Aggregate planning and MPS
Aggregate planning
It may be defined as an intermediate production plan
which has a range of 2 to 18 months to give an idea
to management as to what quantity of materials and
other resources are to be procured and when, so that
the total cost of operations of the organization is kept
to the minimum over that period..
It has different approaches strategies and objectives
which will be discussed next. . . . . . . .
Definition
 There are certain inputs of aggregate planning that is
to say the factors which should be kept in mind while
planning for aggregate production;
 These are
Inputs of aggregate planning
Workforce
Facilities
Demand forecasts
Policies
Costs
Inputs of aggregate planning
 Total cost of a plan
 Projected levels of inventory
 Inventory
 Output
 Employment
 Subcontracting
 Backordering
Outputs of aggregate planning
 Proactive
 Alter demand to match capacity
 Reactive
 Alter capacity to match demand
 Mixed
 Some of each
Aggregate Planning Strategies
 In a proactive strategy a firm plans to change the
demand by means of advertisements or by means of
offering benefits for a specific product.
Proactive strategy
 A reactive planning strategy has two parts which are;
 Level strategy
 Chase strategy
Reactive strategy
 A level strategy seeks to produce an aggregate plan that
maintains a steady production rate and/or a steady
employment level. In order to satisfy changes in customer
demand, the firm must raise or lower inventory levels in
anticipation of increased or decreased levels of forecast
demand. The firm maintains a level workforce and a steady
rate of output when demand is somewhat low. This allows
the firm to establish higher inventory levels than are
currently needed. As demand increases, the firm is able to
continue a steady production rate/steady employment
level, while allowing the inventory surplus to absorb the
increased demand
Level strategy
 A chase strategy implies matching demand and capacity
period by period. This could result in a considerable
amount of hiring, firing or laying off of employees;
insecure and unhappy employees; increased inventory
carrying costs; problems with labor unions; and erratic
utilization of plant and equipment. It also implies a great
deal of flexibility on the firm's part. The major advantage
of a chase strategy is that it allows inventory to be held to
the lowest level possible, and for some firms this is a
considerable savings. Most firms embracing the just-in-
time production concept utilize a chase strategy approach
to aggregate planning.
Chase strategy
Level strategy
 ADVANTAGES
- Stable output rates and workforce
 DISADVANTAGES
 -greater inventory costs
 -increased over time and idle time
 -resource utilizations vary over time
 ADVANTAGES
 -Investment in inventory is low
 -Labor utilization in high
 DISADVANTAGES
 -The cost of fluctuating work force
 -potential damage to employee morale
Chase strategy
 Linear programming model
 Linear decision rule
 Simulation
Techniques
 Master Production Schedule
 Lists the products to be manufactured, when they should be
completed, and in what quantities
 It is the conversion of the aggregate schedule into a very
specific schedule of individual
 products
 Products listed in the master schedule generally divide into
three categories:
 1. Firm customer orders
 2. Forecasted demand
 3. Spare parts
Master production schedule
 Aggregate planning is a relatively longer term
planning that spans over a period of around 18months
on the other hand MPS is the putting of AP action i.e.
planning individual products for a shorter time span.
 Time unit for aggregate planning is one month while
the time unit for MPS is a week.
Relationship between MPS and
aggregate planning
That’s all what we have today for
you
we could have explained it in more
detail but time constraint didn’t
allow us !!!!!!!!
Credits
 This is a joint effort of
UMAR YAZDANI (D 11 IN 05)
AFSAAR ALI ( D 11 IN 27)
HANIF HAZARA (D 11 IN 39)
TAUQIR HAIDER ( D 11 IN 33)

Contenu connexe

Tendances (20)

PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Line balancing
Line balancingLine balancing
Line balancing
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Aggregate Planning Report
Aggregate Planning ReportAggregate Planning Report
Aggregate Planning Report
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Line balancing
Line balancingLine balancing
Line balancing
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
Aggregate Production Planning
Aggregate Production PlanningAggregate Production Planning
Aggregate Production Planning
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 

Similaire à Mps vs aggregate planning

aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfChunWan
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planningAhelVitsu
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planningArushi Verma
 
Aggregate production planning
Aggregate production planningAggregate production planning
Aggregate production planningArushi Gupta
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chainMoine Iqbal
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1arathymalz
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptxDr T.Sivakami
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planningmubarak2009
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningPritam RW
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideShannon Kearns
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec aAbhijeet Dash
 
