BEST PRACTICES FOR SOLVENT WELDING THERMOPLASTIC PIPING: PVC, CPVC, and ABS
                           ®
By Stephen Gardiner, IPS Corporation




SUMMARY OF PRACTICE

MATERIAL PREPARATION

SOLVENT WELDING PROCEDURES FOR PLASTIC PIPE AND FITTINGS

    A. TWO-STEP SOLVENT WELDING METHOD FOR PVC AND CPVC PLASTIC PIPE AND
       FITTINGS

    B. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING
       (COPPER TUBE SIZE ” TO 2” DIAMETER) – HOT AND COLD WATER DISTRIBUTION
       SYSTEMS

    C. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING – FIRE
       SPRINKLER SYSTEMS

    D. ONE-STEP SOLVENT WELDING METHOD FOR ABS PLASTIC PIPE AND FITTINGS

SYSTEM ACCEPTANCE (HYDROSTATIC PRESSURE) TEST

NOTE: SOLVENT WELDING IN LOW TEMPERATURE

NOTE: SAFE HANDLING OF SOLVENT CEMENT, PRIMER AND CLEANER




                       ®
COPYRIGHT © 2008 by IPS Corporation                                   Page 1 of 10
SUMMARY OF PRACTICE (refer to ASTM D 2855)

1.     To consistently make good solvent welded joints, the following should be clearly understood and
adhered to:

        •    The joining surfaces must be softened (dissolved) and made semi-fluid.

        •    Sufficient solvent cement must be applied to fill the gap between pipe and fitting.

        •    Assembly of pipe and fitting must be made while the surfaces are still wet and fluid.

        •    Joint strength develops as the solvent cement dries. In the tight part of the joint, the surfaces
             will tend to fuse together; in the loose part, the solvent cement will bond to both surfaces.

2.       Penetration and dissolving can be achieved by the solvent cement itself, a suitable primer, or by
the use of both primer and solvent cement. A suitable primer will penetrate and dissolve the plastic more
quickly than solvent cement alone. In cold weather, more time and additional applications are required
(see Figure 1).

3.      More than sufficient to fill the loose part of the joint must be applied (see Figure 2). Besides filling
the gap, adequate solvent cement layers will penetrate the surfaces and also remain wet until the joint is
assembled.

4.       If the solvent cement coatings on the pipe and fittings are wet and fluid when assembly takes
place, they will tend to flow together and become one solvent cement layer. Also, if the solvent cement is
wet, the surfaces beneath them will still be soft, and these dissolved surfaces in the tight part of the joint
will tend to fuse together (see Figure 3).

5.       As the solvent dissipates, the solvent cement layer and the dissolved surfaces will harden with a
corresponding increase in joint strength. A good joint will take the required working pressure long before
the joint is fully dry and final strength is obtained. In the tight (fused) part of the joint, strength will develop
more quickly than in the looser (bonded) part of the joint. Completed joints should not be disturbed until
they have cured sufficiently to withstand handling. Joint strength develops as the solvent cement dries.
Information about the development of bond strength of solvent cemented joints is available (see Figure
4).

6.       The techniques described herein can be used to produce strong pressure-tight joints between
pipe and fittings of PVC, CPVC, and ABS., either in shop operations or in the field. However, skill and
knowledge on the part of the welder are required to obtain a good quality joint. This skill and knowledge
can be obtained by making joints under the guidance of skilled welders and testing them until good quality
joints are obtained.




                         ®
COPYRIGHT © 2008 by IPS Corporation                                                                    Page 2 of 10
Figure 1: Areas of Pipe and Fitting to be Softened (Dissolved) and Penetrated




Figure 2: Solvent Cement Coatings of Sufficient Thickness




                       ®
COPYRIGHT © 2008 by IPS Corporation                                             Page 3 of 10
Figure 3: Assembly of Surfaces While They Are Wet and Soft




Figure 4: Fused and Bonded Surfaces of Joined Pipe and Fitting



                       ®
COPYRIGHT © 2008 by IPS Corporation                              Page 4 of 10
MATERIAL PREPARATION

1.        Cutting the Pipe. It is important to cut the pipe square. A square cut provides the surface of the
pipe with the maximum bonding area. Pipe can be easily cut with a ratchet cutter, wheel-type plastic
tubing cutter, power saw, chop saw, or fine toothed saw. Tools used to cut pipe must be designed for
plastic use and must be in good condition in accordance with the tool manufacturer’s recommendations. If
there is any indication of damage or evidence of cracking, cut off at least 2 inches (50mm) beyond any
visible crack. Care must be exercised if using ratchet cutters, especially at low temperatures, as they may
split the pipe if not properly used and maintained.

