SlideShare une entreprise Scribd logo
1  sur  24
©2012 Vector Consulting Group. All Rights Reserved.
www.vectorconsulting.inwww.vectorconsulting.in
VCG employs the 'Theory of Constraints’ philosophy to bring about quantum
jump in performance of organizations in its target industry clusters.
LEVERAGING
THE POTENTIAL
RetailConsumer
Goods
Equipment
Manufacturing
Engineering
& Construction
Automobile &
Auto Components
©2012 Vector Consulting Group. All Rights Reserved.
202, Orion Business Park, Kapurbawdi Naka,
Ghodbunder Road, Thane (West) – 400610
Phone: +91 22 2589 5896
Fax: +91 22 2589 5897
Email: vcg@vectorconsulting.in
Web: www.vectorconsulting.in
TOC Insights - Operations
Sep 18, 2012
2
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 01
3
Only 20% of the Japanese Companies
have implemented Lean/Six Sigma/TQM/TPM
Its not that the remaining 80%didn't try.
These firms tried, but failed repeatedly.
Did they fail because
of lack of seriousness?
Did they fail because
lack of efforts?
Did they fail because
lack of Knowledge?Not really!!
©2012 Vector Consulting Group. All Rights Reserved.
Basics 01 - Part 02
4
The firms tried and failed repeatedly because:
Their Production Environment were
fundamental different from Toyota.
TPS was developed for Toyota.
You cannot “Copy Paste” solution of one
environment to the other environment!
©2012 Vector Consulting Group. All Rights Reserved. 5
Reality of implementation of
Lean / Six Sigma / TQM / TPM
©2012 Vector Consulting Group. All Rights Reserved.
An Insight
6
Application is specific, do
not force them on your
production environments.
01
Concepts are general, learn
them and design application
for your environment.
02
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
7
The assembly line
developed for the Ford Model T
began operation on December 1,
1913. It had immense influence
on the world.
Assembly Lines (FORD)
Features
• Flow line concept introduced for Mass Production.
• Flow means inventories in the operation are moving.
• Inventories are controlled by limiting space
between work-stations.
What happens
when space is
full?
Production stops i.e. in
essence local efficiencies
are abolished (Against
conventional wisdom of
100% efficiency).
Limitations
Single Product lines
where facilities are
dedicated for each
component.
Output is
lost when
production
stops?
Focusing mechanism
now available to
eliminate shortages.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
8
AssemblyLines
(FORD)
Part
02
Generic Concepts
Improving flow (or equivalently lead time) is the
primary objective of operations.
This primary objective should be translated into a
practical mechanism that guides operation when not
to produce (i.e. prevent over-production).
Local efficiencies must be
abolished.
A focusing process to
balance flow must be
in place.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
9
LEAN / TPS (TOYOTA)
Challenges
to introduce
FORD
system to
TOYOTA
Demand for small quantities of a
variety of cars, hence dedicated
lines could not be justified.
Space cannot be used to limit
inventories because:
If components are unavailable,
then Assembly would stop.
If space is full, feeder
lines would stop.
Solution was realized when Taichi Ohno heard about Super-Markets
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
10
Part
02
LEAN/TPS
(TOYOTA)
Features
• Flow is the most important element of TPS
• In place of Space, Kanban System introduced to limit
the inventory
• Only when an allocated container is used, production of
that container is triggered (No Card ..... No Production)
Frequent switching for small lots means
more set-ups and hence loss of production
• Just-in-time Evolved i.e. produce only those items which are
required in the very short-term.
• Set-up reduction techniques were developed (called Lean).
• Kanban was further used to guide process improvement efforts.
• Gradual reduction in Containers (FIVE WHYs introduced to guide
improvement efforts).
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
11
Part
03
LEAN/TPS
(TOYOTA)
Almost
everyone has
implemented
TPS, but still
no one has
achieved the
same
Productivity
numbers as
Toyota ...
Why?
Answer lies in the process of
choosing local improvements
Conventional companies use cost savings as
the parameter to decide local improvements
whereas Toyota uses “Flow Improvement”.
E.g. Setup Reduction was never done to
gain cost savings, rather it was done to
create better availability at a faster rate.
E.g. Quality was not improved to save trivial
costs, rather it was improved to remove
disruptions caused by defective part.
No focus on squeezing better prices from
supplier or cut payroll cost (manpower
reduction), rather full energy is spent on
improving the flow.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
12
Part
04
LEAN/TPS
(TOYOTA)
End Results
Focusing on Flow instead of local cost considerations
resulted in a much better lower cost per unit.
Abolishing local efficiencies resulted in much higher
efficiency of the workforce.
Important Insight
All cost reductions have a ceiling
(can cost be made ZERO?).
Improvement efforts have diminishing returns.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
13
Part
05
LEAN/TPS
(TOYOTA)
Generic
Concepts
Improving flow (or equivalently lead time)
is a primary objective of operations.
This primary objective should be
