Biogas project report

Ujjwal Joshi
Ujjwal JoshiStudent à Fachhochschule Dortmund
Project Handbook
Biogas Powerplant Project
Project Handbook
Biogas Powerplant Project
Version 1.0
Project Manager: Carsten
Group Members:
Ujjwal Kumar Joshi
Project Handbook
Biogas Powerplant Project
Contents
1. Short description of project
2. Project assignment
3. Plan of objectives
4. Description of pre- and post-project phase
5. Project environment analysis
6. Connection between the project, other projects and the organization’s strategy
7. Project organization chart
8. Work breakdown structure (WBS)
9. Project work-package specifications
10. Project responsibility matrix
11. Milestone plan
12. Project bar chart
13. Personnel planning
14. Project cost plan
Project Handbook
Biogas Powerplant Project
1. Short description of project
The production of biogas and the conversion into electricity is subsidized in Germany via the EEG law.
This allowed the construction of biogas power plants with up to 500 kW electrical powers as
agricultural facilities in the farms.
The biogas power plant project is planned to be implemented within a farm in the Westphalian
countryside. This farm produces piglets (young pigs) which are produced by hosting around 400 sows
(mother pigs). The pigs produced also 2000 cbm of waste, in which it must be stored to be used as
fuel for producing heating and electricity.
The biogas power plant will use the liquid waste to produce methane gas for heating of the farm. The
power plant also need apart from biogas, energy from crops like corn or grass. Electricity will also be
produced from the power plant, which will be sold to local energy provider for fixed price and have a
guaranteed price by law for the next 20 years. The project is intended to produce electricity in 2009.
The prerequisite for the permit to build the power plant is that there must be an agreed contract
with local farmers to purchase energy crops over 5 years. After the prerequisite is fulfilled, the power
plant construction can be started, in which it consisted of 3 main building blocks which is crop silo,
block power and heat plant, fermentation and waste facilities. Biogas will be produced 3-4 weeks
after starting to feed the fermentation pots.
The project is planned to be finished at the end 2009 so that the goal to produce electricity can be
achieved.
Project Handbook
Biogas Powerplant Project
2. Project Assignment
Project Assignment
project start event:
Contracts with local farmers are secured
project start date:
24-08-2009
project end event:
Production of biogas energy
project end date:
31-12-2009
project objectives:
 Process waste and crops to produce
electricity and heating (biogas energy)
 Constructing silo & weighing machine
 Constructing block heat & power plant
 Constructing fermentation & waste
facilities
non-objectives:
 Securing contract with local farmers
 Selling of electricity
main tasks (project phases):
 Project management
 Project setup
 Silo & weighing machine
 Block heat & power plant
 Fermentation & waste facilities
 Production (one time test production)
 Review & sign off
project resources and costs:
Resource/cost type unit cost (euro)
 Silo
 Weighing Machine
 Trafo
 Block heat and power
plant
 Auxiliary heating
facility
 Fermentation facilities
 Ground movement +
traffic areas
 Small building
 Crops harvest
 Materials, bio diesel,
oil
TOTAL
200,000
30,000
50,000
200,000
25,000
800,000
100,000
30,000
150,000
10,000
1,595,000
project owner:
Daniel and Anton
project manager:
Carsten
project team:
 Marco (Planner)
 Axel (Project Manager Ground Work)
 Willi (Project Manager Silo)
 Sven (Project Manager Fermenter + Block
Power and Heat Plant)
 Hans (Project Manager Trafo)
 Gerd (Project Manager Weighing Machine)
project coach:
……………………………………………………… …………………………………………………………..
Carsten (project manager) Daniel and Anton (project owners)
Project Handbook
Biogas Powerplant Project
3. Plan of objectives
Plan of goals
(objectives, non-objectives)
Current Objectives Adjusted Objectives as of (date)
Main objectives
Additional
objectives
 Process waste and crops to produce
electricity and heating (biogas
energy)
 Constructing silo & weighing
machine
 Constructing block heat & power
plant
 Constructing fermentation & waste
facilities
Non objectives  Securing contract with local farmers
 Selling of electricity
Project Handbook
Biogas Powerplant Project
4. Description of pre- and post-project phase
description of pre- and post
project phase
1) pre project phase
What triggered the project?
 EEG law forced the states in Germany to construct Bio gas power plants as agricultural facilities in
farms
 The need to use the liquid waste for better use
 To generate the cheaper electricity
Relevant decisions, events
 Decision to do the project in a farm in the westphalian countryside
Relevant documents
 Contract with local farmers (prerequisite for starting the project)
 Project planning documentations
2) post project phase
What will happen after the project has ended?
 Control the flow of resources needed to produce the biogas
 Secure more contracts with local farmers
Use of experiences
 The team will focus long term on Biogas projects
 The team can apply their experiences in other states and countries
 The resulting action plan from the lessons learned review will be executed
Relevant documents
 Project manual
 Review documentations
Project Handbook
Biogas Powerplant Project
5. Project environment analysis
Project environment analysis
Project environment table
Environment Relationship Evaluation Activity Responsible Date
Project
Owners
(Daniel &
Anton)
Customer
(Positive)
Expect and desire
project success
Project start &
closure
(WBS 1.1.2
WBS 1.1.6)
Biogas
production
(WBS 1.6)
Reviews
(WBS 1.7)
PM (Carsten) 24.08.09-
01.09.09
30.12.09
17.11.09-
29.12.09
01.12.09-
29.12.09
Projects
managers
(Axel, Willi,
Sven, Hans,
Gerd)
Executes the
project
phases
(Positive)
Motivated to
achieve their
success with
responsibility and
accountability
Execution of
the project
(WBS 1.2-1.7)
PM (Carsten)
Projects
managers (Axel,
Willi, Sven,
Hans, Gerd)
24.08.09-
29.12.09
Biogas powerplant
project
Overall project
manager
(Carsten)
Project owners
(Daniel & Anton)
Project managers
Planner
(Marco)
Farmer & main user
(Stefan)
Bank contact
(Bernd)
Other farmers
(Josef & Armin)
Public authorities
(Markus)
+ : Positive influence
- : Negative influence
+
+
+
+
+
-
-
+
External
Internal
Project Handbook
Biogas Powerplant Project
Farmer &
main user
(Stefan)
Farm owner
(Positive)
Gain access to
renewable energy
to reduce costs
Biogas
production
(WBS 1.6.2)
Review
(WBS 1.7)
PM (Carsten) 08.12.09-
28.12.09
01.12.09-
31.12.09
Public
authorities
(Markus)
Grant
permits
(Negative)
Make sure the
requirements to
start the project
are met
Project
management
(WBS 1.1)
PM (Carsten) 24.08.09-
31.12.09
Other
farmers
(Josef &
Armin)
Supply crops
for making
biogas
(Positive)
Gain access to
renewable energy
Biogas
production
(WBS 1.6.2)
PM (Carsten) 08.12.09-
28.12.09
Bank contact
(Bernd)
Help finance
the project
(Negative)
Discussion of
possibility for
project funding
Project
management
(WBS 1.1)
PM (Carsten) 24.08.09-
31.12.09
Planner
(Marco)
Develop plan
for the
project
(Positive)
Develop strategic
plan to support
the overall
execution of the
project
Project
management
(WBS 1.1)
PM (Carsten) 24.08.09-
31.12.09
Project Handbook
