Representation of 600 MW Chandgana power plant
The information contained in this presentation (“Presentation”) has been prepared by Prophecy Resources Corp. (“Company”) and is being communicated for general background informational purposes only. The
Presentation has not been independently verified and the information contained within is subject to updating, completion, revision, verification and further amendment. Neither the Company, nor its shareholders, directors,
officers, agents, employees, or advisors give, has given or has authority to give, any representations or warranties (express or implied) as to, or in relation to, the accuracy, reliability or completeness of the information in
this Presentation, or any revision thereof, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability
therefore is expressly disclaimed. Information contained in this Presentation is the property of the Company. It is made available strictly for the purposes referred to above. Neither the communication of this Presentation
nor any part of its contents is to be taken as any form of commitment on the part of the Company to proceed with any transaction. This Presentation does not constitute, or form part of, any offer or invitation to sell or issue,
or any solicitation of any offer to subscribe for or purchase any securities in the Company, nor shall it, or the fact of its communication, form the basis of, or be relied upon in connection with, or act as any inducement to
enter into, any contract or commitment whatsoever with respect to such securities. The communication of this Presentation in or to persons in certain jurisdictions may be restricted by law and persons who may rceive
communication of this Presentation should inform themselves about, and observe, any such restrictions in advance of communication to them of this Presentation. In particular, this Presentation has not been approved by
an authorised person pursuant to Section 21 of the Financial Services and Markets Act 2000 (“FSMA”) and accordingly it is being delivered in the United Kingdom only to persons to whom this Presentation may be
delivered without contravening the financial promotion prohibition in Section 21 of the FSMA. Those persons are described in the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (“Order”)
and include persons who have professional experience in matters relating to investments and who fall within the category of person set out in Article 19 (investment professionals) of the Order. In addition, other than a
limited number of persons reasonably believed to be qualified institutional buyers (as defined in Rule 144A under the US Securities Act of 1933, as amended) or accredited investors (as defined in the National Instrument
45/106), neither this Presentation nor any copy of its may be transmitted into the United States of America or Canada or distributed directly or indirectly, in the United States of America or Canada, or to any resident thereof
except in compliance with the applicable securities laws. Any failure to comply with these restrictions may constitute a violation of applicable US or Canadian securities laws. By accepting communication of this
Presentation, the recipient represents and warrants that it is a person to whom this Presentation may be communicated without a violation of the laws of any relevant jurisdiction. This Presentation is not to be
communicated to any other person or used for any other purpose and any other person who receives communication of this Presentation should not rely or act upon it. In furnishing this Presentation, the Company does
not undertake or agree to any obligation to provide the attendee with access to any additional information or to update this Presentation or to correct any inaccuracies in, or omissions from, this Presentation that may
become apparent either during, or at any time after this Presentation. This Presentation contains or incorporates by reference “forward-looking information” which means disclosure regarding possible events, conditions,
acquisitions, or results of operations that is based on assumptions about future conditions and courses of action and includes future oriented financial information with respect to prospective results of operations, financial
position or cash flows that is presented either as a forecast or a projection, and also includes, but is not limited to, statements with respect to the future financial and operating performance of the Company any of its
subsidiaries and other considerations as set out in more detail in the documents filed by the Company with the Toronto Stock Exchange. Often, but not always, forward-looking statements can be identified by the use of
words such as “plans”, “proposes”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or
state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may
cause the actual results, performance or achievements of the Company and/or its current and proposed subsidiaries to be materially different from any future results, performance or achievements expressed or implied by
the forward-looking statements. Forward-looking statements contained herein are made as of the date of this Presentation and the Company disclaims any obligation to update any forward-looking statements, whether as
a result of new information, future events or results or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements due to the inherent uncertainty therein. In addition, investors are
cautioned that this presentation may contain information about mineral properties adjacent to or near the Company’s properties and in which the Company has no right or interest. Mineral deposits on such adjacent or near
properties are not indicative of the mineral deposits, if any, which may be found on the Company’s properties. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Neither the TSX
nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release. Certain statements contained in this Presentation, including
statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts, are forward-looking
information within the meaning of securities laws. Such forward-looking statements, which reflect management’s expectations regarding Prophecy’s future growth, results of operations, performance, business prospects
and opportunities are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements of the Company to be materially
different from any future results, performance, or achievements expressed or implied by such forward-looking statements. Forward-looking statements in this Presentation include, without limitation, statements regarding
the development and production of the Company’s Chandgana Power Plant and other information concerning possible or assumed future results of operations of Prophecy. Material risks and uncertainties which could
cause actual results to differ materially from such forward-looking statements include, but are not limited to, exploration, development and production risks, risks related to the Company not having a history of mineral
production, risks related to the development of the Chandgana Power Plant, risks related to the uncertainty of mineral resource and mineral reserve estimates, the cyclical nature of the mining industry, risks related to the
availability of capital and financing on acceptable terms, commodity price fluctuations, currency exchange rate and interest rate risks, risks associated with operating in foreign jurisdictions, uninsured risks, regulatory
changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, and unanticipated environmental impacts on
operations and costs to remedy same. Assumptions underlying our expectations regarding forward-looking statements or information contained in this Presentation include, among others, that all required third party
contractual, regulatory and governmental approvals will be obtained for the development, construction and production of the Company’s properties, there being no significant disruptions affecting operations, whether due to
labour disruptions, currency exchange rates being approximately consistent with current levels, certain price assumptions for coal, prices for and availability of diesel, parts and equipment and other key supplies remaining
consistent with current levels, production forecasts meeting expectations, the accuracy of the Company’s current mineral resource and reserve estimates, labour and materials costs increasing on a basis consistent with
the Company’s current expectations and that any additional required financing will be available on reasonable terms. Although Prophecy has attempted to identify important risks and factors that could cause actual actions,
events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not anticipated, estimated or intended. Accordingly, readers
should not place any undue reliance on forward-looking statements as such information may not be appropriate for other purposes. We disclaim any intention or obligation to update or revise any forward looking
statements, whether as a result of new information, future events or otherwise, except as required by law. Last updated May 14, 2012
Disclaimer
2
• Leading energy play, focus on developing energy solutions for Mongolia
• 1.4* billion tonnes of coal in two distinct properties in Mongolia
• Chandgana ($10million+ invested): 600MW mine mouth power plant
