EEESD’08  The 4th IASME/WSEAS International Conference  Algarve, Portugal, June 11-13, 2008 IMPLEMENTATION OF CLEAN DEVELOPMENT MECHANISM (CDM) METHODOLOGIES IN NATURAL GAS CHP PLANT
Table of contents ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Introduction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Analysis of energy requirements in “Sojaprotein”  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Analysis of energy requirements in “Sojaprotein”  Annual energy consumption and energy costs in Sojaprotein.  Basic units Conversion factor Energy consumption Energy costs [GJ] [€] Natural gas 10412213 [m 3 ] 0,0342 355995,72 2   825   669,2 Electricity  24867840  [kWh] 3.6 x 10 –3 89524,22 856   495,8 Total:  445 519,9 3 682 165
Analysis of energy requirements in “Sojaprotein” ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Analysis of energy requirements in “Sojaprotein” ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cogeneration plant selection Nominal Operation Characteristics of Cogeneration Plant .  Load [%] 100 100 100 100 100 Inlet Air Temperature  [°C] 11 -20 0  10 20 Power [MW] 10.5 5 11. 90 11.1 8 10.6 1 9.9 4 Efficiency Factor, Electric [%] 31.9 5 32.4 8 32.3 1 31.9 6 31.5 0 Combustion Products Quantity [kg/s] 41.80 46. 20 43.6 7 41.9 8 40.0 6 Outlet Combustion Products Temp.  [°C] 487 459 477 486 494
Cogeneration plant selection
Techno – economic study Costs = investment + maintenance + additional quantity of gas for cogeneration plant  Income = generated electricity  UNPROFITABLE (annual profit < annual costs) Actual electricity price for industry, being significantly lower from electricity price in neighborhood countries! ( Hungary  0,1012 e/kWh,  Romani a 0,0894 e/kWh,  Bu lgaria  0,0588 e/kWh  the price include all taxes  2007.) Investment Cost O&M Cost Gas price Electricity price 5000000 [e] 15  [e/h] 0,29 [e/m 3 ] 0,0366 [e/kWh]
CDM project and CHP ,[object Object],[object Object],[object Object],[object Object],Some approved CDM methodology applicable for combined energy production projects: ACM002, ACM006, ACM0012, AM0014, AM0024, AM0036.
Selection of CDM methodology Applicability of the mentioned methodologies is influenced directly by the conditions defined within each methodology. Based on the analysis carried out on the applicability of methodologies,   AM0014   was selected. Methodology AM0014 enable its application for combined heat and power generation, using natural gas as a fuel, with certain limitations.
Application of CDM methodology Baseline Scenario – Power and Heat Energy Supply Through applied methodology AM0014 for the selected CHP plant in Sojaprotein,  the achieved savings could be  51,034.5 eq/year  or approx.  360,000 €/year , using equivalent emission value for 1t CO 2  eq = 7 euro . Heat Energy Supply Power Supply Existing facility From existing boiler house using  natural gas as a fuels Grid-connected New SPI Plant Construction of a new boiler house, using natural gas as a fuel Grid-connected
Application of CDM methodology ABEC BF  - Annual baseline scenario energy consumption [GJ/year] 455,600 CAHO - Annual heat energy production in a combined plant  [GJ/year] 410,040 e b  - Coefficient of efficiency for boilers in industrial facilities (proposed value for calculation) [-] 0.9 AOH - Annual operation hours of facility [h/year] 6700 NoWD - Number of working days [w.d./year] 335 Baseline scenario TBE th  - Total equivalent emission of CO 2,  produced by natural gas combustion in baseline scenario t CO 2 /year 103,591 Project scenario TPE th Total equivalent emission of CO 2,  produced by natural gas combustion in project scenario  t CO 2 /year 52 556,5 Achieved savings through CDM project application:  t CO 2 /year 51 034,5
Conclusion   Based on the results obtained from techno-economic study, it could be concluded that the construction of selected cogeneration plant is unprofitable one in this moment, due to an actual power cost . Referring the selection of CDM methodology for combined power and heat energy, the analysis of approved methodologies was done . O nly the technical analysis of CDM project application is shown in this paper, without any financial analysis, as well as any analysis of the project “supplementary“ .
Conclusion   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Contenu connexe

Tendances

How costs affect deployment of low carbon technologies - analysis with JRC-EU...
How costs affect deployment of low carbon technologies - analysis with JRC-EU...How costs affect deployment of low carbon technologies - analysis with JRC-EU...
How costs affect deployment of low carbon technologies - analysis with JRC-EU...IEA-ETSAP
 
Maria Petroni achieved projects
Maria Petroni achieved projectsMaria Petroni achieved projects
Maria Petroni achieved projectsMaria Petroni
 