Biogas Powerplant Project
6. Connection between project, other projects and the organization’s strategy
connection between the project and other projects
Project Relationship Evaluation Activity Responsible Date
connection between the project and organization’s strategy
Strategy of the
organization
Description of the relationship
Improve the usage of
renewable energy in
Germany
Reduce the usage of fossil fuel and CO2 level in Germany
Address the farmers in
Westphalia countryside
Give them the possibility to process the waste to another form of
process and gain some income from it
Project Handbook
Biogas Powerplant Project
(project support)
Project Organization
7. Project organization chart
Project Managers
(project execution)
Carsten
(Project
Manager)
Axel
(Ground
Work)
Gerd
(Weighing
Machine)
Hans
(Trafo)
Sven
(Fermenter +
Block Power +
Heat Plant)
Willi
(Silo)
Bernd
(Bank
Contact)
Josef &
Armin
(Other
Farmers)
Markus
(Public
Authorities)
Daniel &
Anton
(Project
Owners)
Marco
(Planner)
Stefan
(Farmer &
Main
User)
Project Handbook
Biogas Powerplant Project
1. Biogas
powerplant project
1.1 PM 1.2 Project setup
1.3 Silo & weighing
machine
1.4 Block heat &
power plant
1.5 Fermentation &
waste facilities
1.6 Production
1.7 Review & sign
off
1.1.1 Project started
1.1.2 Project start
activity
1.1.3 Project
coordination
1.1.4 Project controlling
1.1.5 Project marketing
1.1.6 Project closure
1.1.7 Project end
1.2.1 Hire human
resources
1.2.2 Purchase
materials
1.2.3 Setup
done
1.3.1 Concrete walls
1.3.2 Waste water
system
1.3.3 Traffic area 1
1.3.4 Asphalt
1.3.5 Weighing
machine
1.3.7 Silo finished
1.3.6 Traffic area 2
1.4.1 Trafo
1.4.2 Heating facility
1.4.3 Facilities
finished
1.5.1 Ground
movement
1.5.2 Floor
1.5.3 Walls
1.5.4 Roof + isolation
1.5.5 Equipment
1.5.7 Facilities
finished
1.5.6 Small building
1.6.3 Production
finished
1.6.1 Heating the pots 1.7.1 Unit performance
review
1.7.2 Electricity
production review
1.7.3 Technical review
1.7.4 Documentation
1.7.5 Sign off
1.7.6 Review & sign off
done
1.6.2 Producing biogas
energy
8. Work breakdown structure (WBS)
Project Handbook
Biogas Powerplant Project
9. Project work-package specifications
Project work-package specifications
WBS 1.5.1,
ground movement
Content
 Digging holes for fermentation pots
 Lowering the whole fermentation facility 3m below surface
 Surrounding the whole area with a 2,5m high rampart
Non-content
Doing ground movement for areas other than the fermentation pots
Results
Ground are finished and ready to be constructed on
Progress measure
Work on fermentation pots can start
WBS 1.5.6,
Small building
Content
 Building small building
 Installation of pump and control electronics
Non-content
Building the fermentation pots
Results
Pumps and control electronics are installed
Progress measure
Pumps and control electronics functions properly with the
fermentation pots
WBS 1.6.1,
Heating the pots
Content
Heating up the pots to 38°C
Non-content
Collection of crops and wastes
Results
The pots are heated
Progress measure
Crops and wastes can be started to be fed to the pots
Project Handbook
Biogas Powerplant Project
10. Project responsibility matrix
project responsibility matrix
Roles
WBS-code & WP-title
(ProjectOwners)
DanielandAnton
(OverallProjectManager)Carsten
(Planner)Marco
(ProjectManagerGroundWork)Axel
(ProjectManagerSilo)Willi
(ProjectManagerFermenter+Block
PowerandHeatPlant)Sven
ProjectManagerTrafo)Hans
(ProjectManagerWeighingMachine)
Gerd
1.1 Project management
1.1.2 Project start activity I R I I I I I I
1.1.3 Project coordination R C
1.1.4 Project controlling R C
1.1.5 Project marketing R C
1.1.6 Project closure I R I I I I I I
1.2 Project setup
1.2.1 Hire human resources R C C C C C C
1.2.2 Purchase materials R C C C C C C
1.3 Silo & weighing machine
1.3.1 Concrete walls I R
1.3.2 Waste water system I R
1.3.3 Traffic area 1 I R
1.3.4 Asphalt I R
1.3.5 Weighing machine I I R
1.3.6 Traffic area 2 I R
1.4 Block heat & power plant
1.4.1 Trafo I I R
1.4.2 Heating facility I R
1.5 Fermentation & waste
facilities
1.5.1 Ground movement I R I
1.5.2 Floor I R
1.5.3 Walls I R
1.5.4 Roof + isolation I R
1.5.5 Equipment I R
1.5.6 Small building I R
Project Handbook
Biogas Powerplant Project
Informations:
R: Responsible
C: Contribution
I: Information
D: Decision
1.6 Production
1.6.1 Heating the pots I R I I I I I I
1.6.2 Producing biogas energy I R I I I I I I
1.7 Review & sign off
1.7.1 Unit performance review I R
1.7.2 Electricity production
review
I R
1.7.3 Technical review I R
1.7.4 Documentation I R
1.7.5 Signoff R I
Project Handbook
Biogas Powerplant Project
11. Milestone plan
Project milestone plan
WBS
code
Milestone Plan date Revised date Actual date
1.1.1 Project started 24.08.09
1.1.7 Project end 31.12.09
1.2.3 Setup done 31.08.09
1.3.7 Silo finished 29.09.09
1.4.3 Facilities finished 28.10.09
1.5.7 Facilities finished 01.12.09
1.6.3 Production finished 29.12.09
1.7.6 Review and sign off done 31.12.09
Project Handbook
Biogas Powerplant Project
12. Project bar chart
Project Handbook
Biogas Powerplant Project
13. Personnel planning
personnel planning
WBS code phase /
work
package
resource
type
base plan
person
days
revised
plan
person
days
actuals
person
days
deviation
person
days
1.1.2 Project Start
Activity
7
1.1.3 Project
Coordination
21
1.1.4 Project
Controlling
28
1.1.5 Project
Marketing
28
1.1.6 Project Closure 1
1.1 Project
management
85
1.2.1 Hire human
resources
5
Project Handbook
Biogas Powerplant Project
1.2.2 Purchase
materials
5
1.2 Project setup 10
1.3.1 Concrete walls 5
1.3.2 Waste water
system
5
1.3.3 Traffic area 1 5
1.3.4 Asphalt 5
1.3.5 Weighing
machine
5
1.3.6 Traffic area 2 5
1.3 Silo &
weighing
machine
30
1.4.1 Trafo 5
Project Handbook
Biogas Powerplant Project
1.4.2 Heating facility 8
1.4 Block heat &
power plant
13
1.5.1 Ground
movement
5
1.5.2 Floor 5
1.5.3 Walls 5
1.5.4 Roof + isolation 5
1.5.5 Equipment 5
1.5.6 Small building 7.5
1.5 Fermentation
& waste
facilities
32.5
1.6.1 Heating the
pots
5
Project Handbook
Biogas Powerplant Project
1.6.2 Producing
biogas energy
5
1.6 Production 10
1.7.1 Unit
performance
review
5
1.7.2 Electricity
production
review
1
1.7.3 Technical
review
5
1.7.4 Documentation 5.5
1.7.5 Signoff 1
1.7 Review & sign
off
17.5
Project Handbook
Biogas Powerplant Project
14. Project cost plan
project cost plan
WBS-code,
project
work
package
cost type base
plan
cost
revised
plan cost
€
actuals
cost
€
cost
deviation
€
Phase 1 personnel (150
EUR / man
day)
12,750
Material
external services
Other
Total PM 12,750
Phase 2 personnel (150
EUR / man
day)
1500
Material
Project Handbook
Biogas Powerplant Project
external services
Other
Total Project
setup
1,500
Phase 3 personnel (150
EUR / man
day)
4500
material 230,000
external services
other
Total Silo &
weighting
machine
234,500
Phase 4 personnel (150
EUR / man
day)
1,950
material 1,075,000
Project Handbook
Biogas Powerplant Project
external services
other
Total Block
heat & power
plant
1,076,950
Phase 5 personnel (150
EUR / man
day)
4,875
material 130,000
external services
other
Total Fermentation
& waste facilities
134,875
Phase 6 personnel (150
EUR / man
day)
1,500
material 160,000
Project Handbook
Biogas Powerplant Project
external services
other
Total
Production
161,500
Phase 7 personnel (150
EUR / man
day)
2,625
material
external services
other
Total Review &
sign off
2,625
Total cost 1,624,700