2.        Deburring and Beveling. Burrs and filings can prevent proper contact between pipe and fitting
during assembly, and must be removed from the outside and the inside of the pipe. A chamfering tool or a
file is suitable for this purpose. A slight bevel (approximately 10°-15° chamfer and a minimum width of
3/32 of an inch) shall be placed at the end of the pipe to ease entry of the pipe into the fitting socket. This
will minimize the chance that the edges of the pipe will wipe solvent cement or will scrape softened
surface material from the fitting socket during the insertion of the pipe.

3.       Test Dry Fit of the Joint. The pipe should enter the fitting socket easily to   of the way for a
tight interference fit. Contact between pipe and fitting is essential in making a good joint. This contact
allows the solvent cement to effectively join the pipe and fitting.

4.      Cleaning. Using a clean dry rag, wipe any dirt and moisture from the fitting socket and the pipe
end. Moisture will slow the cure time, and at this stage of assembly, excessive water can reduce joint
strength.

5.        Applicator Size. Use an applicator that is properly sized for the pipe and will completely coat the
surfaces of the pipe and fittings with primer and solvent cement. Dauber-type applicators will give
adequate coverage on pipe diameters that are approximately twice the diameter of the dauber-ball. Swab
or roller-type applicators are preferable on larger diameter pipe surfaces of 4” and above.




                        ®
COPYRIGHT © 2008 by IPS Corporation                                                               Page 5 of 10
SOLVENT WELDING PROCEDURES FOR PLASTIC PIPE AND FITTINGS

A. TWO-STEP SOLVENT WELDING METHOD FOR PVC AND CPVC PLASTIC PIPE AND FITTINGS

1.      Apply primer to the inside of the fitting socket. Be aggressive and work the solvents into the
surface to break down the surface tension and to soften the surfaces.

2.      Apply primer to the pipe end, equal to the depth of the fitting socket. Be aggressive.

3.      Apply primer to the inside of the fitting socket.

4.      While the primer is still wet and the surfaces are soft, apply a full, even layer of solvent cement,
equal to the depth of the fitting socket, to the pipe end. Like the primer, be aggressive. Remember to
apply enough solvent cement to fill the gap between the pipe and fitting.

        Use PVC solvent cement that meets ASTM D 2564 on PVC plastic pipe and fittings.

        Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings.

        For CPVC potable water systems, use a purple primer and orange CPVC solvent cement in
        accordance with UPC 605.16.2.

5.      Apply a thin layer of solvent cement to the inside of the fitting socket.

        5.1       This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive
        solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or
        fitting to weaken due to softening by the trapped solvents.

6.      Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on
the pipe outer diameter (O.D.) can be easily wiped away after assembly.

7.       Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a
turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do
not turn any further; doing so could break any fusion that is starting to occur.

8.      Hold the pipe and fitting together for approximately 30 seconds to avoid push out.

9.       A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry
cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the
solvent to evaporate from within the joint.




                       ®
COPYRIGHT © 2008 by IPS Corporation                                                              Page 6 of 10
B. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING (COPPER
TUBE SIZE ” TO 2” DIAMETER) – HOT AND COLD WATER DISTRIBUTION SYSTEMS

1.      Apply yellow CPVC solvent cement to the pipe end. Be aggressive to break down the surface
tension and to soften the surfaces.

        Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings.

        For CPVC potable water systems, use yellow CPVC one-step solvent cement in accordance with
        UPC 605.16.2.

2.      Without re-dipping the dauber, apply a very light layer of solvent cement to the inside of the fitting
socket.

        2.1       This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive
        solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or
        fitting to weaken due to softening by the trapped solvents.

3.       Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a
turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do
not turn any further; doing so could break any fusion that is starting to occur.

4.      Hold the pipe and fitting together for approximately 30 seconds to avoid push out.

5.       A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry
cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the
solvent to evaporate from within the joint.




                       ®
COPYRIGHT © 2008 by IPS Corporation                                                              Page 7 of 10
C. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING – FIRE
SPRINKLER SYSTEMS

1.      Apply red CPVC solvent cement to the pipe end. Be aggressive to break down the surface
tension and to soften the surfaces.

        1.1     Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings.

        1.2      For CPVC fire sprinkler systems, use red CPVC one-step solvent cement that have been
        specifically investigated and tested for this use, and approved by the pipe and fittings
        manufacturers.

2.      Without re-dipping the dauber, apply a light layer of solvent cement to the inside of the fitting
socket.

        2.1       This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive
        solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or
        fitting to weaken due to softening by the trapped solvents.

3.      Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on
the pipe O.D. can be easily wiped away after assembly.