license received, uses environmentally-friendly technology and is first
independent power plant in Mongolia
• Ulaan Ovoo ($30million+ invested): The largest independent thermal coal
supplier in Mongolia
• As of May 10th, 2012, 83% of Prophecy Coal’s market cap is attributed to
its equity share position in Prophecy Platinum Corp (TSX.V: NKL)
*Ulaan Ovoo: 174 million tonnes of measured and 34 million tonnes of indicated coal. Ulaan Ovoo’s resource numbers are from the Behre Dolbear & Company (USA), Inc report referenced in the Dec 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Chandgana consists of two
properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana
Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person under NI 43-101 at the time of report preparation. And the Chandgana Tal resource
estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101.
3
Shares 225 Million (basic); 262 million (diluted)
Market
Capitalization
~62 million CDN*
Ownership 50% Retail, 30% Institutional, 20% Management & Directors
Investment
Portfolio
$51 million in Prophecy Platinum (TSX.V-NKL) 22.5m
shares, Victory Nickel 36.6m shares, Compliance Energy
5m shares
Locations
Canadian Office: Vancouver, BC Canada
Mongolian Office: Ulaanbaatar, Mongolia
*As of 05/01/12 4
John Lee, CFA – Chairman / CEO
• Founder of Prophecy Coal Corp. and Prophecy Platinum Corp.
Greg Hall – Director
• Co-founder of Prophecy Coal Corp. and Prophecy Platinum Corp.
• Former Director of Silvercorp
Jivko Savov - Director
• Over 15 years of energy and natural resources experience focused on emerging markets.
• Head of Global M&A at Gazprom in London.
• Former Deputy Chief Executive Officer of En+ Group.
Chuluunbaatar Baz - Director
• President and Chairman of Monnis Group
• Monnis has over 1,000+ employees; top 15 enterprises in Mongolia
Michael Deats - Director
• Former Managing Director of BP Coal South Africa, Ex-Director of Eskom
5
6
Mongolia is currently
importing power from
Russia at a rate of
$0.08 per kw/h
PROXIMITY TO CHINA:
- CHINA: 350 KM
- BEIJING: 1,167 KM
Central Energy system (CES)
Eastern Energy system (EES)
New transmission lines 7
Ulaan Ovoo
Chandgana
*Source: Eurasia Capital
• GDP growth 2011: 17.3%
• Compounded GDP growth since 2000: 123%
• Power supply capacity from 2000 ~ 2016: ~750MW
(until TPP5 starts)
• Largest coal supplier to China in 2011 (30MT), now exceeds Australia
• Tavan Tolgoi coking coal to triple production to 13MT/yr by 2015
• Oyu Tolgoi Cu-Au scheduled production in 2013, could boost GDP by 30%
FAST GROWTH = RISING ENERGY DEMAND
*GDP source and power supply figures from the World Bank
Coal data source: http://www.bloomberg.com/news/2012-01-05/mongolia-s-renewables-belittle-world-s-nuclear-supply.html
8
9
Blue Sky Tower, UBOyu Tolgoi, MongoliaCentral Tower, UB
Tavan Tolgoi, MongoliaShangriLa Hotel, UB
Source: Energy International Corporation, Eurasia
Capital’s Mongolia Outlook Report
0
200
400
600
800
1000
1200
1400
1600
2010 2011 2012 2013 2014 2015
Russia
EES
CES
Demand
Supply
MW
744 MW
Deficit
Russia
EES
CES
Power Supply / Demand and GDP Growth Forecast
CES – Central Energy System
EES – Eastern Energy System
10
$16
$14
$12
$10
$8
$6
$4
$2
GDP,US$bn
• Second most polluted air of any city in the world
- World Health Organization (WHO)
• Population quadrupled since 2000
(1.7 million)
• GDP per capita in 2011 USD$3,173
• Antiquated and inefficient power infrastructure
lacking pollution controls
11
Source: The World Bank (Dec 2009). Mongolia: Air Pollution in Ulaanbaatar –
Initial Assessment of Current Situation and Effects of Abatement Measures.
World Health Organization-Global Health Observatory Data Repository-‘Annual
mean concentration of PM10 in cities’
Ulaanbaatar
Ulaanbaatar
12
Representation of 600 MW Chandgana power plant
Mongolia is currently
importing power from
Russia at a rate of
$0.08 per kw/h
PROXIMITY TO CHINA:
- CHINA: 350 KM
- BEIJING: 1,167 KM
Central Energy system (CES)
Eastern Energy system (EES)
New transmission lines 13
Ulaan Ovoo
Chandgana
*Source: Eurasia Capital
100% Owned
Resource: 1.2 Billion Tonnes* (M&I) Thermal Coal
Power plant license granted by the Mongolian
Government
0.5:1 Strip Ratio*
Mining license obtained for 140MT Chandgana Tal
Close proximity to infrastructure
150km From Central Energy System
*Chandgana consists of two properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based
on the September 2010 NI 43-101 Chandgana Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person at the time of report
preparation under NI 43-101. And the Chandgana Tal resource estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear &
Company (USA), Inc., who is an independent Qualified Person under NI 43-101.. Chandgana Tal has a strip ratio of 0.5:1 and Chandgana Khavtgai has a strip ratio of 2.2:1.
Power plant conceptual rendering
Chandgana deposit & proposed power plant site
14
Coal
20m Clay
40m Coal
Chandgana Khavtgai
Chandgana Tal
• Mining License Obtained for 140MT
Chandgana Tal
• 0.68% sulphur / 12.5% ash
• 2 km from paved road
• 150 km from Central Energy System
• 100km2 Prospective Claims
15
16
Coal from
Chandgana
(or contiguous license)
Power
Transmission
Power Plant
Proposed Installed capacity:
Phase I: 600 MW
(connect to CES, EES of Mongolia)
Phase II: 3600 MW
(connect to China)
- Helping to meet Mongolia’s Power Needs -
350km to China
150km to gridMine
mouth
Central Energy system (CES)
Eastern Energy system (EES) 17
 Proposed output increase
of 600MW to 4200MW
would enable Mongolia to
export power directly into
China via existing Ultra
High Voltage Lines.
18Source: SSE, sxcoal, McQuarie Research
Beijing
Total Electricity Consumption
Source: China Electricity Council
0
1000
2000
3000
4000
5000
6000
2007 2008 2009 2010 2011 2012E
Billion
kWh
19
Source: The Central Intelligence Agency (CIA) The World Fact Book
Electricpowerconsumption
(kWhpercapita)
20
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2006 2007 2008 2009 2010
Mongolia
China
India
Japan
USA
Estimated time line:
• TSX listing (Q4 2011)
• Power plant license (Q4 2011)
• Conclude PPA* (Q2 2012)
• Award EPC** Contract (Q2 2012)
• Project financing (Q4 2012)
• Start construction (Q2 2013)
• Power on (Q4 2015)
*PPA – Power Purchase Agreement
**EPC – Engineering, Procurement & Construction
Scale model of Chandgana power plant
21
Scale model of Chandgana power plant
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2011 2012 2013 2014 2015
Conclude PPA*
Award EPC**
Contract
Commence
Construction
Power On
Conclude Project Financing
Power plant construction license received
Power Plant
License Granted
*PPA – Power Purchase Agreement
**EPC – Engineering, Procurement & Construction
22
23
100% Owned – Status: Commissioned
Resource: 209 million tonnes* (M&I)
thermal coal – 20+ year mine life**
1.8: 1 Strip Ratio** - Surface Mining
Production:
2011: 370,000 tonnes mined (133,000
tonnes sold)
2012: 300,000 tonnes (est.)
Markets: Mongolia, Russia
$30million invested (mine + equipment)
2011
2010
*Coal resources of 174 million tonnes measured and 34 million tonnes indicated from the NI 43-101 Behre Dolbear report prepared in 2007.
**Information based on Dec. 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Strip ratio applies to the initial starting pit area only.
24
Abundant High Quality Thermal Coal
• (ar) Min. 5,000 kcal/kg GCV*
• Max. 1% sulfur / 11.3% ash**
Low Cost Mining
• Single seam – 50m thickness
• 1.8:1 strip ratio**
Equipment Received in April 2011
• Two sets CAT mining fleets: 500kt/annum
• 18 SCANIA and 4 UD coal haul trucks
ar – as received / GCV** – gross calorific value
**Information based on Dec. 2010, 43-101 Prefeasibility Study by Wardrop Engineering. 25
Mongolia is currently
importing power from
Russia at a rate of
$0.08 per kw/h
PROXIMITY TO CHINA:
- CHINA: 350 KM
- BEIJING: 1,167 KM
Central Energy system (CES)
Eastern Energy system (EES)
New transmission lines 26
Ulaan Ovoo
Chandgana
*Source: Eurasia Capital
• Leading energy play, focus on developing energy solutions for Mongolia
• 1.4* billion tonnes of coal in two distinct properties in Mongolia
• Chandgana ($10million+ invested): 600MW mine mouth power plant
license received, uses environmentally-friendly technology and is first
independent power plant in Mongolia
• Ulaan Ovoo ($30million+ invested): The largest independent thermal coal
supplier in Mongolia
• As of May 10th, 2012, 83% of Prophecy Coal’s market cap is attributed to
its equity share position in Prophecy Platinum Corp (TSX.V: NKL)
*Ulaan Ovoo: 174 million tonnes of measured and 34 million tonnes of indicated coal. Ulaan Ovoo’s resource numbers are from the Behre Dolbear & Company (USA), Inc report referenced in the Dec 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Chandgana consists of two
properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana
Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person under NI 43-101 at the time of report preparation. And the Chandgana Tal resource
estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101.
27
CANADIAN OFFICE
342 Water Street – 2nd Floor
Vancouver, BC
Canada V6B 1B6
Phone: 604-569-3661
Fax: 604-569-3617
Toll Free: 1-800-459-5583
info@prophecycoal.com
MONGOLIAN OFFICE
8/F Monnis Tower, Chinggis
Ave.
1st Khoroo, Sukhbaatar District
Ulaanbaatar, Mongolia 14240
Tel: +976.11.331669
Fax: +976.11.312721
info@prophecycoal.com
28
29

