With its abundance of natural gas and oil resources, the energy sector of Uzbekistan is heavily dependent
on non-renewable resources. Although the technical potential for renewable energy sources, particularly
solar power, is very high, dependence on non-renewable sources, along with very low energy tariffs, aggra-
vates the process of energy diversification (Eshchanov et al., 2013). The high upfront capital investment re-
quired for renewable energy projects and an absence of a legislative support scheme make renewable energy
unfavourable compared to investments in oil or gas (UNDP, 2007). The Law on Rational Energy Utilization in-
troduces project-specific feed-in tariffs by allowing a sufficient return on the capital invested, the future op-
eration costs and other technical costs for renewable energy facilities. But the vertically integrated,
Uzbekistan
General Country
Information
Population: 29,776,850
Surface Area: 447,400 km²
Capital City: Tashkent
GDP (2012): $ 51.1 billion
GDP Per Capita (2012): $ 1,717
WB Ease of Doing Business: 146
Sources: GTZ (2009); AUCC (2012); UNDP (2007); World Bank (2014); Governmental Portal of the Republic of Uzbekistan (2010);
UNDP (2013); Renewable Facts (2013); EIA (2010); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk (2004);
JRC (2011); SJSC Uzbekenergo (2013); CER (2011); and UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Uzbekistan
Empowered lives.
Resilient nations.
3.2%
RE Share
12,517 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
1.5 < 1 < 1 394
800 593,000 1,600 1,800
396 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
state-owned electricity company UzbekEnergo generates 97.5 percent of the country’s electricity. The re-
maining 2.5 percent is the entire installed small hydropower capacity, of which 2.1 percent is operated by
state owned Uzsuvenergo and 0.4 percent is operated by small block-stations enterprises (SJSC Uzbekenergo,
2013). The law has not yet been applied to private investors. Around half of Uzbekistan’s population lives in
rural areas that experience significant problems with electricity shortages and cut-offs due to high distribu-
tion losses, illegal energy tapping and the poor condition of the infrastructure in remote areas generally. A
2013 study by Eshchanov et al. suggests a high degree of acceptance and interest in renewable energy by
rural populations. This makes investment in off-grid renewable energy power plants in remote areas inter-
esting. The World Bank’s Ease of Doing Business indicator ranks Uzbekistan at 146 (IFC& World Bank, 2014),
although Uzbekistan is currently liberalizing its energy sector.
One of the government’s intentions in its development of the electricity sector is the diversification of power
generation. The Law on Electric-Power Industry, adopted in 2009, aims to increase private investment in the
energy sector. The Law on Rational Energy Utilization provides more benefits for renewable energy power
plants. Priority grid access is granted if in line with the grid’s optimal operation, and energy suppliers are
obliged to purchase the energy from renewable energy sources at agreed prices (Article 20). Despite those
incentives, the Government of Uzbekistan wants to attract foreign investment by exempting newly estab-
lished renewable energy enterprises from profit tax, property tax, and unified tax payments for small and
medium enterprises. Renewable energy producers are also exempt from payments to the country’s road
fund. Those tax privileges are granted for three years if the foreign investment is between $300,000 and $3
million, or for five and seven years respectively for investments up to and exceeding $10 million respectively.
The government also ensures legislation security of 10 years (UNDP et al., 2013). It should be noted that
those investment incentives do have conditions. For example, the share of the foreign investor’s capital
should not be less than 33 percent for the incentives to apply.
Legislation and policy
R E N E W A B L E E N E R G Y S N A P S H O T :
Uzbekistan
Institutions:
Organization Responsibility Website
Cabinet of Ministers - Responsible for the country’s energy policy www.gov.uz/
Ministry of Economy - Responsible for development programmes on mod-
ernization of sectors, and introduction of advanced
and resource-saving technologies
www.mineconomy.uz
Ministry of Finance - Regulates and sets tariffs www.mf.uz/
Ministry of Agriculture
and Water Recourses
- Manages the Uzsuvenergo company, responsible for