4.       Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a
turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do
not turn any further; doing so could break any fusion that is starting to occur.

5.      Hold the pipe and fitting together for approximately 30 seconds to avoid push out.

6.       A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry
cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the
solvent to evaporate from within the joint.

7.       Sprinkler heads shall be installed only after all of the CPVC pipe and fittings, including the
sprinkler head adapters, are solvent welded and allowed to cure for a minimum of 30 minutes.




                       ®
COPYRIGHT © 2008 by IPS Corporation                                                             Page 8 of 10
D. ONE-STEP SOLVENT WELDING METHOD FOR ABS PLASTIC PIPE AND FITTINGS

1.       Apply ABS solvent cement to the pipe end. Be aggressive to break down the surface tension and
to soften the surfaces.

        1.1     Use ABS solvent cement that meets ASTM D 2235 on ABS plastic pipe and fittings.

        1.2     Primer shall NEVER be used when solvent welding ABS pipe and fittings.

2.      Without re-dipping the dauber, apply a very light layer of solvent cement to the inside of the fitting
socket.

        2.1       This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive
        solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or
        fitting to weaken due to softening by the trapped solvents.

3.      Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on
the pipe O.D. can be easily wiped away after assembly.

4.       Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a
turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do
not turn any further; doing so could break any fusion that is starting to occur.

5.      Hold the pipe and fitting together for approximately 30 seconds to avoid push out.

6.       A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry
cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the
solvent to evaporate from within the joint.




                       ®
COPYRIGHT © 2008 by IPS Corporation                                                              Page 9 of 10
SYSTEM ACCEPTANCE (HYDROSTATIC PRESSURE) TEST

1.     Set time is the time required before the joint can be carefully handled. Refer to the solvent
cement manufacturer for recommended set times.

2.      Cure time is the time required before the system can be hydrostatically pressure tested. Refer to
the solvent cement manufacturer for recommended cure times.

Cure time is dependent upon pipe diameter, solvent cement viscosity, ambient temperature, humidity,
and the dry-joint tightness (interference fit). As a general rule, relatively short cure periods are satisfactory
for high-ambient temperatures with low humidity, small pipe sizes, quick-drying solvent cements, and
tight-fitting joints. Longer cure periods are required for low temperatures, large pipe sizes, slow-drying
solvent cements, loose joints, and relatively high humidity.

        3.      Hydrostatic pressure test should be 150% of the system design pressure and held at
        this pressure until the system is checked for leaks, or follow the requirements of the applicable
        code, whichever is higher.

        3.1      Shade backfill, leaving all joints exposed so that they can be examined during pressure
        tests.

        3.2    On long runs, pressure tests should be performed on sections not longer than 5000 feet
        (1500 meters).

        3.3     DANGER! Air or compressed gas must never be used for system acceptance
        testing. Use HYDROSTATIC PRESSURE TEST ONLY. System failure when using
        compressed air or gas for system acceptance testing can result in bodily injury, death
        and/or property damage.

        3.4     If a leak is found, the joint must be cut out and discarded. A new section can be installed
        using coupling, mechanical repair joint, or a union. Mechanical repair joints or unions should be
        used in accessible areas only.

NOTE: SOLVENT WELDING IN LOW TEMPERATURE

Using a little extra care, successful solvent welded joints can be made at temperatures as low as -15ºF (-
26ºC). In cold weather, solvents penetrate and soften the thermoplastic pipe and fitting surfaces more
slowly than in warm weather. The thermoplastic is also more resistant to solvent attack. Therefore, it
becomes even more important to pre-soften surfaces of the pipe and fittings with an aggressive primer.
Because of slower evaporation of the solvents, a longer cure time is necessary.

NOTE: SAFE HANDLING OF SOLVENT CEMENT, PRIMER AND CLEANER

1.      Solvent cement, primer, and cleaner for plastic pipe are made from flammable liquids and should
be kept away from all sources of ignition. Good ventilation should be maintained to reduce fire hazard and
to minimize the breathing of solvent vapors. Avoid contact with skin and eyes.

2.      Refer to ASTM F 402, Standard Practice for Safe Handling of Solvent Cements, Primers, and
Cleaners Used for Joining Thermoplastic Pipe and Fittings, plus the cautionary notes contained in the
Material Safety Data Sheets (MSDSs) supplied by the material supplier.




