This curriculum vitae outlines the qualifications and experience of Professor Emad Elbeltagi. He has over 50 research publications and extensive experience in construction management, planning, scheduling, and cost estimation. He holds a Ph.D. in Construction Engineering and Management and has worked as a professor in Egypt and visiting professor/researcher in Canada. He teaches various undergraduate and graduate courses related to construction engineering and management.
1. Page 1 of 13
CURRICULUM VITAE
Name : Emad Elbeltagi
Current Position: Professor
Address :
Dept. of Structural Eng., Mansoura University
Mansoura 35516
Egypt
Tel : (+050) 224-4105 Ext. 1285
Fax : (+50) 224-4690
E-mail : eelbelta@mans.edu.eg, eelbelta@uwaterloo.ca
Homepage : http://osp.mans.edu.eg/elbeltagi, www.eng.uwaterloo.ca/~eelbelta
1. QUALIFICATION HIGHLIGHTS:
• Strong research background. Authored and Co-authored more than 50 research papers. Presented
papers in a number of conferences and seminars in the USA, Canada, Mexico, Greece, turkey,
Saudi Arabia and Egypt.
• Extensive research experience on construction management, site layout planning, resource
management, repetitive and linear project planning and scheduling, cost estimation, asset and
infrastructure management systems, multi-criteria decision analysis, and optimization using
evolutionary algorithms.
• Expertise on construction management computer-related applications.
• Project/Construction Management, Planning and Co-ordination. Preparation of Tender Documents.
Designing, Preparation of Bill of Quantities and Cost Estimates, etc.
• Teaching of many courses related to Construction Engineering and Management.
2. EDUCATION:
Dec 1996 – Jan 2000: Ph.D. in Construction Engineering and Management, Joint supervision
between University of Waterloo, CANADA and Mansoura University,
Mansoura, EGYPT.
Thesis: “Construction Site Management”. This study optimizes the placing
of the temporary facilities within the boundaries of the construction site. An
integrated model developed using three different modules: A knowledge
base module to identify the facilities and to determine their areas; a fuzzy
logic module to determine their relationships; and a genetic algorithm
module to optimize their placement. The research also involves an extensive
programming work using “Visual Basic for Applications”, “Microsoft Excel
97” and “Microsoft Project 98”.
Dec 1990 – Jan 1993: M.Sc. in Construction Engineering and Management, Thesis: “Scheduling
Construction Projects Under Multiple Resource Constraints by Heuristic
Methods”, Mansoura University, Mansoura, EGYPT.
2. Page 2 of 13
Oct 1981 – Jun 1986: B.Sc. in Civil Engineering, grade: Very Good with Honor’s Degree,
83.18%, rank = 6/482.
Nov 1995 – Nov 1995: Training course on Project Management conducted by Energy Conservation
& Environmental Protection Project, Mansoura, Egypt.
Jul 1985 – Aug 1985: Training for 6 weeks with the Arab Contractors Company, Egypt, in one of
their projects in Mansoura, Egypt.
Jul 1984 – Aug 1984: Training for 6 weeks with the Arab Contractors Company, Egypt, in their
training center in Giza, Egypt.
Jul 1983 – Aug 1983: Training for 6 weeks with the Arab Contractors Company, Egypt, in their
training center in Tanta, Egypt.
3. EMPLOYMENT HISTORY AND EXPERIENCE:
Mar 2011 – Present : Professor – Structural Engineering Department, Faculty of Engineering,
Mansoura University, EGYPT. Duties include conducting research work,
supervising graduate students and teaching the following graduate and
undergraduate courses:
- Construction Project Management (Graduation Project: Mansoura
University, AASTMT, Shorouk Academy).
- Systems Analysis for Construction Engineers (CB312), 6th term, Arab
Academy for Science, Technology & Maritime Transport.
- Techniques of Planning, Scheduling and Project Control (CB517), 8th
term, Arab Academy for Science, Technology & Maritime Transport.
- Advanced Project Management (Graduate Course).
Sep 2005 – Mar 2011 : Associate Professor – Structural Engineering Department, Faculty of
Engineering, Mansoura University, EGYPT. Duties include conducting
research work, supervising graduate students and teaching the following
graduate and undergraduate courses:
- Construction Project Management, 3rd year Civil, Mansoura University.
- Construction Project Management (Graduation Project: Mansoura
University, Tanta University, AASTMT, Cairo University, Shorouk
Academy).
- Systems Analysis for Construction Engineers (CB312), 6th term, Arab
Academy for Science, Technology & Maritime Transport.
- Techniques of Planning, Scheduling and Project Control (CB517), 8th
term, Arab Academy for Science, Technology & Maritime Transport.
- Construction Project Management (CE502) Misr University for Science
and Technology.
- Advanced Project Management (Graduate Course).
- Engineering Economy.
- Artificial Intelligence & Expert Systems (CB711 - Graduate Course),
Arab Academy for Science, Technology & Maritime Transport.
- Project Planning and Resource Allocation (CB717 – Graduate Course),
Arab Academy for Science, Technology & Maritime Transport.
- Techniques of Planning and Scheduling (CB612 – Pre-master Course),
Arab Academy for Science, Technology & Maritime Transport.
3. Page 3 of 13
Nov 2010: Visiting Professor – Faculty of Engineering, University of Waterloo, Dubai
campus, Dubai, UAE. Duties include conducting collaborative research with
Dr. Donald Grierson in multi-objective optimization.
Sep 2008 – Dec 2008: Visiting Research Associate Professor – Faculty of Engineering, Waterloo
University, Ontario, Canada. Duties include conducting collaborative
research with Dr. Donald Grierson and Dr. Tarek Hegazy in multi-objective
optimization and multi-criteria decision making.
