The Republic of Serbia’s carbon intensity per GDP is over ten times higher than the OECD average (Karakosta et
al., 2012). To increase its share of renewable energy in power production, the Government of the Republic of
Serbia introduced secondary legislation that laid down requirements and the amount of feed-in tariffs for re-
newable energy producers. Privileged power producers enter into power purchase agreements with public sup-
pliers over a period of 12 years (subject to annual correction due to the Eurozone’s inflation rate) beginning in
February 2014 (Ministry of Energy, Development, and Environmental Protection, 2013). The feed-in tariffs are set
for three years (until 31 December 2015). Experts believe that feed-in tariffs will likely bring an increase in invest-
ment in renewable energy sources, for example in wind power plants (EWEA, 2013). The World Bank’s Ease of
Doing Business ranks Serbia in 93rd
position (IFC & World Bank, 2014).
Serbia
General Country
Information
Population: 7,223,887
Surface Area: 88,360 km²
Capital City: Belgrade
GDP (2012): $ 37.5 billion
GDP Per Capita (2012): $ 5,190
WB Ease of Doing Business: 93
Sources: Benkovic et al. (2013); Karakosta et al. (2012); Tesic et al. (2011); SIEPA (2013); Panic et al. (2013); Katic et al. (2013); EWEA
(2013); EBRD (2009); World Bank (2014); EIA (2010); Renewable Facts (2013); Republic of Serbia(2013); EIA (2013); SRS NET & EEE
(2008); EPS (2012); and UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Serbia
Empowered lives.
Resilient nations.
0.5%
RE Share
7,124 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
0 2.2 0 31.3
5,400 1,000 400 4,500
33.5 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
In 2012, the Energy Community Ministerial Council adopted the EU Directive 2009/28/EC on the promotion of
renewable energy. In line with that, Serbia developed a National Renewable Energy Action Plan, which created
a national binding target of 27 percent share of renewable energy in gross final energy consumption by 2020
(Republic of Serbia, 2013). The Energy Law together with the AERS (Serbian energy agency) Decree on Incentive
Measures for Privileged Power Producers provides the legislative foundation for renewable energy promotion.
In addition to the feed-in tariffs and purchase obligations, renewable energy developers are given prioritized
grid access. Power production (except power plants less than 1 MW of installed capacity) is subject to licencing.
The licence for Engaging in Energy Related Activities is obtained from AERS. Eligibility to receive the feed-in tariffs
has to be obtained from the Ministry of Energy, Development and Environment Protection, while temporary el-
igibility for wind and solar power plants can be granted (Energy Law, Article 53 (6)). The total installed wind and
solar capacity required to be a privileged producer is capped. Eligible wind capacity cannot exceed 500 MW until
2020, eligible solar capacity cannot exceed 10 MW, a figure that is re-established annually (Republic of Serbia,
2012). In a joint project, the Ministry of Energy, Development and Environment Protection and UNDP published
investor guides for renewable energy technologies. The guides offer detailed explanations of the construction
processes for small hydro, wind, solar, geothermal, or biomass power plants and include information of, for ex-
ample, the licences and permits required and which authorities are involved (UNDP, 2013).
Legislation and policy
R E N E W A B L E E N E R G Y S N A P S H O T :
Source: Ministry of Energy, Development, and Environmental Protection of Republic of Serbia (2013)1
Feed-in tariff in Serbia
Eligible technologies Infrastructure Installed capacity
in MW (P)
Tariff granted in €/MW-h valid until
31December 2015
Wind - - 92
Solar Roof
Roof
Ground
up to 0.03 MW
0.03 - 0.5 MW
206.6
209.41 - (P*93.8)
162.5
Hydro
(up to 30 MW)
New
New
New
New
New
Existing
up to 0.2 MW
0.2 - 0.5 MW
0.5 - 1 MW
1 - 10 MW
10 - 30 MW
up to 30 MW
124
137.27 - (P*66.33)
104.1
107.47 - (P*33.7)
73.8
59
Biomass - up to 1 MW
1 - 10 MW
exceeding 10 MW
132.6
138.2 - (P*56)
82.2
1 Biogas, waste-fired power plants and geothermal power plants are also eligible for feed-in tariffs (MERZ, 2013).
Serbia
Institutions
Organization Responsibility Website
Ministry of Energy,
Development and
Environmental
Protection
- Responsible for shaping the national energy strategy
and policy
- Grants operators renewable energy producer status,
which gives entitlement to the feed-in tariff
www.merz.gov.rs/
Energy Agency
of the Republic
of Serbia (AERS)
- Responsible for setting tariffs
- Authority to issue licence in the energy sector
www.aers.rs/Index.asp?l=2&a=100
Elektromreža
Srbije (EMS)
- State-owned and largest energy cooperation func-
tioning as transmission system operator and electric-
ity market operator
- Responsible for issuing guarantees of origin certifi-
cating energy produced from renewable sources
www.ems.rs/
EPS - Largest energy producer which had the monopoly
on energy production until 1 January 2013
www.eps.rs/
Opportunities to finance renewable energy projects in Serbia
Financing organization Details Website
EU Means
- European Investment Fund
(EIF)
- European Investment Bank
(EIB)
- Structural funds
Loans and guarantees through commercial banks as
intermediaries (e.g. Banca Intesa a.d. Beograd, Erste
Bank a.d. Novi Sad) and private equity/venture capital
available.
www.europa.eu/youreurope/business
/finance-support/access-to-finance/
