating - Straightening & Relaxation Of High Voltage HV Cables
Cable Heating - Straightening & Relaxation Of High Voltage HV CablesCable Heating - Straightening & Relaxation Of High Voltage HV Cables
Cable Heating - Straightening & Relaxation Of High Voltage HV Cables
 
Blackburn Mechanical Connectors Catalogue
Blackburn Mechanical Connectors CatalogueBlackburn Mechanical Connectors Catalogue
Blackburn Mechanical Connectors Catalogue
 

Plus de Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

Plus de Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 

Dernier

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Dernier (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

4. Heat Shrink Cable Termination (HV) - 11kV Triplex BS7870 Cables

  • 1. Installation Instruction Heat Shrink Termination For Single Core 12kV Triplex Cable * PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING * INDOOR OUTDOOR ISSUE DATE: 06.06.14 UNITS E3 CROWN WAY CROWN PARK INDUSTRIAL ESTATE RUSHDEN NORTHANTS NN10 6FD TEL: +44(0) 1933 356758 FAX: +44(0) 1933 413821 E-MAIL:info@shrinkpolymersystems.co.uk WEB: www.shrinkpolymersystems.co.uk Use free software on your smart phone to scan the QR code below to watch an installation video on single core xlpe medium voltage terminations
  • 2. General Fitting Instructions  It is highly recommended that a tool suitable for the removal of the semi-conductive screen is used to provide a reliable discharge free termination screen point  Use a propane gas torch with a soft flame  Avoid a pencil like blue flame which is caused by unregulated supply  Keep the flame on the move to ensure even shrinkage of all the materials and also helps to reduce scorching  Ensure that all components are kept clean and grease free during installation  Allow to cool before applying any mechanical strain VOLTAGE INDOOR L OUTDOOR L X 12kV 190mm 270mm LENGTH OF LUG BARREL + 10% Remove Outer Cable Sheath: Glanding Gland kits are available for Triplex Cables, see kit reference SPS 1095 and SPS 1197 IMPORTANT NOTICE TO PURCHASER:- Sellers and Manufacturere’s only obligation shall be to replace such quantity of the product proved to be defective. Neither the Seller nor Manufacturer shall be liable for any injury, loss or damage, direct or consequential, arising out of the use or inability to use the product. Before using, User shall determine the suitability of the product for his or her intended use and User assumes all risk and liability whatsoever in connection therewith. Table 1 X L 60 mm Fig1
  • 3. 1. Installation Remove the Outer Cable Sheath to the dimensions L + X given in Table 1. Remove any fillers before cleaning and de-greaseing the Cable Sheath below. 2. Screen Treatment Copper Wire Screen Apply one turn of the Red Mastic Sealant Tape at a point 30mm below the sheath cut (Fig 2). Bend back the Copper Wires and press them into the Tape. Apply one more turn of Red Mastic Tape over this point. The Wires should be twisted together and Bonded to a suitable earth point. 3. Conductive Layer Treatment Extruded Conductive Layer Remove the Conductive layer using a suitable Tool to the dimensions shown in Fig 3. Avoid scoring and damage to the Primary Insulation. Note:- The Screen should be removed leaving a cleanly cut end. Do not roughen the Insulation with Emery Cloth. 4. Apply Stress Relief Tape Remove the release paper, stretch and wrap the Yellow Stress Tape (TS31785Y) around the end of each Core Screen by approx 10mm onto the Primary Insulation and 15mm on to the Semi Conductive layer. Fig 2 Fig 3 30mm PRIMARY INSULATION RED MASTIC 40mm YELLOW STRESS TAPE Fig 4 10 15
  • 4. 5. Stress Control Tubes Position the Stress Control Tubes so that they cover the Earth connection point and the Conductive Screen end. However do not extend past this point onto the Outer Cable Sheath. Shrink the Tubes one at a time starting from the bottom. Ensure the tubes are wrinkle free and have an even wall thickness. 6. Installing Cable Lugs The Cable should be cut to dimension L+X as given in Table 1. Remove the Insulation at X and install the Lug using the appropriate method. Preheat each Lug and wrap two layers of Red Sealant Tape over the Lug barrel and extend onto the Insulation by approx 10mm. Ensure the Tape is applied as shown. Important:- use more tape to build up the diameter to ensure tube recovers upon it and creates a moisture seal. Fig 5 Fig 6 Fig 7 STRESS CONTROL TUBES L + X RED SEALANT TAPE X
  • 5. 7. Installing Anti-Track Tube Position the Anti-Track Tubes so that they overlap the Earth connection point and outer Cable Sheath by 60mm as shown in Fig 8. Shrink the Tubes starting from the bottom towards the top. Keep the flame on the move to ensure an even wall thickness. User may trim the Tubes at the Lug end with a sharp knife if necessary. 8. Indoor Terminations Anti-Track Rain Sheds are not required on Indoor Terminations. Clearance Dimensions Minimum clearances should be observed for phase to phase and phase to ground from top of Stress Tubes:- Phase to Phase = 20mm Phase to Ground = 20mm Top of Stress Control Tube to bottom of Lug Barrel = 50mm 9. Outdoor Terminations Anti-Track Sheds should be fitted starting from the bottom up as per the dimensions given in Fig 10. Two Sheds per phase are fitted, see Fig 9. Positioning of Sheds The first Shed should be fitted at a distance of 200mm from the lower edge of the Anti-Track Tube to the edge of the Shed. All subsequent Sheds should be fitted at a distance of 80mm from edge to edge. Note:- It is advisable not to position Sheds at the top of the Stress Control Tubes. Re-position if necessary. Fig 8 Fig 9 Fig 10 ANTI-TRACK TUBE 60mm 80mm 200mm
  • 6. Reverse Connection If a Termination is to be mounted for connection above the equipment i.e in the reverse position, Sheds should be installed through 180º. 10. Cable Bending Radius If required The Cable can be heated to approximately 70ºC to enable a bend to be introduced. See Fig 12 showing the bending radius. Fig 11 Fig 12 D Min Bending Radius r=15xD