Feb 2000 – Aug 2005 : Assistant Professor – Structural Engineering Department, Faculty of
Engineering, Mansoura University, EGYPT. Duties include conducting
research work, supervising graduate students and teaching the following
graduate and undergraduate courses:
- Construction Project Management, 3rd year Civil, Mansoura University.
- Advanced Project Management (Graduate Course).
- Construction Project Management (Graduation Project).
Jul 2005 – Aug 2005: Post-Doctoral Fellow – Faculty of Engineering, Waterloo University,
Ontario, Canada. Duties include conducting research in optimization and
computer modeling.
Aug 2003 – Dec 2004: Research Associate – Faculty of Engineering, Waterloo University, Ontario,
Canada. Duties include conducting collaborative research with Dr. Donald
Grierson and Dr. Tarek Hegazy in optimization and computer modeling.
Oct 2001 – May 2003: Project Management Specialist (part-time) at OPTEAM Project
Management Consultants Inc., Ontario, Canada (www.opteam1.com). Duties
include software development, training, providing consultation to the industry.
Aug 2001 – Jul 2003: NSERC’s Post-Doctoral Fellow – Faculty of Engineering, Waterloo
University, Ontario, Canada. Duties include conducting collaborative
research with Dr. Tarek Hegazy.
Jul 2000 – Sep 2000: Post-Doctoral Fellow – Faculty of Engineering, Waterloo University,
Ontario, Canada. Duties include research with Dr. Tarek Hegazy.
Jul 1997 – Aug 1999: Visiting Scholar – Faculty of Engineering, Waterloo University, Ontario,
Canada. Duties include conducting my research work towards obtaining my
Ph.D.
Oct 1993 – Jan 2000: Assistant Lecturer – Structural Engineering Department, Faculty of
Engineering, Mansoura University, EGYPT. Duties include conducting
research work and tutoring the following undergraduate courses:
- Construction Project Management, 4th year Civil.
- Structural Analysis, 1st year Civil.
Oct 1988 – Sep 1993: Research Assistant – Structural Engineering Department, Faculty of
Engineering, Mansoura University, EGYPT. Duties include conducting
research work and tutoring the following undergraduate courses:
- Construction Project Management, 4th year Civil.
- Structural Analysis, 1st year Civil.
- Strength of Materials, 2nd year Civil.
- Reinforced Concrete Design, 2nd year Civil.
4. Page 4 of 13
Oct 1988 - Jun 1997: Civil/Structural Engineer (Part-time) – Dr. Mahmoud Elgamal Consulting
Office, Mansoura, EGYPT. Duties include the structural design of a variety
of concrete multi-story buildings, and sharing in the design of many steel
buildings.
Jan 1988 – Sep 1988: Civil/Structural Engineer (Full-time) – Dr. Mahmoud Elgamal Consulting
Office, Mansoura, EGYPT. Duties include the design and supervision on
construction of many projects. This includes the preparation of structural
design drawings for projects.
Oct 1986 – Dec 1987: Military Service – the Egyptian Armed Forces, Metallic Floating Bridges
Department. Duties include the construction and maintenance of such type of
bridges.
4. PROFESSIONAL AFFILIATIONS:
• Member of the Egyptian Engineers Syndicate
• Member of the American Society of Civil Engineers (ASCE)
• Member of the Professional Engineers Ontario (PEO)
5. PROFESSIONAL ACTIVITIES AND SERVICES:
• Reviewer for the following journals:
- Journal of Construction Engineering and Management, American Society of Civil Engineers.
- Journal of Computing in Civil Engineering, American Society of Civil Engineers.
- Journal of Construction Management and Economics, Taylor & Francis Group.
- Journal of Automation in Construction, Elsevier Publishing.
- Journal of Advances in Structural Engineering, Multi-Science Publishing.
- Computer-Aided Civil and Infrastructure Engineering Journal, Wiley-Blackwell Publishing.
- Emirates Journal of Engineering Research (EJER), United Arab Emirates University.
- Journal of Infrastructure Systems, American Society of Civil Engineers.
- Operational Research: An International Journal (ORIJ), Springer Publishing.
- Journal of Mathematics and Computers in Simulation, Elsevier Publishing.
- Canadian Journal of Civil Engineering.
- Journal of Engineering with Computers, Springer.
- IEEE Transactions on Evolutionary Computation, ScholarOne.
• Reviewer for the following conferences:
- 7th Mansoura International Engineering Conference, 2010.
- Construction Research Congress (CRC), ASCE, 2010.
- 13th International Colloquium in Structural and Geotechnical Engineering, 2009.
- 2nd International Conference on Construction In Developing Countries (ICCIDC-II), "Advancing
and Integrating Construction Education, Research & Practice”, 2010.
- 3rd International / 9th Construction Specialty Conference, CSCE, Ottawa, Ontario, 2011.
• Reviewer for the following agencies:
- ITIDA - Information Technology Industry Development Agency, Egypt.
- STDF – Science and Technology Development Fund, Egypt.
• Theses Examination:
- " ,ﻓﻼح ﻋﺒﺪ اﷲ اﻟﺴﺒﻴﻌﻰ "أراء واﺗﺠﺎهﺎت اﻟﻌﺎﻣﻠﻴﻦ ﺣﻮل اﻟﺨﺼﺨﺼﺔ ﺑﺎﻟﺘﻄﺒﻴﻖ ﻋﻠﻰ وزارة اﻟﻜﻬﺮﺑﺎء واﻟﻤﺎء ﺑﺪوﻟﺔ اﻟﻜﻮﻳﺖMaster
Thesis, Structural Engineering Department, Mansoura University, Mansoura, Egypt, Nov. 5th, 2009.