Western Balkans
Sustainable
Energy Direct
Financing Facility
Local small and medium enterprises with a sound fi-
nancial and economic structure and sufficient means
of equity capital can apply for direct loans from the
European Bank for Reconstruction and Development’s
Western Balkan Sustainable Energy Direct Financing
Facility of between €2 million and €6 million.
www.websedff.com
Western Balkans
Sustainable Energy
Financing Facility
Provides loans of between €2 million and €5 million
through local banks (UniCredit Bank Srbija a.d. or
Banca Intesa a.d. Beograd) for private investments in
energy efficiency or renewable energy projects. Loans
can cover 100 percent of the investment costs.
www.webseff.com/
Green Growth Fund Provides direct and indirect (through financial inter-
mediaries) financing for small scale renewable energy
projects usually not larger than €50 million.
www.ggf.lu/
International
Finance Corporation (IFC)
Through investment (equity, loans and other financial
instruments) and advisory services, IFC support
focuses on climate change, including investments
in infrastructure and energy sectors.
www.ifc.org/
European Bank for
Reconstruction and
Development (EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml
Serbia
References
Benkovic, S., Makojevic, N., and S. Jednak, 2013:
Possibilities for development of the Electric Power
Industry of Serbia through private source financing of
small hydropower plants. In: Renewable Energy, 50:
1053-1059
Electric Power Industry of Serbia (EPS), 2013:Technical
Report 2012
European Bank for Reconstruction and Development
(EBRD), 2009: Serbia – Country Profile. Available at:
http://ebrdrenewables.com/sites/renew/countries/
serbiamontenegro/profile.aspx
EuropeanWind Energy Association (EWEA), 2013:
Annual Report 2012. Available at:
www.ewea.org/fileadmin/files/library/publications/
reports/EWEA_Annual_Report_2012.pdf
EuropeanWind Energy Association (EWEA), 2013:
EasternWinds – Emerging European wind power
markets. Available at:
www.ewea.org/fileadmin/files/library/publications/
reports/Eastern_Winds_emerging_markets.pdf
International Finance Corporation (IFC) andWorld Bank,
2014: Doing Business – Measuring Business
Regulations. Available at: www.doingbusiness.org
/data/exploreeconomies/ serbia/
Katic,V., Corba, Z., Milicevic, D., Dumnic, B., Popdic, B.,
and A. Evgenije, 2013: Overview of Solar PV Energy in
Market in Serbia. Presented at the 6th PSU-UNS
Karakosta, C., Flouri, M., Dimopoulou, S. and J. Psarras,
2012: Analysis of renewable energy progress in the
Western Balkan countries: Bosnia–Herzegovina and
Serbia. In: Renewable and Sustainable Energy Reviews,
16: 5166-5175
Ministry of Energy, Development, and Environmental
Protection of Republic of Serbia (MERZ), 2013:
Decree on Incentive Measures for Privileged Power
Producers. Available at:
www.merz.gov.rs/en/dokumenti/decree-incentive-
measures-privileged-power-producers
Panic, M., Urosec, M., Milanovic, A., Brankov, J., and
Z. Bjeljac, 2013: Small hydropower plants in Serbia:
Hydropower potential, current state and
perspectives. In: Renewable and Sustainable Energy
Reviews, 23: 341-3149
Renewable Facts, 2013: Serbia. Available at:
http://www.renewablefacts.com/country/serbia/
Republic of Serbia, 2012: Decree on Conditions and
Procedure for Acquiring the Status of Privileged
Producer. Available at:
www.merz.gov.rs/en/dokumenti/decree-conditions-
and-procedure-acquiring-status-ppp
Republic of Serbia, 2013: National Renewable Energy
Action Plan of the Republic of Serbia.
Available at: www.energy-community.org
/pls/portal/docs/ 2144185.PDF
Scientific Reference System on New Energy
Technologies, Energy End-use Efficiency and Energy
(SRS NET & EEE), 2008:WP3-Technology data - Executive
Summary on Small Hydro. Available at:
http://srs.epu.ntua.gr/Portals/SRS/material/
technologyreview/Small%20Hydro.pdf
Tesic, M., Kiss, F., and Z. Zavargo, 2011: Renewable
energy policy in the Republic of Serbia. In: Renewable
and Sustainable Energy Reviews, 15: 752-758
UNDP, 2013: Guides for Investors in Renewable Energy
in Serbia. Available at:
www.undp.org/content/serbia/en/home/presscenter/
articles/2013/02/27/guides-for-investors-in-renewable-
energy-in-serbia/
U.S. Energy Information Administration (EIA), 2010:
Electricity Data -Total Electricity Installed Capacity.
Available at:
www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm?
tid=2&pid=2&aid=7
U.S. Energy Information Administration (EIA). 2013:
Levelized Cost of New Generation Resources in the
Annual Energy Outlook 2013. Available at:
www.eia.gov/forecasts/aeo/electricity_generation.cfm
World Bank, 2014: Data Catalog. Available at:
http://datacatalog.worldbank.org/
Recent projects
Company Project Status
Wind Alliance Group (Spain) Intends to invest around €420 million in the construc-
tion of a wind farm in Pancevo, northern Serbia. 350
MW of the planned wind farm has already all of the
necessary permits to start construction.
Under development
AB Energy Srbija (subsidy
of Italian Gruppo AB)
Plans to build three biomass power plants in the
northern Serbian province of Vojvodina with a total
installed capacity of 6 MW, and with estimated
construction costs of €3.5 million.
Under development
Electrawinds (Belgium) In February 2013, the animal waste biomass plant
Energo Zelena, a joint venture between Electrawinds
and Serbian investment partners, was commissioned.
Construction started in September 2011 with a total
investment of €21 million.
Commissioned

