PEPGI: Promoting Employment & Productivity in Garment Industry

Industrial
Engineering
Consulting Guidelines
Artistic Apparels
November 09, 2013
PEPGI: Promoting Employment & Productivity in Garment Industry

Contents
1

Objectives & Methodology

2

Technopak Gap Analysis

3

Observations and Recommendations

4

IE Activities

5

Follow up Schedule

6

Activities Already Started
PEPGI: Promoting Employment & Productivity in Garment Industry

Why Consulting Guidelines Required?
Association with PEPGI provides the participating companies, a unique experience
through consulting guideline in one of the chosen area from the following topics:
Fabric

& Cutting Room Management
Sewing Room Production Management(SRPM)
Industrial Engineering
Quality management system
Business process mapping
Artistic Apparel has chosen Industrial Engineering for enhancing the performance in
this area. On the basis of assessment study, the various gaps are identified which will
be filled by company’s employees through consulting guidelines, followed up and
monitored by Technopak Advisors and UNDP team.
PEPGI: Promoting Employment & Productivity in Garment Industry

Objectives


Assess the sewing operations at Artistic Apparel Unit # 01 (Stitching Line # 5), in
terms of Productivity and Efficiency, based on observation of the entire
operations and a comprehensive “Technopak Gap Analysis”.



Compare performance data and results from gap analysis to industry
benchmarks. Determine areas of improvement.



Put forward the observations pertaining to sewing floors and share
recommendations.



Identify the need gaps for performance improvement and suggest a roadmap
based on Industrial Engineering, to the management for bridging these gaps.



Highlight the advantages and benefits of having Industrial Engineering
department .
PEPGI: Promoting Employment & Productivity in Garment Industry

Methodology


Identify current performance levels in – Capacities, Utilization, Using Methods, and
productivity.
Productivity level was evaluated from 5 perspectives:



Worker’s Capacity

Evaluation of existing capacities of sewing operators & their ability to meet their
capacities.

Training Requirement

Requirement of training based on Worker’s capacity.

Worker’s Utilization

How well are the operators being utilized.

Methodology Terms

Evaluation of methodology of doing operations for the product profile being
manufactured.

Efficiency terms

Evaluation of production data recorded for the current month.
General observations




PEPGI: Promoting Employment & Productivity in Garment Industry

Technopak Gap Analysis

Capacity
Gap

Are the operators performing
as well as they can?

Training
Gap

Are the operators trained
enough to do the operation?

Utilization
Gap

Are we using our workers all
the time?

Methods
Gap
Efficiency
Gap

Is this the best way to do
this operation?
How efficient is the work ?

P
P
R
R
O
O
D
D
U
U
C
C
T
T
I
I
V
V
I
I
T
T
Y
Y
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Capacity/Training Gap
Capacity Gap - Difference between achievable production capacity of operators based
on their sewing pace & the actual output produced by them.

Methodology - Single cycle time was taken for randomly chosen operators to calculate
their sewing capacity and their actual output recorded over a
production day, under standard conditions.

Result:

Capacity Gap: 42%

Training Gap - Difference between achievable efficiency of operators based on their
sewing pace and their actual efficiency.

Methodology - Operators’ actual capacities are compared with targets and the gaps
calculated.

Result:

Training Gap: 12%
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Capacity/Training Gap
CAPACITY AND TRAINING GAP ANALYSIS
Factory: Artistic Apparel

Line #: 05

Style: Jade Grey

28-10-13

Machine

Operator
(Name)

SAM

Target
SCT

Actual
SCT

Capacity
(%)

Capacity

Actual
O/P

Capacity
Gap %

Training
GAP %

Btn Tag & Fly O/L

3T-O/L

Noshad

0.25

14.50

243

0.20

0.23

85.00

206

180

12.79

15.00

Zipper Attach (on fly)

DNLS

Sajjid Ali

0.14

25.00

432

0.10

0.10

95.00

411

180

56.18

5.00

Zipper cutting

Helper

Anwer

0.13

11.00

475

0.10

0.12

82.00

390

180

53.83

18.00

Label Making (3 lable attach)

SNLS

Shakeela

0.28

20.00

214

0.22

0.25

87.00

186

120

35.40

13.00

Facing Marking

Helper

Erum

0.24

11.00

254

0.20

0.22

90.00

228

110

51.83

10.00

Facing Attach

Flat Lock

Nazia

0.48

16.50

124

0.40

0.47

85.00

106

100

5.47

15.00

Facing Cutting

Helper

Koser

0.13

11.00

452

0.10

0.12

87.00

393

100

74.59

13.00

Linning Closing

3T-O/L

Noshaba

0.34

14.50

179

0.28

0.30

92.00

164

150

8.69

8.00

Linning Top

SNLS

Aqsa

0.36

20.00

165

0.29

0.33

86.00

142

90

36.51

14.00

Linning Top

SNLS

Nasreen

0.39

20.00

154

0.31

0.37

84.00

129

90

30.43

16.00

Linning Attach on Front PKT

SNLS

Rukhsana

0.74

20.00

81

0.60

0.67

90.00

73

65

10.93

10.00

Linning Attach on Front PKT

SNLS

Shoaib

0.60

20.00

100

0.49

0.53

91.00

91

75

17.25

9.00

Front Pannel O/L

3T-O/L

Nazia

0.32

25.00

189

0.24

0.27

89.00

169

140

16.98

11.00

Mouth Top (with piping)

DNLS

Ali

0.29

25.00

210

0.21

0.25

85.00

179

85

52.40

15.00

Mouth Top Cutting

Helper

Niqab

0.18

11.00

337

0.14

0.15

95.00

320

85

73.43

5.00

Mouth Top (with piping)

DNLS

Sajjad

0.30

25.00

199

0.23

0.25

90.00

179

90

49.79

10.00

Mouth Top Cutting

Helper

Gulzara

0.22

11.00

268

0.18

0.20

92.00

246

90

63.44

8.00

Fly press

Helper

Ayaz

0.15

11.00

412

0.11

0.13

85.00

350

180

48.54

15.00

Fly Attach

SNLS

Shan

0.18

20.00

336

0.13

0.15

88.00

296

170

42.56

12.00

Fly Top

SNLS

Saleem

0.25

20.00

238

0.21

0.23

90.00

214

170

20.67

10.00

S.No.

Operation

Allowance Target/hr
s(MD+PF) @ 100%
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Capacity/Training Gap
Usual reasons identified for capacity gap:




Inappropriate line balancing
Unstable behavior of Operators
Off standard time
• No WIP (Waiting Time)
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Capacity/Training Gap

Unstable behavior
of Operators

Off Standard Time
No WIP
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Capacity/Training Gap
Recommendations to fill the Capacity Gap:







Review the operations and use the concept of clubbing of operations
where SAMs are low.
Effective line balancing through Operation Bulletins.
Measurement and subsequent reduction in off standard time of
operators.
Making the operators more disciplined and responsible.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Utilization Gap

Utilization Gap - Difference between available time & used productive
time of operators based on their activity sampling.