translated into a practical mechanism that
guides the operation when not to produce
(prevents overproduction).
Ford used space; Ohno used inventory.
Local efficiencies must be abolished.
Ford used dedicated lines; Ohno
introduced JIT & Lean techniques.
A focusing process to balance flow must
be in place. Ford used direct observation.
Ohno used gradual reduction of the
number of containers and then gradual
reduction of parts per container.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 02
14
Part
06
LEAN/TPS(TOYOTA
ProductionSystem)
Boundaries
of TPS
Works in Stable environments i.e.
the processes and the products
do not change significantly for a
considerable length of time.
Demand over time per product
should be relatively stable.
E.g. Toyota has
only 1 time
change yearly
per model.
Combine specific
techniques of
Lean with cost
saving programs.
Total load placed by orders on
the various types of resources
must be relatively stable.
Imagine holding
containers for items which
have sporadic demand.
When load changes
frequently, promising firm
due dates is challenging.
Typical way of
implementing
Lean in most
companies
Is this
really a true
implementa-
tion of Lean?
©2012 Vector Consulting Group. All Rights Reserved. 15
Theory of Constraint
Way of Production
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part01
16
Core
Principles
Flow is the most important
objective of Operations.
Practical Mechanism to
avoid Over-Production.
Achieved by ensuring
synchronization from everywhere
achieved by reducing lead times
cross the chain.
Local Efficiencies are
abolished.
Restrict release of material ahead
of time (suitable for unstable
environments as it is less sensitive
to disruptions in flow.
Buffer Management (BM) and Load
control are put in place.
Focusing process to balance
flow must be in place.
Analysis of Blacks & Reds guide
the improvement efforts.
©2012 Vector Consulting Group. All Rights Reserved.
Bottleneck
Basics 03 - TOC way of Production - Part02
17
Abolishment of Local Efficiencies
If C is to be used 100%
• There has to be Continuous bank of work in front of “C”.
• Whenever, there are disruptions in “A” or “B”; not only they have to ensure
that “C” is fed but also the Bank is rebuilt. Which means “A” / “B” should
have excess capacity than “C”.
• Similarly, incase of disruptions in “D”; not only it has to produce what “C”
is producing, “D” also has to clear the backlog created by “C”. Which again
means “D” has excess capacity than “C”.
A B C D
By this very definition, “A” / “B” / “D” should have much more capacity than “C” just
to keep “C” 100% busy. If so then local efficiencies at places other than “C” have to be
abolished otherwise inventory will hit the roofs.
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part03
18
Time Based Mechanism to control WIP
Problem of using Space to control WIP between Workstations
• E.g. Conveyers, Trolleys, etc.
• When space is full, production stops which may not mean 100% utilization
of Bottleneck (“C”) resource.
• WIP in front of Bottleneck and Space after the Bottleneck is a function of
the “Normal Disruptions” at upstream & downstream resources.
o Typically the WIP is designed to be kept to bare minimum which
can result in production loss.
A B C D
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part04
19
Time Based Mechanism to control WIP
In TOC,
• WIP in the system is not artificially restrained between every 2 work
centers; rather it is controlled for the entire system allowing the effects of
Murphy to be absorbed throughout the system and yet protect the due
dates.
• Unlike Kanban, WIP is not maintained everywhere in the system. Rather it
is maintained only where needed i.e. to ensure 100% utilization of
bottleneck.
A B C D
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part05
20
Concept of Lead Time
• Most of the time, order is waiting in queues in front of the
resources.
• Generally the time actually spent working on an order is less
than 10% of the total lead time.
• Therefore at times of Urgency, material can moved very fast
through the system.
Total Lead Time
Waiting TimeTouch Time
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part06
21
Choke The Release
• Small lead times cause too much expediting (termed as “Hand-2-mouth”)
• Large lead times cause Jams, missed priorities
• Stables zone is in the middle and hence “Choke the Release” is done by
cutting WIP by half
ManagementAttention
Time Buffer Size
Insufficient
Reaction
time
Jams,
Missed
priorities
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part07
22
Priority System
• Just “Choking the Release” i.e. reducing WIP by half will not result in
more than 90% due date performance.
• Therefore a simple yet robust priority system is needed to guide
operations.
• Buffer Management gives clear priority to all the work-centers to
effectively plan and execute orders.
Reduced Lead Time
©2012 Vector Consulting Group. All Rights Reserved.
Basics 03 - TOC way of Production - Part08
23
Focusing Mechanism (POOGI)
• Analysis of RED orders every week.
• Identifying the top reason for REDs and eliminating it.
40%
30%
20%
10%
Material availability Manpower availability Machine availability Utilities availability
Red Reasons
©2012 Vector Consulting Group. All Rights Reserved.©2012 Vector Consulting Group. All Rights Reserved.
Thank You
):