Recommandé

Ppt on par
Ppt onPpt on
Ppt ondufferrahul
3.6K vues16 diapositives
How to Start Biogas Production, Biogas – An Intense Opportunity (Landfill Gas... par
How to Start Biogas Production, Biogas – An Intense Opportunity (Landfill Gas...How to Start Biogas Production, Biogas – An Intense Opportunity (Landfill Gas...
How to Start Biogas Production, Biogas – An Intense Opportunity (Landfill Gas...Ajjay Kumar Gupta
2.4K vues59 diapositives
BIOGAS for Everyone : Simplified for all par
BIOGAS for Everyone : Simplified for all BIOGAS for Everyone : Simplified for all
BIOGAS for Everyone : Simplified for all Centre for Application of renewable Energy
41K vues63 diapositives
4.10 - "Development of efficient methane fermentation process and biogas plan... par
4.10 - "Development of efficient methane fermentation process and biogas plan...4.10 - "Development of efficient methane fermentation process and biogas plan...
4.10 - "Development of efficient methane fermentation process and biogas plan...Pomcert
3.6K vues41 diapositives
Biogas par
BiogasBiogas
BiogasHARISH J
4.5K vues30 diapositives
Biogas final project proposal submitted par
Biogas final project proposal  submittedBiogas final project proposal  submitted
Biogas final project proposal submittedAdane Nega
94.7K vues25 diapositives

Contenu connexe

Tendances

Biogas generation a climate neutral project par
Biogas generation   a climate neutral projectBiogas generation   a climate neutral project
Biogas generation a climate neutral projectBIOTECH INDIA
1.7K vues30 diapositives
biomass gasification par
biomass gasificationbiomass gasification
biomass gasificationAkepati S. Reddy
30.1K vues44 diapositives
Biomass par
BiomassBiomass
Biomassnagham ali hasan
4.1K vues41 diapositives
Biomass combustion par
Biomass combustionBiomass combustion
Biomass combustionH Janardan Prabhu
11K vues77 diapositives
Biomass par
BiomassBiomass
BiomassMrutunjayya Vastrad
2.9K vues17 diapositives
A Proposal on Bio Gas Plants for villages par
A Proposal on Bio Gas Plants for villagesA Proposal on Bio Gas Plants for villages
A Proposal on Bio Gas Plants for villagesRishabh Gupta
3.4K vues15 diapositives

Tendances(20)

