Risk assessment of 170 kV GIS connected to combined
                      cable/OHL network
•Claus Leth Bak, Institute of Energy Technology,
Aalborg University, Denmark
•Jakob Kessel, Energinet.dk, Denmark
                                                                                                                                                                                                                                                       Simulations
•Víðir Atlason, Landsnet, Iceland                                                                                                                                                                              Front time             Time to half             Crest magnitude                   Soil Resistivity
•Jesper Lund, NV Net, Denmark                                                                                                                                                                                      [ µs]                  [ µs]                       [kA]                             [ Ωm]
                                                                                                                                                                                                     SF        1,4                    350                      -41,8                             92,5
                                       Introduction                                                                                                                                                  BFO       10                     350                      -200                              92,5

Danish power system has been decided to be cabled
fully up to and including 170 kV. This makes planning
of new network and GIS an urgent matter.
    Transmission system around
          city of Aalborg                                                                                                                                                                                  Simulation of a -41,8 kA 1,4/350 µs Shielding Failure                           Simulation of a -200 kA 10/350 µs Back Flashover



                                                                                       To HVO                To BDK
                                                                                                             To SBA
                                                                                                                                                                                                      IEC safety factor 15% makes admissible overvoltage level
                                                                                                        NVV
                                                                                                                           Area 1
                                                                                                                                                                                                      for transformers 565 kV. This is seen to be exceeded!
                                                                             Area 3                              VHA
                                                                                                                                    To DYB
                                                                                                                                     Area 2
                                                                                                                                                                                                     Effects of surge front time, soil resistivity and length of cable leading to
                                                                                   ABØ
                                                                                                                                                                                                     the transformer are investigated:
                              Aalborg
                                                        HVV                                                                                                                                         Surge front time                                                           Soil resistivity
                                                       ADL

                                                                                                                                    Limfjord



                                                                                                                                                                                                      Varying lightning front time,            Varying lightning front time,     Varying soil resistivity, SF,        Varying soil resistivity, SF,
                                                                                                                                                                                                         SF, closed breaker.                       SF, open breaker.                  closed breaker.                       open breaker.
                                                                                                                                        Denmark
                                                                                                                                                                                                    Cable length between GIS busbar and transformer
             Area 4                   FER                                    170 kV outdoor substation
                                                                             170 kV gas insulated substation
                To MOS
                               To THØ                                        Overhead lines
                5 km                                                         Underground cables




   Planned 170 kV network 2014                                                                                                                                                                                Varying cable length to transformer, SF, closed breaker.            Varying cable length to transformer, SF, open breaker.
                                                                                                                           SBA
                                                                                                                       C2
                                                                                                                       3,5 km         DYB
                                                                                        420 kV
                                                                                                                 JER                                                                                                                        Risk Assessment
                                             HVO
                                                                             S1
                                                                               NVV
                                                                                        S1         S1

                                                                                                   S1
                                                                                                        S1

                                                                                                                 S1
                                                                                                                      S1
                                                                                                                             S1
                                                                                                                                  VHA
                                                                                                                                        S1
                                                                                                                                                S1

                                                                                                                                                     S2
                                                                                                                                                                                                    Soil resistivity
                         60 kV

               HVV                            ADL            60 kV
                  T2          T2
                                                                                              S2
                S2               S2
                                                  T1              T1



                                                             S3                        ABØ          60 kV
                          C2
                          1,8 km                                                        T1               T1


               C2                                 C1                                                              C1
               10,6 km                            8,7 km                                                          1 km
                                                                   C1                                                                 C2
                                                                   14,7 km                                                            6 km
                                        R1              S2

                                             S2




                                                                                                        Transformer LIWL:
                                             S1         T3
                         S2
                                             S2
                                                                  60 kV                                                                                                                                      MTBF vs. soil resistivity, BFO,              MTBF vs. soil resistivity, SF,                   MTBF vs. soil resistivity, BFO,

                                                                                                        650 kV                                                                                                                                            open breaker.                                    closed breaker.
                                       R2
                         C2                                                                                                                                                                                  open breaker.
                         20 km
                                             S2        FER
       MOS
                         THØ
                                                                                                                                                                                                    Front time                                          Cable length
Simulation taking into account:
-Lightning parameters
-Lightning current magnitude and rate of rise                                                                                                                                I
                                                                                                                                             tfront =
- ÅBØ substation layout                                                                                                                                           1 
                                                                                                                                                             24 ⋅  − 1
                                                                                                                                                                                          0.25



- Underground cable ÅBØ-NVV                                                                                                                                       P 

- Limfjord high tower crossing
                                                                                                                                                       ABØ - Indoor GIS
                                                                                                                                             60 kV busbar              170 kV busbar