the operation of small hydropower plants in the
country
www.agro.uz/
Uzbekenergo - Vertically integrated and state electricity company
owning over 97 percent of the country’s generating
capacity and responsible for distribution and trans-
mission
www.uzbekenergo.uz
UZINFOINVEST - Investment agency responsible for consulting and
attracting foreign investors
www.uzinfoinvest.uz/
Opportunities to finance renewable energy projects in Uzbekistan
Financing organization Details Website
European Bank for Recon-
struction and Development
(EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml
International Finance
Corporation (IFC)
Provides loans and equity to eligible private and tech-
nically sound and profitable projects either via direct
capital or financial intermediaries
www.ifc.org/
Asian Development Bank
(ADB)
Provides equity, loans and guarantees for private sec-
tor projects with clear development impacts as well as
a sound rate of return.
www.adb.org/
Uzbekistan
References
American Uzbekistan Chamber of Commerce (AUCC),
2012: Uzbekistan starts construction of new hydro
power station. Available at:
www.aucconline.com/news.php?news_id=319
Center for Economic Research (CER), 2011: Renewable
Energy Potential. Available at:
www.cer.uz/upload/iblock/b28/pb_2011_03
_energiy.pdf
Deutsche Gesellschaft fürTechnische Zusammenarbeit
(GTZ), 2009: Country Chapter – Republic of Uzbekistan.
Available at:
www.giz.de/Themen/en/dokumente/gtz2009-en-
regionalreport-uzbekistan.pdf
Eshchanov, B.R., Plaat Stultjes, M. G.., Eshchanov, R.A.,
and S.K.Salaev, 2013: Prospects of renewable energy
penetration in Uzbekistan—Perception of the
Khorezmian people. In: Renewable and Sustainable
Energy Reviews, 21: 789-797
Governmental Portal of the Republic of Uzbekistan,
2010:Wind Energy Plant Built inTashkent Region.
Available at: www.gov.uz/en/press/economics/5442
Hoogwijk, M., 2004: On the global and regional
potential of renewable energy sources. Utrecht:
Universiteit Utrecht, Faculteit Scheikunde. Dissertation.
Available at:
http://igitur-archive.library.uu.nl/dissertations/ 2004-
0309-123617/full.pdf
Hoogwiijk, M. andW. Graus, 2008: Global Potential of
Renewable Energy Sources: A Literature Assessment.
Available at: www.ecofys.com/files/files/report_global
_potential_of_renewable_energy_sources_a_literature
_assessment.pdf
International Finance Corporation (IFC) andWorld Bank,
2014: Doing Business – Measuring Business
Regulations. Available at:
www.doingbusiness.org/data/exploreeconomies
/uzbekistan/
Joint Research Centre of the European Commission
(JRC), 2011:Technical Assessment of the Renewable
Energy Action Plans. Available at:
http://ec.europa.eu/dgs/jrc/downloads/jrc_
reference_report_2011_reap.pdf
Renewable Facts, 2013: Uzbekistan. Available at:
www.renewablefacts.com/country/uzbekistan/
Republic of Uzbekistan, 1997: Law on the Rational Use
of Renewable Energy Source, Available at:
www.unescap.org/esd/publications/energy
/compend/ceccpart4chapter12.htm#3 Economic
Scientific Reference System on New Energy
Technologies, Energy End-use Efficiency and Energy
(SRS NET & EEE), 2008:WP3-Technology data - Executive
Summary on Small Hydro. Available at:
http://srs.epu.ntua.gr/Portals/SRS/material
/technologyreview/Small%20Hydro.pdf
SJSC“Uzbekenergo”, 2013:Total Installed Electricity
Capacity. Available at: www.uzbekenergo.uz/
UNDP, 2007:The Outlook for Development of
Renewable Energy in Uzbekistan. Available at:
www.undp.uz/en/publications/publication.php?id=79
UNDP, UZINFOINVEST & Ministry for Foreign
Economic Relations Investments and Trade of the
Republic of Uzbekistan, 2013: Invest in Uzbekistan.
Available at: www.undp.uz/en/publications/
publication.php?id=331
U.S. Energy Information Administration (EIA), 2010:
Electricity Data -Total Electricity Installed Capacity.
Available at: www.eia.gov/cfapps/ipdbproject/
IEDIndex3.cfm ?tid=2&pid=2&aid=7
U.S. Energy Information Administration (EIA). 2013:
Levelized Cost of New Generation Resources in the
Annual Energy Outlook 2013. Available at:
www.eia.gov/forecasts/aeo/electricity_generation.cfm
World Bank, 2014: Data Catalog. Available at:
http://datacatalog.worldbank.org/
Recent projects
Company Project Status
Joint venture of Suntech
Power Holdings (China) and
Uzbekenergo (Uzbekistan)
Solar panel production, which aims to produce 50
MW of solar panels.
Under development
Uzbekenergo (Uzbekistan) The company intended to hold a tender in late-2013
for a $240-million 100-MW solar power station in the
Samarkand region
Under development