Biogas generation a climate neutral project par BIOTECH INDIA
Biogas generation   a climate neutral projectBiogas generation   a climate neutral project
Biogas generation a climate neutral project
BIOTECH INDIA1.7K vues
A Proposal on Bio Gas Plants for villages par Rishabh Gupta
A Proposal on Bio Gas Plants for villagesA Proposal on Bio Gas Plants for villages
A Proposal on Bio Gas Plants for villages
Rishabh Gupta3.4K vues
Biogas plant designs and engery calculations by ali saqlain par ali saqlain
Biogas plant designs and engery calculations by ali saqlainBiogas plant designs and engery calculations by ali saqlain
Biogas plant designs and engery calculations by ali saqlain
ali saqlain40K vues
Biogas traditional vs modern plant. par Arpit Saraf
Biogas traditional vs modern plant.Biogas traditional vs modern plant.
Biogas traditional vs modern plant.
Arpit Saraf8.4K vues
Biogas-energy of the future par Abhinav Ojha
Biogas-energy of the futureBiogas-energy of the future
Biogas-energy of the future
Abhinav Ojha3.3K vues
Biomass energy par Smk Xlr
Biomass energyBiomass energy
Biomass energy
Smk Xlr18.8K vues
Biogas plant par Kaleem
Biogas plantBiogas plant
Biogas plant
Kaleem 1.8K vues
Biogas - Sustainability Through Green Energy par Trishan Perera
Biogas - Sustainability Through  Green Energy Biogas - Sustainability Through  Green Energy
Biogas - Sustainability Through Green Energy
Trishan Perera4.1K vues

En vedette

Biogas plant project par
Biogas plant projectBiogas plant project
Biogas plant projectTulika Ghosh
132.3K vues19 diapositives
Biogas par
BiogasBiogas
BiogasKashmeera N.A.
37.2K vues43 diapositives
Bio gas par
Bio gasBio gas
Bio gaspsidjain
32.6K vues14 diapositives
Bio-Gas par
Bio-Gas Bio-Gas
Bio-Gas vigyanashram
58.4K vues27 diapositives
Biogas production par
Biogas productionBiogas production
Biogas productionAsad Leo
85.4K vues13 diapositives
Bio gas plant par
Bio gas plantBio gas plant
Bio gas plantJahanzaib Bhat
23.5K vues18 diapositives

En vedette(18)

Biogas plant project par Tulika Ghosh
Biogas plant projectBiogas plant project
Biogas plant project
Tulika Ghosh132.3K vues
Bio gas par psidjain
Bio gasBio gas
Bio gas
psidjain32.6K vues
Biogas production par Asad Leo
Biogas productionBiogas production
Biogas production
Asad Leo85.4K vues
Report on Bio Gas Plant par aditya singh
Report on Bio Gas PlantReport on Bio Gas Plant
Report on Bio Gas Plant
aditya singh22.3K vues
Business plan bio gas par Awais Alii
Business plan bio gasBusiness plan bio gas
Business plan bio gas
Awais Alii34.8K vues
Biomass energy ppt par Sann Jana
Biomass energy pptBiomass energy ppt
Biomass energy ppt
Sann Jana108.9K vues
In-Game Advvertising research par Wentao Guo
In-Game Advvertising researchIn-Game Advvertising research
In-Game Advvertising research
Wentao Guo344 vues
Bio CNG FromWholesaleVegetableAndFruitMarkets:A Truly Sustanable and renewabl... par Sarita Mishra
Bio CNG FromWholesaleVegetableAndFruitMarkets:A Truly Sustanable and renewabl...Bio CNG FromWholesaleVegetableAndFruitMarkets:A Truly Sustanable and renewabl...
Bio CNG FromWholesaleVegetableAndFruitMarkets:A Truly Sustanable and renewabl...
Sarita Mishra738 vues
BIOMASS PROJECT DEVELOPMENT 140723-d2s2.indo par Dinno Kurniawan
BIOMASS PROJECT DEVELOPMENT 140723-d2s2.indoBIOMASS PROJECT DEVELOPMENT 140723-d2s2.indo
BIOMASS PROJECT DEVELOPMENT 140723-d2s2.indo
Dinno Kurniawan1K vues

Similaire à Biogas project report

Co-design of an implementation concept for a deep geothermal energy project a... par
Co-design of an implementation concept for a deep geothermal energy project a...Co-design of an implementation concept for a deep geothermal energy project a...
Co-design of an implementation concept for a deep geothermal energy project a...Oeko-Institut
121 vues8 diapositives
20181128 1 schoof platform geothermie and geothermal masterplan par
20181128 1 schoof   platform geothermie and geothermal masterplan20181128 1 schoof   platform geothermie and geothermal masterplan
20181128 1 schoof platform geothermie and geothermal masterplanAlexandros Daniilidis
238 vues16 diapositives
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptx par
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptxIEF programme theme #2 Just & Affordable Clean Energy_20230214.pptx
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptxTEPBLEMIGAS
11 vues26 diapositives
PDD for GTCC par
PDD for GTCCPDD for GTCC
PDD for GTCCProbodh Mallick
29.8K vues130 diapositives
Germany’s experience with renovation financing | Knut Höller par
Germany’s experience with renovation financing | Knut HöllerGermany’s experience with renovation financing | Knut Höller
Germany’s experience with renovation financing | Knut HöllerEkonomikas ministrija/ Dzīvo siltāk
47 vues23 diapositives
Topic 1.ppt par
Topic 1.pptTopic 1.ppt
Topic 1.pptAlanDSH74
6 vues32 diapositives

Similaire à Biogas project report(20)