5. Page 5 of 13
- "Predicting Pavement Performance Using Markov Chain Mode," Ehab Samir Awad Alla Erian,
Master Thesis, Structural Engineering Department, Cairo University, Cairo, Egypt, Jan. 27th, 2010.
- " ,أﺵﺮف ﻋﺒﺪ اﻟﺸﻬﻴﺪ ﻋﻠﻴﻮة ﺣﺴﻦ "ﺗﺨﺼﻴﺺ اﻟﻤﺨﺎﻃﺮ واﻟﺤﺪ ﻣﻦ ﺗﺄﺛﻴﺮهﺎ ﻓﻰ ﻣﺸﺮوﻋﺎت اﻟﻘﻨﺎﻃﺮ ﺑﻤﺼﺮMaster Thesis,
Structural Engineering Department, Tanta University, Tanta, Egypt, Mar. 11th, 2010.
- “Decision Support System for Construction Projects Feasibility Analysis," Khaled Mohamed
Youssef, Master Thesis, Civil Engineering Department, Helwan University, Cairo, Egypt, Mar. 10th,
2011.
- “Integrated Visualized Framework for Repetitive Construction Projects Control," Mahmoud
Dawood, Doctoral Thesis, Structural Engineering Department, Mansoura University, Mansoura,
Egypt, Mar. 13th, 2011.
- " ,زﻳﺪ ﺥﺎﻟﺪ ﻣﺼﻠﺢ اﻟﻤﻄﻴﺮي " دراﺱﺔ ﻋﻮاﻣﻞ ﻥﺠﺎح ﺗﻄﺒﻴﻖ اﻟﻬﻨﺪﺱﺔ اﻟﻘﻴﻤﻴﺔ ﻓﻲ ﻣﺸﺮوﻋﺎت اﻟﺘﺸﻴﻴﺪ ﺑﺪوﻟﺔ اﻟﻜﻮﻳﺖMaster Thesis,
Structural Engineering Department, Mansoura University, Mansoura, Egypt, Apr. 3rd, 2011.
- “Value Engineering Model for Construction Projects," Hakem Safwat, Master Thesis, Structural
Engineering Department, Mansoura University, Mansoura, Egypt, Apr. 20th, 2011.
- “Construction Materials Waste Assessment using Artificial Neural Networks" Khaled Kamal
Eldeen, Master Thesis, Construction and Building Engineering Department, Arab Academy for
Science & Technology and Maritime Transport, Alexandria, Egypt, May 8th, 2011.
- “Selecting a Suitable Contract Strategy for Construction Projects in Egypt" Nabil Mohamed Abd
El-Baset, Master Thesis, Construction and Building Engineering Department, Arab Academy for
Science & Technology and Maritime Transport, Cairo, Egypt, May 24th, 2011.
- “Towards Promoting Sustainable Construction in Egypt: A Life-cycle Cost Approach" Minas Nagy
Assad, Master Thesis, Architecture and Construction Engineering Department, The American
University in Cairo, Egypt, June 9th, 2011.
- “Optimum Analysis of Construction Projects with Nonlinear Cash Flow," Haytham Sanad,
Doctoral Thesis, Structural Engineering Department, Tanta University, Tanta, Egypt, June 29th,
2011.
6. COMPUTER RELATED SKILLS:
• Good programming ability using Visual Basic programming language to write Windows-based
programs.
• Excellent programming ability using Visual Basic for Applications (VBA) to write Macro programs
for Microsoft Excel, Microsoft project, and Microsoft Word.
• Excellent programming ability using ForTran.
• Familiar with the following software packages:
- Microsoft Word (word processing)
- Microsoft Excel (spreadsheet) and
- Microsoft PowerPoint (presentation)
• Experienced in Microsoft Project (project management).
• Experienced in Primavera Enterprise (project management).
• Experienced in Sap2000 (Structural Analysis)
• Fair working knowledge of AutoCAD (computer-aided drawing).
6. Page 6 of 13
7. TRAINING COURSES OFFERED AND CONSULTATION:
• Participated in many training courses for practicing engineers in both Egypt and Canada.
• Provided many training courses in Project Management and Primavera with many private sector
training centers in Egypt.
• Providing consultation for some projects for preparing the tender documents such as: project
scheduling, resource scheduling, material delivery schedule, cash flow analysis, preparing of the
method statement, preparing of the safety program, and preparing the project management plan for
the project.
• Provided Project Planning, Scheduling along with hands-on-training on Microsoft Project.
• Consultant for the training program for the Water and Wastewater Sector Support Project (WWSS),
Holding Company for Water and Wastewater, Egypt.
• Project Management Training Program for the Water and Wastewater Sector, American University
in Cairo, Egypt.
• Consultant for the training program for the Water Policy and Regulatory Reform Project (WPRR),
Ministry of Housing and Utilities, Egypt.
• Project Management Training Program for Qatar General Electricity and Water Corporation
(KAHRAMAA), Doha, Qatar.
8. SCHOLARSHIPS, FELLOWSHIPS, AND OTHER AWARDS RECEIVED:
• Mansoura University Scholarship for outstanding undergraduate students, from Oct. 1981 – May
1986.
• M.Sc. Scholarship for three years, faculty of Engineering, Mansoura University, Mansoura, Egypt
(Dec. 89 – Dec. 92).
• Egyptian Government Scholarship for a period of two years (Aug. 97 – July 99) to study at the
University of Waterloo, Waterloo, Ontario, Canada.
• Post-Doctoral Fellowship for a period of three months (July 2000 – Sept. 2000) at the Department
of Civil Engineering, University of Waterloo, Waterloo, Ontario, Canada.
• NSERC’s Post-Doctoral Fellowship for a period of two years (Aug. 2001 – July 2003) to conduct a
research at the University of Waterloo, Canada.