Contenu connexe

Tendances

Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyVector Consulting Group
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainVector Consulting Group
 
Five Years Atos@Ahold 20120208
Five Years Atos@Ahold 20120208Five Years Atos@Ahold 20120208
Five Years Atos@Ahold 20120208Yvonne Kubbinga
 
Outsourcing to India - Service Wing Outlook
Outsourcing to India - Service Wing OutlookOutsourcing to India - Service Wing Outlook
Outsourcing to India - Service Wing Outlookservicewingsolutions
 
TVS Case Study
TVS Case StudyTVS Case Study
TVS Case Studyjyoraji
 
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...Institut Lean France
 
MBA Solutions – We Provide Certifications and Consultation Services
  MBA Solutions – We Provide Certifications and Consultation Services  MBA Solutions – We Provide Certifications and Consultation Services
MBA Solutions – We Provide Certifications and Consultation Servicesssuser4cbb48
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Institut Lean France
 
Videocon final sip report
Videocon final sip reportVideocon final sip report
Videocon final sip reportRajdeep Laha
 
Bajaj Financial Analysis
Bajaj Financial AnalysisBajaj Financial Analysis
Bajaj Financial AnalysisNISHCHAY SAXENA
 
LED Installation at Hitachi
LED Installation at HitachiLED Installation at Hitachi
LED Installation at HitachiCompucare
 
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluSelect A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluRubber & Tyre Machinery World
 
Website Development Prioritization Techniques Powerpoint Presentation Slides
Website Development Prioritization Techniques Powerpoint Presentation SlidesWebsite Development Prioritization Techniques Powerpoint Presentation Slides
Website Development Prioritization Techniques Powerpoint Presentation SlidesSlideTeam
 
Internship Report honda
Internship Report hondaInternship Report honda
Internship Report hondaZain Agha
 