Methodology -

Result:

Activity sampling was done for a sample size of 78
operators over one full working day , to calculate their
utilization levels.
Utilization Gap: 25%
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Utilization Gap
UTILIZATION ANALYSIS
Factory: Artistic Apparel

Date: 28-10-13

Sample Size: 78

Activity Sampling occasions:

S.No
1

Activity

Line/Lines: 05
Task

Normal Productive Work

Occasions

As Percentage of total As Percentage of
time
Sewing time

Standard

Sew and Handle

253

41%

Shears

34

5%

Total

287

46%

100%

100%

170

27%

59%

15%

12

2%

4%

2%

2

Bundle Handling / Parts layout

3

Machine Delay

4

Machine Breakdown

6

1%

2%

1%

5

Personal and Fatigue

56

9%

20%

3%

6

Waiting Time

59

9%

21%

1%

34

5%

12%

3%

TOTAL

624

100%

Total opportunity for Improvement

25%

MB, P &F, Waiting time, others

Achievable Improvement

9%

Estimated

7

TB, CC, BC, NC

Repair, talk with
supervisor & others,
looking around

Others
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Utilization Gap

Excessive & Uncontrolled
movement

Machine Break Down
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Utilization Gap
Usual reasons identified for utilization gap:





Improper line balancing
Waiting time for WIP
Excessive & Uncontrolled movement
Personal And Fatigue

Recommendation to fill the Utilization Gap:


The Utilization Gap of 25 % suggests an estimated improvement
potential of (09-10)% by reducing the wastage of productive work
time and with preventing measures to avoid above mentioned
reasons.
PEPGI: Promoting Employment & Productivity in Garment Industry

Off Standard Time
Line No. 05
Date

Observation time

5/11/2013 09:30 to 12:30
6/11/2013 02:30 to 04:30
7/11/2013 09:00 to 12:30
Sum
Percentage

Off
Machine
No
Minutes
Standard Break Feeding
Observed
Time
Down
WIP
2520
386
145
241
3600
590
220
370
7350
855
380
475
13470
1831
745
1086
100%
14%
6%
8%
PEPGI: Promoting Employment & Productivity in Garment Industry

Off Standard Time
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap
Methods Gap Potential for increasing operator productivity by improving the
way an operation is performed.

Methodology - Methods of randomly selected operators/workers were

reviewed and potential for improvement studied. A study was
conducted to analyze the current methods being used and the
timings taken. The methods were then analyzed for engineering
possibilities and some basic improvements done. The timing on
the new methods was again taken and compared with the
timings taken on the methods before engineering.

Result:

Method Gap:

15.68 %
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap
METHODS GAP ANALYSIS
Factory: Artistic Apparel

Department

Style: Jade Grey

S.No.

Operation
Linning Attach Before Front Rise Over
Lock

1

2

3

4

Line No. 05
Cycle Time
Before
Engineering

Fly top, Front bundle put on the leg after
sew one by one pcs then dispose and
arrange the side table.
Front PKT mouth top with piping, first
operator or helper unroll the piping with in
a box, during the stitch piping hang on
over the Tube lite.

5

Savings
in
Savings in
Minutes Percentage

0.40

0.13

24.53

0.22

0.03

12.00

0.20

0.03

13.04

0.25

0.05

16.67

0.65

0.25

0.09

12.16

Use some extension of machine bed over the leg, in
order to put the bundle.
0.23
Some extension of thread stand, hang the role in
this stand, don't waist time to unroll the piping.
0.3
Checker should keep unchecked garments on the
left side, altered garments on the right side and use
a trolley for keeping checked garments.
0.74

Fly Round, One helper mark the Fly
Round

Cycle Time
After
Engineering

Use a fabric poach fixed side the machine bed.

Checking, (Front, Back and Assembly),
insufficient space for checking.

6

Engineering Possibilities
Both front panels over lock together before lining
attach due to which numbering will not disarranged

0.53
Label Making (3 or 4 labels attach
togather), use poly beg for each label in
top of machine bed.

Date: 28-30 October, 2013

0.30

Don’t need helper for marking, use gage able fly round pattern
for fly round stitch.

0.30

Total Savings
15.68
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap

Front Rise O/L, after
pocket lining attach

Label Making
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap

Unroll the piping and hang
on over the Tube lite.

Insufficient space for
checking
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap
Fly round Without marking,
use gage able fly pattern
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Gap

Usual reasons contributing to methods gap:





Inefficient method
Unproductive Handling
No concept of clubbing of operations
Workspace layout and suitability, etc.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Unproductive handling

Cycle
Per
Operation
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room – Method Gap

Recommendations to fill the Method Gap:






Use the most appropriate method.
Usage of work-aids if necessary.
Reduce unnecessary movements.
Clubbing of operations where necessary.
Improve the workspace layout.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Approaches


Use of left table extensions to provide more workplace space to the
operator which in turn facilitates the handling of big articles such as
quilt covers and flat sheets.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Approaches
Use of front table extensions to provide more workplace area to
the operator and reduce the number of bursts in sewing long and
straight seams.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Method Approaches


Having innovative solutions
 To reduce operation complication
 To reduce operator movement relating to personal fatigue.
PEPGI: Promoting Employment & Productivity in Garment Industry

Work aid to Attach Labels
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Efficiency Gap
Efficiency Gap - Difference between target production output at 100% efficiency
and achieved production output at existing efficiency level.

Methodology - Production data was collected for past 2 months (60 days) for

the floor. This data included the workers directly involved in
production (operators + helpers), the output in terms of pieces
each day, work hours & standard allowed minutes for the
products studied. This data was then worked upon to find out the
average efficiency percentage over a the period for which the
data has been collected and subsequently arriving at the
efficiency gap.

Result:

Efficiency Gap: 53%
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Efficiency Gap
Date

Unit

Line
no.

1-Oct-2013
2-Oct-2013
3-Oct-2013
4-Oct-2013
5-Oct-2013
6-Oct-2013
7-Oct-2013
8-Oct-2013
9-Oct-2013
10-Oct-2013
11-Oct-2013
12-Oct-2013
13-Oct-2013
14-Oct-2013
15-Oct-2013
16-Oct-2013
17-Oct-2013
18-Oct-2013
19-Oct-2013
20-Oct-2013
21-Oct-2013
22-Oct-2013
23-Oct-2013
24-Oct-2013
25-Oct-2013
26-Oct-2013
27-Oct-2013
28-Oct-2013
29-Oct-2013
30-Oct-2013
31-Oct-2013

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5

Average No. of Average No.
operators
of helpers

Style no.