• Post-Doctoral Fellowship for a period of two months (July 2005 – Aug. 2005) at the Department of
Civil Engineering, University of Waterloo, Waterloo, Ontario, Canada.
• Visiting Research Professor Fellowship for a period of four months (Sep. 2008 – Dec. 2008) at the
Department of Civil and Environmental Engineering, University of Waterloo, Waterloo, Ontario,
Canada.
• Visiting Professor (5/11/2010 – 11/11/2010) at the Department of Civil and Environmental
Engineering, University of Waterloo, Dubai Campus, Dubai, UAE.
9. CONTINUING EDUCATION AND PERSONAL DEVELOPMENT:
• Training workshop in “Effective Presentation Skills” for 20 hours (4 days) from 24/04/05-28/04/05,
Mansoura University, Mansoura, Egypt.
• Training workshop in “Modern Directions in Teaching” for 20 hours (4 days) from 22/05/05-
25/05/05, Mansoura University, Mansoura, Egypt.
• Training workshop in “Management of Scientific Research” for 20 hours (4 days) from 12/06/05-
15/06/05, Mansoura University, Mansoura, Egypt.
• Training workshop in “University Legal and Financial Aspects” for 15 hours (3days) from 2/07/06-
4/07/06, Mansoura University, Mansoura, Egypt.
• Training workshop in “The Credit-Hour System” for 15 hours (3 days) from 27/08/06-29/08/06,
Mansoura University, Mansoura, Egypt.
7. Page 7 of 13
• Training workshop in “Use of Technology in Teaching” for 15 hours (3 days) from 3/09/06-5/09/06,
Mansoura University, Mansoura, Egypt.
• Training workshop in “Student Evaluation and Examination Techniques” for 15 hours (3 days) from
21/01/07-23/01/07, Mansoura University, Mansoura, Egypt.
• Training workshop in “Time and Meeting Management” for 15 hours (3 days) from 17/08/08-
19/08/08, Mansoura University, Mansoura, Egypt.
• Training workshop in “Organizing Scientific Conferences” for 15 hours (3 days) from 01/02/09-
03/02/09, Mansoura University, Mansoura, Egypt.
• Training course in “Service Science Management and Engineering “SSME” for 40 hours (5 days)
from 8/11/2009-12/11/2009, Supreme Council of Universities (SCU), Cairo, Egypt.
• Training workshop in “Application of Academic Standards on Programs and Curricula” for 15 hours
(3 days) from 16/1/2010-18/1/2010, Mansoura University, Mansoura, Egypt.
10. PUBLICATIONS AND SCHOLARLY ACHIEVEMENTS:
10.1 Refereed Journal Publications
1. Elbeltagi, E., Hosny, O, Abdul-Razek, M., and Saeed, M. (2010). “A Fuzzy Logic Model for
Selection of Vertical Formwork Systems.” Paper submitted for possible publication in Construction
Engineering and Management Journal, ASCE.
2. Elbeltagi, E., and Dawood, M. (2010). “Mathematical Model for Controlling Repetitive Construction
Projects.” Paper submitted for possible publication in Engineering, Construction and Architectural
Management Journal, Emerald.
3. Elbeltagi, E., Hosny, O, Elhakeem, A., Abdul-Razek, M., and Abdullah, A. (2011). “Selection of
Slab Formwork System Using Fuzzy Logic.” Paper Accepted for publication in Construction
Management and Economics Journal.
4. Elbeltagi, E., and Dawood, M. (2011). “Integrated Visualized Time Control System for Repetitive
Construction Projects.” Paper Accepted for publication in Automation in Construction Journal,
Elsevier Science. .
5. Elbeltagi, E., Dawood, M., and Abd Elraheem, A. (2011). “Statistical Fuzzy Process Control Charts
for Monitoring Construction Project Performance.” Journal of Engineering and Applied Science,
Cairo University, Vol. 58, No. 1, pp..
6. Ammar, M., Elbeltagi, E., and Sanad, H. (2010). “Modeling Nonlinear Activity Cost Distributions for
Optimizing Construction Cash Flow.” Ain-Shams Journal of Civil Engineering (ASJCE), Vol. 2, pp..
7. Saeed, M., Elbeltagi, E., and Emam, M. (2008) "Selection of Optimal Vertical Formwork System in
Egypt Using Fuzzy Logic." Civil Engineering Research Magazine (CERM), Al-Azhar University,
Egypt, Vol. 30, No. 3, pp. 796-807.
8. Elbeltagi, E., Hegazy, T., and Grierson, D. (2007). “A Modified Shuffled-Frog-Leaping Optimization
Algorithm: Applications to Project Management.” Journal of Structure and Infrastructure
Engineering, Taylor & Francis, Vol. 3, No. 1, pp. 53-60.
9. Elbehairy, H., Elbeltagi, E., Hegazy, T, and Soudki K. (2006). “Comparison of Two Evolutionary
Algorithms for Optimization of Bridge Deck Repairs” Journal of Computer-Aided Civil and
Infrastructure Engineering, Vol. 21, No. 8, pp. 561-572.
8. Page 8 of 13
10. Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). “Comparison among Five Evolutionary-Based
Optimization Algorithms.” Journal of Advanced Engineering Informatics, Elsevier Science, Vol. 19,
No. 1, pp. 43-53.
11. Hegazy, T., Elbeltagi, E., and Zhang, K. (2005). “Keeping Better Site Records Using Intelligent Bar
Charts.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 5, pp. 513-
521.
12. Hegazy, T., Elbeltagi, E., and Elbehairy, H. (2004). “Bridge Deck Management System with
Integrated Life Cycle Cost Optimization.” Transportation Research Record: Journal of the
Transportation Research Board, No. 1866, TRB, National Research Council, Washington, D.C., pp.
44-50.