Update on applications of an Australian TIMES model
Update on applications of an Australian TIMES modelUpdate on applications of an Australian TIMES model
Update on applications of an Australian TIMES modelIEA-ETSAP
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemIEA-ETSAP
 
Impact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryImpact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryIEA-ETSAP
 
Role of power to heat in the energy system of Europe – A first analysis
Role of power to heat in the energy system of Europe – A first analysisRole of power to heat in the energy system of Europe – A first analysis
Role of power to heat in the energy system of Europe – A first analysisIEA-ETSAP
 
District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...IEA-ETSAP
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemIEA-ETSAP
 
CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)Lugas Raka Adrianto
 
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy SystemEnergy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy SystemIEA-ETSAP
 
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...Université de Liège (ULg)
 
Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...IEA-ETSAP
 
"Taking on TIAM" a new user´s experience and lessons learned
"Taking on TIAM" a new user´s experience and lessons learned"Taking on TIAM" a new user´s experience and lessons learned
"Taking on TIAM" a new user´s experience and lessons learnedIEA-ETSAP
 
Development of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesDevelopment of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesIEA-ETSAP
 
Polygeneration and CCS India
Polygeneration and CCS IndiaPolygeneration and CCS India
Polygeneration and CCS IndiaRahulA
 
Power-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridPower-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridRebecca Markillie
 

Tendances (17)

How costs affect deployment of low carbon technologies - analysis with JRC-EU...
How costs affect deployment of low carbon technologies - analysis with JRC-EU...How costs affect deployment of low carbon technologies - analysis with JRC-EU...
How costs affect deployment of low carbon technologies - analysis with JRC-EU...
 
Maria Petroni achieved projects
Maria Petroni achieved projectsMaria Petroni achieved projects
Maria Petroni achieved projects
 
Update on applications of an Australian TIMES model
Update on applications of an Australian TIMES modelUpdate on applications of an Australian TIMES model
Update on applications of an Australian TIMES model
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
 
Impact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryImpact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industry
 
Role of power to heat in the energy system of Europe – A first analysis
Role of power to heat in the energy system of Europe – A first analysisRole of power to heat in the energy system of Europe – A first analysis
Role of power to heat in the energy system of Europe – A first analysis
 
District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...District heating potential in the Italian NECP: assessment through a new resi...
District heating potential in the Italian NECP: assessment through a new resi...
 
89 aziz
89 aziz89 aziz
89 aziz
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy system
 
CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)
 
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy SystemEnergy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
 
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...
Harnessing the Potential of Power-to-Gas Technologies. Insights from a prelim...
 
Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...Planning a reliable power system with a high share of renewables in France by...
Planning a reliable power system with a high share of renewables in France by...
 
"Taking on TIAM" a new user´s experience and lessons learned
"Taking on TIAM" a new user´s experience and lessons learned"Taking on TIAM" a new user´s experience and lessons learned
"Taking on TIAM" a new user´s experience and lessons learned
 
Development of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesDevelopment of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectives
 
Polygeneration and CCS India
Polygeneration and CCS IndiaPolygeneration and CCS India
Polygeneration and CCS India
 
Power-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridPower-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas grid
 

En vedette

Kodėl E-Bros pradėjo taikyti Scrum
Kodėl E-Bros pradėjo taikyti ScrumKodėl E-Bros pradėjo taikyti Scrum
Kodėl E-Bros pradėjo taikyti ScrumAgile Lietuva
 
Informations météorologiques
Informations météorologiquesInformations météorologiques
Informations météorologiquesXL3FLE
 
HBMeU 2012 conference
HBMeU 2012 conferenceHBMeU 2012 conference
HBMeU 2012 conferenceStella Porto
 

En vedette (6)

Kodėl E-Bros pradėjo taikyti Scrum
Kodėl E-Bros pradėjo taikyti ScrumKodėl E-Bros pradėjo taikyti Scrum
Kodėl E-Bros pradėjo taikyti Scrum
 
1001 barce
1001   barce1001   barce
1001 barce
 
Informations météorologiques
Informations météorologiquesInformations météorologiques
Informations météorologiques
 
Electric markets
Electric marketsElectric markets
Electric markets
 
HBMeU 2012 conference
HBMeU 2012 conferenceHBMeU 2012 conference
HBMeU 2012 conference
 
Homonyms2
Homonyms2Homonyms2
Homonyms2
 

Similaire à Presentation Durosevic IASME 08

Energy Concept For Future Use Sreevidhya@Students
Energy Concept For Future Use Sreevidhya@StudentsEnergy Concept For Future Use Sreevidhya@Students
Energy Concept For Future Use Sreevidhya@StudentsB Bhargav Reddy
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)The SEAM Centre
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantIRJET Journal
 
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...IAEME Publication
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaDicky Edwin Hindarto
 
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...The i-Capital Africa Institute
 