Co-design of an implementation concept for a deep geothermal energy project a... par Oeko-Institut
Co-design of an implementation concept for a deep geothermal energy project a...Co-design of an implementation concept for a deep geothermal energy project a...
Co-design of an implementation concept for a deep geothermal energy project a...
Oeko-Institut121 vues
20181128 1 schoof platform geothermie and geothermal masterplan par Alexandros Daniilidis
20181128 1 schoof   platform geothermie and geothermal masterplan20181128 1 schoof   platform geothermie and geothermal masterplan
20181128 1 schoof platform geothermie and geothermal masterplan
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptx par TEPBLEMIGAS
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptxIEF programme theme #2 Just & Affordable Clean Energy_20230214.pptx
IEF programme theme #2 Just & Affordable Clean Energy_20230214.pptx
TEPBLEMIGAS11 vues
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors par Osvaldas Ciuksys
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsIgnalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
Osvaldas Ciuksys858 vues
Updated (version 0.6) European Union & IEA Energy Plan (REPowerEU 2022)-Ver 0... par EmadfHABIB2
Updated (version 0.6) European Union & IEA Energy Plan (REPowerEU 2022)-Ver 0...Updated (version 0.6) European Union & IEA Energy Plan (REPowerEU 2022)-Ver 0...
Updated (version 0.6) European Union & IEA Energy Plan (REPowerEU 2022)-Ver 0...
EmadfHABIB221 vues
Applied Project Management Team Assignment Eco-House Project Management Plan par Nicole Heredia
Applied Project Management Team Assignment Eco-House Project Management PlanApplied Project Management Team Assignment Eco-House Project Management Plan
Applied Project Management Team Assignment Eco-House Project Management Plan
Rice husk based cogeneration power plant for finance, subsidy & project rel... par Radha Krishna Sahoo
Rice husk based cogeneration power plant   for finance, subsidy & project rel...Rice husk based cogeneration power plant   for finance, subsidy & project rel...
Rice husk based cogeneration power plant for finance, subsidy & project rel...
Rice husk power plant information for finance, subsidy & project related su... par Radha Krishna Sahoo
Rice husk power plant information   for finance, subsidy & project related su...Rice husk power plant information   for finance, subsidy & project related su...
Rice husk power plant information for finance, subsidy & project related su...
Final Project: Odense Residential Building Renovation par Monica Badia Marin
Final Project: Odense Residential Building RenovationFinal Project: Odense Residential Building Renovation
Final Project: Odense Residential Building Renovation
Monica Badia Marin2.2K vues
Ignalina NPP Presentation To A o C (June 2011) par Osvaldas Ciuksys
Ignalina NPP Presentation To A o C (June 2011)Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)
Osvaldas Ciuksys954 vues
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O... par KTN
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
KTN791 vues

Plus de Ujjwal Joshi

Client Service Executive - Junior Event Manager par
Client Service Executive - Junior Event ManagerClient Service Executive - Junior Event Manager
Client Service Executive - Junior Event ManagerUjjwal Joshi
764 vues1 diapositive
Understanding france- Brief overview of Marseille par
Understanding france- Brief overview of MarseilleUnderstanding france- Brief overview of Marseille
Understanding france- Brief overview of MarseilleUjjwal Joshi
1.9K vues20 diapositives
Npv and IRR, a link to Project Management par
Npv and IRR, a link to Project ManagementNpv and IRR, a link to Project Management
Npv and IRR, a link to Project ManagementUjjwal Joshi
11.1K vues12 diapositives
Melamchi Drinking Water Project par
Melamchi Drinking Water ProjectMelamchi Drinking Water Project
Melamchi Drinking Water ProjectUjjwal Joshi
5K vues8 diapositives
Namibia- Project Hope par
Namibia- Project HopeNamibia- Project Hope
Namibia- Project HopeUjjwal Joshi
1.4K vues39 diapositives
Supply chain par
Supply chainSupply chain
Supply chainUjjwal Joshi
7.6K vues43 diapositives

Plus de Ujjwal Joshi(20)

Client Service Executive - Junior Event Manager par Ujjwal Joshi
Client Service Executive - Junior Event ManagerClient Service Executive - Junior Event Manager
Client Service Executive - Junior Event Manager
Ujjwal Joshi764 vues
Understanding france- Brief overview of Marseille par Ujjwal Joshi
Understanding france- Brief overview of MarseilleUnderstanding france- Brief overview of Marseille
Understanding france- Brief overview of Marseille
Ujjwal Joshi1.9K vues
Npv and IRR, a link to Project Management par Ujjwal Joshi
Npv and IRR, a link to Project ManagementNpv and IRR, a link to Project Management
Npv and IRR, a link to Project Management
Ujjwal Joshi11.1K vues
Melamchi Drinking Water Project par Ujjwal Joshi
Melamchi Drinking Water ProjectMelamchi Drinking Water Project
Melamchi Drinking Water Project
Ujjwal Joshi5K vues
Implementation of SAP BI in Coca Cola par Ujjwal Joshi
Implementation of SAP BI in Coca ColaImplementation of SAP BI in Coca Cola
Implementation of SAP BI in Coca Cola
Ujjwal Joshi29.8K vues
Micro patterns in agile software par Ujjwal Joshi
Micro patterns in agile softwareMicro patterns in agile software
Micro patterns in agile software
Ujjwal Joshi730 vues
Project Types and their importance par Ujjwal Joshi
Project Types and their importanceProject Types and their importance
Project Types and their importance
Ujjwal Joshi39.3K vues
ICB Competence, Project Standards par Ujjwal Joshi
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
Ujjwal Joshi1.3K vues
PMBOK Risk Management and Safety Health and Environment par Ujjwal Joshi
PMBOK Risk Management and Safety Health and EnvironmentPMBOK Risk Management and Safety Health and Environment
PMBOK Risk Management and Safety Health and Environment
Ujjwal Joshi2.7K vues
Report on Kotter's Change Model par Ujjwal Joshi
Report on Kotter's Change ModelReport on Kotter's Change Model
Report on Kotter's Change Model
Ujjwal Joshi36.9K vues
Chad cameroon pipeline project par Ujjwal Joshi
Chad cameroon pipeline projectChad cameroon pipeline project
Chad cameroon pipeline project
Ujjwal Joshi15.2K vues
Kotter’s 8 step change model par Ujjwal Joshi
Kotter’s 8 step change modelKotter’s 8 step change model
Kotter’s 8 step change model
Ujjwal Joshi53.8K vues
Knowledge Management- Ernst & Young par Ujjwal Joshi
Knowledge Management- Ernst & YoungKnowledge Management- Ernst & Young
Knowledge Management- Ernst & Young
Ujjwal Joshi9.3K vues
Knowledge Management in NASA par Ujjwal Joshi
Knowledge Management in NASAKnowledge Management in NASA
Knowledge Management in NASA
Ujjwal Joshi1.5K vues