Output

Jade Grey
Jade Grey
Jade Grey Black
Jade Grey Black
Jade Grey Black

1000
1050
900
1000
800

50
53
55
51
52

20
21
16
18
23

7
8
8
9
9

Julia Black
Julia Black
Julia Black
Julia Black
Jade Black
Jade Black

800
700
1000
1000
1100
1000

54
54
52
52
52
49

17
17
22
22
26
22

5
5
8
7
8
6

Jade Black

1200

54

24

8

Jade Grey

0

42

13

8

Jade Black
Jade Black
Jade Black
Jade Black
Julia Dark Pink
Julia Pink Jade Grey

850
750
300
800
1000
1000

53
53
56
54
53
49

25
19
24
27
18
23

6
8
8
9
9
8

Julia Pink Jade Grey
Julia Pink Jade Grey
Julia Pink Jade Grey

700
1000
200

47
51
50

22
24
24

9
9
8

Avarage Month of Octuber

Checker

Total
workers

Available
minutes

SAM of the
style

Minutes
produced

Efficiency %

Efficiency Gap
%

8
8
8
8
8

36960
39360
37920
37440
40320

21.7
21.7
21.7
21.7
21.7

21700
22785
19530
21700
17360

58.71
57.89
51.50
57.96
43.06

41.29
42.11
48.50
42.04
56.94

8
8
8
8
8
8

36480
36480
39360
38880
41280
36960

22.7
22.7
22.7
22.7
21.7
21.7

18160
15890
22700
22700
23870
21700

49.78
43.56
57.67
58.38
57.82
58.71

50.22
56.44
42.33
41.62
42.18
41.29

8

41280

21.7

26040

63.08

36.92

8

30240

21.7

0

0.00

100.00

8
8
8
8
8
8

40320
38400
42240
43200
38400
38400

21.7
21.7
21.7
21.7
22.7
22.7

18445
16275
6510
17360
22700
22700

45.75
42.38
15.41
40.19
59.11
59.11

54.25
57.62
84.59
59.81
40.89
40.89

8
8
8

37440
40320
39360

22.7
22.7
22.7

15890
22700
4540

42.44
56.30
11.53

57.56
43.70
88.47

46.83

53.17

Working Hr

77
82
79
78
84
Sunday
76
76
82
81
86
77
Sunday
86
Eid Holydays
Eid Holydays
Eid Holydays
Eid Holydays
63
Sunday
84
80
88
90
80
80
Sunday
78
84
82
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Efficiency Gap
Usual reasons identified for Efficiency gap:






No proper method of doing time study being followed.
Improper line balancing causing unnecessary movement and
delay in WIP.
Excessive and uncontrolled movement of operators.
No monitoring and assessment of Off standard and On Standard
time losses.
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Efficiency Gap

On Standard time losses.

Delay in WIP
PEPGI: Promoting Employment & Productivity in Garment Industry

Sewing Room - Efficiency Gap
Recommendations to fill the Efficiency gap:






Proper time studies should be conducted to fix realistic SAM.
Targets to be revised as per the revised SAM and verified by IE Dept
Operation Bulletin to be used for Line balancing.
Reduce and control movement of operators.
Reduce Off standards and On Standard time losses.
PEPGI: Promoting Employment & Productivity in Garment Industry

General Observations
The factory has product profile and sewing lines run on salary
system of payment.


Skill level of the sewing operators are average but they lack
consistency in performance.



Industrial Engineering Department does exist, however, the
discrepancies in the calculation of SMVs needs to convert SAM.



SMVs given by the IE dept. were found to be rather loose.



During the style change taking too much time lose.
PEPGI: Promoting Employment & Productivity in Garment Industry

Recommendations









SAMs for all the operations need to be calculated as per the
standard method.
Operation Bulletin to be prepared based on the SAM thus
calculated, to work out the revised targets.
Operation Bulletin to include SAM based details of operation
sequence, machine required, manpower required, attachment
required etc.
Line balancing to be done through time studies
Skill matrix should be prepared for all the workers and should be
used in line manning to achieve optimum skill utilization.
PEPGI: Promoting Employment & Productivity in Garment Industry

Recommendations


Start recording the machine off-standard time and analysis of the
same, to work upon preventive measures (preventive
maintenance)



Work-aids and attachments should be extensively used at various
operations to facilitate smoother pickup, dispose, and to reduce the
handling time of operators. E.g. Front & side table extensions,
pickup & disposal stands etc. This also reduces helpers within the
Sewing Line.
PEPGI: Promoting Employment & Productivity in Garment Industry

General Observation
Movement Of Garments Parts
Long movement of garment
Front bundle move to pairing table
Use three supervisors (Front, Back, Assembly)

A ssambly sectIon Side Table

Back Section Side Table

Front Section Side Table

Machine
Machine

Checking Table
Machine
Machime
Machine
Machine
Machine
Machime
Machine
Machine
Pairing Table
Checking Table
Machine
Machime
Machine
Machine
Machine
Machime
Machine
Machine
Checking Table
Machine
Machime
Machine
Machine
Machine
Machime
Machine
Machine

LIne No. 5

Press Table
PEPGI: Promoting Employment & Productivity in Garment Industry

Suggestion
Movement Of Garments Parts
Short movement of garment
Front bundle automatically move to pairing table
Use two supervisors one for(Front & Back), Second for (Assembly)

Machine

Machine

Machine

Press Table

Machime

Machine

Machine

Machine

Machine

Machine

Machime

Machine

Machine

Machine
Machine

Machime

Machine

Checking Table

Pairing Table

Front Section Side Table

Machine

Machine

Machime

Machine

Machine

Checking Table

Assambly section Side Table

Machime

Machine

Checking Table

Pairing Table

Machine

Machine

Machime

Machine

Machine

Checking Table

LIneNo. 5
PEPGI: Promoting Employment & Productivity in Garment Industry

IE Activities
PEPGI: Promoting Employment & Productivity in Garment Industry

IE - Pre Production Activities
A. Preproduction stage


Review production planning with the production department.



Make Operation Bulletin.



Suggest construction changes on the basis of use of folders/
production feasibility/ machines availability/ proposed machine
requirement / Test requirements.



Provide the list of machines/ folders / attachments/ work aids
required to the maintenance department.



Follow up for machines / folders/ attachments/ work aids
availability with production department/ maintenance department
and making adjustment in case of non availability.
PEPGI: Promoting Employment & Productivity in Garment Industry

IE OTHER ACTIVITIES
B. Production Run
 Confirm Operation Bulletin (SAMs) /Machine Requirement.
 Ensure machine layout / method as per plan and operation bulletin
 Assign targets as determined by the Operation Bulletin.
 Monitor WIP and help supervisors in Line Management (Balancing).
 Identify low performing operators and send for retraining if required.
 Review output and order status with production department every day
to make adjustments.
 Record daily outputs and calculate minutes produced.
 Monitor Floor Efficiency levels.
PEPGI: Promoting Employment & Productivity in Garment Industry

IE OTHER ACTIVITIES
C. Other Activities

Maintain Database for all styles in terms of SAMs, machines, folders
and work aids used.