Contenu connexe

Tendances

An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)ENTSO-E
 
Week_6_Production.pdf
Week_6_Production.pdfWeek_6_Production.pdf
Week_6_Production.pdfChetan989024
 
Chapter 6 Urban Land Rent - Urban Economics 6th Edition
Chapter 6 Urban Land Rent - Urban Economics 6th EditionChapter 6 Urban Land Rent - Urban Economics 6th Edition
Chapter 6 Urban Land Rent - Urban Economics 6th EditionParamita E.
 
Understanding Welfare maximization Model for Economics in Municipal services
Understanding Welfare maximization Model for Economics in Municipal servicesUnderstanding Welfare maximization Model for Economics in Municipal services
Understanding Welfare maximization Model for Economics in Municipal servicesferdous hussain
 
Chapter 9 Zoning and Growth Controls - Urban Economics 6th Edition
Chapter 9 Zoning and Growth Controls - Urban Economics 6th EditionChapter 9 Zoning and Growth Controls - Urban Economics 6th Edition
Chapter 9 Zoning and Growth Controls - Urban Economics 6th EditionParamita E.
 
Urban economics Introduction _ Dr. Mousumi Ghosh
Urban economics Introduction  _ Dr. Mousumi GhoshUrban economics Introduction  _ Dr. Mousumi Ghosh
Urban economics Introduction _ Dr. Mousumi Ghoshmousumighosh16
 
The Evolution of Smart Cities and Connected Communities
The Evolution of Smart Cities and Connected Communities The Evolution of Smart Cities and Connected Communities
The Evolution of Smart Cities and Connected Communities UPS Longitudes
 
Opportunity Cost.Teacher
Opportunity Cost.TeacherOpportunity Cost.Teacher
Opportunity Cost.TeacherOlivehasarrived
 
Revision on Externalities
Revision on ExternalitiesRevision on Externalities
Revision on Externalitiestutor2u
 
Ch11lecture MicroEconomic M.Parkin
Ch11lecture MicroEconomic M.ParkinCh11lecture MicroEconomic M.Parkin
Ch11lecture MicroEconomic M.ParkinSinhHarley
 
Keynesian theory of aggregate demand
Keynesian theory of aggregate demandKeynesian theory of aggregate demand
Keynesian theory of aggregate demandMuhammad Yasir
 
Negative externalities
Negative externalitiesNegative externalities
Negative externalitiesmattbentley34
 
Market Failure
Market FailureMarket Failure
Market FailureSeemanto
 
Agglomeration of economics
Agglomeration of economicsAgglomeration of economics
Agglomeration of economicsMIRAL SONI
 
Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Neil Mathew
 
Labour Market Failure (2019 Update)
Labour Market Failure (2019 Update)Labour Market Failure (2019 Update)
Labour Market Failure (2019 Update)tutor2u
 
Public Goods and Private Goods
Public Goods and Private GoodsPublic Goods and Private Goods
Public Goods and Private Goodstutor2u
 

Tendances (20)

Cost curves
Cost curvesCost curves
Cost curves
 
An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)An Introduction to Network Codes (April 2014)
An Introduction to Network Codes (April 2014)
 
Week_6_Production.pdf
Week_6_Production.pdfWeek_6_Production.pdf
Week_6_Production.pdf
 
Chapter 6 Urban Land Rent - Urban Economics 6th Edition
Chapter 6 Urban Land Rent - Urban Economics 6th EditionChapter 6 Urban Land Rent - Urban Economics 6th Edition
Chapter 6 Urban Land Rent - Urban Economics 6th Edition
 