                        ®
COPYRIGHT © 2008 by IPS Corporation                                                                 Page 10 of 10

Contenu connexe

Tendances

Obturation materials
Obturation materialsObturation materials
Obturation materials
Moola Reddy
 

Tendances (20)

Cementation
CementationCementation
Cementation
 
Terrace waterproofing
Terrace waterproofingTerrace waterproofing
Terrace waterproofing
 
waterproofing
waterproofingwaterproofing
waterproofing
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
Select of cement
Select of cementSelect of cement
Select of cement
 
Product Catalogue
Product CatalogueProduct Catalogue
Product Catalogue
 
Waterproofing Solutions
Waterproofing SolutionsWaterproofing Solutions
Waterproofing Solutions
 
Waterproofing Challenges and Suggested Remedial measures for High Rise Buildi...
Waterproofing Challenges and Suggested Remedial measures for High Rise Buildi...Waterproofing Challenges and Suggested Remedial measures for High Rise Buildi...
Waterproofing Challenges and Suggested Remedial measures for High Rise Buildi...
 
Waterproofing and insulaton
Waterproofing and insulatonWaterproofing and insulaton
Waterproofing and insulaton
 
Finishing and cementation /certified fixed orthodontic courses by Indian dent...
Finishing and cementation /certified fixed orthodontic courses by Indian dent...Finishing and cementation /certified fixed orthodontic courses by Indian dent...
Finishing and cementation /certified fixed orthodontic courses by Indian dent...
 
Waterproofing copmound
Waterproofing copmoundWaterproofing copmound
Waterproofing copmound
 
Critical Importance of Site Design
Critical Importance of Site DesignCritical Importance of Site Design
Critical Importance of Site Design
 
Waterproofing dublin09 1
Waterproofing dublin09 1Waterproofing dublin09 1
Waterproofing dublin09 1
 
Kryton Concrete Waterproofing and Durability Solutions Guide
Kryton Concrete Waterproofing and Durability Solutions GuideKryton Concrete Waterproofing and Durability Solutions Guide
Kryton Concrete Waterproofing and Durability Solutions Guide
 
Failures in fpd
Failures in fpdFailures in fpd
Failures in fpd
 
Luting agents and cementation
Luting agents and cementation Luting agents and cementation
Luting agents and cementation
 
Luting cements/prosthodontic courses
Luting cements/prosthodontic coursesLuting cements/prosthodontic courses
Luting cements/prosthodontic courses
 
Obturation materials
Obturation materialsObturation materials
Obturation materials
 
Cement additives
Cement additivesCement additives
Cement additives
 
Sanchit
SanchitSanchit
Sanchit
 

Similaire à Bil Godwin #2 Working with PVC Best PracticesThermoplastic Jan 27 Wed

Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
sharad_kadbhane
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
Sukhdeep Jat
 

Similaire à Bil Godwin #2 Working with PVC Best PracticesThermoplastic Jan 27 Wed (20)

type of Cracks in building and its repair
type of Cracks in building and its repairtype of Cracks in building and its repair
type of Cracks in building and its repair
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Methodes of reparing cracks
Methodes of reparing cracksMethodes of reparing cracks
Methodes of reparing cracks
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
 
Various methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failureVarious methods for repair and rehabilitation for concrete structure failure
Various methods for repair and rehabilitation for concrete structure failure
 
Epoxy Injection & vacuum concrete (RR&S)
Epoxy Injection & vacuum concrete (RR&S)Epoxy Injection & vacuum concrete (RR&S)
Epoxy Injection & vacuum concrete (RR&S)
 
Rebuild
RebuildRebuild
Rebuild
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
 
Curing of Concret
Curing of ConcretCuring of Concret
Curing of Concret
 
construction chemical
construction chemicalconstruction chemical
construction chemical
 
Rehabilitation methods
Rehabilitation methodsRehabilitation methods
Rehabilitation methods
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
Put Your Seal on Better Pavement Performance
Put Your Seal on Better Pavement PerformancePut Your Seal on Better Pavement Performance
Put Your Seal on Better Pavement Performance
 
Analogy of Some Physicomechanical Properties for Rubber Cement
Analogy of Some Physicomechanical Properties for Rubber CementAnalogy of Some Physicomechanical Properties for Rubber Cement
Analogy of Some Physicomechanical Properties for Rubber Cement
 
B.3. Arch 561 LEC-10 detail spec example.pdf
B.3. Arch 561  LEC-10 detail spec example.pdfB.3. Arch 561  LEC-10 detail spec example.pdf
B.3. Arch 561 LEC-10 detail spec example.pdf
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdf
 

Plus de Utah Nursery and Landscape Association

Plus de Utah Nursery and Landscape Association (20)

Dan hinkley the dry lush
Dan hinkley   the dry lushDan hinkley   the dry lush
Dan hinkley the dry lush
 
Successful Pool And Spa Projects Handouts J Im Redman
Successful Pool And Spa Projects Handouts  J Im RedmanSuccessful Pool And Spa Projects Handouts  J Im Redman
Successful Pool And Spa Projects Handouts J Im Redman
 