Dernier

Azure DevOps Pipeline setup for Mule APIs #36 par
Azure DevOps Pipeline setup for Mule APIs #36Azure DevOps Pipeline setup for Mule APIs #36
Azure DevOps Pipeline setup for Mule APIs #36MysoreMuleSoftMeetup
88 vues21 diapositives
Class 10 English lesson plans par
Class 10 English  lesson plansClass 10 English  lesson plans
Class 10 English lesson plansTARIQ KHAN
239 vues53 diapositives
DU Oral Examination Toni Santamaria par
DU Oral Examination Toni SantamariaDU Oral Examination Toni Santamaria
DU Oral Examination Toni SantamariaMIPLM
138 vues2 diapositives
Gopal Chakraborty Memorial Quiz 2.0 Prelims.pptx par
Gopal Chakraborty Memorial Quiz 2.0 Prelims.pptxGopal Chakraborty Memorial Quiz 2.0 Prelims.pptx
Gopal Chakraborty Memorial Quiz 2.0 Prelims.pptxDebapriya Chakraborty
553 vues81 diapositives
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) par
 Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)AnshulDewangan3
275 vues12 diapositives
UWP OA Week Presentation (1).pptx par
UWP OA Week Presentation (1).pptxUWP OA Week Presentation (1).pptx
UWP OA Week Presentation (1).pptxJisc
68 vues11 diapositives

Dernier(20)

Class 10 English lesson plans par TARIQ KHAN
Class 10 English  lesson plansClass 10 English  lesson plans
Class 10 English lesson plans
TARIQ KHAN239 vues
DU Oral Examination Toni Santamaria par MIPLM
DU Oral Examination Toni SantamariaDU Oral Examination Toni Santamaria
DU Oral Examination Toni Santamaria
MIPLM138 vues
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) par AnshulDewangan3
 Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation) Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
Compare the flora and fauna of Kerala and Chhattisgarh ( Charttabulation)
AnshulDewangan3275 vues
UWP OA Week Presentation (1).pptx par Jisc
UWP OA Week Presentation (1).pptxUWP OA Week Presentation (1).pptx
UWP OA Week Presentation (1).pptx
Jisc68 vues
The basics - information, data, technology and systems.pdf par JonathanCovena1
The basics - information, data, technology and systems.pdfThe basics - information, data, technology and systems.pdf
The basics - information, data, technology and systems.pdf
JonathanCovena177 vues
Structure and Functions of Cell.pdf par Nithya Murugan
Structure and Functions of Cell.pdfStructure and Functions of Cell.pdf
Structure and Functions of Cell.pdf
Nithya Murugan317 vues
AI Tools for Business and Startups par Svetlin Nakov
AI Tools for Business and StartupsAI Tools for Business and Startups
AI Tools for Business and Startups
Svetlin Nakov89 vues
Scope of Biochemistry.pptx par shoba shoba
Scope of Biochemistry.pptxScope of Biochemistry.pptx
Scope of Biochemistry.pptx
shoba shoba121 vues
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx par ISSIP
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptxEIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx
EIT-Digital_Spohrer_AI_Intro 20231128 v1.pptx
ISSIP256 vues
Chemistry of sex hormones.pptx par RAJ K. MAURYA
Chemistry of sex hormones.pptxChemistry of sex hormones.pptx
Chemistry of sex hormones.pptx
RAJ K. MAURYA119 vues
Are we onboard yet University of Sussex.pptx par Jisc
Are we onboard yet University of Sussex.pptxAre we onboard yet University of Sussex.pptx
Are we onboard yet University of Sussex.pptx
Jisc71 vues
Narration ppt.pptx par TARIQ KHAN
Narration  ppt.pptxNarration  ppt.pptx
Narration ppt.pptx
TARIQ KHAN110 vues
7 NOVEL DRUG DELIVERY SYSTEM.pptx par Sachin Nitave
7 NOVEL DRUG DELIVERY SYSTEM.pptx7 NOVEL DRUG DELIVERY SYSTEM.pptx
7 NOVEL DRUG DELIVERY SYSTEM.pptx
Sachin Nitave56 vues
Narration lesson plan.docx par TARIQ KHAN
Narration lesson plan.docxNarration lesson plan.docx
Narration lesson plan.docx
TARIQ KHAN99 vues