13. Elbeltagi, E., Hegazy, T., and Eldosouky, A. (2004). “Dynamic Layout of Construction Temporary
Facilities Considering Safety." Journal of Construction Engineering and Management, ASCE, Vol.
130, No. 4, pp. 534-541.
14. Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). “Distributed Scheduling Model for
Infrastructure Networks.” Journal of Construction Engineering and Management, ASCE, Vol. 130,
No. 2, pp. 160-167.
15. Attalla, M., Hegazy, T. and Elbeltagi, E. (2004). “In-House Delivery of Multiple-Small
Reconstruction Projects.” Journal of Management in Engineering, ASCE, Vol. 20, No. 1, pp. 25-31.
16. Sakla, S., and Elbeltagi, E. (2003). “Design of Steel Roofs Subjected to Drifted Snow Using
Genetic Optimization.” Journal of Computers and Structures, Elsevier Publisher, Vol. 81, No. 6, pp.
339-348.
17. Ammar, M., and Elbeltagi, E. (2001). “Algorithm for Determining Controlling Path Considering
Resource Continuity." Journal of Computing in Civil Engineering, ASCE, Vol. 15, No. 4, pp. 292-
298.
18. Elbeltagi, E., Hegazy, T., Hosny, A., and Eldosouky, A. (2001). “Schedule-Dependent Evolution of
Site Layout Planning." Journal of Construction Management and Economics, Vol. 19, No. 7, pp.
689-697.
19. Elbeltagi, E., and Hegazy, T. (2001). “A Hybrid AI-Based System for Site Layout Planning in
Construction." Computer-Aided Civil and Infrastructure Engineering Journal, Vol. 16, No.2, pp. 79-
93.
20. Hegazy, T., Shabeeb, A., Elbeltagi, E., and Cheema T. (2000). “Algorithm for Scheduling with
MultiSkilled Constrained Resources.” Journal of Construction Engineering and Management,
ASCE, Vol. 126, No. 6, pp. 414-421.
21. Karray, F., Zaneldin, E., Hegazy, T., Shabeeb, A., and Elbeltagi, E. (2000). "Tools of Soft
Computing as Applied to the Problem of Facilities Layout Planning." IEEE Transactions on Fuzzy
Systems, Vol. 8., No. 4, pp. 367-379.
22. Hegazy, T., and Elbeltagi, E. (2000). “Simplified Spreadsheet Solutions: A Model for Site Layout
Planning.” Cost Engineering Journal, AACE International, Vol. 42, No. 1, pp. 24-30.
23. Hegazy, T., and Elbeltagi, E. (1999). “EvoSite: An Evolution-Based Model for Site Layout
Planning." Journal of Computing in Civil Engineering, ASCE, Vol. 13, No. 3, pp. 198-206.
9. Page 9 of 13
24. Eldosouky, A., Abdel Reheem, A., and Elbeltagi, E. (1992). “A Comparison Approaches for Multi
Project Scheduling.” Civil Engineering Research Magazine (CERM), Al-Azhar University, Egypt,
Vol. 14, No. 9, pp. 42-51.
10.2 Conference Publications
25. Wefki, H., Elbeltagi, E., and Abdul-Razek, M.E. (2010). “Selecting an Appropriate Excavation
Support System in Egypt Using Fuzzy AHP.” Al-Azhar Engineering Eleventh International
Conference (AEIC 2010) (CD-ROM), Dec. 21-23, 2010, Cairo, Egypt. Published, also, in Al-Azhar
University Engineering Journal, Vol. 5, No. 1, pp. 510-523.
26. اﻟﻤﻠﻴﺠﻰ،ﻡﺤﻤﻮد، اﻟﺒﻠﺘﺎﺝﻰ، ﻋﻤﺎد و اﻟﻤﻄﻴﺮى، زیﺪ )0102(. "زیﺎدة ﻡﻌﺮﻓﺔ اﻟﻤﻬﻨﺪﺳﻴﻦ ﺏﻌﻮاﻡﻞ ﻧﺠﺎح ﺕﻄﺒﻴﻖ اﻟﻬﻨﺪﺳﺔ
،اﻟﻘﻴﻤﻴﺔ ﻓﻰ ﻡﺸﺮوﻋﺎت اﻟﺘﺸﻴﻴﺪ" اﻟﻤﺆﺕﻤﺮ اﻟﺴﻨﻮى اﻟﺨﺎﻡﺲ واﻷرﺏﻌﻴﻦ ﻓﻰ اﻹﺡﺼﺎء وﻋﻠﻮم اﻟﺤﺎﺳﺐ وﺏﺤﻮث اﻟﻌﻤﻠﻴﺎت
.2010 اﻟﻘﺎهﺮة، ﻡﺼﺮ، 31-61 دیﺴﻤﺒﺮ
27. Elbeltagi, E., Hegazy, T., and Grierson, D. (2010). “A New Evolutionary Strategy for Pareto Multi-
Objective Optimization.” Proceedings of the Seventh International Conference on Engineering
Computational Technology, B.H.V. Topping, J.M. Adam, F.J. Pallares, R. Bru and M.L. Romero,
(Editors), Civil-Comp Press, Stirlingshire, Scotland, Paper Ref. 19, Sep. 14-17, 2010, Valencia,
Spain, 17 pages.
28. Elbeltagi, E., and Dawood, M. (2010). “Automated BIM and GIS-Based nD Visualization System for
Controlling Repetitive Construction Projects.” Proceedings of the 2nd International Conference on
Construction In Developing Countries (ICCIDC-II) (CD-ROM), Aug 3-5, 2010, Cairo, Egypt, pp. 530-
540.
29. Elbeltagi, E., and Dawood, M. (2010). “Construction Performance Monitoring Based on Fuzzy
Control Chart.” the 35th Annual Meeting of the Australasian Universities Building Education
Association (AUBEA) (CD-ROM), Jul 14-16, 2010, University of Melbourne, Victoria, Australia, pp.