Maintain skill matrix for all the operators coming out of the training
centre to utilize their skills in a better way.

Monitor target monitoring boards to keep an eye on line and floor
efficiency.

Maintain thread consumption database

Maintain and enhance the housekeeping, safety and layout of the
factory to meet the compliance requirements.
PEPGI: Promoting Employment & Productivity in Garment Industry

IE - Activity Schedule
I.E. Activity Schedule.xls
S. No.
1

Industrial Engineering Activities (Guidelines):

2

Make Operation Bulletin (OB) for the style
Machine Calculation & planning machine layout as per planned target in
the OB

3

Suggest construction changes on the basis of following:

4

*Use of folders and attachments

5

*Production feasibility

6

*Machine availability

7
8

*Proposed machine requirement
Monitor WIP and help supervisors in line management (Balancing) (Bundle tracking form)

9

Conduct method study and time study after setting line

10 Review methods, SAMs and OB(Revise if required)
11 Start measuring off standard times- (machine breakdown, low WIP etc)
12 Improve operator efficiency/ line efficiency-(Bi-Hourly reports)
Identify low performing operators and send them for training- (operator
13 monitoring board)
14 Create and maintain skill matrix for operators working in sewing
15 Daily floor report
Maintain and enhance th house keeping (5-S), safety and layout of the
16 factory to meet the compliance requirements
17 Order Completion report
18 Follow up & Control all activities

Responsibility/
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10
Assistance
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs
Artistic Apparel
Team/ MTs

NOTE: A particular activites once started should be maintained thereafter on a dail y
basis.
The schedule is tentative and subject to change if required.
PEPGI: Promoting Employment & Productivity in Garment Industry

IE - Follow up schedule
S.No.

Activity I.E. Follow up Schedule..xls

Performed by

1

Presentation on Consulting Guideline
Core Team Formation of the Participating Factory
Handing over of the guidelines
Study of the guidelines
First Meeting for Clarification of concepts on points asked by core team

5

6

7

8

9

10

Participating Company

5

4

Technopak

4

3

Participating Company

3

2

Technopak & UNDP

2

Weeks

1

6
7
8
9
10
11
12
13
14

15

Technopak /
Participating Company
Participating Company's
Implementation of system and Formats
Core team
Second Meeting for Clarification of concepts on points asked by core
Technopak /
team
Participating Company
Participating Company's
Implementation of system and Formats
Core team
Technopak /
Third Meeting for Clarification of concepts on points asked by core team Participating Company 's
core
Participating Company's
Implementation of system and Formats
Core team
Technopak /
Forth Meeting for Clarification of concepts on points asked by core team Participating Company's
Core Team
Participating Company's
Implementation of the system and Formats
Core team
Technopak /
Fifth Meeting for Clarification of concepts on points asked by core team Participating Company
Core Team
Participating Company's
Implementation of the system and Formats
Core team
Technopak /
Sixth Meeting for Clarification of concepts on points asked by core team Participating Company
Core Team
Participating Company's
Implementation of the system and Formats
Core team
Technopak /
Final Meeting for Clarification of concepts on points asked by core team Participating Company
Core Team
Technopak
Participating company's core team

1 Hr
Meeting
1 Hr.
Review

1 Hr.
Review

1 Hr.
Review

1 Hr.
Review

1 Hr.
Review

1 Hr.
Review
PEPGI: Promoting Employment & Productivity in Garment Industry

Activities Already Started






SAM calculations of all styles for Line # 5.
Capacity studies
Utilization studies
Method studies
Efficiency calculations
PEPGI: Promoting Employment & Productivity in Garment Industry

Thank You

Contenu connexe

Tendances

Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industryTanmoy Antu
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 
Finishing department of a garments industry
Finishing department of a garments industryFinishing department of a garments industry
Finishing department of a garments industryDustoAnik
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedureMazharul Islam
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Khairul Bashar
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industryAzmir Latif Beg
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Ankur Shukla
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionMomin Uddin
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirtAzmir Latif Beg
 

Tendances (20)

IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Finishing department of a garments industry
Finishing department of a garments industryFinishing department of a garments industry
Finishing department of a garments industry
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Quality systems for garment
Quality systems for garmentQuality systems for garment
Quality systems for garment
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
SMV & Benefits
SMV & BenefitsSMV & Benefits
SMV & Benefits
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
GSD cords
GSD cordsGSD cords
GSD cords
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
 

En vedette

Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Presentation on Apparel Merchandising
Presentation on Apparel MerchandisingPresentation on Apparel Merchandising
Presentation on Apparel MerchandisingTextile Aid
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productPrasanta Sarkar
 
Garment Development Presentation
Garment Development PresentationGarment Development Presentation
Garment Development Presentationg_isernia
 
Fashionmktingwk15 Review
Fashionmktingwk15   ReviewFashionmktingwk15   Review
Fashionmktingwk15 Reviewjanemonkey
 
Case Study Sri Lanka Lean Wip Reduction
Case Study Sri Lanka   Lean Wip ReductionCase Study Sri Lanka   Lean Wip Reduction
Case Study Sri Lanka Lean Wip ReductionJAMES_MARSH
 
15020441094, garment manufacturing
15020441094, garment manufacturing15020441094, garment manufacturing
15020441094, garment manufacturingGaurav Baishya
 
Fashion Marketing Week 3
Fashion Marketing Week 3Fashion Marketing Week 3
Fashion Marketing Week 3janemonkey
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and PrinciplesAzmir Latif Beg
 
Manufacturing And Product Design July 07 Briefing Session
Manufacturing And Product Design July 07 Briefing SessionManufacturing And Product Design July 07 Briefing Session
Manufacturing And Product Design July 07 Briefing SessionFNian
 
GST impact analysis - Textile & Apparels
GST impact analysis - Textile & ApparelsGST impact analysis - Textile & Apparels
GST impact analysis - Textile & Apparelsshwetika12
 
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Prasanta Sarkar
 
Tafe Fashion Marketing notes wk 9
Tafe Fashion Marketing notes wk 9Tafe Fashion Marketing notes wk 9
Tafe Fashion Marketing notes wk 9janemonkey
 
Industrial engineering intro
Industrial engineering introIndustrial engineering intro
Industrial engineering introvishnuvardhinikj
 
Application of information technology in gi k
Application of information technology in gi kApplication of information technology in gi k
Application of information technology in gi kkibrom G
 
Supply Chain
Supply ChainSupply Chain
Supply ChainFNian
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdownvikram kumar
 

En vedette (20)

Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Presentation on Apparel Merchandising
Presentation on Apparel MerchandisingPresentation on Apparel Merchandising
Presentation on Apparel Merchandising
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished product
 