Biogas project report

  • 1. Project Handbook Biogas Powerplant Project Project Handbook Biogas Powerplant Project Version 1.0 Project Manager: Carsten Group Members: Ujjwal Kumar Joshi
  • 2. Project Handbook Biogas Powerplant Project Contents 1. Short description of project 2. Project assignment 3. Plan of objectives 4. Description of pre- and post-project phase 5. Project environment analysis 6. Connection between the project, other projects and the organization’s strategy 7. Project organization chart 8. Work breakdown structure (WBS) 9. Project work-package specifications 10. Project responsibility matrix 11. Milestone plan 12. Project bar chart 13. Personnel planning 14. Project cost plan
  • 3. Project Handbook Biogas Powerplant Project 1. Short description of project The production of biogas and the conversion into electricity is subsidized in Germany via the EEG law. This allowed the construction of biogas power plants with up to 500 kW electrical powers as agricultural facilities in the farms. The biogas power plant project is planned to be implemented within a farm in the Westphalian countryside. This farm produces piglets (young pigs) which are produced by hosting around 400 sows (mother pigs). The pigs produced also 2000 cbm of waste, in which it must be stored to be used as fuel for producing heating and electricity. The biogas power plant will use the liquid waste to produce methane gas for heating of the farm. The power plant also need apart from biogas, energy from crops like corn or grass. Electricity will also be produced from the power plant, which will be sold to local energy provider for fixed price and have a guaranteed price by law for the next 20 years. The project is intended to produce electricity in 2009. The prerequisite for the permit to build the power plant is that there must be an agreed contract with local farmers to purchase energy crops over 5 years. After the prerequisite is fulfilled, the power plant construction can be started, in which it consisted of 3 main building blocks which is crop silo, block power and heat plant, fermentation and waste facilities. Biogas will be produced 3-4 weeks after starting to feed the fermentation pots. The project is planned to be finished at the end 2009 so that the goal to produce electricity can be achieved.
  • 4. Project Handbook Biogas Powerplant Project 2. Project Assignment Project Assignment project start event: Contracts with local farmers are secured project start date: 24-08-2009 project end event: Production of biogas energy project end date: 31-12-2009 project objectives:  Process waste and crops to produce electricity and heating (biogas energy)  Constructing silo & weighing machine  Constructing block heat & power plant  Constructing fermentation & waste facilities non-objectives:  Securing contract with local farmers  Selling of electricity main tasks (project phases):  Project management  Project setup  Silo & weighing machine  Block heat & power plant  Fermentation & waste facilities  Production (one time test production)  Review & sign off project resources and costs: Resource/cost type unit cost (euro)  Silo  Weighing Machine  Trafo  Block heat and power plant  Auxiliary heating facility  Fermentation facilities  Ground movement + traffic areas  Small building  Crops harvest  Materials, bio diesel, oil TOTAL 200,000 30,000 50,000 200,000 25,000 800,000 100,000 30,000 150,000 10,000 1,595,000 project owner: Daniel and Anton project manager: Carsten project team:  Marco (Planner)  Axel (Project Manager Ground Work)  Willi (Project Manager Silo)  Sven (Project Manager Fermenter + Block Power and Heat Plant)  Hans (Project Manager Trafo)  Gerd (Project Manager Weighing Machine) project coach: ……………………………………………………… ………………………………………………………….. Carsten (project manager) Daniel and Anton (project owners)
  • 5. Project Handbook Biogas Powerplant Project 3. Plan of objectives Plan of goals (objectives, non-objectives) Current Objectives Adjusted Objectives as of (date) Main objectives Additional objectives  Process waste and crops to produce electricity and heating (biogas energy)  Constructing silo & weighing machine  Constructing block heat & power plant  Constructing fermentation & waste facilities Non objectives  Securing contract with local farmers  Selling of electricity
  • 6. Project Handbook Biogas Powerplant Project 4. Description of pre- and post-project phase description of pre- and post project phase 1) pre project phase What triggered the project?  EEG law forced the states in Germany to construct Bio gas power plants as agricultural facilities in farms  The need to use the liquid waste for better use  To generate the cheaper electricity Relevant decisions, events  Decision to do the project in a farm in the westphalian countryside Relevant documents  Contract with local farmers (prerequisite for starting the project)  Project planning documentations 2) post project phase What will happen after the project has ended?  Control the flow of resources needed to produce the biogas  Secure more contracts with local farmers Use of experiences  The team will focus long term on Biogas projects  The team can apply their experiences in other states and countries  The resulting action plan from the lessons learned review will be executed Relevant documents  Project manual  Review documentations
  • 7. Project Handbook Biogas Powerplant Project 5. Project environment analysis Project environment analysis Project environment table Environment Relationship Evaluation Activity Responsible Date Project Owners (Daniel & Anton) Customer (Positive) Expect and desire project success Project start & closure (WBS 1.1.2 WBS 1.1.6) Biogas production (WBS 1.6) Reviews (WBS 1.7) PM (Carsten) 24.08.09- 01.09.09 30.12.09 17.11.09- 29.12.09 01.12.09- 29.12.09 Projects managers (Axel, Willi, Sven, Hans, Gerd) Executes the project phases (Positive) Motivated to achieve their success with responsibility and accountability Execution of the project (WBS 1.2-1.7) PM (Carsten) Projects managers (Axel, Willi, Sven, Hans, Gerd) 24.08.09- 29.12.09 Biogas powerplant project Overall project manager (Carsten) Project owners (Daniel & Anton) Project managers Planner (Marco) Farmer & main user (Stefan) Bank contact (Bernd) Other farmers (Josef & Armin) Public authorities (Markus) + : Positive influence - : Negative influence + + + + + - - + External Internal
  • 8. Project Handbook Biogas Powerplant Project Farmer & main user (Stefan) Farm owner (Positive) Gain access to renewable energy to reduce costs Biogas production (WBS 1.6.2) Review (WBS 1.7) PM (Carsten) 08.12.09- 28.12.09 01.12.09- 31.12.09 Public authorities (Markus) Grant permits (Negative) Make sure the requirements to start the project are met Project management (WBS 1.1) PM (Carsten) 24.08.09- 31.12.09 Other farmers (Josef & Armin) Supply crops for making biogas (Positive) Gain access to renewable energy Biogas production (WBS 1.6.2) PM (Carsten) 08.12.09- 28.12.09 Bank contact (Bernd) Help finance the project (Negative) Discussion of possibility for project funding Project management (WBS 1.1) PM (Carsten) 24.08.09- 31.12.09 Planner (Marco) Develop plan for the project (Positive) Develop strategic plan to support the overall execution of the project Project management (WBS 1.1) PM (Carsten) 24.08.09- 31.12.09