JUST IN TIME CONCEPT
JUST IN TIME CONCEPTJUST IN TIME CONCEPT
JUST IN TIME CONCEPT09Bhupesh47
 

Tendances (20)

Consumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case StudyConsumer Goods & Retail Industry Case Study
Consumer Goods & Retail Industry Case Study
 
Dealing with variety in supply chain
Dealing with variety in supply chainDealing with variety in supply chain
Dealing with variety in supply chain
 
Nuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply ChainNuggets on Consumer Goods and Retail Supply Chain
Nuggets on Consumer Goods and Retail Supply Chain
 
Five Years Atos@Ahold 20120208
Five Years Atos@Ahold 20120208Five Years Atos@Ahold 20120208
Five Years Atos@Ahold 20120208
 
Outsourcing to India - Service Wing Outlook
Outsourcing to India - Service Wing OutlookOutsourcing to India - Service Wing Outlook
Outsourcing to India - Service Wing Outlook
 
TVS Case Study
TVS Case StudyTVS Case Study
TVS Case Study
 
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...How «Toyota Way» principles guided the architecture of Toyota’s product datah...
How «Toyota Way» principles guided the architecture of Toyota’s product datah...
 
Videocon sip ppt
Videocon sip pptVideocon sip ppt
Videocon sip ppt
 
MBA Solutions – We Provide Certifications and Consultation Services
  MBA Solutions – We Provide Certifications and Consultation Services  MBA Solutions – We Provide Certifications and Consultation Services
MBA Solutions – We Provide Certifications and Consultation Services
 
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
Lean cost planning by Takashi Tanaka at the Lean IT Summit 2013
 
Videocon final sip report
Videocon final sip reportVideocon final sip report
Videocon final sip report
 
Bajaj Financial Analysis
Bajaj Financial AnalysisBajaj Financial Analysis
Bajaj Financial Analysis
 
LED Installation at Hitachi
LED Installation at HitachiLED Installation at Hitachi
LED Installation at Hitachi
 
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul ShanmugaveluSelect A Flexible And Transparent Supplier - Arul Shanmugavelu
Select A Flexible And Transparent Supplier - Arul Shanmugavelu
 
Website Development Prioritization Techniques Powerpoint Presentation Slides
Website Development Prioritization Techniques Powerpoint Presentation SlidesWebsite Development Prioritization Techniques Powerpoint Presentation Slides
Website Development Prioritization Techniques Powerpoint Presentation Slides
 
Bs 43
Bs 43Bs 43
Bs 43
 
Internship Report honda
Internship Report hondaInternship Report honda
Internship Report honda
 
lucas tvs
lucas tvslucas tvs
lucas tvs
 
JUST IN TIME CONCEPT
JUST IN TIME CONCEPTJUST IN TIME CONCEPT
JUST IN TIME CONCEPT
 
Roadmap ERP Clients
Roadmap ERP ClientsRoadmap ERP Clients
Roadmap ERP Clients
 

En vedette

Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of ConstraintsBonnie Aumann
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyVector Consulting Group
 
Administración de Producción y Operaciones
Administración de Producción y OperacionesAdministración de Producción y Operaciones
Administración de Producción y OperacionesMauricio Ocampo
 
La Cadena de Valor de Porter
La Cadena de Valor  de PorterLa Cadena de Valor  de Porter
La Cadena de Valor de PorterOrlando Perez
 
Administración de la producción y operaciones
Administración de la producción y operacionesAdministración de la producción y operaciones
Administración de la producción y operacionesEli Mullisaca Yanqui
 
Operations and Supply Chain Management
Operations and Supply Chain ManagementOperations and Supply Chain Management
Operations and Supply Chain ManagementJohn Cousins
 
Cadenas de valor - Michael Porter
Cadenas de valor - Michael PorterCadenas de valor - Michael Porter
Cadenas de valor - Michael Porterremington2009
 