Garment Development Presentation
Garment Development PresentationGarment Development Presentation
Garment Development Presentation
 
Fashionmktingwk15 Review
Fashionmktingwk15   ReviewFashionmktingwk15   Review
Fashionmktingwk15 Review
 
Production Management by Sandra Carr
Production Management by Sandra CarrProduction Management by Sandra Carr
Production Management by Sandra Carr
 
Case Study Sri Lanka Lean Wip Reduction
Case Study Sri Lanka   Lean Wip ReductionCase Study Sri Lanka   Lean Wip Reduction
Case Study Sri Lanka Lean Wip Reduction
 
15020441094, garment manufacturing
15020441094, garment manufacturing15020441094, garment manufacturing
15020441094, garment manufacturing
 
Fashion Marketing Week 3
Fashion Marketing Week 3Fashion Marketing Week 3
Fashion Marketing Week 3
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Manufacturing And Product Design July 07 Briefing Session
Manufacturing And Product Design July 07 Briefing SessionManufacturing And Product Design July 07 Briefing Session
Manufacturing And Product Design July 07 Briefing Session
 
Garments process
Garments processGarments process
Garments process
 
GST impact analysis - Textile & Apparels
GST impact analysis - Textile & ApparelsGST impact analysis - Textile & Apparels
GST impact analysis - Textile & Apparels
 
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
 
Tafe Fashion Marketing notes wk 9
Tafe Fashion Marketing notes wk 9Tafe Fashion Marketing notes wk 9
Tafe Fashion Marketing notes wk 9
 
Industrial engineering intro
Industrial engineering introIndustrial engineering intro
Industrial engineering intro
 
Application of information technology in gi k
Application of information technology in gi kApplication of information technology in gi k
Application of information technology in gi k
 
Supply Chain
Supply ChainSupply Chain
Supply Chain
 
21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown21548667 t-shirt-operation-breakdown
21548667 t-shirt-operation-breakdown
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 

Similaire à Artistic apparel audit presentation ...

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsNabila Naik
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industryArya Wirabhuana
 
Analysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesAnalysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesDavid Fearnley-Brown
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptxVarun Mehrotra
 
project-presentation
project-presentationproject-presentation
project-presentationronybste
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)Leanleaders.org
 
MVR BEFORE RAMP
MVR BEFORE RAMPMVR BEFORE RAMP
MVR BEFORE RAMPRAMANA M V
 
Internship Report on Knit Dyeing
Internship Report on Knit DyeingInternship Report on Knit Dyeing
Internship Report on Knit DyeingMd. Ibrahim Hossain
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...ijtsrd
 
Internship presentation Md. Shihab Uddin
 Internship presentation Md. Shihab Uddin Internship presentation Md. Shihab Uddin
Internship presentation Md. Shihab UddinMDShihabUddin13
 
1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdfKashifChangez
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 

Similaire à Artistic apparel audit presentation ... (20)

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisors
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Subham Internship
Subham InternshipSubham Internship
Subham Internship
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
 
business review
business reviewbusiness review
business review
 
Analysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesAnalysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companies
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Cost reduction strategies
Cost reduction strategiesCost reduction strategies
Cost reduction strategies
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
project-presentation
project-presentationproject-presentation
project-presentation
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
MVR BEFORE RAMP
MVR BEFORE RAMPMVR BEFORE RAMP
MVR BEFORE RAMP
 
Internship Report on Knit Dyeing
Internship Report on Knit DyeingInternship Report on Knit Dyeing
Internship Report on Knit Dyeing
 
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
Assembly Line Balancing to Improve Productivity using Work Sharing Method in ...
 
Internship presentation Md. Shihab Uddin
 Internship presentation Md. Shihab Uddin Internship presentation Md. Shihab Uddin
Internship presentation Md. Shihab Uddin
 
1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 

Dernier

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Dernier (20)

Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Artistic apparel audit presentation ...