Contenu connexe

Tendances

Prophecy platinum wellgreen_presentation
Prophecy platinum wellgreen_presentationProphecy platinum wellgreen_presentation
Prophecy platinum wellgreen_presentation
Prophecy Plat
 
Mkango Presentation January 2015
Mkango Presentation January 2015Mkango Presentation January 2015
Mkango Presentation January 2015
Aoife Brady
 
Prophecy platinum presentation
Prophecy platinum presentationProphecy platinum presentation
Prophecy platinum presentation
Prophecy Plat
 
Aveda energy investor presentation july 2014 final
Aveda energy investor presentation july 2014 finalAveda energy investor presentation july 2014 final
Aveda energy investor presentation july 2014 final
AvedaEnergy
 
05.08.17 med releaf-en-presentation-amended
05.08.17 med releaf-en-presentation-amended05.08.17 med releaf-en-presentation-amended
05.08.17 med releaf-en-presentation-amended
medreleafinvestor
 

Tendances (16)

Prophecy platinum wellgreen_presentation
Prophecy platinum wellgreen_presentationProphecy platinum wellgreen_presentation
Prophecy platinum wellgreen_presentation
 
Mkango Presentation January 2015
Mkango Presentation January 2015Mkango Presentation January 2015
Mkango Presentation January 2015
 