Gestión de la cadena de suministros
Gestión de la cadena de suministrosGestión de la cadena de suministros
Gestión de la cadena de suministrosAnyeni Garay
 
Gestion tactica de operaciones
Gestion tactica de operacionesGestion tactica de operaciones
Gestion tactica de operacionesgminan2244
 
administracion de operaciones
administracion de operacionesadministracion de operaciones
administracion de operacionesgueste3129d
 
GESTION DE OPERACIONES
GESTION DE OPERACIONESGESTION DE OPERACIONES
GESTION DE OPERACIONESrodrigorigo
 
Operation management, toyota production system
Operation management, toyota production systemOperation management, toyota production system
Operation management, toyota production systemOmar Hamdan
 
La cadena de valor de Michael Porter
La cadena de valor de Michael PorterLa cadena de valor de Michael Porter
La cadena de valor de Michael Porterwsanavria
 

En vedette (20)

Insights on Managing People by VCG
Insights on Managing People by VCGInsights on Managing People by VCG
Insights on Managing People by VCG
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Modelo de cadena de valor
Modelo de cadena de valorModelo de cadena de valor
Modelo de cadena de valor
 
Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
 
Operations Management
Operations ManagementOperations Management
Operations Management
 
Administración de Producción y Operaciones
Administración de Producción y OperacionesAdministración de Producción y Operaciones
Administración de Producción y Operaciones
 
La Cadena de Valor de Porter
La Cadena de Valor  de PorterLa Cadena de Valor  de Porter
La Cadena de Valor de Porter
 
Administración de la producción y operaciones
Administración de la producción y operacionesAdministración de la producción y operaciones
Administración de la producción y operaciones
 
Cadena de valor
Cadena de valorCadena de valor
Cadena de valor
 
Operations and Supply Chain Management
Operations and Supply Chain ManagementOperations and Supply Chain Management
Operations and Supply Chain Management
 
Cadenas de valor - Michael Porter
Cadenas de valor - Michael PorterCadenas de valor - Michael Porter
Cadenas de valor - Michael Porter
 
Gestión de la cadena de suministros
Gestión de la cadena de suministrosGestión de la cadena de suministros
Gestión de la cadena de suministros
 
Gestion tactica de operaciones
Gestion tactica de operacionesGestion tactica de operaciones
Gestion tactica de operaciones
 
Gestion de operaciones
Gestion de operacionesGestion de operaciones
Gestion de operaciones
 
administracion de operaciones
administracion de operacionesadministracion de operaciones
administracion de operaciones
 
GESTION DE OPERACIONES
GESTION DE OPERACIONESGESTION DE OPERACIONES
GESTION DE OPERACIONES
 
Operation management, toyota production system
Operation management, toyota production systemOperation management, toyota production system
Operation management, toyota production system
 
La cadena de valor de Michael Porter
La cadena de valor de Michael PorterLa cadena de valor de Michael Porter
La cadena de valor de Michael Porter
 
LA CADENA DE VALOR Y LA VENTAJA COMPETITIVA
LA CADENA DE VALOR Y LA VENTAJA COMPETITIVALA CADENA DE VALOR Y LA VENTAJA COMPETITIVA
LA CADENA DE VALOR Y LA VENTAJA COMPETITIVA
 
Administración de Operaciones
Administración de OperacionesAdministración de Operaciones
Administración de Operaciones
 

Similaire à Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraint (TOC) as applied to field of manufacturing management.