Contenu connexe

Tendances

Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Sample
vandalmax
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
UNDPhr
 
ELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.lELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.l
Marina Turcati
 
SunFlower - Data centres and ICT sites to provide flexibility to the electric...
SunFlower - Data centres and ICT sites to provide flexibility to the electric...SunFlower - Data centres and ICT sites to provide flexibility to the electric...
SunFlower - Data centres and ICT sites to provide flexibility to the electric...
Alessandro Bogliolo
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129
RCREEE
 
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
preservelenoxmountain
 

Tendances (19)

Albania[1]
Albania[1]Albania[1]
Albania[1]
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Day2 session 3: Morocco
Day2 session 3: MoroccoDay2 session 3: Morocco
Day2 session 3: Morocco
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Sample
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013
 
Creating Smarter Cities 2011 - 23 - Karen Fraser - EU Smart Cities and Commun...
Creating Smarter Cities 2011 - 23 - Karen Fraser - EU Smart Cities and Commun...Creating Smarter Cities 2011 - 23 - Karen Fraser - EU Smart Cities and Commun...
Creating Smarter Cities 2011 - 23 - Karen Fraser - EU Smart Cities and Commun...
 
ELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.lELENA assistance case study - Pool Engineering S.r.l
ELENA assistance case study - Pool Engineering S.r.l
 
Latvia
LatviaLatvia
Latvia
 
Lithuania
LithuaniaLithuania
Lithuania
 
MARIE ESCO GOLEA MODELLI
MARIE ESCO GOLEA MODELLIMARIE ESCO GOLEA MODELLI
MARIE ESCO GOLEA MODELLI
 
Poland
PolandPoland
Poland
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
Doe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget RequestDoe 2013 Eere Congressional Budget Request
Doe 2013 Eere Congressional Budget Request
 
B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
Day2 session 3: Egypt
Day2 session 3: EgyptDay2 session 3: Egypt
Day2 session 3: Egypt
 
SunFlower - Data centres and ICT sites to provide flexibility to the electric...
SunFlower - Data centres and ICT sites to provide flexibility to the electric...SunFlower - Data centres and ICT sites to provide flexibility to the electric...
SunFlower - Data centres and ICT sites to provide flexibility to the electric...
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129
 
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
Cats overview of_scottish_governments_first_annual_update_of_2020_renewables_...
 