  • 1. PEPGI: Promoting Employment & Productivity in Garment Industry Industrial Engineering Consulting Guidelines Artistic Apparels November 09, 2013
  • 2. PEPGI: Promoting Employment & Productivity in Garment Industry Contents 1 Objectives & Methodology 2 Technopak Gap Analysis 3 Observations and Recommendations 4 IE Activities 5 Follow up Schedule 6 Activities Already Started
  • 3. PEPGI: Promoting Employment & Productivity in Garment Industry Why Consulting Guidelines Required? Association with PEPGI provides the participating companies, a unique experience through consulting guideline in one of the chosen area from the following topics: Fabric & Cutting Room Management Sewing Room Production Management(SRPM) Industrial Engineering Quality management system Business process mapping Artistic Apparel has chosen Industrial Engineering for enhancing the performance in this area. On the basis of assessment study, the various gaps are identified which will be filled by company’s employees through consulting guidelines, followed up and monitored by Technopak Advisors and UNDP team.
  • 4. PEPGI: Promoting Employment & Productivity in Garment Industry Objectives  Assess the sewing operations at Artistic Apparel Unit # 01 (Stitching Line # 5), in terms of Productivity and Efficiency, based on observation of the entire operations and a comprehensive “Technopak Gap Analysis”.  Compare performance data and results from gap analysis to industry benchmarks. Determine areas of improvement.  Put forward the observations pertaining to sewing floors and share recommendations.  Identify the need gaps for performance improvement and suggest a roadmap based on Industrial Engineering, to the management for bridging these gaps.  Highlight the advantages and benefits of having Industrial Engineering department .
  • 5. PEPGI: Promoting Employment & Productivity in Garment Industry Methodology  Identify current performance levels in – Capacities, Utilization, Using Methods, and productivity. Productivity level was evaluated from 5 perspectives:  Worker’s Capacity  Evaluation of existing capacities of sewing operators & their ability to meet their capacities.  Training Requirement  Requirement of training based on Worker’s capacity.  Worker’s Utilization  How well are the operators being utilized.  Methodology Terms  Evaluation of methodology of doing operations for the product profile being manufactured.  Efficiency terms  Evaluation of production data recorded for the current month. General observations  
  • 6. PEPGI: Promoting Employment & Productivity in Garment Industry Technopak Gap Analysis Capacity Gap Are the operators performing as well as they can? Training Gap Are the operators trained enough to do the operation? Utilization Gap Are we using our workers all the time? Methods Gap Efficiency Gap Is this the best way to do this operation? How efficient is the work ? P P R R O O D D U U C C T T I I V V I I T T Y Y
  • 7. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Capacity/Training Gap Capacity Gap - Difference between achievable production capacity of operators based on their sewing pace & the actual output produced by them. Methodology - Single cycle time was taken for randomly chosen operators to calculate their sewing capacity and their actual output recorded over a production day, under standard conditions. Result: Capacity Gap: 42% Training Gap - Difference between achievable efficiency of operators based on their sewing pace and their actual efficiency. Methodology - Operators’ actual capacities are compared with targets and the gaps calculated. Result: Training Gap: 12%
  • 8. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Capacity/Training Gap CAPACITY AND TRAINING GAP ANALYSIS Factory: Artistic Apparel Line #: 05 Style: Jade Grey 28-10-13 Machine Operator (Name) SAM Target SCT Actual SCT Capacity (%) Capacity Actual O/P Capacity Gap % Training GAP % Btn Tag & Fly O/L 3T-O/L Noshad 0.25 14.50 243 0.20 0.23 85.00 206 180 12.79 15.00 Zipper Attach (on fly) DNLS Sajjid Ali 0.14 25.00 432 0.10 0.10 95.00 411 180 56.18 5.00 Zipper cutting Helper Anwer 0.13 11.00 475 0.10 0.12 82.00 390 180 53.83 18.00 Label Making (3 lable attach) SNLS Shakeela 0.28 20.00 214 0.22 0.25 87.00 186 120 35.40 13.00 Facing Marking Helper Erum 0.24 11.00 254 0.20 0.22 90.00 228 110 51.83 10.00 Facing Attach Flat Lock Nazia 0.48 16.50 124 0.40 0.47 85.00 106 100 5.47 15.00 Facing Cutting Helper Koser 0.13 11.00 452 0.10 0.12 87.00 393 100 74.59 13.00 Linning Closing 3T-O/L Noshaba 0.34 14.50 179 0.28 0.30 92.00 164 150 8.69 8.00 Linning Top SNLS Aqsa 0.36 20.00 165 0.29 0.33 86.00 142 90 36.51 14.00 Linning Top SNLS Nasreen 0.39 20.00 154 0.31 0.37 84.00 129 90 30.43 16.00 Linning Attach on Front PKT SNLS Rukhsana 0.74 20.00 81 0.60 0.67 90.00 73 65 10.93 10.00 Linning Attach on Front PKT SNLS Shoaib 0.60 20.00 100 0.49 0.53 91.00 91 75 17.25 9.00 Front Pannel O/L 3T-O/L Nazia 0.32 25.00 189 0.24 0.27 89.00 169 140 16.98 11.00 Mouth Top (with piping) DNLS Ali 0.29 25.00 210 0.21 0.25 85.00 179 85 52.40 15.00 Mouth Top Cutting Helper Niqab 0.18 11.00 337 0.14 0.15 95.00 320 85 73.43 5.00 Mouth Top (with piping) DNLS Sajjad 0.30 25.00 199 0.23 0.25 90.00 179 90 49.79 10.00 Mouth Top Cutting Helper Gulzara 0.22 11.00 268 0.18 0.20 92.00 246 90 63.44 8.00 Fly press Helper Ayaz 0.15 11.00 412 0.11 0.13 85.00 350 180 48.54 15.00 Fly Attach SNLS Shan 0.18 20.00 336 0.13 0.15 88.00 296 170 42.56 12.00 Fly Top SNLS Saleem 0.25 20.00 238 0.21 0.23 90.00 214 170 20.67 10.00 S.No. Operation Allowance Target/hr s(MD+PF) @ 100%
  • 9. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Capacity/Training Gap Usual reasons identified for capacity gap:    Inappropriate line balancing Unstable behavior of Operators Off standard time • No WIP (Waiting Time)
  • 10. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Capacity/Training Gap Unstable behavior of Operators Off Standard Time No WIP
  • 11. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Capacity/Training Gap Recommendations to fill the Capacity Gap:     Review the operations and use the concept of clubbing of operations where SAMs are low. Effective line balancing through Operation Bulletins. Measurement and subsequent reduction in off standard time of operators. Making the operators more disciplined and responsible.
  • 12. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Utilization Gap Utilization Gap - Difference between available time & used productive time of operators based on their activity sampling. Methodology - Result: Activity sampling was done for a sample size of 78 operators over one full working day , to calculate their utilization levels. Utilization Gap: 25%
  • 13. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Utilization Gap UTILIZATION ANALYSIS Factory: Artistic Apparel Date: 28-10-13 Sample Size: 78 Activity Sampling occasions: S.No 1 Activity Line/Lines: 05 Task Normal Productive Work Occasions As Percentage of total As Percentage of time Sewing time Standard Sew and Handle 253 41% Shears 34 5% Total 287 46% 100% 100% 170 27% 59% 15% 12 2% 4% 2% 2 Bundle Handling / Parts layout 3 Machine Delay 4 Machine Breakdown 6 1% 2% 1% 5 Personal and Fatigue 56 9% 20% 3% 6 Waiting Time 59 9% 21% 1% 34 5% 12% 3% TOTAL 624 100% Total opportunity for Improvement 25% MB, P &F, Waiting time, others Achievable Improvement 9% Estimated 7 TB, CC, BC, NC Repair, talk with supervisor & others, looking around Others
  • 14. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Utilization Gap Excessive & Uncontrolled movement Machine Break Down
  • 15. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Utilization Gap Usual reasons identified for utilization gap:     Improper line balancing Waiting time for WIP Excessive & Uncontrolled movement Personal And Fatigue Recommendation to fill the Utilization Gap:  The Utilization Gap of 25 % suggests an estimated improvement potential of (09-10)% by reducing the wastage of productive work time and with preventing measures to avoid above mentioned reasons.