15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanMohamed Helmy
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...IRJET Journal
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxssusera34210
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonUtkan Uluçay, MSc., CDDP
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps TransformationBart Driscoll
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Reviewvivatechijri
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatraDANANG WID
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group
 
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...LeanKanbanIndia
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing conceptsSatyendra Sinha
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesDK Sharma
 

Similaire à Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraint (TOC) as applied to field of manufacturing management. (20)

15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of Lean
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps Transformation
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
Just In Time
Just In Time Just In Time
Just In Time
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
H0432045055
H0432045055H0432045055
H0432045055
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatra
 
Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment Mellor Consulting Group approach toward a BKM OEE deployment
Mellor Consulting Group approach toward a BKM OEE deployment
 
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...
Lean Kanban India 2015 | Boring Flow Metrics! Having fun with them to make or...
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
 

Plus de Vector Consulting Group

Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...Vector Consulting Group
 
Introduction to Vector Consulting Group
Introduction to Vector Consulting Group Introduction to Vector Consulting Group
Introduction to Vector Consulting Group Vector Consulting Group
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainVector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Vector Consulting Group
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicVector Consulting Group
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceVector Consulting Group
 

Plus de Vector Consulting Group (11)

Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
Acing New Product Launch - Plugging Common Loopholes in New Product Launch St...
 
Introduction to Vector Consulting Group
Introduction to Vector Consulting Group Introduction to Vector Consulting Group
Introduction to Vector Consulting Group
 
What is Theory of Constraints?
What is Theory of Constraints?What is Theory of Constraints?
What is Theory of Constraints?
 
Textile Industry case study
Textile Industry case studyTextile Industry case study
Textile Industry case study
 
An After Thought on the After Market
An After Thought on the After MarketAn After Thought on the After Market
An After Thought on the After Market
 
Unlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chainUnlock the hidden potential of the fashion supply chain
Unlock the hidden potential of the fashion supply chain
 
Auto Industry Outlook 2012
Auto Industry Outlook 2012Auto Industry Outlook 2012
Auto Industry Outlook 2012
 
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
Leveraging Franchisees for Profitable Growth in Retail Part 2: Infographic
 
Leveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: InfographicLeveraging Franchisees for Profitable Growth in Retail: Infographic
Leveraging Franchisees for Profitable Growth in Retail: Infographic
 
TOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel PerformanceTOC- Improve FMCG Distribution Channel Performance
TOC- Improve FMCG Distribution Channel Performance
 
TOC's role in IT success
TOC's role in IT successTOC's role in IT success
TOC's role in IT success
 

Dernier

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 

Dernier (20)

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 

Understand the differences and similarities between techniques of Lean Manufacturing and Theory of Constraint (TOC) as applied to field of manufacturing management.