Aggregate Production Planning (APP)
Aggregate Production Planning (APP)Aggregate Production Planning (APP)
Aggregate Production Planning (APP)Kelly Lipiec
 

Similaire à Mps vs aggregate planning (20)

aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
 
Master planning
Master planningMaster planning
Master planning
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planning
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planning
 
Aggregate production planning
Aggregate production planningAggregate production planning
Aggregate production planning
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chain
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptx
 
AGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptxAGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptx
 
435ch14
435ch14435ch14
435ch14
 
Session 4
Session 4Session 4
Session 4
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Mrpc final
Mrpc finalMrpc final
Mrpc final
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step Guide
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec a
 
Aggregate Production Planning (APP)
Aggregate Production Planning (APP)Aggregate Production Planning (APP)
Aggregate Production Planning (APP)
 

Dernier

PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Dernier (20)

PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 

Mps vs aggregate planning

  • 1.
  • 4. It may be defined as an intermediate production plan which has a range of 2 to 18 months to give an idea to management as to what quantity of materials and other resources are to be procured and when, so that the total cost of operations of the organization is kept to the minimum over that period.. It has different approaches strategies and objectives which will be discussed next. . . . . . . . Definition
  • 5.  There are certain inputs of aggregate planning that is to say the factors which should be kept in mind while planning for aggregate production;  These are Inputs of aggregate planning
  • 7.  Total cost of a plan  Projected levels of inventory  Inventory  Output  Employment  Subcontracting  Backordering Outputs of aggregate planning
  • 8.  Proactive  Alter demand to match capacity  Reactive  Alter capacity to match demand  Mixed  Some of each Aggregate Planning Strategies
  • 9.  In a proactive strategy a firm plans to change the demand by means of advertisements or by means of offering benefits for a specific product. Proactive strategy
  • 10.  A reactive planning strategy has two parts which are;  Level strategy  Chase strategy Reactive strategy
  • 11.  A level strategy seeks to produce an aggregate plan that maintains a steady production rate and/or a steady employment level. In order to satisfy changes in customer demand, the firm must raise or lower inventory levels in anticipation of increased or decreased levels of forecast demand. The firm maintains a level workforce and a steady rate of output when demand is somewhat low. This allows the firm to establish higher inventory levels than are currently needed. As demand increases, the firm is able to continue a steady production rate/steady employment level, while allowing the inventory surplus to absorb the increased demand Level strategy
  • 12.
  • 13.  A chase strategy implies matching demand and capacity period by period. This could result in a considerable amount of hiring, firing or laying off of employees; insecure and unhappy employees; increased inventory carrying costs; problems with labor unions; and erratic utilization of plant and equipment. It also implies a great deal of flexibility on the firm's part. The major advantage of a chase strategy is that it allows inventory to be held to the lowest level possible, and for some firms this is a considerable savings. Most firms embracing the just-in- time production concept utilize a chase strategy approach to aggregate planning. Chase strategy
  • 14.
  • 15. Level strategy  ADVANTAGES - Stable output rates and workforce  DISADVANTAGES  -greater inventory costs  -increased over time and idle time  -resource utilizations vary over time
  • 16.  ADVANTAGES  -Investment in inventory is low  -Labor utilization in high  DISADVANTAGES  -The cost of fluctuating work force  -potential damage to employee morale Chase strategy
  • 17.  Linear programming model  Linear decision rule  Simulation Techniques
  • 18.  Master Production Schedule  Lists the products to be manufactured, when they should be completed, and in what quantities  It is the conversion of the aggregate schedule into a very specific schedule of individual  products  Products listed in the master schedule generally divide into three categories:  1. Firm customer orders  2. Forecasted demand  3. Spare parts Master production schedule
  • 19.  Aggregate planning is a relatively longer term planning that spans over a period of around 18months on the other hand MPS is the putting of AP action i.e. planning individual products for a shorter time span.  Time unit for aggregate planning is one month while the time unit for MPS is a week. Relationship between MPS and aggregate planning
  • 20. That’s all what we have today for you we could have explained it in more detail but time constraint didn’t allow us !!!!!!!!
  • 21. Credits  This is a joint effort of UMAR YAZDANI (D 11 IN 05) AFSAAR ALI ( D 11 IN 27) HANIF HAZARA (D 11 IN 39) TAUQIR HAIDER ( D 11 IN 33)