  • 16. PEPGI: Promoting Employment & Productivity in Garment Industry Off Standard Time Line No. 05 Date Observation time 5/11/2013 09:30 to 12:30 6/11/2013 02:30 to 04:30 7/11/2013 09:00 to 12:30 Sum Percentage Off Machine No Minutes Standard Break Feeding Observed Time Down WIP 2520 386 145 241 3600 590 220 370 7350 855 380 475 13470 1831 745 1086 100% 14% 6% 8%
  • 17. PEPGI: Promoting Employment & Productivity in Garment Industry Off Standard Time
  • 18. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap Methods Gap Potential for increasing operator productivity by improving the way an operation is performed. Methodology - Methods of randomly selected operators/workers were reviewed and potential for improvement studied. A study was conducted to analyze the current methods being used and the timings taken. The methods were then analyzed for engineering possibilities and some basic improvements done. The timing on the new methods was again taken and compared with the timings taken on the methods before engineering. Result: Method Gap: 15.68 %
  • 19. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap METHODS GAP ANALYSIS Factory: Artistic Apparel Department Style: Jade Grey S.No. Operation Linning Attach Before Front Rise Over Lock 1 2 3 4 Line No. 05 Cycle Time Before Engineering Fly top, Front bundle put on the leg after sew one by one pcs then dispose and arrange the side table. Front PKT mouth top with piping, first operator or helper unroll the piping with in a box, during the stitch piping hang on over the Tube lite. 5 Savings in Savings in Minutes Percentage 0.40 0.13 24.53 0.22 0.03 12.00 0.20 0.03 13.04 0.25 0.05 16.67 0.65 0.25 0.09 12.16 Use some extension of machine bed over the leg, in order to put the bundle. 0.23 Some extension of thread stand, hang the role in this stand, don't waist time to unroll the piping. 0.3 Checker should keep unchecked garments on the left side, altered garments on the right side and use a trolley for keeping checked garments. 0.74 Fly Round, One helper mark the Fly Round Cycle Time After Engineering Use a fabric poach fixed side the machine bed. Checking, (Front, Back and Assembly), insufficient space for checking. 6 Engineering Possibilities Both front panels over lock together before lining attach due to which numbering will not disarranged 0.53 Label Making (3 or 4 labels attach togather), use poly beg for each label in top of machine bed. Date: 28-30 October, 2013 0.30 Don’t need helper for marking, use gage able fly round pattern for fly round stitch. 0.30 Total Savings 15.68
  • 20. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap Front Rise O/L, after pocket lining attach Label Making
  • 21. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap Unroll the piping and hang on over the Tube lite. Insufficient space for checking
  • 22. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap Fly round Without marking, use gage able fly pattern
  • 23. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Gap Usual reasons contributing to methods gap:     Inefficient method Unproductive Handling No concept of clubbing of operations Workspace layout and suitability, etc.
  • 24. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Unproductive handling Cycle Per Operation
  • 25. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room – Method Gap Recommendations to fill the Method Gap:      Use the most appropriate method. Usage of work-aids if necessary. Reduce unnecessary movements. Clubbing of operations where necessary. Improve the workspace layout.
  • 26. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Approaches  Use of left table extensions to provide more workplace space to the operator which in turn facilitates the handling of big articles such as quilt covers and flat sheets.
  • 27. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Approaches Use of front table extensions to provide more workplace area to the operator and reduce the number of bursts in sewing long and straight seams.
  • 28. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Method Approaches  Having innovative solutions  To reduce operation complication  To reduce operator movement relating to personal fatigue.
  • 29. PEPGI: Promoting Employment & Productivity in Garment Industry Work aid to Attach Labels
  • 30. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Efficiency Gap Efficiency Gap - Difference between target production output at 100% efficiency and achieved production output at existing efficiency level. Methodology - Production data was collected for past 2 months (60 days) for the floor. This data included the workers directly involved in production (operators + helpers), the output in terms of pieces each day, work hours & standard allowed minutes for the products studied. This data was then worked upon to find out the average efficiency percentage over a the period for which the data has been collected and subsequently arriving at the efficiency gap. Result: Efficiency Gap: 53%
  • 31. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Efficiency Gap Date Unit Line no. 1-Oct-2013 2-Oct-2013 3-Oct-2013 4-Oct-2013 5-Oct-2013 6-Oct-2013 7-Oct-2013 8-Oct-2013 9-Oct-2013 10-Oct-2013 11-Oct-2013 12-Oct-2013 13-Oct-2013 14-Oct-2013 15-Oct-2013 16-Oct-2013 17-Oct-2013 18-Oct-2013 19-Oct-2013 20-Oct-2013 21-Oct-2013 22-Oct-2013 23-Oct-2013 24-Oct-2013 25-Oct-2013 26-Oct-2013 27-Oct-2013 28-Oct-2013 29-Oct-2013 30-Oct-2013 31-Oct-2013 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Average No. of Average No. operators of helpers Style no. Output Jade Grey Jade Grey Jade Grey Black Jade Grey Black Jade Grey Black 1000 1050 900 1000 800 50 53 55 51 52 20 21 16 18 23 7 8 8 9 9 Julia Black Julia Black Julia Black Julia Black Jade Black Jade Black 800 700 1000 1000 1100 1000 54 54 52 52 52 49 17 17 22 22 26 22 5 5 8 7 8 6 Jade Black 1200 54 24 8 Jade Grey 0 42 13 8 Jade Black Jade Black Jade Black Jade Black Julia Dark Pink Julia Pink Jade Grey 850 750 300 800 1000 1000 53 53 56 54 53 49 25 19 24 27 18 23 6 8 8 9 9 8 Julia Pink Jade Grey Julia Pink Jade Grey Julia Pink Jade Grey 700 1000 200 47 51 50 22 24 24 9 9 8 Avarage Month of Octuber Checker Total workers Available minutes SAM of the style Minutes produced Efficiency % Efficiency Gap % 8 8 8 8 8 36960 39360 37920 37440 40320 21.7 21.7 21.7 21.7 21.7 21700 22785 19530 21700 17360 58.71 57.89 51.50 57.96 43.06 41.29 42.11 48.50 42.04 56.94 8 8 8 8 8 8 36480 36480 39360 38880 41280 36960 22.7 22.7 22.7 22.7 21.7 21.7 18160 15890 22700 22700 23870 21700 49.78 43.56 57.67 58.38 57.82 58.71 50.22 56.44 42.33 41.62 42.18 41.29 8 41280 21.7 26040 63.08 36.92 8 30240 21.7 0 0.00 100.00 8 8 8 8 8 8 40320 38400 42240 43200 38400 38400 21.7 21.7 21.7 21.7 22.7 22.7 18445 16275 6510 17360 22700 22700 45.75 42.38 15.41 40.19 59.11 59.11 54.25 57.62 84.59 59.81 40.89 40.89 8 8 8 37440 40320 39360 22.7 22.7 22.7 15890 22700 4540 42.44 56.30 11.53 57.56 43.70 88.47 46.83 53.17 Working Hr 77 82 79 78 84 Sunday 76 76 82 81 86 77 Sunday 86 Eid Holydays Eid Holydays Eid Holydays Eid Holydays 63 Sunday 84 80 88 90 80 80 Sunday 78 84 82
  • 32. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Efficiency Gap Usual reasons identified for Efficiency gap:     No proper method of doing time study being followed. Improper line balancing causing unnecessary movement and delay in WIP. Excessive and uncontrolled movement of operators. No monitoring and assessment of Off standard and On Standard time losses.
  • 33. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Efficiency Gap On Standard time losses. Delay in WIP
  • 34. PEPGI: Promoting Employment & Productivity in Garment Industry Sewing Room - Efficiency Gap Recommendations to fill the Efficiency gap:      Proper time studies should be conducted to fix realistic SAM. Targets to be revised as per the revised SAM and verified by IE Dept Operation Bulletin to be used for Line balancing. Reduce and control movement of operators. Reduce Off standards and On Standard time losses.