Introduction to Zenabis
Introduction to ZenabisIntroduction to Zenabis
Introduction to Zenabis
 
good natured Products Inc. August 2020
good natured Products Inc. August 2020good natured Products Inc. August 2020
good natured Products Inc. August 2020
 
Prophecy platinum presentation
Prophecy platinum presentationProphecy platinum presentation
Prophecy platinum presentation
 
Pathway Health Corporate Presentation
Pathway Health Corporate PresentationPathway Health Corporate Presentation
Pathway Health Corporate Presentation
 
Aveda energy investor presentation july 2014 final
Aveda energy investor presentation july 2014 finalAveda energy investor presentation july 2014 final
Aveda energy investor presentation july 2014 final
 
Corporate presentation november 2016 final
Corporate presentation november 2016 finalCorporate presentation november 2016 final
Corporate presentation november 2016 final
 
VWE BCAC Investor Presentation (April 23, 2021)
VWE BCAC Investor Presentation (April 23, 2021)VWE BCAC Investor Presentation (April 23, 2021)
VWE BCAC Investor Presentation (April 23, 2021)
 
INVESTOR PRESENTATION AMEX GBT
INVESTOR PRESENTATION AMEX GBTINVESTOR PRESENTATION AMEX GBT
INVESTOR PRESENTATION AMEX GBT
 
Corporate presentation january 2017 v2
Corporate presentation   january 2017 v2Corporate presentation   january 2017 v2
Corporate presentation january 2017 v2
 
Investor Presentation - March 2015
Investor Presentation - March 2015Investor Presentation - March 2015
Investor Presentation - March 2015
 
Top 10 China Stock Picks - Century Financial
Top 10 China Stock Picks - Century FinancialTop 10 China Stock Picks - Century Financial
Top 10 China Stock Picks - Century Financial
 
Med releaf investor presentation july 19 2017
Med releaf investor presentation july 19 2017Med releaf investor presentation july 19 2017
Med releaf investor presentation july 19 2017
 
Canni med investor presentation june 2017
Canni med investor presentation   june 2017Canni med investor presentation   june 2017
Canni med investor presentation june 2017
 
05.08.17 med releaf-en-presentation-amended
05.08.17 med releaf-en-presentation-amended05.08.17 med releaf-en-presentation-amended
05.08.17 med releaf-en-presentation-amended
 

En vedette

En vedette (20)

19.12.2008, NEWSWIRE, 2008 YearEnd Issue
19.12.2008, NEWSWIRE, 2008 YearEnd Issue19.12.2008, NEWSWIRE, 2008 YearEnd Issue
19.12.2008, NEWSWIRE, 2008 YearEnd Issue
 
10.07.2009, NEWSWIRE, Issue 77
10.07.2009, NEWSWIRE, Issue 7710.07.2009, NEWSWIRE, Issue 77
10.07.2009, NEWSWIRE, Issue 77
 
13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya13.12.2010 Making a difference together, Ms. B. Gantuya
13.12.2010 Making a difference together, Ms. B. Gantuya
 
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
05.09.2014 Mongolian Competitiveness Among Asian Emerging Market, Mr. Neil As...
 
20.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue33020.06.2014, NEWSWIRE, Issue330
20.06.2014, NEWSWIRE, Issue330
 
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
03.09.2014 Legal developments in 2014: Changes and future developments, Erden...
 
21.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 25321.12.2012, NEWSWIRE, Issue 253
21.12.2012, NEWSWIRE, Issue 253
 
15.08.2014, NEWSWIRE, Issue 338
15.08.2014, NEWSWIRE, Issue 33815.08.2014, NEWSWIRE, Issue 338
15.08.2014, NEWSWIRE, Issue 338
 
Bcm business growth index Q3 2015
Bcm business growth index Q3 2015Bcm business growth index Q3 2015
Bcm business growth index Q3 2015
 
27.09.2010, AIESEC Internship, Mr. Tomas Petrzela
27.09.2010, AIESEC Internship, Mr. Tomas Petrzela27.09.2010, AIESEC Internship, Mr. Tomas Petrzela
27.09.2010, AIESEC Internship, Mr. Tomas Petrzela
 
12.12.2008, NEWSWIRE, Issue 50
12.12.2008, NEWSWIRE, Issue 5012.12.2008, NEWSWIRE, Issue 50
12.12.2008, NEWSWIRE, Issue 50
 
08.05.2009, NEWSWIRE, Issue 68
08.05.2009, NEWSWIRE, Issue 6808.05.2009, NEWSWIRE, Issue 68
08.05.2009, NEWSWIRE, Issue 68
 
23.05.2012 Russian coking coal developments and leading Mongolian operations ...
23.05.2012 Russian coking coal developments and leading Mongolian operations ...23.05.2012 Russian coking coal developments and leading Mongolian operations ...
23.05.2012 Russian coking coal developments and leading Mongolian operations ...
 
27.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue33127.06.2014, NEWSWIRE, Issue331
27.06.2014, NEWSWIRE, Issue331
 
28.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 24128.09.2012, NEWSWIRE, Issue 241
28.09.2012, NEWSWIRE, Issue 241
 
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
21.02.2014 Wirtgen surface mining technology and challenges in coal in Mongol...
 