  • 1. ©2012 Vector Consulting Group. All Rights Reserved. www.vectorconsulting.inwww.vectorconsulting.in VCG employs the 'Theory of Constraints’ philosophy to bring about quantum jump in performance of organizations in its target industry clusters. LEVERAGING THE POTENTIAL RetailConsumer Goods Equipment Manufacturing Engineering & Construction Automobile & Auto Components
  • 2. ©2012 Vector Consulting Group. All Rights Reserved. 202, Orion Business Park, Kapurbawdi Naka, Ghodbunder Road, Thane (West) – 400610 Phone: +91 22 2589 5896 Fax: +91 22 2589 5897 Email: vcg@vectorconsulting.in Web: www.vectorconsulting.in TOC Insights - Operations Sep 18, 2012 2
  • 3. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 01 3 Only 20% of the Japanese Companies have implemented Lean/Six Sigma/TQM/TPM Its not that the remaining 80%didn't try. These firms tried, but failed repeatedly. Did they fail because of lack of seriousness? Did they fail because lack of efforts? Did they fail because lack of Knowledge?Not really!!
  • 4. ©2012 Vector Consulting Group. All Rights Reserved. Basics 01 - Part 02 4 The firms tried and failed repeatedly because: Their Production Environment were fundamental different from Toyota. TPS was developed for Toyota. You cannot “Copy Paste” solution of one environment to the other environment!
  • 5. ©2012 Vector Consulting Group. All Rights Reserved. 5 Reality of implementation of Lean / Six Sigma / TQM / TPM
  • 6. ©2012 Vector Consulting Group. All Rights Reserved. An Insight 6 Application is specific, do not force them on your production environments. 01 Concepts are general, learn them and design application for your environment. 02
  • 7. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 7 The assembly line developed for the Ford Model T began operation on December 1, 1913. It had immense influence on the world. Assembly Lines (FORD) Features • Flow line concept introduced for Mass Production. • Flow means inventories in the operation are moving. • Inventories are controlled by limiting space between work-stations. What happens when space is full? Production stops i.e. in essence local efficiencies are abolished (Against conventional wisdom of 100% efficiency). Limitations Single Product lines where facilities are dedicated for each component. Output is lost when production stops? Focusing mechanism now available to eliminate shortages.
  • 8. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 8 AssemblyLines (FORD) Part 02 Generic Concepts Improving flow (or equivalently lead time) is the primary objective of operations. This primary objective should be translated into a practical mechanism that guides operation when not to produce (i.e. prevent over-production). Local efficiencies must be abolished. A focusing process to balance flow must be in place.
  • 9. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 9 LEAN / TPS (TOYOTA) Challenges to introduce FORD system to TOYOTA Demand for small quantities of a variety of cars, hence dedicated lines could not be justified. Space cannot be used to limit inventories because: If components are unavailable, then Assembly would stop. If space is full, feeder lines would stop. Solution was realized when Taichi Ohno heard about Super-Markets
  • 10. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 10 Part 02 LEAN/TPS (TOYOTA) Features • Flow is the most important element of TPS • In place of Space, Kanban System introduced to limit the inventory • Only when an allocated container is used, production of that container is triggered (No Card ..... No Production) Frequent switching for small lots means more set-ups and hence loss of production • Just-in-time Evolved i.e. produce only those items which are required in the very short-term. • Set-up reduction techniques were developed (called Lean). • Kanban was further used to guide process improvement efforts. • Gradual reduction in Containers (FIVE WHYs introduced to guide improvement efforts).
  • 11. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 11 Part 03 LEAN/TPS (TOYOTA) Almost everyone has implemented TPS, but still no one has achieved the same Productivity numbers as Toyota ... Why? Answer lies in the process of choosing local improvements Conventional companies use cost savings as the parameter to decide local improvements whereas Toyota uses “Flow Improvement”. E.g. Setup Reduction was never done to gain cost savings, rather it was done to create better availability at a faster rate. E.g. Quality was not improved to save trivial costs, rather it was improved to remove disruptions caused by defective part. No focus on squeezing better prices from supplier or cut payroll cost (manpower reduction), rather full energy is spent on improving the flow.
  • 12. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 12 Part 04 LEAN/TPS (TOYOTA) End Results Focusing on Flow instead of local cost considerations resulted in a much better lower cost per unit. Abolishing local efficiencies resulted in much higher efficiency of the workforce. Important Insight All cost reductions have a ceiling (can cost be made ZERO?). Improvement efforts have diminishing returns.