A001-1:A001-13.
30. Ammar, M., Elbeltagi, E. and Sanad, H. (2010). “Multi-Objective Time-Cost Trade-Off Optimization
Using Ant Colony.” Proceedings of the 7th International Engineering Conference, Faculty of
Engineering, Mansoura University, Mar. 23-28, 2010, Mansoura-Sharm El-Sheikh, Egypt, pp.400-
409.
31. Elbeltagi, E., Ammar, M. and Sanad, H. (2009). “Optimization of Construction Cash Flows with
Nonlinear Cost Distributions.” Proceedings of the 13th International Conference on Structural and
Geotechnical Engineering (CD-ROM), Dec 27-29, 2009, Cairo, Egypt, pp. 191-200.
32. Elbeltagi, E., and Tantawy, M. (2009) “Integrated Asset Management Framework.” 11th Arab
Structural Engineering Conference, October 25-27, 2009, Dhahran, KSA, 6 pages.
33. El-Agroudy, M., Elbeltagi, E., and Abdul-Razek, M.E. (2009). “A Fuzzy Logic Approach for
Contractor Selection.” Proceedings of the Fifth International Conference on Construction in the 21st
Century (CITC-V) (CD-ROM), May 20-22, Istanbul, Turkey, pp. 194-201.
34. Salem, A., Elbeltagi, E., and Abdel-Razek, R. (2008) "Predicting Conceptual Cost of Libyan
Highway Projects Using Artificial Neural Network." Al-Azhar Engineering Tenth International
Conference (AEIC 2008) (CD-ROM), Dec. 24-26, 2008, Cairo, Egypt. Published, also, in Al-Azhar
University Engineering Journal, Vol. 3, No. 10, pp. 76-88.
35. Elbeltagi, E., and Elkassas, E. (2008) "Cost Optimization of Projects with Repetitive Activities
Using Genetic Algorithms." The Sixth International Conference on Engineering Computational
10. Page 10 of 13
Technology, M. Papadrakakis and B.H.V. Topping, (Editors), Civil-Comp Press, Stirlingshire,
Scotland, Paper Ref. 66, Sep. 2-5, 2008, Athens, Greece, 15 pages.
36. Elbeltagi, E., and Tantawy, M. (2008) “Asset Management: The Ongoing Crisis.” Second
Conference on Project Management (CD-ROM), April 5-9, 2008, Riyadh, KSA, 9 pages.
37. Elgamal, A., Elbeltagi, E., and Emam, M. (2008) “Parametric Cost Estimate of Maintenance Works
for Educational Buildings Using Artificial Neural Networks.” 6th International Engineering
Conference, Faculty of Engineering, Mansoura University, (CD-ROM), Mar. 13-16, 2008,
Mansoura-Sharm El-Sheikh, Egypt, pp. 68-77.
38. Elbeltagi, E., El-Kassas, E., Abdel Rasheed, I., and El-Tawil, S. (2007) “Scheduling and Cost
Optimization of Repetitive Projects Using Genetic Algorithms.” 17th International Conference on
Computer Theory and Applications (ICCTA) (CD-ROM), Sep. 1-3, 2007, Alexandria, Egypt, pp.
319-327.
39. Elbeltagi, E. (2007). “Evolutionary Algorithms for Large-Scale Optimization in Construction
Management.” First Conference on Project Management: the Future Trends in the Project
Management (CD-ROM), April 7-11, 2007, Riyadh, KSA, 10 pages.
40. Elbeltagi, E. (2006). “A Modified Shuffled-Frog-Leaping Algorithm for Optimizing Bridge Deck
Repairs.” International Conference on Bridge Management Systems Monitoring, Assessment, and
Rehabilitation (HBRC) (CD-ROM), March 21-23, 2006, Cairo, Egypt, Paper # BMS03805, 10
pages.
41. Elbeltagi, E., Elbehairy, H., Hegazy, T., and Grierson, D. (2005). “Evolutionary Algorithms for
Optimizing Bridge Deck Rehabilitation.” International Conference on Computing in Civil Engineering
(CD-ROM), July 12-15, 2005, Cancun, Mexico, Paper # 8542.
42. Elbehairy, H., Hegazy, T, Elbeltagi, E., and Soudki K. (2005). “Alternative Formulations for Large
Scale Optimization of Infrastructure Maintenance.” 1st Infrastructure Specialty Conference of the
Canadian Society of Civil Engineering (CD-ROM), CSCE, June 2-4, 2005, Toronto, Canada, pp.
FR-160-1 - FR-160-9.
43. Elbeltagi, E. (2005). “Using Ant Colony Optimization for Time-Cost Trade-Off in Construction.” 11th
International Colloquium of Structural and Geotechnical Engineering (ICSGE) (CD-ROM), May 17-
19, 2005, Cairo, Egypt, pp. MG15-1 – MG15-10.
44. Elbeltagi, E. (2004). “Applicability of Genetic Algorithms in Construction Engineering and
Management.” Proceedings of the International Conference on Structural & Geotechnical
Engineering and Construction Technology (SGECT’04), March 23-25, Mansoura, Egypt, Vol. 2, pp.
1049-1062.
45. Hegazy, T., Elbeltagi, E., and Elbehairy, H. (2004). “Bridge Deck Management System with
Integrated Life Cycle Cost Optimization.” 83rd Transportation Research Board Annual Meeting (CD-
ROM), TRB, Jan 11-15, Washington, D.C., USA, Paper # 04-5060.
46. Hegazy, T., Elbeltagi, E., Elhakeem, A., and Attalla, M. (2003). “Optimum Resource Planning for
Large Infrastructure Maintenance/Construction Operation.” 9th Arab Structural Engineering
Conference (CD-ROM), ASEC, Nov 29 – Dec 1, Abu Dhabi, UAE, pp. 1017-1024.