07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange07.12.2015 building better leaders through education & idea exchange
07.12.2015 building better leaders through education & idea exchange
 
The Japan- Mongolia Cooperation on the Joint Crediting Mechanism
The Japan- Mongolia Cooperation on the Joint Crediting MechanismThe Japan- Mongolia Cooperation on the Joint Crediting Mechanism
The Japan- Mongolia Cooperation on the Joint Crediting Mechanism
 
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
13.12.2010, Mongolia Investment Needs and Opportunities, Mr. Randolph Koppa
 
23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati23.04.2012, Trends in politics, L. Sumati
23.04.2012, Trends in politics, L. Sumati
 

Similaire à 23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee

aker horizons january 2021.pdf
aker horizons january 2021.pdfaker horizons january 2021.pdf
aker horizons january 2021.pdf
ssuserb6c38d
 
Aveda energy investor presentation january 2014
Aveda energy investor presentation january 2014Aveda energy investor presentation january 2014
Aveda energy investor presentation january 2014
AvedaEnergy
 
Banking service and operation.pptx
Banking service and operation.pptxBanking service and operation.pptx
Banking service and operation.pptx
JerrySingh30
 

Similaire à 23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee (18)

COPL Investor Presentation, April 2022
COPL Investor Presentation, April 2022COPL Investor Presentation, April 2022
COPL Investor Presentation, April 2022
 
Canadian Overseas Petroleum Limited: Investor Presentation - October 2022
Canadian Overseas Petroleum Limited: Investor Presentation - October 2022 Canadian Overseas Petroleum Limited: Investor Presentation - October 2022
Canadian Overseas Petroleum Limited: Investor Presentation - October 2022
 
Nextdoor SPAC Pitch Deck ($4.3B valuation)
Nextdoor SPAC Pitch Deck ($4.3B valuation)Nextdoor SPAC Pitch Deck ($4.3B valuation)
Nextdoor SPAC Pitch Deck ($4.3B valuation)
 
Presentation-Jan2015
Presentation-Jan2015Presentation-Jan2015
Presentation-Jan2015
 
aker horizons january 2021.pdf
aker horizons january 2021.pdfaker horizons january 2021.pdf
aker horizons january 2021.pdf
 
AHEL-Investor-Presentation-June-22-INR.pdf
AHEL-Investor-Presentation-June-22-INR.pdfAHEL-Investor-Presentation-June-22-INR.pdf
AHEL-Investor-Presentation-June-22-INR.pdf
 
Canni med investor presentation third qtr 2017
Canni med investor presentation   third qtr 2017Canni med investor presentation   third qtr 2017
Canni med investor presentation third qtr 2017
 
09.09.2011 Permitting process in Mongolia, Mr. John Lee
09.09.2011 Permitting process in Mongolia, Mr. John Lee09.09.2011 Permitting process in Mongolia, Mr. John Lee
09.09.2011 Permitting process in Mongolia, Mr. John Lee
 
Global Mining Summit October 2017
Global Mining Summit October 2017Global Mining Summit October 2017
Global Mining Summit October 2017
 
Hemptown Spring 2019 Investor Presentation
Hemptown Spring 2019 Investor PresentationHemptown Spring 2019 Investor Presentation
Hemptown Spring 2019 Investor Presentation
 
Zenabis Corporate Presentation
Zenabis Corporate PresentationZenabis Corporate Presentation
Zenabis Corporate Presentation
 
VWE BCAC Investor Presentation (February 4, 2021)
VWE BCAC Investor Presentation (February 4, 2021)VWE BCAC Investor Presentation (February 4, 2021)
VWE BCAC Investor Presentation (February 4, 2021)
 
VWE & BCAC Investor Presentation (March 15, 2021)
VWE & BCAC Investor Presentation (March 15, 2021)VWE & BCAC Investor Presentation (March 15, 2021)
VWE & BCAC Investor Presentation (March 15, 2021)
 
Vintage Wine Estate's SPAC Pitch Deck ($690M valuation)
Vintage Wine Estate's SPAC Pitch Deck ($690M valuation)Vintage Wine Estate's SPAC Pitch Deck ($690M valuation)
Vintage Wine Estate's SPAC Pitch Deck ($690M valuation)
 
VWE Investor Presentation 6.9.21
VWE Investor Presentation 6.9.21VWE Investor Presentation 6.9.21
VWE Investor Presentation 6.9.21
 
Aveda energy investor presentation january 2014
Aveda energy investor presentation january 2014Aveda energy investor presentation january 2014
Aveda energy investor presentation january 2014
 
Banking service and operation.pptx
Banking service and operation.pptxBanking service and operation.pptx
Banking service and operation.pptx
 
Renesola Modules-Jefry 9643282399 (Solar panel Manufacturer China& India)
Renesola Modules-Jefry 9643282399 (Solar panel Manufacturer China& India)Renesola Modules-Jefry 9643282399 (Solar panel Manufacturer China& India)
Renesola Modules-Jefry 9643282399 (Solar panel Manufacturer China& India)
 

Plus de The Business Council of Mongolia

Plus de The Business Council of Mongolia (20)

Three Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itineraryThree Camel Lodge 3 days itinerary
Three Camel Lodge 3 days itinerary
 
Three Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itineraryThree Camel Lodge 4 days itinerary
Three Camel Lodge 4 days itinerary
 
BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020BCM Macroeconomic Updates January 2020
BCM Macroeconomic Updates January 2020
 
Digital Enterprise 2019
Digital Enterprise 2019Digital Enterprise 2019
Digital Enterprise 2019
 
Faro Foundation presentation
Faro Foundation presentationFaro Foundation presentation
Faro Foundation presentation
 
Business Council of Mongolia presentation
Business Council of Mongolia presentationBusiness Council of Mongolia presentation
Business Council of Mongolia presentation
 
National Development Association of Mongolia presentation
National Development Association of Mongolia presentationNational Development Association of Mongolia presentation
National Development Association of Mongolia presentation
 
Gobi Green Energy Gankhuyag
Gobi Green Energy GankhuyagGobi Green Energy Gankhuyag
Gobi Green Energy Gankhuyag
 
Ch.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sectorCh.Anar Competitiveness of the fintech sector
Ch.Anar Competitiveness of the fintech sector
 
A.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sectorA.Bilguun Competitiveness of Mongolia's resource sector
A.Bilguun Competitiveness of Mongolia's resource sector
 
B.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of MongoliaB.Lakshmi EPCRC Competitiveness of Mongolia
B.Lakshmi EPCRC Competitiveness of Mongolia
 
Munkhzorig - Digital Transformation
Munkhzorig - Digital TransformationMunkhzorig - Digital Transformation
Munkhzorig - Digital Transformation
 
Tseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for InnovationTseesuren - Data is the Key for Innovation
Tseesuren - Data is the Key for Innovation
 
System analysis study on the Constitution of Mongolia
System analysis study on the Constitution of MongoliaSystem analysis study on the Constitution of Mongolia
System analysis study on the Constitution of Mongolia
 
Kincora Copper March 2019
Kincora Copper March 2019Kincora Copper March 2019
Kincora Copper March 2019
 
Erdenes Mongol presentation
Erdenes Mongol presentationErdenes Mongol presentation
Erdenes Mongol presentation
 
Tatsuya Hamada presentation
Tatsuya Hamada presentationTatsuya Hamada presentation
Tatsuya Hamada presentation
 
BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019BCM Monthly Meeting BCM updates January 30, 2019
BCM Monthly Meeting BCM updates January 30, 2019
 
N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12N. Chimguundari economic corridor and investment research center Nov 12
N. Chimguundari economic corridor and investment research center Nov 12
 
Procurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcmProcurement mca-compact-ii-presentation-bcm
Procurement mca-compact-ii-presentation-bcm
 

Dernier

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Dernier (20)

Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 

23.05.2012 Putting fundings into Mongolia's growing need for power, John Lee

  • 1. Representation of 600 MW Chandgana power plant
  • 2. The information contained in this presentation (“Presentation”) has been prepared by Prophecy Resources Corp. (“Company”) and is being communicated for general background informational purposes only. The Presentation has not been independently verified and the information contained within is subject to updating, completion, revision, verification and further amendment. Neither the Company, nor its shareholders, directors, officers, agents, employees, or advisors give, has given or has authority to give, any representations or warranties (express or implied) as to, or in relation to, the accuracy, reliability or completeness of the information in this Presentation, or any revision thereof, or of any other written or oral information made or to be made available to any interested party or its advisers (all such information being referred to as “Information”) and liability therefore is expressly disclaimed. Information contained in this Presentation is the property of the Company. It is made available strictly for the purposes referred to above. Neither the communication of this Presentation nor any part of its contents is to be taken as any form of commitment on the part of the Company to proceed with any transaction. This Presentation does not constitute, or form part of, any offer or invitation to sell or issue, or any solicitation of any offer to subscribe for or purchase any securities in the Company, nor shall it, or the fact of its communication, form the basis of, or be relied upon in connection with, or act as any inducement to enter into, any contract or commitment whatsoever with respect to such securities. The communication of this Presentation in or to persons in certain jurisdictions may be restricted by law and persons who may rceive communication of this Presentation should inform themselves about, and observe, any such restrictions in advance of communication to them of this Presentation. In particular, this Presentation has not been approved by an authorised person pursuant to Section 21 of the Financial Services and Markets Act 2000 (“FSMA”) and accordingly it is being delivered in the United Kingdom only to persons to whom this Presentation may be delivered without contravening the financial promotion prohibition in Section 21 of the FSMA. Those persons are described in the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (“Order”) and include persons who have professional experience in matters relating to investments and who fall within the category of person set out in Article 19 (investment professionals) of the Order. In addition, other than a limited number of persons reasonably believed to be qualified institutional buyers (as defined in Rule 144A under the US Securities Act of 1933, as amended) or accredited investors (as defined in the National Instrument 45/106), neither this Presentation nor any copy of its may be transmitted into the United States of America or Canada or distributed directly or indirectly, in the United States of America or Canada, or to any resident thereof except in compliance with the applicable securities laws. Any failure to comply with these restrictions may constitute a violation of applicable US or Canadian securities laws. By accepting communication of this Presentation, the recipient represents and warrants that it is a person to whom this Presentation may be communicated without a violation of the laws of any relevant jurisdiction. This Presentation is not to be communicated to any other person or used for any other purpose and any other person who receives communication of this Presentation should not rely or act upon it. In furnishing this Presentation, the Company does not undertake or agree to any obligation to provide the attendee with access to any additional information or to update this Presentation or to correct any inaccuracies in, or omissions from, this Presentation that may become apparent either during, or at any time after this Presentation. This Presentation contains or incorporates by reference “forward-looking information” which means disclosure regarding possible events, conditions, acquisitions, or results of operations that is based on assumptions about future conditions and courses of action and includes future oriented financial information with respect to prospective results of operations, financial position or cash flows that is presented either as a forecast or a projection, and also includes, but is not limited to, statements with respect to the future financial and operating performance of the Company any of its subsidiaries and other considerations as set out in more detail in the documents filed by the Company with the Toronto Stock Exchange. Often, but not always, forward-looking statements can be identified by the use of words such as “plans”, “proposes”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company and/or its current and proposed subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this Presentation and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements due to the inherent uncertainty therein. In addition, investors are cautioned that this presentation may contain information about mineral properties adjacent to or near the Company’s properties and in which the Company has no right or interest. Mineral deposits on such adjacent or near properties are not indicative of the mineral deposits, if any, which may be found on the Company’s properties. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release. Certain statements contained in this Presentation, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts, are forward-looking information within the meaning of securities laws. Such forward-looking statements, which reflect management’s expectations regarding Prophecy’s future growth, results of operations, performance, business prospects and opportunities are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance, or achievements expressed or implied by such forward-looking statements. Forward-looking statements in this Presentation include, without limitation, statements regarding the development and production of the Company’s Chandgana Power Plant and other information concerning possible or assumed future results of operations of Prophecy. Material risks and uncertainties which could cause actual results to differ materially from such forward-looking statements include, but are not limited to, exploration, development and production risks, risks related to the Company not having a history of mineral production, risks related to the development of the Chandgana Power Plant, risks related to the uncertainty of mineral resource and mineral reserve estimates, the cyclical nature of the mining industry, risks related to the availability of capital and financing on acceptable terms, commodity price fluctuations, currency exchange rate and interest rate risks, risks associated with operating in foreign jurisdictions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, and unanticipated environmental impacts on operations and costs to remedy same. Assumptions underlying our expectations regarding forward-looking statements or information contained in this Presentation include, among others, that all required third party contractual, regulatory and governmental approvals will be obtained for the development, construction and production of the Company’s properties, there being no significant disruptions affecting operations, whether due to labour disruptions, currency exchange rates being approximately consistent with current levels, certain price assumptions for coal, prices for and availability of diesel, parts and equipment and other key supplies remaining consistent with current levels, production forecasts meeting expectations, the accuracy of the Company’s current mineral resource and reserve estimates, labour and materials costs increasing on a basis consistent with the Company’s current expectations and that any additional required financing will be available on reasonable terms. Although Prophecy has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not anticipated, estimated or intended. Accordingly, readers should not place any undue reliance on forward-looking statements as such information may not be appropriate for other purposes. We disclaim any intention or obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except as required by law. Last updated May 14, 2012 Disclaimer 2
  • 3. • Leading energy play, focus on developing energy solutions for Mongolia • 1.4* billion tonnes of coal in two distinct properties in Mongolia • Chandgana ($10million+ invested): 600MW mine mouth power plant license received, uses environmentally-friendly technology and is first independent power plant in Mongolia • Ulaan Ovoo ($30million+ invested): The largest independent thermal coal supplier in Mongolia • As of May 10th, 2012, 83% of Prophecy Coal’s market cap is attributed to its equity share position in Prophecy Platinum Corp (TSX.V: NKL) *Ulaan Ovoo: 174 million tonnes of measured and 34 million tonnes of indicated coal. Ulaan Ovoo’s resource numbers are from the Behre Dolbear & Company (USA), Inc report referenced in the Dec 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Chandgana consists of two properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person under NI 43-101 at the time of report preparation. And the Chandgana Tal resource estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101. 3
  • 4. Shares 225 Million (basic); 262 million (diluted) Market Capitalization ~62 million CDN* Ownership 50% Retail, 30% Institutional, 20% Management & Directors Investment Portfolio $51 million in Prophecy Platinum (TSX.V-NKL) 22.5m shares, Victory Nickel 36.6m shares, Compliance Energy 5m shares Locations Canadian Office: Vancouver, BC Canada Mongolian Office: Ulaanbaatar, Mongolia *As of 05/01/12 4
  • 5. John Lee, CFA – Chairman / CEO • Founder of Prophecy Coal Corp. and Prophecy Platinum Corp. Greg Hall – Director • Co-founder of Prophecy Coal Corp. and Prophecy Platinum Corp. • Former Director of Silvercorp Jivko Savov - Director • Over 15 years of energy and natural resources experience focused on emerging markets. • Head of Global M&A at Gazprom in London. • Former Deputy Chief Executive Officer of En+ Group. Chuluunbaatar Baz - Director • President and Chairman of Monnis Group • Monnis has over 1,000+ employees; top 15 enterprises in Mongolia Michael Deats - Director • Former Managing Director of BP Coal South Africa, Ex-Director of Eskom 5
  • 6. 6
  • 7. Mongolia is currently importing power from Russia at a rate of $0.08 per kw/h PROXIMITY TO CHINA: - CHINA: 350 KM - BEIJING: 1,167 KM Central Energy system (CES) Eastern Energy system (EES) New transmission lines 7 Ulaan Ovoo Chandgana *Source: Eurasia Capital
  • 8. • GDP growth 2011: 17.3% • Compounded GDP growth since 2000: 123% • Power supply capacity from 2000 ~ 2016: ~750MW (until TPP5 starts) • Largest coal supplier to China in 2011 (30MT), now exceeds Australia • Tavan Tolgoi coking coal to triple production to 13MT/yr by 2015 • Oyu Tolgoi Cu-Au scheduled production in 2013, could boost GDP by 30% FAST GROWTH = RISING ENERGY DEMAND *GDP source and power supply figures from the World Bank Coal data source: http://www.bloomberg.com/news/2012-01-05/mongolia-s-renewables-belittle-world-s-nuclear-supply.html 8
  • 9. 9 Blue Sky Tower, UBOyu Tolgoi, MongoliaCentral Tower, UB Tavan Tolgoi, MongoliaShangriLa Hotel, UB
  • 10. Source: Energy International Corporation, Eurasia Capital’s Mongolia Outlook Report 0 200 400 600 800 1000 1200 1400 1600 2010 2011 2012 2013 2014 2015 Russia EES CES Demand Supply MW 744 MW Deficit Russia EES CES Power Supply / Demand and GDP Growth Forecast CES – Central Energy System EES – Eastern Energy System 10 $16 $14 $12 $10 $8 $6 $4 $2 GDP,US$bn