Ralph Whitesides Pesticides And Ornamentals Handout
Ralph Whitesides Pesticides And Ornamentals HandoutRalph Whitesides Pesticides And Ornamentals Handout
Ralph Whitesides Pesticides And Ornamentals Handout
 
Kris Ashby How To Bid Projects And Live With The Numbers
Kris Ashby How To Bid Projects And Live With The NumbersKris Ashby How To Bid Projects And Live With The Numbers
Kris Ashby How To Bid Projects And Live With The Numbers
 
Jerry Goodspeed Common Sense Sustainability
Jerry Goodspeed Common Sense SustainabilityJerry Goodspeed Common Sense Sustainability
Jerry Goodspeed Common Sense Sustainability
 
Michael Dukes Irrigation
Michael Dukes IrrigationMichael Dukes Irrigation
Michael Dukes Irrigation
 
Ruby Ward Business Maintenance For Your Landscape Business
Ruby Ward Business Maintenance For Your Landscape BusinessRuby Ward Business Maintenance For Your Landscape Business
Ruby Ward Business Maintenance For Your Landscape Business
 
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
Bill Godwin #6 Irrigation Pipe & Fittings Wed Jan 27
 
Bill Godwin #5 Irrigation Pipe & Fittings Tech Wed Jan 27
Bill Godwin #5 Irrigation Pipe & Fittings Tech Wed Jan 27Bill Godwin #5 Irrigation Pipe & Fittings Tech Wed Jan 27
Bill Godwin #5 Irrigation Pipe & Fittings Tech Wed Jan 27
 
Bill Godwin #4 Irrigation Pipe & Fittings Solvents Wed Jan 27
Bill Godwin #4 Irrigation Pipe & Fittings Solvents Wed Jan 27Bill Godwin #4 Irrigation Pipe & Fittings Solvents Wed Jan 27
Bill Godwin #4 Irrigation Pipe & Fittings Solvents Wed Jan 27
 
Bill Godwin #3 Working with pipe & fittings Irrigation Wed Jan 27
Bill Godwin #3 Working with pipe & fittings Irrigation Wed Jan 27Bill Godwin #3 Working with pipe & fittings Irrigation Wed Jan 27
Bill Godwin #3 Working with pipe & fittings Irrigation Wed Jan 27
 
Bill Godwin #1 Working with PVC Irrigation Wed jan 27
Bill Godwin #1 Working with PVC Irrigation Wed jan 27Bill Godwin #1 Working with PVC Irrigation Wed jan 27
Bill Godwin #1 Working with PVC Irrigation Wed jan 27
 
Steve Elder Lesser Known Plants For Utah List
Steve Elder   Lesser Known Plants For Utah ListSteve Elder   Lesser Known Plants For Utah List
Steve Elder Lesser Known Plants For Utah List
 
Ryan Bushman Chemical & Backflow Prevention
Ryan Bushman Chemical & Backflow PreventionRyan Bushman Chemical & Backflow Prevention
Ryan Bushman Chemical & Backflow Prevention
 
Mike Kuhns Urban Forestry Seattle
Mike Kuhns Urban Forestry SeattleMike Kuhns Urban Forestry Seattle
Mike Kuhns Urban Forestry Seattle
 
Roger Tsai Mon Jan 25 At 9
Roger Tsai  Mon Jan 25 At 9Roger Tsai  Mon Jan 25 At 9
Roger Tsai Mon Jan 25 At 9
 
Rob Larkin Cold Hardy Exotics For Utah Wed Jan 26 At 2
Rob Larkin Cold Hardy Exotics For Utah Wed Jan 26 At 2Rob Larkin Cold Hardy Exotics For Utah Wed Jan 26 At 2
Rob Larkin Cold Hardy Exotics For Utah Wed Jan 26 At 2
 
Jim Redman Successful Pool And Spa Projects Tues Jan 26 At 2
Jim Redman Successful Pool And Spa Projects Tues Jan 26 At 2Jim Redman Successful Pool And Spa Projects Tues Jan 26 At 2
Jim Redman Successful Pool And Spa Projects Tues Jan 26 At 2
 
Fred Liljegren Landscape Lifecycle Analysis Mon Jan 25 At 10 Part 2
Fred Liljegren Landscape Lifecycle Analysis Mon Jan 25 At 10 Part 2Fred Liljegren Landscape Lifecycle Analysis Mon Jan 25 At 10 Part 2
Fred Liljegren Landscape Lifecycle Analysis Mon Jan 25 At 10 Part 2
 