47. Attalla, M., Fetaih, A., Hegazy, T., and Elbeltagi, E. (2003). “Delivering Projects with Quality and
Safety.” 5th Construction Specialty Conference of the Canadian Society of Civil Engineering (CD-
ROM), CSCE, June 4-7, Moncton, NB, Canada, pp. COH-294-1 - COH-294-9.
11. Page 11 of 13
48. Elbeltagi, E., and Hegazy, T. (2003). “Optimum Layout Planning for Irregular Construction Sites.”
5th Construction Specialty Conference of the Canadian Society of Civil Engineering (CD-ROM),
CSCE, June 4-7, Moncton, NB, Canada, pp. COG-197-1 – COG-197-10.
49. Sakla, S., and Elbeltagi, E. (2003). “Using Genetic Algorithms for the Optimal Design of Steel
Roofs Subjected to Non-Uniform Loads.” 10th International Colloquium of Structural and
Geotechnical Engineering (ICSGE) (CD-ROM), April 22-24, Cairo, Egypt, pp. E03ST22-1 –
E03ST22-15.
50. Elbeltagi, E., and Hegazy, T. (2002). “Incorporating Safety into Construction Site Management.”
Proceedings of the First International Conference on construction in the 21st Century (CITC2002),
“Challenges and Opportunities in Management and Technology”, April 25-26, Miami, Florida, USA,
pp. 261-268.
51. Ammar, M., and Elbeltagi, E., (2001). “Controlling Path Determination in Linear Construction
Projects.” 9th International Colloquium of Structural and Geotechnical Engineering (ICSGE) (CD-
ROM), April 10-12, Cairo, Egypt, pp. MG01-1 - MG01-10.
52. Karray, F., Zaneldin, E., Hegazy, T., Shabeeb, A., and Elbeltagi, E. (2000). "Computational
Intelligence Tools for Solving the Facilities Layout Planning Problem." Proceedings of the American
Control Conference 2000, ACC 2000, June 28-30, Illinois, USA, Vol. 6, pp. 3954-3958.
53. Elbeltagi, E., and Hegazy, T. (1999). “Genetic Optimization of Site Layout Planning.” AACE
Transactions, 43rd AACE International Annual Conference, June 27-30, Denver, CO, USA, pp.
IT.05.1-IT.05.8.
10.3 Discussion and Closure
54. “Algorithm for Determining Controlling Path Considering Resource Continuity." by P.G. Ioannou,
R.B. Harris, and I-T. Yang, Closure by M. Ammar and E. Elbeltagi, Journal of Computing in Civil
Engineering, ASCE, Vol. 17, No. 1, pp. 68-73.
10.4 Other Publications
55. Elbeltagi, E. (2000). “Construction Site Management.” Ph.D. Thesis, Structural Engineering
Department, Mansoura University, Mansoura, EGYPT.
56. Elbeltagi, E. (1993). “Scheduling Construction Projects Under Multiple Resource Constraints by
Heuristic Methods.” Master’s Thesis, Structural Engineering Department, Mansoura University,
Mansoura, EGYPT.
57. Elbeltagi, E. (1986). “Reinforced Concrete Design.” Undergraduate Graduation project, Civil
Engineering Department, Mansoura University, Mansoura, EGYPT.
10.5 Presentations
1. “A New Evolutionary Strategy for Pareto Multi- Objective Optimization.” Seventh International
Conference on Engineering Computational Technology, Sep. 14-17, 2010, Valencia, Spain.
2. “Automated BIM and GIS-Based nD Visualization System for Controlling Repetitive Construction
Projects.” 2nd International Conference on Construction In Developing Countries (ICCIDC-II), Aug 3-
5, 2010, Cairo, Egypt.
12. Page 12 of 13
3. “Multi-Objective Time-Cost Trade-Off Optimization Using Ant Colony.” 7th International Engineering
Conference, Faculty of Engineering, Mansoura University, Mar. 23-28, 2010, Mansoura-Sharm El-
Sheikh, Egypt.
4. “Optimization of Construction Cash Flows with Nonlinear Cost Distributions.” 13th International
Conference on Structural and Geotechnical Engineering, Dec 27-29, 2009, Cairo, Egypt.
5. "Cost Optimization of Projects with Repetitive Activities Using Genetic Algorithms." The Sixth
International Conference on Engineering Computational Technology, Sep. 2-5, 2008, Athens,
Greece.
6. “Asset Management: The Ongoing Crisis.” Second Conference on Project Management, April 5-9,
2008, Riyadh, KSA.
7. “Parametric Cost Estimate of Maintenance Works for Educational Buildings Using Artificial Neural
Networks.” 6th International Engineering Conference, Faculty of Engineering, Mansoura University,
Mar. 13-16, 2008, Mansoura-Sharm El-Sheikh.
8. “Evolutionary Algorithms for Large-Scale Optimization in Construction Management.” First
Conference on Project Management: the Future Trends in the Project Management, April 7-11,
2007, Riyadh, KSA.
9. “A Modified Shuffled-Frog-Leaping Algorithm for Optimizing Bridge Deck Repairs.” International
Conference on Bridge Management Systems Monitoring, Assessment, and Rehabilitation (HBRC),
March 21-23, 2006, Cairo, Egypt.
10. “Evolutionary Algorithms for Optimizing Bridge Deck Rehabilitation.” The International Conference
on Computing in Civil Engineering, July 12-15, 2005, Cancun, Mexico.
11. “Using Ant Colony Optimization for Time-Cost Trade-Off in Construction.” The 11th International
Colloquium of Structural and Geotechnical Engineering (ICSGE), May 17-19, 2005, Cairo, Egypt.