En vedette (6)

La serbia passoni,colla
La serbia passoni,collaLa serbia passoni,colla
La serbia passoni,colla
 
Serbia
SerbiaSerbia
Serbia
 
Serbia
SerbiaSerbia
Serbia
 
BOSNIA-ERZEGOVINA
BOSNIA-ERZEGOVINABOSNIA-ERZEGOVINA
BOSNIA-ERZEGOVINA
 
MONTENEGRO
MONTENEGROMONTENEGRO
MONTENEGRO
 
Serbia (Presentation)
Serbia (Presentation)Serbia (Presentation)
Serbia (Presentation)
 

Similaire à Serbia

Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
Lulzim
 
Rea presentation to Renewable energy day
Rea presentation to Renewable energy dayRea presentation to Renewable energy day
Rea presentation to Renewable energy day
andrewmnzava
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013
UNDPhr
 

Similaire à Serbia (20)

Macedonia
MacedoniaMacedonia
Macedonia
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Moldova
MoldovaMoldova
Moldova
 
Romania
RomaniaRomania
Romania
 
Belarus
BelarusBelarus
Belarus
 
Ukraine
UkraineUkraine
Ukraine
 
Georgia
GeorgiaGeorgia
Georgia
 
Uzbekistan
UzbekistanUzbekistan
Uzbekistan
 
Armenia
ArmeniaArmenia
Armenia
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Dr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy SectorDr. Admir Softic, Assistant Minister of Energy Sector
Dr. Admir Softic, Assistant Minister of Energy Sector
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programs
 
Rea presentation to Renewable energy day
Rea presentation to Renewable energy dayRea presentation to Renewable energy day
Rea presentation to Renewable energy day
 
14 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 201314 undp turkey ee presentation katalin_zaim 09 dec 2013
14 undp turkey ee presentation katalin_zaim 09 dec 2013
 
Turkey
TurkeyTurkey
Turkey
 
Scaling up energy efficiency in morocco
Scaling up energy efficiency in moroccoScaling up energy efficiency in morocco
Scaling up energy efficiency in morocco
 

Plus de UNDP Eurasia

Plus de UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Dernier

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Dernier (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 