Fred Liljegren Value Engineering Concepts Mon Jan 25 At 10 Part 1
Fred Liljegren Value Engineering Concepts Mon Jan 25 At 10 Part 1Fred Liljegren Value Engineering Concepts Mon Jan 25 At 10 Part 1
Fred Liljegren Value Engineering Concepts Mon Jan 25 At 10 Part 1
 

Dernier

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Dernier (20)

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 

Bil Godwin #2 Working with PVC Best PracticesThermoplastic Jan 27 Wed

  • 1. BEST PRACTICES FOR SOLVENT WELDING THERMOPLASTIC PIPING: PVC, CPVC, and ABS ® By Stephen Gardiner, IPS Corporation SUMMARY OF PRACTICE MATERIAL PREPARATION SOLVENT WELDING PROCEDURES FOR PLASTIC PIPE AND FITTINGS A. TWO-STEP SOLVENT WELDING METHOD FOR PVC AND CPVC PLASTIC PIPE AND FITTINGS B. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING (COPPER TUBE SIZE ” TO 2” DIAMETER) – HOT AND COLD WATER DISTRIBUTION SYSTEMS C. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING – FIRE SPRINKLER SYSTEMS D. ONE-STEP SOLVENT WELDING METHOD FOR ABS PLASTIC PIPE AND FITTINGS SYSTEM ACCEPTANCE (HYDROSTATIC PRESSURE) TEST NOTE: SOLVENT WELDING IN LOW TEMPERATURE NOTE: SAFE HANDLING OF SOLVENT CEMENT, PRIMER AND CLEANER ® COPYRIGHT © 2008 by IPS Corporation Page 1 of 10
  • 2. SUMMARY OF PRACTICE (refer to ASTM D 2855) 1. To consistently make good solvent welded joints, the following should be clearly understood and adhered to: • The joining surfaces must be softened (dissolved) and made semi-fluid. • Sufficient solvent cement must be applied to fill the gap between pipe and fitting. • Assembly of pipe and fitting must be made while the surfaces are still wet and fluid. • Joint strength develops as the solvent cement dries. In the tight part of the joint, the surfaces will tend to fuse together; in the loose part, the solvent cement will bond to both surfaces. 2. Penetration and dissolving can be achieved by the solvent cement itself, a suitable primer, or by the use of both primer and solvent cement. A suitable primer will penetrate and dissolve the plastic more quickly than solvent cement alone. In cold weather, more time and additional applications are required (see Figure 1). 3. More than sufficient to fill the loose part of the joint must be applied (see Figure 2). Besides filling the gap, adequate solvent cement layers will penetrate the surfaces and also remain wet until the joint is assembled. 4. If the solvent cement coatings on the pipe and fittings are wet and fluid when assembly takes place, they will tend to flow together and become one solvent cement layer. Also, if the solvent cement is wet, the surfaces beneath them will still be soft, and these dissolved surfaces in the tight part of the joint will tend to fuse together (see Figure 3). 5. As the solvent dissipates, the solvent cement layer and the dissolved surfaces will harden with a corresponding increase in joint strength. A good joint will take the required working pressure long before the joint is fully dry and final strength is obtained. In the tight (fused) part of the joint, strength will develop more quickly than in the looser (bonded) part of the joint. Completed joints should not be disturbed until they have cured sufficiently to withstand handling. Joint strength develops as the solvent cement dries. Information about the development of bond strength of solvent cemented joints is available (see Figure 4). 6. The techniques described herein can be used to produce strong pressure-tight joints between pipe and fittings of PVC, CPVC, and ABS., either in shop operations or in the field. However, skill and knowledge on the part of the welder are required to obtain a good quality joint. This skill and knowledge can be obtained by making joints under the guidance of skilled welders and testing them until good quality joints are obtained. ® COPYRIGHT © 2008 by IPS Corporation Page 2 of 10
  • 3. Figure 1: Areas of Pipe and Fitting to be Softened (Dissolved) and Penetrated Figure 2: Solvent Cement Coatings of Sufficient Thickness ® COPYRIGHT © 2008 by IPS Corporation Page 3 of 10
  • 4. Figure 3: Assembly of Surfaces While They Are Wet and Soft Figure 4: Fused and Bonded Surfaces of Joined Pipe and Fitting ® COPYRIGHT © 2008 by IPS Corporation Page 4 of 10
  • 5. MATERIAL PREPARATION 1. Cutting the Pipe. It is important to cut the pipe square. A square cut provides the surface of the pipe with the maximum bonding area. Pipe can be easily cut with a ratchet cutter, wheel-type plastic tubing cutter, power saw, chop saw, or fine toothed saw. Tools used to cut pipe must be designed for plastic use and must be in good condition in accordance with the tool manufacturer’s recommendations. If there is any indication of damage or evidence of cracking, cut off at least 2 inches (50mm) beyond any visible crack. Care must be exercised if using ratchet cutters, especially at low temperatures, as they may split the pipe if not properly used and maintained. 