  • 11. • Second most polluted air of any city in the world - World Health Organization (WHO) • Population quadrupled since 2000 (1.7 million) • GDP per capita in 2011 USD$3,173 • Antiquated and inefficient power infrastructure lacking pollution controls 11 Source: The World Bank (Dec 2009). Mongolia: Air Pollution in Ulaanbaatar – Initial Assessment of Current Situation and Effects of Abatement Measures. World Health Organization-Global Health Observatory Data Repository-‘Annual mean concentration of PM10 in cities’ Ulaanbaatar Ulaanbaatar
  • 12. 12 Representation of 600 MW Chandgana power plant
  • 13. Mongolia is currently importing power from Russia at a rate of $0.08 per kw/h PROXIMITY TO CHINA: - CHINA: 350 KM - BEIJING: 1,167 KM Central Energy system (CES) Eastern Energy system (EES) New transmission lines 13 Ulaan Ovoo Chandgana *Source: Eurasia Capital
  • 14. 100% Owned Resource: 1.2 Billion Tonnes* (M&I) Thermal Coal Power plant license granted by the Mongolian Government 0.5:1 Strip Ratio* Mining license obtained for 140MT Chandgana Tal Close proximity to infrastructure 150km From Central Energy System *Chandgana consists of two properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person at the time of report preparation under NI 43-101. And the Chandgana Tal resource estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101.. Chandgana Tal has a strip ratio of 0.5:1 and Chandgana Khavtgai has a strip ratio of 2.2:1. Power plant conceptual rendering Chandgana deposit & proposed power plant site 14
  • 15. Coal 20m Clay 40m Coal Chandgana Khavtgai Chandgana Tal • Mining License Obtained for 140MT Chandgana Tal • 0.68% sulphur / 12.5% ash • 2 km from paved road • 150 km from Central Energy System • 100km2 Prospective Claims 15
  • 16. 16
  • 17. Coal from Chandgana (or contiguous license) Power Transmission Power Plant Proposed Installed capacity: Phase I: 600 MW (connect to CES, EES of Mongolia) Phase II: 3600 MW (connect to China) - Helping to meet Mongolia’s Power Needs - 350km to China 150km to gridMine mouth Central Energy system (CES) Eastern Energy system (EES) 17
  • 18.  Proposed output increase of 600MW to 4200MW would enable Mongolia to export power directly into China via existing Ultra High Voltage Lines. 18Source: SSE, sxcoal, McQuarie Research Beijing
  • 19. Total Electricity Consumption Source: China Electricity Council 0 1000 2000 3000 4000 5000 6000 2007 2008 2009 2010 2011 2012E Billion kWh 19
  • 20. Source: The Central Intelligence Agency (CIA) The World Fact Book Electricpowerconsumption (kWhpercapita) 20 - 2,000 4,000 6,000 8,000 10,000 12,000 14,000 2006 2007 2008 2009 2010 Mongolia China India Japan USA
  • 21. Estimated time line: • TSX listing (Q4 2011) • Power plant license (Q4 2011) • Conclude PPA* (Q2 2012) • Award EPC** Contract (Q2 2012) • Project financing (Q4 2012) • Start construction (Q2 2013) • Power on (Q4 2015) *PPA – Power Purchase Agreement **EPC – Engineering, Procurement & Construction Scale model of Chandgana power plant 21 Scale model of Chandgana power plant
  • 22. Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2011 2012 2013 2014 2015 Conclude PPA* Award EPC** Contract Commence Construction Power On Conclude Project Financing Power plant construction license received Power Plant License Granted *PPA – Power Purchase Agreement **EPC – Engineering, Procurement & Construction 22
  • 23. 23
  • 24. 100% Owned – Status: Commissioned Resource: 209 million tonnes* (M&I) thermal coal – 20+ year mine life** 1.8: 1 Strip Ratio** - Surface Mining Production: 2011: 370,000 tonnes mined (133,000 tonnes sold) 2012: 300,000 tonnes (est.) Markets: Mongolia, Russia $30million invested (mine + equipment) 2011 2010 *Coal resources of 174 million tonnes measured and 34 million tonnes indicated from the NI 43-101 Behre Dolbear report prepared in 2007. **Information based on Dec. 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Strip ratio applies to the initial starting pit area only. 24
  • 25. Abundant High Quality Thermal Coal • (ar) Min. 5,000 kcal/kg GCV* • Max. 1% sulfur / 11.3% ash** Low Cost Mining • Single seam – 50m thickness • 1.8:1 strip ratio** Equipment Received in April 2011 • Two sets CAT mining fleets: 500kt/annum • 18 SCANIA and 4 UD coal haul trucks ar – as received / GCV** – gross calorific value **Information based on Dec. 2010, 43-101 Prefeasibility Study by Wardrop Engineering. 25
  • 26. Mongolia is currently importing power from Russia at a rate of $0.08 per kw/h PROXIMITY TO CHINA: - CHINA: 350 KM - BEIJING: 1,167 KM Central Energy system (CES) Eastern Energy system (EES) New transmission lines 26 Ulaan Ovoo Chandgana *Source: Eurasia Capital
  • 27. • Leading energy play, focus on developing energy solutions for Mongolia • 1.4* billion tonnes of coal in two distinct properties in Mongolia • Chandgana ($10million+ invested): 600MW mine mouth power plant license received, uses environmentally-friendly technology and is first independent power plant in Mongolia • Ulaan Ovoo ($30million+ invested): The largest independent thermal coal supplier in Mongolia • As of May 10th, 2012, 83% of Prophecy Coal’s market cap is attributed to its equity share position in Prophecy Platinum Corp (TSX.V: NKL) *Ulaan Ovoo: 174 million tonnes of measured and 34 million tonnes of indicated coal. Ulaan Ovoo’s resource numbers are from the Behre Dolbear & Company (USA), Inc report referenced in the Dec 2010, 43-101 Prefeasibility Study by Wardrop Engineering. Chandgana consists of two properties-Chandgana Tal and Chandgana Khavtgai. Chandgana Tal consists of 141 mt of measured resource. Chandgana Khavtgai consists of 509 mt measured and 539 mt indicated resource. Chandgana Khavtgai’s resource estimates are based on the September 2010 NI 43-101 Chandgana Khavtgai Technical Report by Kravits Geological Services, LLC. The report is authored by Christopher M. Kravits CPG, LPG of Kravits Geological Services, LLC., who was an independent Qualified Person under NI 43-101 at the time of report preparation. And the Chandgana Tal resource estimate is also based on the September 2007 NI 43-101 Chandgana Tal Technical Report by Behre Dolbear & Company (USA), Inc..The report is authored by Mr. Gardar G. Dahl, Jr., CPG of Behre Dolbear & Company (USA), Inc., who is an independent Qualified Person under NI 43-101. 27
  • 28. CANADIAN OFFICE 342 Water Street – 2nd Floor Vancouver, BC Canada V6B 1B6 Phone: 604-569-3661 Fax: 604-569-3617 Toll Free: 1-800-459-5583 info@prophecycoal.com MONGOLIAN OFFICE 8/F Monnis Tower, Chinggis Ave. 1st Khoroo, Sukhbaatar District Ulaanbaatar, Mongolia 14240 Tel: +976.11.331669 Fax: +976.11.312721 info@prophecycoal.com 28