  • 9. Project Handbook Biogas Powerplant Project 6. Connection between project, other projects and the organization’s strategy connection between the project and other projects Project Relationship Evaluation Activity Responsible Date connection between the project and organization’s strategy Strategy of the organization Description of the relationship Improve the usage of renewable energy in Germany Reduce the usage of fossil fuel and CO2 level in Germany Address the farmers in Westphalia countryside Give them the possibility to process the waste to another form of process and gain some income from it
  • 10. Project Handbook Biogas Powerplant Project (project support) Project Organization 7. Project organization chart Project Managers (project execution) Carsten (Project Manager) Axel (Ground Work) Gerd (Weighing Machine) Hans (Trafo) Sven (Fermenter + Block Power + Heat Plant) Willi (Silo) Bernd (Bank Contact) Josef & Armin (Other Farmers) Markus (Public Authorities) Daniel & Anton (Project Owners) Marco (Planner) Stefan (Farmer & Main User)
  • 11. Project Handbook Biogas Powerplant Project 1. Biogas powerplant project 1.1 PM 1.2 Project setup 1.3 Silo & weighing machine 1.4 Block heat & power plant 1.5 Fermentation & waste facilities 1.6 Production 1.7 Review & sign off 1.1.1 Project started 1.1.2 Project start activity 1.1.3 Project coordination 1.1.4 Project controlling 1.1.5 Project marketing 1.1.6 Project closure 1.1.7 Project end 1.2.1 Hire human resources 1.2.2 Purchase materials 1.2.3 Setup done 1.3.1 Concrete walls 1.3.2 Waste water system 1.3.3 Traffic area 1 1.3.4 Asphalt 1.3.5 Weighing machine 1.3.7 Silo finished 1.3.6 Traffic area 2 1.4.1 Trafo 1.4.2 Heating facility 1.4.3 Facilities finished 1.5.1 Ground movement 1.5.2 Floor 1.5.3 Walls 1.5.4 Roof + isolation 1.5.5 Equipment 1.5.7 Facilities finished 1.5.6 Small building 1.6.3 Production finished 1.6.1 Heating the pots 1.7.1 Unit performance review 1.7.2 Electricity production review 1.7.3 Technical review 1.7.4 Documentation 1.7.5 Sign off 1.7.6 Review & sign off done 1.6.2 Producing biogas energy 8. Work breakdown structure (WBS)
  • 12. Project Handbook Biogas Powerplant Project 9. Project work-package specifications Project work-package specifications WBS 1.5.1, ground movement Content  Digging holes for fermentation pots  Lowering the whole fermentation facility 3m below surface  Surrounding the whole area with a 2,5m high rampart Non-content Doing ground movement for areas other than the fermentation pots Results Ground are finished and ready to be constructed on Progress measure Work on fermentation pots can start WBS 1.5.6, Small building Content  Building small building  Installation of pump and control electronics Non-content Building the fermentation pots Results Pumps and control electronics are installed Progress measure Pumps and control electronics functions properly with the fermentation pots WBS 1.6.1, Heating the pots Content Heating up the pots to 38°C Non-content Collection of crops and wastes Results The pots are heated Progress measure Crops and wastes can be started to be fed to the pots
  • 13. Project Handbook Biogas Powerplant Project 10. Project responsibility matrix project responsibility matrix Roles WBS-code & WP-title (ProjectOwners) DanielandAnton (OverallProjectManager)Carsten (Planner)Marco (ProjectManagerGroundWork)Axel (ProjectManagerSilo)Willi (ProjectManagerFermenter+Block PowerandHeatPlant)Sven ProjectManagerTrafo)Hans (ProjectManagerWeighingMachine) Gerd 1.1 Project management 1.1.2 Project start activity I R I I I I I I 1.1.3 Project coordination R C 1.1.4 Project controlling R C 1.1.5 Project marketing R C 1.1.6 Project closure I R I I I I I I 1.2 Project setup 1.2.1 Hire human resources R C C C C C C 1.2.2 Purchase materials R C C C C C C 1.3 Silo & weighing machine 1.3.1 Concrete walls I R 1.3.2 Waste water system I R 1.3.3 Traffic area 1 I R 1.3.4 Asphalt I R 1.3.5 Weighing machine I I R 1.3.6 Traffic area 2 I R 1.4 Block heat & power plant 1.4.1 Trafo I I R 1.4.2 Heating facility I R 1.5 Fermentation & waste facilities 1.5.1 Ground movement I R I 1.5.2 Floor I R 1.5.3 Walls I R 1.5.4 Roof + isolation I R 1.5.5 Equipment I R 1.5.6 Small building I R
  • 14. Project Handbook Biogas Powerplant Project Informations: R: Responsible C: Contribution I: Information D: Decision 1.6 Production 1.6.1 Heating the pots I R I I I I I I 1.6.2 Producing biogas energy I R I I I I I I 1.7 Review & sign off 1.7.1 Unit performance review I R 1.7.2 Electricity production review I R 1.7.3 Technical review I R 1.7.4 Documentation I R 1.7.5 Signoff R I
  • 15. Project Handbook Biogas Powerplant Project 11. Milestone plan Project milestone plan WBS code Milestone Plan date Revised date Actual date 1.1.1 Project started 24.08.09 1.1.7 Project end 31.12.09 1.2.3 Setup done 31.08.09 1.3.7 Silo finished 29.09.09 1.4.3 Facilities finished 28.10.09 1.5.7 Facilities finished 01.12.09 1.6.3 Production finished 29.12.09 1.7.6 Review and sign off done 31.12.09
  • 16. Project Handbook Biogas Powerplant Project 12. Project bar chart
  • 17. Project Handbook Biogas Powerplant Project 13. Personnel planning personnel planning WBS code phase / work package resource type base plan person days revised plan person days actuals person days deviation person days 1.1.2 Project Start Activity 7 1.1.3 Project Coordination 21 1.1.4 Project Controlling 28 1.1.5 Project Marketing 28 1.1.6 Project Closure 1 1.1 Project management 85 1.2.1 Hire human resources 5
  • 18. Project Handbook Biogas Powerplant Project 1.2.2 Purchase materials 5 1.2 Project setup 10 1.3.1 Concrete walls 5 1.3.2 Waste water system 5 1.3.3 Traffic area 1 5 1.3.4 Asphalt 5 1.3.5 Weighing machine 5 1.3.6 Traffic area 2 5 1.3 Silo & weighing machine 30 1.4.1 Trafo 5
  • 19. Project Handbook Biogas Powerplant Project 1.4.2 Heating facility 8 1.4 Block heat & power plant 13 1.5.1 Ground movement 5 1.5.2 Floor 5 1.5.3 Walls 5 1.5.4 Roof + isolation 5 1.5.5 Equipment 5 1.5.6 Small building 7.5 1.5 Fermentation & waste facilities 32.5 1.6.1 Heating the pots 5
  • 20. Project Handbook Biogas Powerplant Project 1.6.2 Producing biogas energy 5 1.6 Production 10 1.7.1 Unit performance review 5 1.7.2 Electricity production review 1 1.7.3 Technical review 5 1.7.4 Documentation 5.5 1.7.5 Signoff 1 1.7 Review & sign off 17.5
  • 21. Project Handbook Biogas Powerplant Project 14. Project cost plan project cost plan WBS-code, project work package cost type base plan cost revised plan cost € actuals cost € cost deviation € Phase 1 personnel (150 EUR / man day) 12,750 Material external services Other Total PM 12,750 Phase 2 personnel (150 EUR / man day) 1500 Material
  • 22. Project Handbook Biogas Powerplant Project external services Other Total Project setup 1,500 Phase 3 personnel (150 EUR / man day) 4500 material 230,000 external services other Total Silo & weighting machine 234,500 Phase 4 personnel (150 EUR / man day) 1,950 material 1,075,000
  • 23. Project Handbook Biogas Powerplant Project external services other Total Block heat & power plant 1,076,950 Phase 5 personnel (150 EUR / man day) 4,875 material 130,000 external services other Total Fermentation & waste facilities 134,875 Phase 6 personnel (150 EUR / man day) 1,500 material 160,000
  • 24. Project Handbook Biogas Powerplant Project external services other Total Production 161,500 Phase 7 personnel (150 EUR / man day) 2,625 material external services other Total Review & sign off 2,625 Total cost 1,624,700