Market in Microeconomics
Market in MicroeconomicsMarket in Microeconomics
Market in Microeconomics
 
Understanding Welfare maximization Model for Economics in Municipal services
Understanding Welfare maximization Model for Economics in Municipal servicesUnderstanding Welfare maximization Model for Economics in Municipal services
Understanding Welfare maximization Model for Economics in Municipal services
 
Chapter 9 Zoning and Growth Controls - Urban Economics 6th Edition
Chapter 9 Zoning and Growth Controls - Urban Economics 6th EditionChapter 9 Zoning and Growth Controls - Urban Economics 6th Edition
Chapter 9 Zoning and Growth Controls - Urban Economics 6th Edition
 
Urban economics Introduction _ Dr. Mousumi Ghosh
Urban economics Introduction  _ Dr. Mousumi GhoshUrban economics Introduction  _ Dr. Mousumi Ghosh
Urban economics Introduction _ Dr. Mousumi Ghosh
 
The Evolution of Smart Cities and Connected Communities
The Evolution of Smart Cities and Connected Communities The Evolution of Smart Cities and Connected Communities
The Evolution of Smart Cities and Connected Communities
 
Opportunity Cost.Teacher
Opportunity Cost.TeacherOpportunity Cost.Teacher
Opportunity Cost.Teacher
 
Revision on Externalities
Revision on ExternalitiesRevision on Externalities
Revision on Externalities
 
Ch11lecture MicroEconomic M.Parkin
Ch11lecture MicroEconomic M.ParkinCh11lecture MicroEconomic M.Parkin
Ch11lecture MicroEconomic M.Parkin
 
Keynesian theory of aggregate demand
Keynesian theory of aggregate demandKeynesian theory of aggregate demand
Keynesian theory of aggregate demand
 
Negative externalities
Negative externalitiesNegative externalities
Negative externalities
 
Market Failure
Market FailureMarket Failure
Market Failure
 
Agglomeration of economics
Agglomeration of economicsAgglomeration of economics
Agglomeration of economics
 
Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)Cost Benefit Analysis in Public Project Appraisal (PPAC)
Cost Benefit Analysis in Public Project Appraisal (PPAC)
 
Labour Market Failure (2019 Update)
Labour Market Failure (2019 Update)Labour Market Failure (2019 Update)
Labour Market Failure (2019 Update)
 
OPEN ECONOMY
OPEN ECONOMYOPEN ECONOMY
OPEN ECONOMY
 
Public Goods and Private Goods
Public Goods and Private GoodsPublic Goods and Private Goods
Public Goods and Private Goods
 

Similaire à Uzbekistan (20)

Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Macedonia
MacedoniaMacedonia
Macedonia
 
Georgia
GeorgiaGeorgia
Georgia
 
Belarus
BelarusBelarus
Belarus
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Albania[1]
Albania[1]Albania[1]
Albania[1]
 
Ukraine
UkraineUkraine
Ukraine
 
Armenia
ArmeniaArmenia
Armenia
 
Slovenia
SloveniaSlovenia
Slovenia
 
Croatia
CroatiaCroatia
Croatia
 
Serbia
SerbiaSerbia
Serbia
 
Turkey
TurkeyTurkey
Turkey
 
Estonia
EstoniaEstonia
Estonia
 
Moldova
MoldovaMoldova
Moldova
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Hungary
HungaryHungary
Hungary
 
Turkmenistan
TurkmenistanTurkmenistan
Turkmenistan
 
Modeling and simulation of distributed generation system
Modeling and simulation of distributed generation systemModeling and simulation of distributed generation system
Modeling and simulation of distributed generation system
 

Plus de UNDP Eurasia

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan ZverzhanovskiUNDP Eurasia
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben SlayUNDP Eurasia
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta AyoungUNDP Eurasia
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka CetkovicUNDP Eurasia
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim BouevUNDP Eurasia
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 