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...IJERA Editor
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptsomnathmahapatra6
 
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET Journal
 
Co2 capture-technologies
Co2 capture-technologiesCo2 capture-technologies
Co2 capture-technologiesDzung Le
 
Conferencia unifei
Conferencia  unifeiConferencia  unifei
Conferencia unifeiRED REBIBIR
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET Journal
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdfRiswandaHimawan3
 
Use of Process Analyzers in Fossil Fuel Plants
Use of Process Analyzers in Fossil Fuel PlantsUse of Process Analyzers in Fossil Fuel Plants
Use of Process Analyzers in Fossil Fuel PlantsIves Equipment
 
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...IRJET Journal
 

Similaire à Presentation Durosevic IASME 08 (20)

Energy Concept For Future Use Sreevidhya@Students
Energy Concept For Future Use Sreevidhya@StudentsEnergy Concept For Future Use Sreevidhya@Students
Energy Concept For Future Use Sreevidhya@Students
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plant
 
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...
OPTIMISATION OF BINARY COGENERATIVE THERMAL POWER PLANTS WITH SOLID OXIDE FUE...
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
 
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...
Eng. Demiss Alemu - Energy Efficiency Improvement and GHG Emission Reduction ...
 
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
Design of Heat Exchanger Network for VCM Distillation Unit Using Pinch Techno...
 
ID-109.pdf
ID-109.pdfID-109.pdf
ID-109.pdf
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
 
30120140501013
3012014050101330120140501013
30120140501013
 
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...IRJET-  	  Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
IRJET- Performance and Evaluation of Aqua Ammonia Air Conditioner System ...
 
Co2 capture-technologies
Co2 capture-technologiesCo2 capture-technologies
Co2 capture-technologies
 
Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Susse...
Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Susse...Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Susse...
Gas CCS in China - Jia Li at the UKCCSRC Gas CCS Meeting, University of Susse...
 
Conferencia unifei
Conferencia  unifeiConferencia  unifei
Conferencia unifei
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdf
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Use of Process Analyzers in Fossil Fuel Plants
Use of Process Analyzers in Fossil Fuel PlantsUse of Process Analyzers in Fossil Fuel Plants
Use of Process Analyzers in Fossil Fuel Plants
 
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
Design and Development of Small Scale VAR System by Using Exhaust Gas of IC E...
 

Plus de victoriagroup

Prezentacija D Urosevic IEEP 08
Prezentacija D Urosevic IEEP 08Prezentacija D Urosevic IEEP 08
Prezentacija D Urosevic IEEP 08victoriagroup
 
PRAVO VREME ZA ANALIZU ZEMLJIŠTA
PRAVO VREME ZA ANALIZU ZEMLJIŠTAPRAVO VREME ZA ANALIZU ZEMLJIŠTA
PRAVO VREME ZA ANALIZU ZEMLJIŠTAvictoriagroup
 
Oebs Mission To Serbia
Oebs   Mission To SerbiaOebs   Mission To Serbia
Oebs Mission To Serbiavictoriagroup
 
Ekonomist Bd V1 (Eng)
Ekonomist Bd V1 (Eng)Ekonomist Bd V1 (Eng)
Ekonomist Bd V1 (Eng)victoriagroup
 
Prezentacija Vg Energetika In Progress V2
Prezentacija Vg Energetika In Progress V2Prezentacija Vg Energetika In Progress V2
Prezentacija Vg Energetika In Progress V2victoriagroup
 
Effective GIS Solutions for Agribusiness
Effective GIS Solutions for AgribusinessEffective GIS Solutions for Agribusiness
Effective GIS Solutions for Agribusinessvictoriagroup
 

Plus de victoriagroup (6)

Prezentacija D Urosevic IEEP 08
Prezentacija D Urosevic IEEP 08Prezentacija D Urosevic IEEP 08
Prezentacija D Urosevic IEEP 08
 
PRAVO VREME ZA ANALIZU ZEMLJIŠTA
PRAVO VREME ZA ANALIZU ZEMLJIŠTAPRAVO VREME ZA ANALIZU ZEMLJIŠTA
PRAVO VREME ZA ANALIZU ZEMLJIŠTA
 
Oebs Mission To Serbia
Oebs   Mission To SerbiaOebs   Mission To Serbia
Oebs Mission To Serbia
 
Ekonomist Bd V1 (Eng)
Ekonomist Bd V1 (Eng)Ekonomist Bd V1 (Eng)
Ekonomist Bd V1 (Eng)
 
Prezentacija Vg Energetika In Progress V2
Prezentacija Vg Energetika In Progress V2Prezentacija Vg Energetika In Progress V2
Prezentacija Vg Energetika In Progress V2
 
Effective GIS Solutions for Agribusiness
Effective GIS Solutions for AgribusinessEffective GIS Solutions for Agribusiness
Effective GIS Solutions for Agribusiness
 

Dernier

Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...roshnidevijkn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432motiram463
 
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...priyasharma62062
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...priyasharma62062
 
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator OptionsVince Stanzione
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...priyasharma62062
 
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Call Girls in Nagpur High Profile
 

Dernier (20)

Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 9352852248 Cal...
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Taloja 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
 
Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432
 
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...
Navi Mumbai Cooperetive Housewife Call Girls-9833754194-Natural Panvel Enjoye...
 
