23. CTCI Major Reference in Vietnam : On-going Project PV – Phu My Go Dau Pipeline PV – Condensate Processing Plant PV – Dung Quat Refinery Building PV & ZNSM – Vietross Refinery Package II & III Na Doung – Power Plant Phu My – Power Plant III Ca Mau – Power Plant I & II PHI – Hai Duong Phase 1 & 2 (Building EPC) 3 4 1 7 Hochiminh 2 6 Hanoi 5 8 1 2 3 4 5 6 7 8 -- --
24. BUILDINGS -- -- King Faisal University, Al-Hassa, KSA Prince Faisal Stadium, Riyadh
26. AIRPORTS King Abdulaziz International Airport, Jeddah Aramco Airport Runway, Shaybah, KSA -- --
27. Major Achievements of PI-Consult Client: ROYAL COMMISSION FOR JUBAIL AND YANBU Project Location: JUBAIL Description: Front End Engineering & Design (FEED) include the following: Staged site development and drainage of entire site Roads and utilities crossing at the KRT (3.0 KM Wide) High Ways, Main roads and high ways rail road system. Sea water cooling supply and distribution. Potable water supply distribution. Industrial Wastewater collection and treatment system. Sanitary wastewater collection and treatment system. Material Handling, pipe and utility corridors. Feedstock supply and fuel gas system supply and distribution. Electrical Power and telecommunication transmission. Value Engineering and Optimization. Value in SAR: 35 Million (For FEED) Project Title: FEED FOR THE NEW INDUSTRIAL PARK WEST /JUBIAL 2 CONTRACT NO. 202-TO3 Design Duration: 2003-2008 Client: SAUDI ARAMCO Project Location: K.S.A Project Title: INSTALL & UPGRADE IDAS SYSTEM AT 18 COMPANY FACILITIES Description: Provide Conceptual / project Proposal for the Following: All IDAS field devices will be located within respective perimeter site fences. The IDAS system equipment which will be located at respective Control Center with relevant communications transport for each site. Also, the system shall provide local monitoring for the gate of each. Value in SAR: 7,232,963 Design Duration: 2007-2008 -- --
28. Client: SAUDI ARAMCO Project Location: KHURSANIA Description: Provide detail engineering of crude oil upstream facilities at Abu-Hadriyah and Fadhili fields consisting of Drill-sites development including the connecting pipelines from wellheads to interface manifolds. Each Drill-sites, consisting of single-well to multi-wells system, is equipped with multi-phase flow-meters and testing facility, corrosion inhibitor chemical injection system, corrosion monitoring system, remote terminal unit, switch- rack, signal muti-plexing unit (mux). Value in SAR: 5,000,000 Project Title: DETAILED ENGINEERING FOR ABU HADRIYAH / FADHILI NEW OIL DRILL SITES & DETAILED ENGINEERING FOR ABU HADRIYAH / FADHILI T/L, INTERFACE MANIFOLDS & UPGRADING EXISTING WELLS Design Duration: 2005-2006 Client: PUBLIC HOUSING EST. DAMASCUS, SYRIA Project Location: DAMASCUS, SYRIA Project Title: DIPLOMATIC QUARTERS PROJECT - DAMASCUS Description: The project is located in the suburbs of Damascus city with a total area of 600 Hectare. The project includes diplomatic area (225 Hect), General Services Area (125 Hect), open uncovered area (50 Hect.), Landscaped Area (150 Hect), Roads and Access passage and walk ways (50 Hect). Pi-Consult consortium grouped with Arch Center Riyadh, and SPC Damascus were awarded the design on Jan 19, 2006. Design Duration: 2006-2007 Value in SAR: 5 Million Major Achievements of PI-Consult -- --
29. Client: NESMA TRADING COMPANY LTD . Project Location: VARIOUS Description: The project shall provide a detail engineering design package for IDAS at 18 Company facilitates with a dedicated Alarm Management System (AMS) per site to monitor, detect, assess, trace and video record potential intrusion for 18 Company facilities. And to provide Long Range Detection and Assessment System (LRDAS) with the required infrastructure at twenty five (25) company’s vital sites as specified henceforth in this document. Value in SAR: 5,000,000 Project Title: IDAS, LR DAS INFRASTRUCTURE PROJECT Design Duration: 2009-2010 On going Major Achievements of PI-Consult -- --
31. Our Vision – Partnership with Clients -- -- Core Team from CTCI Group Full Spectrum Coach / Self-Dependent Stage Time High Value / Localization Setting Up Operation Mechanism / Implant Stage 2009 Comprehensive Training 2014 Leading EPC Company in KSA, Patnership with Mr. Clients Recruit KSA Engineers Common 3D Work Platform Advanced On-Line Support Stretch Local Capablity ISO 9001 Certificate Intergration Capability / Esteem Stage -- -- On-Line Support Introduce Corporate Social Responsibility Create Value in KSA