Plus de UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Dernier

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 

Dernier (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 

Uzbekistan

  • 1. With its abundance of natural gas and oil resources, the energy sector of Uzbekistan is heavily dependent on non-renewable resources. Although the technical potential for renewable energy sources, particularly solar power, is very high, dependence on non-renewable sources, along with very low energy tariffs, aggra- vates the process of energy diversification (Eshchanov et al., 2013). The high upfront capital investment re- quired for renewable energy projects and an absence of a legislative support scheme make renewable energy unfavourable compared to investments in oil or gas (UNDP, 2007). The Law on Rational Energy Utilization in- troduces project-specific feed-in tariffs by allowing a sufficient return on the capital invested, the future op- eration costs and other technical costs for renewable energy facilities. But the vertically integrated, Uzbekistan General Country Information Population: 29,776,850 Surface Area: 447,400 km² Capital City: Tashkent GDP (2012): $ 51.1 billion GDP Per Capita (2012): $ 1,717 WB Ease of Doing Business: 146 Sources: GTZ (2009); AUCC (2012); UNDP (2007); World Bank (2014); Governmental Portal of the Republic of Uzbekistan (2010); UNDP (2013); Renewable Facts (2013); EIA (2010); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); SJSC Uzbekenergo (2013); CER (2011); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Uzbekistan Empowered lives. Resilient nations. 3.2% RE Share 12,517 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 1.5 < 1 < 1 394 800 593,000 1,600 1,800 396 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW
  • 2. state-owned electricity company UzbekEnergo generates 97.5 percent of the country’s electricity. The re- maining 2.5 percent is the entire installed small hydropower capacity, of which 2.1 percent is operated by state owned Uzsuvenergo and 0.4 percent is operated by small block-stations enterprises (SJSC Uzbekenergo, 2013). The law has not yet been applied to private investors. Around half of Uzbekistan’s population lives in rural areas that experience significant problems with electricity shortages and cut-offs due to high distribu- tion losses, illegal energy tapping and the poor condition of the infrastructure in remote areas generally. A 2013 study by Eshchanov et al. suggests a high degree of acceptance and interest in renewable energy by rural populations. This makes investment in off-grid renewable energy power plants in remote areas inter- esting. The World Bank’s Ease of Doing Business indicator ranks Uzbekistan at 146 (IFC& World Bank, 2014), although Uzbekistan is currently liberalizing its energy sector. One of the government’s intentions in its development of the electricity sector is the diversification of power generation. The Law on Electric-Power Industry, adopted in 2009, aims to increase private investment in the energy sector. The Law on Rational Energy Utilization provides more benefits for renewable energy power plants. Priority grid access is granted if in line with the grid’s optimal operation, and energy suppliers are obliged to purchase the energy from renewable energy sources at agreed prices (Article 20). Despite those incentives, the Government of Uzbekistan wants to attract foreign investment by exempting newly estab- lished renewable energy enterprises from profit tax, property tax, and unified tax payments for small and medium enterprises. Renewable energy producers are also exempt from payments to the country’s road fund. Those tax privileges are granted for three years if the foreign investment is between $300,000 and $3 million, or for five and seven years respectively for investments up to and exceeding $10 million respectively. The government also ensures legislation security of 10 years (UNDP et al., 2013). It should be noted that those investment incentives do have conditions. For example, the share of the foreign investor’s capital should not be less than 33 percent for the incentives to apply. Legislation and policy R E N E W A B L E E N E R G Y S N A P S H O T :