12. “Applicability of Genetic Algorithms in Construction Engineering and Management.” The
International Conference on Structural & Geotechnical Engineering and Construction Technology
(SGECT’04), March 23-25, 2004, Mansoura, Egypt.
13. “Bridge Deck Management System with Integrated Life Cycle Cost Optimization.” TRB 83rd Annual
Meeting, Jan11-15, 2004, Washington, D.C., USA.
14. “Optimum Layout Planning for Irregular Construction Sites.” 5th Construction Specialty Conference
of the Canadian Society of Civil Engineering, CSCE, June 4-7, 2003, Moncton, NB, Canada.
15. “Incorporating Safety into Construction Site Management.” 1st International Conference on
construction in the 21st Century (CITC2002), “Challenges and Opportunities in Management and
Technology”, April 25-26, 2002, Miami, Florida, USA.
16. “Controlling Path Determination in Linear Construction Projects.” 9th International Colloquium on
Structural and Geo-technical Engineering (ICSGE), April 10-12, 2001, Cairo, Egypt.
17. “Schedule-Dependent Evolution of Construction Site Plans.” University of Waterloo, Civil
Engineering Department Seminar Series, Fall 2000, Waterloo, ON, Canada.
18. “Genetic Optimization of Site Layout Planning.” AACE 43rd International Annual Conference, June
27-30, 1999, Denver, CO, USA.
13. Page 13 of 13
10.6 Masters Theses Supervised to Completion
1. Dawood, M. (2003) "Construction Project Control." M.Sc. Thesis, Mansoura University, Mansoura,
Egypt (Co-supervised with Prof. A. Hasanein and Prof. A. Eldosouky).
2. Al-Taweel, S. (2007) “Repetitive Projects Scheduling and Optimization Using Genetic Algorithms.”
Arab Academy for Science Technology and Maritime Transport (AASTMT), Alexandria, Egypt (Co-
supervised with Prof. I. Abdelrasheed and Prof. E. Elkassas).
3. Elgamal, A. (2008) “Parametric Cost Estimate of Maintenance Works for Educational Buildings
using Artificial Neural Networks.” Arab Academy for Science Technology and Maritime Transport
(AASTMT), Cairo, Egypt (Co-supervised with Prof. M. Emam).
4. El-Fitory, A. (2008) “Predicting Conceptual Cost of Libyan Highway Projects Using Artificial Neural
Network.” Arab Academy for Science Technology and Maritime Transport (AASTMT), Cairo, Egypt
(Co-supervised with Prof. R. Abdel-Razek).
5. El-Abbasy, M. (2008) “Selection of Optimal Vertical Formwork System in Egypt Using Fuzzy Logic.”
Arab Academy for Science Technology and Maritime Transport (AASTMT), Cairo, Egypt (Co-
supervised with Prof. M. Emam).
6. El-Agroudy, M. (2008) “A Fuzzy Model for Contractor Selection in the Egyptian Construction
Industry.” Arab Academy for Science Technology and Maritime Transport (AASTMT), Cairo, Egypt
(Co-supervised with Prof. M. Emam).
7. اﻟﺴﺒﻴﻌﻰ، ﻓﻼح )9002( "أراء واﺗﺠﺎهﺎت اﻟﻌﺎﻣﻠﻴﻦ ﺣﻮل اﻟﺨﺼﺨﺼﺔ ﺑﺎﻟﺘﻄﺒﻴﻖ ﻋﻠﻰ وزارة اﻟﻜﻬﺮﺑﺎء واﻟﻤﺎء ﺑﺪوﻟﺔ
.اﻟﻜﻮﻳﺖ" آﻠﻴﺔ اﻟﻬﻨﺪﺱﺔ – ﺝﺎﻣﻌﺔ اﻟﻤﻨﺼﻮرة، اﻟﻤﻨﺼﻮرة، ﻣﺼﺮ
.()اﺵﺮاف ﻣﺸﺘﺮك ﻣﻊ د. ﺹﻼح اﻟﺒﺠﻼﺗﻰ
8. Wefki, H. (2011) “Selecting an Appropriate Excavation Support System in Egypr Using Fuzzy AHP.”
Arab Academy for Science Technology and Maritime Transport (AASTMT), Cairo, Egypt (Co-
supervised with Prof. M. Emam).
9. اﻟﻤﻄﻴﺮى، زﻳﺪ )1102( "دراﺱﺔ ﻋﻮاﻣﻞ ﻥﺠﺎح ﺗﻄﺒﻴﻖ اﻟﻬﻨﺪﺱﺔ اﻟﻘﻴﻤﻴﺔ ﻓﻲ ﻣﺸﺮوﻋﺎت اﻟﺘﺸﻴﻴﺪ ﺑﺪوﻟﺔ اﻟﻜﻮﻳﺖ" آﻠﻴﺔ اﻟﻬﻨﺪﺱﺔ
.– ﺝﺎﻣﻌﺔ اﻟﻤﻨﺼﻮرة، اﻟﻤﻨﺼﻮرة، ﻣﺼﺮ
.()اﺵﺮاف ﻣﺸﺘﺮك ﻣﻊ د. ﻣﺤﻤﻮد اﻟﻤﻠﻴﺠﻰ
10.7 Doctoral Theses Supervised to Completion
1. Dawood, M. (2011) "Integrated Visualized Framework for Repetitive Construction Projects Control."
PhD Thesis, Mansoura University, Mansoura, Egypt (Co-supervised with Prof. A. Hasanein).
2. Sanad, H. (2011) "Optimum Analysis of Construction Projects with Nonlinear Cash Flow." PhD
Thesis, Tanata University, Tanta, Egypt (Co-supervised with Prof. M. Ammar).