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Sant Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
 
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
 
W.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdfW.D. Gann Theory Complete Information.pdf
W.D. Gann Theory Complete Information.pdf
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Sinhagad Road ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...Top Rated  Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
Top Rated Pune Call Girls Shikrapur ⟟ 6297143586 ⟟ Call Me For Genuine Sex S...
 

Presentation Durosevic IASME 08

  • 1. EEESD’08 The 4th IASME/WSEAS International Conference Algarve, Portugal, June 11-13, 2008 IMPLEMENTATION OF CLEAN DEVELOPMENT MECHANISM (CDM) METHODOLOGIES IN NATURAL GAS CHP PLANT
  • 2.
  • 3.
  • 4.
  • 5. Analysis of energy requirements in “Sojaprotein” Annual energy consumption and energy costs in Sojaprotein. Basic units Conversion factor Energy consumption Energy costs [GJ] [€] Natural gas 10412213 [m 3 ] 0,0342 355995,72 2 825 669,2 Electricity 24867840 [kWh] 3.6 x 10 –3 89524,22 856 495,8 Total: 445 519,9 3 682 165
  • 6.
  • 7.
  • 8. Cogeneration plant selection Nominal Operation Characteristics of Cogeneration Plant . Load [%] 100 100 100 100 100 Inlet Air Temperature [°C] 11 -20 0 10 20 Power [MW] 10.5 5 11. 90 11.1 8 10.6 1 9.9 4 Efficiency Factor, Electric [%] 31.9 5 32.4 8 32.3 1 31.9 6 31.5 0 Combustion Products Quantity [kg/s] 41.80 46. 20 43.6 7 41.9 8 40.0 6 Outlet Combustion Products Temp. [°C] 487 459 477 486 494
  • 10. Techno – economic study Costs = investment + maintenance + additional quantity of gas for cogeneration plant Income = generated electricity UNPROFITABLE (annual profit < annual costs) Actual electricity price for industry, being significantly lower from electricity price in neighborhood countries! ( Hungary 0,1012 e/kWh, Romani a 0,0894 e/kWh, Bu lgaria 0,0588 e/kWh the price include all taxes 2007.) Investment Cost O&M Cost Gas price Electricity price 5000000 [e] 15 [e/h] 0,29 [e/m 3 ] 0,0366 [e/kWh]
  • 11.
  • 12. Selection of CDM methodology Applicability of the mentioned methodologies is influenced directly by the conditions defined within each methodology. Based on the analysis carried out on the applicability of methodologies, AM0014 was selected. Methodology AM0014 enable its application for combined heat and power generation, using natural gas as a fuel, with certain limitations.
  • 13. Application of CDM methodology Baseline Scenario – Power and Heat Energy Supply Through applied methodology AM0014 for the selected CHP plant in Sojaprotein, the achieved savings could be 51,034.5 eq/year or approx. 360,000 €/year , using equivalent emission value for 1t CO 2 eq = 7 euro . Heat Energy Supply Power Supply Existing facility From existing boiler house using natural gas as a fuels Grid-connected New SPI Plant Construction of a new boiler house, using natural gas as a fuel Grid-connected
  • 14. Application of CDM methodology ABEC BF - Annual baseline scenario energy consumption [GJ/year] 455,600 CAHO - Annual heat energy production in a combined plant [GJ/year] 410,040 e b - Coefficient of efficiency for boilers in industrial facilities (proposed value for calculation) [-] 0.9 AOH - Annual operation hours of facility [h/year] 6700 NoWD - Number of working days [w.d./year] 335 Baseline scenario TBE th - Total equivalent emission of CO 2, produced by natural gas combustion in baseline scenario t CO 2 /year 103,591 Project scenario TPE th Total equivalent emission of CO 2, produced by natural gas combustion in project scenario t CO 2 /year 52 556,5 Achieved savings through CDM project application: t CO 2 /year 51 034,5
  • 15. Conclusion Based on the results obtained from techno-economic study, it could be concluded that the construction of selected cogeneration plant is unprofitable one in this moment, due to an actual power cost . Referring the selection of CDM methodology for combined power and heat energy, the analysis of approved methodologies was done . O nly the technical analysis of CDM project application is shown in this paper, without any financial analysis, as well as any analysis of the project “supplementary“ .
  • 16.