2. Deburring and Beveling. Burrs and filings can prevent proper contact between pipe and fitting during assembly, and must be removed from the outside and the inside of the pipe. A chamfering tool or a file is suitable for this purpose. A slight bevel (approximately 10°-15° chamfer and a minimum width of 3/32 of an inch) shall be placed at the end of the pipe to ease entry of the pipe into the fitting socket. This will minimize the chance that the edges of the pipe will wipe solvent cement or will scrape softened surface material from the fitting socket during the insertion of the pipe. 3. Test Dry Fit of the Joint. The pipe should enter the fitting socket easily to of the way for a tight interference fit. Contact between pipe and fitting is essential in making a good joint. This contact allows the solvent cement to effectively join the pipe and fitting. 4. Cleaning. Using a clean dry rag, wipe any dirt and moisture from the fitting socket and the pipe end. Moisture will slow the cure time, and at this stage of assembly, excessive water can reduce joint strength. 5. Applicator Size. Use an applicator that is properly sized for the pipe and will completely coat the surfaces of the pipe and fittings with primer and solvent cement. Dauber-type applicators will give adequate coverage on pipe diameters that are approximately twice the diameter of the dauber-ball. Swab or roller-type applicators are preferable on larger diameter pipe surfaces of 4” and above. ® COPYRIGHT © 2008 by IPS Corporation Page 5 of 10
  • 6. SOLVENT WELDING PROCEDURES FOR PLASTIC PIPE AND FITTINGS A. TWO-STEP SOLVENT WELDING METHOD FOR PVC AND CPVC PLASTIC PIPE AND FITTINGS 1. Apply primer to the inside of the fitting socket. Be aggressive and work the solvents into the surface to break down the surface tension and to soften the surfaces. 2. Apply primer to the pipe end, equal to the depth of the fitting socket. Be aggressive. 3. Apply primer to the inside of the fitting socket. 4. While the primer is still wet and the surfaces are soft, apply a full, even layer of solvent cement, equal to the depth of the fitting socket, to the pipe end. Like the primer, be aggressive. Remember to apply enough solvent cement to fill the gap between the pipe and fitting. Use PVC solvent cement that meets ASTM D 2564 on PVC plastic pipe and fittings. Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings. For CPVC potable water systems, use a purple primer and orange CPVC solvent cement in accordance with UPC 605.16.2. 5. Apply a thin layer of solvent cement to the inside of the fitting socket. 5.1 This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or fitting to weaken due to softening by the trapped solvents. 6. Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on the pipe outer diameter (O.D.) can be easily wiped away after assembly. 7. Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do not turn any further; doing so could break any fusion that is starting to occur. 8. Hold the pipe and fitting together for approximately 30 seconds to avoid push out. 9. A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the solvent to evaporate from within the joint. ® COPYRIGHT © 2008 by IPS Corporation Page 6 of 10
  • 7. B. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING (COPPER TUBE SIZE ” TO 2” DIAMETER) – HOT AND COLD WATER DISTRIBUTION SYSTEMS 1. Apply yellow CPVC solvent cement to the pipe end. Be aggressive to break down the surface tension and to soften the surfaces. Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings. For CPVC potable water systems, use yellow CPVC one-step solvent cement in accordance with UPC 605.16.2. 2. Without re-dipping the dauber, apply a very light layer of solvent cement to the inside of the fitting socket. 2.1 This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or fitting to weaken due to softening by the trapped solvents. 3. Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do not turn any further; doing so could break any fusion that is starting to occur. 4. Hold the pipe and fitting together for approximately 30 seconds to avoid push out. 5. A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the solvent to evaporate from within the joint. ® COPYRIGHT © 2008 by IPS Corporation Page 7 of 10
  • 8. C. ONE-STEP SOLVENT WELDING METHOD FOR CPVC PLASTIC PIPE AND FITTING – FIRE SPRINKLER SYSTEMS 1. Apply red CPVC solvent cement to the pipe end. Be aggressive to break down the surface tension and to soften the surfaces. 1.1 Use CPVC solvent cement that meets ASTM F 493 on CPVC plastic pipe and fittings. 1.2 For CPVC fire sprinkler systems, use red CPVC one-step solvent cement that have been specifically investigated and tested for this use, and approved by the pipe and fittings manufacturers. 2. Without re-dipping the dauber, apply a light layer of solvent cement to the inside of the fitting socket. 2.1 This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or fitting to weaken due to softening by the trapped solvents. 3. Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on the pipe O.D. can be easily wiped away after assembly. 4. Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do not turn any further; doing so could break any fusion that is starting to occur. 5. Hold the pipe and fitting together for approximately 30 seconds to avoid push out. 6. A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the solvent to evaporate from within the joint. 7. Sprinkler heads shall be installed only after all of the CPVC pipe and fittings, including the sprinkler head adapters, are solvent welded and allowed to cure for a minimum of 30 minutes. ® COPYRIGHT © 2008 by IPS Corporation Page 8 of 10