  • 3. Uzbekistan Institutions: Organization Responsibility Website Cabinet of Ministers - Responsible for the country’s energy policy www.gov.uz/ Ministry of Economy - Responsible for development programmes on mod- ernization of sectors, and introduction of advanced and resource-saving technologies www.mineconomy.uz Ministry of Finance - Regulates and sets tariffs www.mf.uz/ Ministry of Agriculture and Water Recourses - Manages the Uzsuvenergo company, responsible for the operation of small hydropower plants in the country www.agro.uz/ Uzbekenergo - Vertically integrated and state electricity company owning over 97 percent of the country’s generating capacity and responsible for distribution and trans- mission www.uzbekenergo.uz UZINFOINVEST - Investment agency responsible for consulting and attracting foreign investors www.uzinfoinvest.uz/ Opportunities to finance renewable energy projects in Uzbekistan Financing organization Details Website European Bank for Recon- struction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml International Finance Corporation (IFC) Provides loans and equity to eligible private and tech- nically sound and profitable projects either via direct capital or financial intermediaries www.ifc.org/ Asian Development Bank (ADB) Provides equity, loans and guarantees for private sec- tor projects with clear development impacts as well as a sound rate of return. www.adb.org/
  • 4. Uzbekistan References American Uzbekistan Chamber of Commerce (AUCC), 2012: Uzbekistan starts construction of new hydro power station. Available at: www.aucconline.com/news.php?news_id=319 Center for Economic Research (CER), 2011: Renewable Energy Potential. Available at: www.cer.uz/upload/iblock/b28/pb_2011_03 _energiy.pdf Deutsche Gesellschaft fürTechnische Zusammenarbeit (GTZ), 2009: Country Chapter – Republic of Uzbekistan. Available at: www.giz.de/Themen/en/dokumente/gtz2009-en- regionalreport-uzbekistan.pdf Eshchanov, B.R., Plaat Stultjes, M. G.., Eshchanov, R.A., and S.K.Salaev, 2013: Prospects of renewable energy penetration in Uzbekistan—Perception of the Khorezmian people. In: Renewable and Sustainable Energy Reviews, 21: 789-797 Governmental Portal of the Republic of Uzbekistan, 2010:Wind Energy Plant Built inTashkent Region. Available at: www.gov.uz/en/press/economics/5442 Hoogwijk, M., 2004: On the global and regional potential of renewable energy sources. Utrecht: Universiteit Utrecht, Faculteit Scheikunde. Dissertation. Available at: http://igitur-archive.library.uu.nl/dissertations/ 2004- 0309-123617/full.pdf Hoogwiijk, M. andW. Graus, 2008: Global Potential of Renewable Energy Sources: A Literature Assessment. Available at: www.ecofys.com/files/files/report_global _potential_of_renewable_energy_sources_a_literature _assessment.pdf International Finance Corporation (IFC) andWorld Bank, 2014: Doing Business – Measuring Business Regulations. Available at: www.doingbusiness.org/data/exploreeconomies /uzbekistan/ Joint Research Centre of the European Commission (JRC), 2011:Technical Assessment of the Renewable Energy Action Plans. Available at: http://ec.europa.eu/dgs/jrc/downloads/jrc_ reference_report_2011_reap.pdf Renewable Facts, 2013: Uzbekistan. Available at: www.renewablefacts.com/country/uzbekistan/ Republic of Uzbekistan, 1997: Law on the Rational Use of Renewable Energy Source, Available at: www.unescap.org/esd/publications/energy /compend/ceccpart4chapter12.htm#3 Economic Scientific Reference System on New Energy Technologies, Energy End-use Efficiency and Energy (SRS NET & EEE), 2008:WP3-Technology data - Executive Summary on Small Hydro. Available at: http://srs.epu.ntua.gr/Portals/SRS/material /technologyreview/Small%20Hydro.pdf SJSC“Uzbekenergo”, 2013:Total Installed Electricity Capacity. Available at: www.uzbekenergo.uz/ UNDP, 2007:The Outlook for Development of Renewable Energy in Uzbekistan. Available at: www.undp.uz/en/publications/publication.php?id=79 UNDP, UZINFOINVEST & Ministry for Foreign Economic Relations Investments and Trade of the Republic of Uzbekistan, 2013: Invest in Uzbekistan. Available at: www.undp.uz/en/publications/ publication.php?id=331 U.S. Energy Information Administration (EIA), 2010: Electricity Data -Total Electricity Installed Capacity. Available at: www.eia.gov/cfapps/ipdbproject/ IEDIndex3.cfm ?tid=2&pid=2&aid=7 U.S. Energy Information Administration (EIA). 2013: Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013. Available at: www.eia.gov/forecasts/aeo/electricity_generation.cfm World Bank, 2014: Data Catalog. Available at: http://datacatalog.worldbank.org/ Recent projects Company Project Status Joint venture of Suntech Power Holdings (China) and Uzbekenergo (Uzbekistan) Solar panel production, which aims to produce 50 MW of solar panels. Under development Uzbekenergo (Uzbekistan) The company intended to hold a tender in late-2013 for a $240-million 100-MW solar power station in the Samarkand region Under development