Serbia

  • 1. The Republic of Serbia’s carbon intensity per GDP is over ten times higher than the OECD average (Karakosta et al., 2012). To increase its share of renewable energy in power production, the Government of the Republic of Serbia introduced secondary legislation that laid down requirements and the amount of feed-in tariffs for re- newable energy producers. Privileged power producers enter into power purchase agreements with public sup- pliers over a period of 12 years (subject to annual correction due to the Eurozone’s inflation rate) beginning in February 2014 (Ministry of Energy, Development, and Environmental Protection, 2013). The feed-in tariffs are set for three years (until 31 December 2015). Experts believe that feed-in tariffs will likely bring an increase in invest- ment in renewable energy sources, for example in wind power plants (EWEA, 2013). The World Bank’s Ease of Doing Business ranks Serbia in 93rd position (IFC & World Bank, 2014). Serbia General Country Information Population: 7,223,887 Surface Area: 88,360 km² Capital City: Belgrade GDP (2012): $ 37.5 billion GDP Per Capita (2012): $ 5,190 WB Ease of Doing Business: 93 Sources: Benkovic et al. (2013); Karakosta et al. (2012); Tesic et al. (2011); SIEPA (2013); Panic et al. (2013); Katic et al. (2013); EWEA (2013); EBRD (2009); World Bank (2014); EIA (2010); Renewable Facts (2013); Republic of Serbia(2013); EIA (2013); SRS NET & EEE (2008); EPS (2012); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Serbia Empowered lives. Resilient nations. 0.5% RE Share 7,124 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 0 2.2 0 31.3 5,400 1,000 400 4,500 33.5 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW
  • 2. In 2012, the Energy Community Ministerial Council adopted the EU Directive 2009/28/EC on the promotion of renewable energy. In line with that, Serbia developed a National Renewable Energy Action Plan, which created a national binding target of 27 percent share of renewable energy in gross final energy consumption by 2020 (Republic of Serbia, 2013). The Energy Law together with the AERS (Serbian energy agency) Decree on Incentive Measures for Privileged Power Producers provides the legislative foundation for renewable energy promotion. In addition to the feed-in tariffs and purchase obligations, renewable energy developers are given prioritized grid access. Power production (except power plants less than 1 MW of installed capacity) is subject to licencing. The licence for Engaging in Energy Related Activities is obtained from AERS. Eligibility to receive the feed-in tariffs has to be obtained from the Ministry of Energy, Development and Environment Protection, while temporary el- igibility for wind and solar power plants can be granted (Energy Law, Article 53 (6)). The total installed wind and solar capacity required to be a privileged producer is capped. Eligible wind capacity cannot exceed 500 MW until 2020, eligible solar capacity cannot exceed 10 MW, a figure that is re-established annually (Republic of Serbia, 2012). In a joint project, the Ministry of Energy, Development and Environment Protection and UNDP published investor guides for renewable energy technologies. The guides offer detailed explanations of the construction processes for small hydro, wind, solar, geothermal, or biomass power plants and include information of, for ex- ample, the licences and permits required and which authorities are involved (UNDP, 2013). Legislation and policy R E N E W A B L E E N E R G Y S N A P S H O T : Source: Ministry of Energy, Development, and Environmental Protection of Republic of Serbia (2013)1 Feed-in tariff in Serbia Eligible technologies Infrastructure Installed capacity in MW (P) Tariff granted in €/MW-h valid until 31December 2015 Wind - - 92 Solar Roof Roof Ground up to 0.03 MW 0.03 - 0.5 MW 206.6 209.41 - (P*93.8) 162.5 Hydro (up to 30 MW) New New New New New Existing up to 0.2 MW 0.2 - 0.5 MW 0.5 - 1 MW 1 - 10 MW 10 - 30 MW up to 30 MW 124 137.27 - (P*66.33) 104.1 107.47 - (P*33.7) 73.8 59 Biomass - up to 1 MW 1 - 10 MW exceeding 10 MW 132.6 138.2 - (P*56) 82.2 1 Biogas, waste-fired power plants and geothermal power plants are also eligible for feed-in tariffs (MERZ, 2013).
  • 3. Serbia Institutions Organization Responsibility Website Ministry of Energy, Development and Environmental Protection - Responsible for shaping the national energy strategy and policy - Grants operators renewable energy producer status, which gives entitlement to the feed-in tariff www.merz.gov.rs/ Energy Agency of the Republic of Serbia (AERS) - Responsible for setting tariffs - Authority to issue licence in the energy sector www.aers.rs/Index.asp?l=2&a=100 Elektromreža Srbije (EMS) - State-owned and largest energy cooperation func- tioning as transmission system operator and electric- ity market operator - Responsible for issuing guarantees of origin certifi- cating energy produced from renewable sources www.ems.rs/ EPS - Largest energy producer which had the monopoly on energy production until 1 January 2013 www.eps.rs/ Opportunities to finance renewable energy projects in Serbia Financing organization Details Website EU Means - European Investment Fund (EIF) - European Investment Bank (EIB) - Structural funds Loans and guarantees through commercial banks as intermediaries (e.g. Banca Intesa a.d. Beograd, Erste Bank a.d. Novi Sad) and private equity/venture capital available. www.europa.eu/youreurope/business /finance-support/access-to-finance/ Western Balkans Sustainable Energy Direct Financing Facility Local small and medium enterprises with a sound fi- nancial and economic structure and sufficient means of equity capital can apply for direct loans from the European Bank for Reconstruction and Development’s Western Balkan Sustainable Energy Direct Financing Facility of between €2 million and €6 million. www.websedff.com Western Balkans Sustainable Energy Financing Facility Provides loans of between €2 million and €5 million through local banks (UniCredit Bank Srbija a.d. or Banca Intesa a.d. Beograd) for private investments in energy efficiency or renewable energy projects. Loans can cover 100 percent of the investment costs. www.webseff.com/ Green Growth Fund Provides direct and indirect (through financial inter- mediaries) financing for small scale renewable energy projects usually not larger than €50 million. www.ggf.lu/ International Finance Corporation (IFC) Through investment (equity, loans and other financial instruments) and advisory services, IFC support focuses on climate change, including investments in infrastructure and energy sectors. www.ifc.org/ European Bank for Reconstruction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml
  • 4. Serbia References Benkovic, S., Makojevic, N., and S. Jednak, 2013: Possibilities for development of the Electric Power Industry of Serbia through private source financing of small hydropower plants. In: Renewable Energy, 50: 1053-1059 Electric Power Industry of Serbia (EPS), 2013:Technical Report 2012 European Bank for Reconstruction and Development (EBRD), 2009: Serbia – Country Profile. Available at: http://ebrdrenewables.com/sites/renew/countries/ serbiamontenegro/profile.aspx EuropeanWind Energy Association (EWEA), 2013: Annual Report 2012. Available at: www.ewea.org/fileadmin/files/library/publications/ reports/EWEA_Annual_Report_2012.pdf EuropeanWind Energy Association (EWEA), 2013: EasternWinds – Emerging European wind power markets. Available at: www.ewea.org/fileadmin/files/library/publications/ reports/Eastern_Winds_emerging_markets.pdf International Finance Corporation (IFC) andWorld Bank, 2014: Doing Business – Measuring Business Regulations. Available at: www.doingbusiness.org /data/exploreeconomies/ serbia/ Katic,V., Corba, Z., Milicevic, D., Dumnic, B., Popdic, B., and A. Evgenije, 2013: Overview of Solar PV Energy in Market in Serbia. Presented at the 6th PSU-UNS Karakosta, C., Flouri, M., Dimopoulou, S. and J. Psarras, 2012: Analysis of renewable energy progress in the Western Balkan countries: Bosnia–Herzegovina and Serbia. In: Renewable and Sustainable Energy Reviews, 16: 5166-5175 Ministry of Energy, Development, and Environmental Protection of Republic of Serbia (MERZ), 2013: Decree on Incentive Measures for Privileged Power Producers. Available at: www.merz.gov.rs/en/dokumenti/decree-incentive- measures-privileged-power-producers Panic, M., Urosec, M., Milanovic, A., Brankov, J., and Z. Bjeljac, 2013: Small hydropower plants in Serbia: Hydropower potential, current state and perspectives. In: Renewable and Sustainable Energy Reviews, 23: 341-3149 Renewable Facts, 2013: Serbia. Available at: http://www.renewablefacts.com/country/serbia/ Republic of Serbia, 2012: Decree on Conditions and Procedure for Acquiring the Status of Privileged Producer. Available at: www.merz.gov.rs/en/dokumenti/decree-conditions- and-procedure-acquiring-status-ppp Republic of Serbia, 2013: National Renewable Energy Action Plan of the Republic of Serbia. Available at: www.energy-community.org /pls/portal/docs/ 2144185.PDF Scientific Reference System on New Energy Technologies, Energy End-use Efficiency and Energy (SRS NET & EEE), 2008:WP3-Technology data - Executive Summary on Small Hydro. Available at: http://srs.epu.ntua.gr/Portals/SRS/material/ technologyreview/Small%20Hydro.pdf Tesic, M., Kiss, F., and Z. Zavargo, 2011: Renewable energy policy in the Republic of Serbia. In: Renewable and Sustainable Energy Reviews, 15: 752-758 UNDP, 2013: Guides for Investors in Renewable Energy in Serbia. Available at: www.undp.org/content/serbia/en/home/presscenter/ articles/2013/02/27/guides-for-investors-in-renewable- energy-in-serbia/ U.S. Energy Information Administration (EIA), 2010: Electricity Data -Total Electricity Installed Capacity. Available at: www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm? tid=2&pid=2&aid=7 U.S. Energy Information Administration (EIA). 2013: Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013. Available at: www.eia.gov/forecasts/aeo/electricity_generation.cfm World Bank, 2014: Data Catalog. Available at: http://datacatalog.worldbank.org/ Recent projects Company Project Status Wind Alliance Group (Spain) Intends to invest around €420 million in the construc- tion of a wind farm in Pancevo, northern Serbia. 350 MW of the planned wind farm has already all of the necessary permits to start construction. Under development AB Energy Srbija (subsidy of Italian Gruppo AB) Plans to build three biomass power plants in the northern Serbian province of Vojvodina with a total installed capacity of 6 MW, and with estimated construction costs of €3.5 million. Under development Electrawinds (Belgium) In February 2013, the animal waste biomass plant Energo Zelena, a joint venture between Electrawinds and Serbian investment partners, was commissioned. Construction started in September 2011 with a total investment of €21 million. Commissioned