  • 9. D. ONE-STEP SOLVENT WELDING METHOD FOR ABS PLASTIC PIPE AND FITTINGS 1. Apply ABS solvent cement to the pipe end. Be aggressive to break down the surface tension and to soften the surfaces. 1.1 Use ABS solvent cement that meets ASTM D 2235 on ABS plastic pipe and fittings. 1.2 Primer shall NEVER be used when solvent welding ABS pipe and fittings. 2. Without re-dipping the dauber, apply a very light layer of solvent cement to the inside of the fitting socket. 2.1 This will prevent puddling of the solvent cement inside of the pipe or fitting. Excessive solvent cement applied to the fitting socket can cause the joint to clog and the wall of the pipe or fitting to weaken due to softening by the trapped solvents. 3. Apply a second full, even layer of solvent cement to the pipe end. Excessive solvent cement on the pipe O.D. can be easily wiped away after assembly. 4. Without delay, while the solvent cement is still wet, assemble the pipe and fitting, and twist a turn as the pipe is being inserted, if possible. Once the pipe end has reached the fitting socket stop, do not turn any further; doing so could break any fusion that is starting to occur. 5. Hold the pipe and fitting together for approximately 30 seconds to avoid push out. 6. A bead of solvent cement must be around the entire socket fitting entrance. With a clean, dry cloth, remove the excess solvent cement from the pipe and fitting socket entrance. This will allow the solvent to evaporate from within the joint. ® COPYRIGHT © 2008 by IPS Corporation Page 9 of 10
  • 10. SYSTEM ACCEPTANCE (HYDROSTATIC PRESSURE) TEST 1. Set time is the time required before the joint can be carefully handled. Refer to the solvent cement manufacturer for recommended set times. 2. Cure time is the time required before the system can be hydrostatically pressure tested. Refer to the solvent cement manufacturer for recommended cure times. Cure time is dependent upon pipe diameter, solvent cement viscosity, ambient temperature, humidity, and the dry-joint tightness (interference fit). As a general rule, relatively short cure periods are satisfactory for high-ambient temperatures with low humidity, small pipe sizes, quick-drying solvent cements, and tight-fitting joints. Longer cure periods are required for low temperatures, large pipe sizes, slow-drying solvent cements, loose joints, and relatively high humidity. 3. Hydrostatic pressure test should be 150% of the system design pressure and held at this pressure until the system is checked for leaks, or follow the requirements of the applicable code, whichever is higher. 3.1 Shade backfill, leaving all joints exposed so that they can be examined during pressure tests. 3.2 On long runs, pressure tests should be performed on sections not longer than 5000 feet (1500 meters). 3.3 DANGER! Air or compressed gas must never be used for system acceptance testing. Use HYDROSTATIC PRESSURE TEST ONLY. System failure when using compressed air or gas for system acceptance testing can result in bodily injury, death and/or property damage. 3.4 If a leak is found, the joint must be cut out and discarded. A new section can be installed using coupling, mechanical repair joint, or a union. Mechanical repair joints or unions should be used in accessible areas only. NOTE: SOLVENT WELDING IN LOW TEMPERATURE Using a little extra care, successful solvent welded joints can be made at temperatures as low as -15ºF (- 26ºC). In cold weather, solvents penetrate and soften the thermoplastic pipe and fitting surfaces more slowly than in warm weather. The thermoplastic is also more resistant to solvent attack. Therefore, it becomes even more important to pre-soften surfaces of the pipe and fittings with an aggressive primer. Because of slower evaporation of the solvents, a longer cure time is necessary. NOTE: SAFE HANDLING OF SOLVENT CEMENT, PRIMER AND CLEANER 1. Solvent cement, primer, and cleaner for plastic pipe are made from flammable liquids and should be kept away from all sources of ignition. Good ventilation should be maintained to reduce fire hazard and to minimize the breathing of solvent vapors. Avoid contact with skin and eyes. 2. Refer to ASTM F 402, Standard Practice for Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings, plus the cautionary notes contained in the Material Safety Data Sheets (MSDSs) supplied by the material supplier. ® COPYRIGHT © 2008 by IPS Corporation Page 10 of 10