  • 13. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 13 Part 05 LEAN/TPS (TOYOTA) Generic Concepts Improving flow (or equivalently lead time) is a primary objective of operations. This primary objective should be translated into a practical mechanism that guides the operation when not to produce (prevents overproduction). Ford used space; Ohno used inventory. Local efficiencies must be abolished. Ford used dedicated lines; Ohno introduced JIT & Lean techniques. A focusing process to balance flow must be in place. Ford used direct observation. Ohno used gradual reduction of the number of containers and then gradual reduction of parts per container.
  • 14. ©2012 Vector Consulting Group. All Rights Reserved. Basics 02 14 Part 06 LEAN/TPS(TOYOTA ProductionSystem) Boundaries of TPS Works in Stable environments i.e. the processes and the products do not change significantly for a considerable length of time. Demand over time per product should be relatively stable. E.g. Toyota has only 1 time change yearly per model. Combine specific techniques of Lean with cost saving programs. Total load placed by orders on the various types of resources must be relatively stable. Imagine holding containers for items which have sporadic demand. When load changes frequently, promising firm due dates is challenging. Typical way of implementing Lean in most companies Is this really a true implementa- tion of Lean?
  • 15. ©2012 Vector Consulting Group. All Rights Reserved. 15 Theory of Constraint Way of Production
  • 16. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part01 16 Core Principles Flow is the most important objective of Operations. Practical Mechanism to avoid Over-Production. Achieved by ensuring synchronization from everywhere achieved by reducing lead times cross the chain. Local Efficiencies are abolished. Restrict release of material ahead of time (suitable for unstable environments as it is less sensitive to disruptions in flow. Buffer Management (BM) and Load control are put in place. Focusing process to balance flow must be in place. Analysis of Blacks & Reds guide the improvement efforts.
  • 17. ©2012 Vector Consulting Group. All Rights Reserved. Bottleneck Basics 03 - TOC way of Production - Part02 17 Abolishment of Local Efficiencies If C is to be used 100% • There has to be Continuous bank of work in front of “C”. • Whenever, there are disruptions in “A” or “B”; not only they have to ensure that “C” is fed but also the Bank is rebuilt. Which means “A” / “B” should have excess capacity than “C”. • Similarly, incase of disruptions in “D”; not only it has to produce what “C” is producing, “D” also has to clear the backlog created by “C”. Which again means “D” has excess capacity than “C”. A B C D By this very definition, “A” / “B” / “D” should have much more capacity than “C” just to keep “C” 100% busy. If so then local efficiencies at places other than “C” have to be abolished otherwise inventory will hit the roofs.
  • 18. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part03 18 Time Based Mechanism to control WIP Problem of using Space to control WIP between Workstations • E.g. Conveyers, Trolleys, etc. • When space is full, production stops which may not mean 100% utilization of Bottleneck (“C”) resource. • WIP in front of Bottleneck and Space after the Bottleneck is a function of the “Normal Disruptions” at upstream & downstream resources. o Typically the WIP is designed to be kept to bare minimum which can result in production loss. A B C D
  • 19. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part04 19 Time Based Mechanism to control WIP In TOC, • WIP in the system is not artificially restrained between every 2 work centers; rather it is controlled for the entire system allowing the effects of Murphy to be absorbed throughout the system and yet protect the due dates. • Unlike Kanban, WIP is not maintained everywhere in the system. Rather it is maintained only where needed i.e. to ensure 100% utilization of bottleneck. A B C D
  • 20. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part05 20 Concept of Lead Time • Most of the time, order is waiting in queues in front of the resources. • Generally the time actually spent working on an order is less than 10% of the total lead time. • Therefore at times of Urgency, material can moved very fast through the system. Total Lead Time Waiting TimeTouch Time
  • 21. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part06 21 Choke The Release • Small lead times cause too much expediting (termed as “Hand-2-mouth”) • Large lead times cause Jams, missed priorities • Stables zone is in the middle and hence “Choke the Release” is done by cutting WIP by half ManagementAttention Time Buffer Size Insufficient Reaction time Jams, Missed priorities
  • 22. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part07 22 Priority System • Just “Choking the Release” i.e. reducing WIP by half will not result in more than 90% due date performance. • Therefore a simple yet robust priority system is needed to guide operations. • Buffer Management gives clear priority to all the work-centers to effectively plan and execute orders. Reduced Lead Time
  • 23. ©2012 Vector Consulting Group. All Rights Reserved. Basics 03 - TOC way of Production - Part08 23 Focusing Mechanism (POOGI) • Analysis of RED orders every week. • Identifying the top reason for REDs and eliminating it. 40% 30% 20% 10% Material availability Manpower availability Machine availability Utilities availability Red Reasons
  • 24. ©2012 Vector Consulting Group. All Rights Reserved.©2012 Vector Consulting Group. All Rights Reserved. Thank You ):