UK Nuclear New Build Power Stations - Nationally Significant Infrastructure Projects (NSIP) through the Infrastructure Planning Commission (IPC) Process
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure Projects (NSIP) through the Infrastructure Planning Commission (IPC) Process - taking into account National Policy Statements (NPS)
Similaire à UK Nuclear New Build Power Stations - Nationally Significant Infrastructure Projects (NSIP) through the Infrastructure Planning Commission (IPC) Process
Offshore renewables in the UK: Funding and developing offshore wind projectsNaturalEngland
Similaire à UK Nuclear New Build Power Stations - Nationally Significant Infrastructure Projects (NSIP) through the Infrastructure Planning Commission (IPC) Process (20)
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure Projects (NSIP) through the Infrastructure Planning Commission (IPC) Process
1. UK Nuclear New Build Nationally Significant Infrastructure Projects (NSIP) and the Infrastructure Planning Commission (IPC) Process Online Presentation: http://interimpublicsectorconsultants.co.uk/NuclearPresentation Tony Hagan BSc MSc CEng MICE 2009
10. 2. The New IPC Planning Regime: National Policy Statements (NPSs) for Nationally Significant Infrastructure Projects (NSIPs) to be submitted through the Infrastructure Planning Commission (IPC) process
19. National Policy Statements Publication of draft Designation Members of the public will have their first chance to get involved in the new process when National Policy Statements on infrastructure are published for consultation later this autumn. Energy: Nuclear Power Stations; Renewables; Electricity Networks; Fossil Fuel (electricity generation); and, Oil and Gas Infrastructure Autumn 2009 (Probably End of October) During 2010 Ports Autumn 2009 (Probably End of October) During 2010 National Networks (Road and Rail) Autumn 2009 (Probably End of October) During 2010 Waste Water Spring 2010 During 2011 Water Supply Late 2010 Early 2012 Hazardous Waste Summer 2010 During 2011 Aviation By 2011 During 2011
29. Nuclear Build Sites Supported by Promoters / Utilities Nuclear Build Sites With Letters of Deployability From CNPO Energy Utilities (DECC, 15 Apr 2009) EDF Iberdrola RWE E.ON Vattenfall Hinkley X Sizewell X Hartlepool X Dungeness X X Heysham X X Bradwell X X Oldbury X X Wylfa X X Sellafield X X X Braystones X Kirksanton X Totals 6 6 4 1 1
30.
31. 3 x Nominated New Build sites for Copeland: Adjacent Authorities
47. 5. Activity Mapping Work Programme for New Build NSIPs within Copeland and Cumbria
48.
49. Key Activity Tasks / Organisation / Consultancy Advice Pre-Application 1 Validation 2 Pre-Examination 3 Examination 4 Decision 5 Post-Decision 6 Local Planning Authority / Public Statutory Agencies & Communities 4. Respond to consultation 11. Submit representations 15. Input views 25. Discharge Conditions Consultancy Advice Required: Planning Consultants (refer to GVA Appendices) Multi-Disciplinary Engineering Consultants (Refer to Arup Appendices) Planning Policy and Economics Socio Economics and Stakeholder Engagement Transport and Logistics Hydrology, Flooding (including Coastal Defence) and Bathymetry Seismology Ecology Environmental Impact Assessment Legal Advisers (Refer to JMW / Bircham Dyson Bell Appendices) Provide advice on Statement of Community Consultation (s47) S52 and s53 Notices EIA Screening EIA Scoping Provide views on Draft ES LA comments on adequacy of Consultation by Promoter Make Pre-Examination Representations following publicity of Accepted Application Attend Pre-Examination Meeting Receives Procedural Decision and Deadline for Further Representations Make Detailed Representations (Optional) including Local Impact Report (Local Authority Only) and Request Appearance at Open Floor and/or Acquisition Hearing (Optional) Attend Relevant Part of Hearing and Respond to Any Additional Representations Received Receive Decision Legal Challenge regarding Case Validation or IPC Development Consent Decision? Discharge and Enforce Conditions
50.
51.
52.
53.
54. 6. Roles and Protocols for Successful Delivery of New Build NSIPs in Copeland and Cumbria
71. 9. Existing Spatial Plans / Business Plans / Masterplans for Transport and Utilities Infrastructure for Copeland and Cumbria Based on: 20-30 year Business / Masterplans for National Rail, DfT and National Grid. Needs also to be carried out for: Oil, Gas, Water and Waste See Appendix
72. RSS Masterplan for Cumbria ***** Lack of Reference to all things Nuclear *****
81. 10. The Way Forward for Copeland and Cumbria: Sub-Regional Partnership, a Memorandum of Agreement, a Multi-Area Agreement and a New Build NSIP Coordinator
147. Agree a long term strategy and action plan to create a sustainable economy for West Cumbria that matches or exceeds the average economic performance in the North West region