  • 35. PEPGI: Promoting Employment & Productivity in Garment Industry General Observations The factory has product profile and sewing lines run on salary system of payment.  Skill level of the sewing operators are average but they lack consistency in performance.  Industrial Engineering Department does exist, however, the discrepancies in the calculation of SMVs needs to convert SAM.  SMVs given by the IE dept. were found to be rather loose.  During the style change taking too much time lose.
  • 36. PEPGI: Promoting Employment & Productivity in Garment Industry Recommendations      SAMs for all the operations need to be calculated as per the standard method. Operation Bulletin to be prepared based on the SAM thus calculated, to work out the revised targets. Operation Bulletin to include SAM based details of operation sequence, machine required, manpower required, attachment required etc. Line balancing to be done through time studies Skill matrix should be prepared for all the workers and should be used in line manning to achieve optimum skill utilization.
  • 37. PEPGI: Promoting Employment & Productivity in Garment Industry Recommendations  Start recording the machine off-standard time and analysis of the same, to work upon preventive measures (preventive maintenance)  Work-aids and attachments should be extensively used at various operations to facilitate smoother pickup, dispose, and to reduce the handling time of operators. E.g. Front & side table extensions, pickup & disposal stands etc. This also reduces helpers within the Sewing Line.
  • 38. PEPGI: Promoting Employment & Productivity in Garment Industry General Observation Movement Of Garments Parts Long movement of garment Front bundle move to pairing table Use three supervisors (Front, Back, Assembly) A ssambly sectIon Side Table Back Section Side Table Front Section Side Table Machine Machine Checking Table Machine Machime Machine Machine Machine Machime Machine Machine Pairing Table Checking Table Machine Machime Machine Machine Machine Machime Machine Machine Checking Table Machine Machime Machine Machine Machine Machime Machine Machine LIne No. 5 Press Table
  • 39. PEPGI: Promoting Employment & Productivity in Garment Industry Suggestion Movement Of Garments Parts Short movement of garment Front bundle automatically move to pairing table Use two supervisors one for(Front & Back), Second for (Assembly) Machine Machine Machine Press Table Machime Machine Machine Machine Machine Machine Machime Machine Machine Machine Machine Machime Machine Checking Table Pairing Table Front Section Side Table Machine Machine Machime Machine Machine Checking Table Assambly section Side Table Machime Machine Checking Table Pairing Table Machine Machine Machime Machine Machine Checking Table LIneNo. 5
  • 40. PEPGI: Promoting Employment & Productivity in Garment Industry IE Activities
  • 41. PEPGI: Promoting Employment & Productivity in Garment Industry IE - Pre Production Activities A. Preproduction stage  Review production planning with the production department.  Make Operation Bulletin.  Suggest construction changes on the basis of use of folders/ production feasibility/ machines availability/ proposed machine requirement / Test requirements.  Provide the list of machines/ folders / attachments/ work aids required to the maintenance department.  Follow up for machines / folders/ attachments/ work aids availability with production department/ maintenance department and making adjustment in case of non availability.
  • 42. PEPGI: Promoting Employment & Productivity in Garment Industry IE OTHER ACTIVITIES B. Production Run  Confirm Operation Bulletin (SAMs) /Machine Requirement.  Ensure machine layout / method as per plan and operation bulletin  Assign targets as determined by the Operation Bulletin.  Monitor WIP and help supervisors in Line Management (Balancing).  Identify low performing operators and send for retraining if required.  Review output and order status with production department every day to make adjustments.  Record daily outputs and calculate minutes produced.  Monitor Floor Efficiency levels.
  • 43. PEPGI: Promoting Employment & Productivity in Garment Industry IE OTHER ACTIVITIES C. Other Activities  Maintain Database for all styles in terms of SAMs, machines, folders and work aids used.  Maintain skill matrix for all the operators coming out of the training centre to utilize their skills in a better way.  Monitor target monitoring boards to keep an eye on line and floor efficiency.  Maintain thread consumption database  Maintain and enhance the housekeeping, safety and layout of the factory to meet the compliance requirements.
  • 44. PEPGI: Promoting Employment & Productivity in Garment Industry IE - Activity Schedule I.E. Activity Schedule.xls S. No. 1 Industrial Engineering Activities (Guidelines): 2 Make Operation Bulletin (OB) for the style Machine Calculation & planning machine layout as per planned target in the OB 3 Suggest construction changes on the basis of following: 4 *Use of folders and attachments 5 *Production feasibility 6 *Machine availability 7 8 *Proposed machine requirement Monitor WIP and help supervisors in line management (Balancing) (Bundle tracking form) 9 Conduct method study and time study after setting line 10 Review methods, SAMs and OB(Revise if required) 11 Start measuring off standard times- (machine breakdown, low WIP etc) 12 Improve operator efficiency/ line efficiency-(Bi-Hourly reports) Identify low performing operators and send them for training- (operator 13 monitoring board) 14 Create and maintain skill matrix for operators working in sewing 15 Daily floor report Maintain and enhance th house keeping (5-S), safety and layout of the 16 factory to meet the compliance requirements 17 Order Completion report 18 Follow up & Control all activities Responsibility/ Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Assistance Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs Artistic Apparel Team/ MTs NOTE: A particular activites once started should be maintained thereafter on a dail y basis. The schedule is tentative and subject to change if required.
  • 45. PEPGI: Promoting Employment & Productivity in Garment Industry IE - Follow up schedule S.No. Activity I.E. Follow up Schedule..xls Performed by 1 Presentation on Consulting Guideline Core Team Formation of the Participating Factory Handing over of the guidelines Study of the guidelines First Meeting for Clarification of concepts on points asked by core team 5 6 7 8 9 10 Participating Company 5 4 Technopak 4 3 Participating Company 3 2 Technopak & UNDP 2 Weeks 1 6 7 8 9 10 11 12 13 14 15 Technopak / Participating Company Participating Company's Implementation of system and Formats Core team Second Meeting for Clarification of concepts on points asked by core Technopak / team Participating Company Participating Company's Implementation of system and Formats Core team Technopak / Third Meeting for Clarification of concepts on points asked by core team Participating Company 's core Participating Company's Implementation of system and Formats Core team Technopak / Forth Meeting for Clarification of concepts on points asked by core team Participating Company's Core Team Participating Company's Implementation of the system and Formats Core team Technopak / Fifth Meeting for Clarification of concepts on points asked by core team Participating Company Core Team Participating Company's Implementation of the system and Formats Core team Technopak / Sixth Meeting for Clarification of concepts on points asked by core team Participating Company Core Team Participating Company's Implementation of the system and Formats Core team Technopak / Final Meeting for Clarification of concepts on points asked by core team Participating Company Core Team Technopak Participating company's core team 1 Hr Meeting 1 Hr. Review 1 Hr. Review 1 Hr. Review 1 Hr. Review 1 Hr. Review 1 Hr. Review
  • 46. PEPGI: Promoting Employment & Productivity in Garment Industry Activities Already Started      SAM calculations of all styles for Line # 5. Capacity studies Utilization studies Method studies Efficiency calculations
  • 47. PEPGI: Promoting Employment & Productivity in Garment Industry Thank You