- Surge arrester precise model
                                                                                                                                                            TF2


                                                                                                                                                                     s.a.              NVV



-Dynamic grounding impedance
                                                                                                                                                                  Busbar               1 km UC
                                                                                                                                                                  breaker              1,5 km OHL
                                                                                                                                                                                                            MTBF vs. front time, SF, open                    MTBF vs. distance, SF, open                     MTBF vs. distance, BFO, open
                                                                                                                                                            TF1
                                                                                                                                                                                       VHA                  breaker.                                         breaker.                                        breaker.
-Voltage-time characteristics of insulators
                                                                                                                                                                                       6 km

                                                                                                                                                                                       ADL
                                                                                                                                                                                       14,7 km


-Implemented in PSCAD/EMTDC
                                                                                                                                                                                                                                                        Conclusion
   Shielding failure and back flashover                                                                                                                                                                   •MTBF above the acceptable limit of 1.000 years was obtained
    considered for Limfjord high tower                                                                                                                                                                    for all cases.
                  crossing                                                                                                                                                                                •The steepness of the lightning surge did not prove to be a
                                                                                                                                                                                                          parameter of significance for this system.
                                                                                                                                                                                                          •Improved grounding resulted in a decrease of the voltage
                                                                                                                                                                                                          appearing at the transformer terminals.
                                                                                                                                                                                                          •Increased cable length yielded increased voltage magnitude to
                                                                                                                                                                                                          appear at the transformer terminals, for cable lengths up to 50 m.

Contenu connexe

Similaire à Nordis Poster V02

Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv OverheadlineRte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
corinne rocherieux
 
2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck
FloridaPipeTalk
 
2012 FEPA Presentation: Jeff Didas
2012 FEPA Presentation: Jeff Didas2012 FEPA Presentation: Jeff Didas
2012 FEPA Presentation: Jeff Didas
FloridaPipeTalk
 

Similaire à Nordis Poster V02 (15)

ESS-Bilbao Initiative Workshop. Front Ends for High Intensity
ESS-Bilbao Initiative Workshop. Front Ends for High IntensityESS-Bilbao Initiative Workshop. Front Ends for High Intensity
ESS-Bilbao Initiative Workshop. Front Ends for High Intensity
 
Development Of Emissive Layers For High Definition Plasma Displays
Development Of Emissive Layers For High Definition Plasma DisplaysDevelopment Of Emissive Layers For High Definition Plasma Displays
Development Of Emissive Layers For High Definition Plasma Displays
 
Tan delta faq
Tan delta faqTan delta faq
Tan delta faq
 
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv OverheadlineRte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
 
2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck
 
Tunnel diode
Tunnel diodeTunnel diode
Tunnel diode
 
2012 FEPA Presentation: Jeff Didas
2012 FEPA Presentation: Jeff Didas2012 FEPA Presentation: Jeff Didas
2012 FEPA Presentation: Jeff Didas
 
A simplified model for oscillating water column motion
A simplified model for oscillating water column motionA simplified model for oscillating water column motion
A simplified model for oscillating water column motion
 
Cathode Ray Tube and Oscilloscopes
Cathode Ray Tube and OscilloscopesCathode Ray Tube and Oscilloscopes
Cathode Ray Tube and Oscilloscopes
 
Graphene MOSFET
Graphene MOSFETGraphene MOSFET
Graphene MOSFET
 
Iclp 2008 Aau
Iclp 2008 AauIclp 2008 Aau
Iclp 2008 Aau
 
Welding lectures 7 8
Welding lectures 7 8Welding lectures 7 8
Welding lectures 7 8
 
Welding lectures 7 8
Welding lectures 7 8Welding lectures 7 8
Welding lectures 7 8
 
15.30 o5 a kaiser
15.30 o5 a kaiser15.30 o5 a kaiser
15.30 o5 a kaiser
 
Abl activities
Abl activitiesAbl activities
Abl activities
 

Dernier

Dernier (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Nordis Poster V02

  • 1. Risk assessment of 170 kV GIS connected to combined cable/OHL network •Claus Leth Bak, Institute of Energy Technology, Aalborg University, Denmark •Jakob Kessel, Energinet.dk, Denmark Simulations •Víðir Atlason, Landsnet, Iceland Front time Time to half Crest magnitude Soil Resistivity •Jesper Lund, NV Net, Denmark [ µs] [ µs] [kA] [ Ωm] SF 1,4 350 -41,8 92,5 Introduction BFO 10 350 -200 92,5 Danish power system has been decided to be cabled fully up to and including 170 kV. This makes planning of new network and GIS an urgent matter. Transmission system around city of Aalborg Simulation of a -41,8 kA 1,4/350 µs Shielding Failure Simulation of a -200 kA 10/350 µs Back Flashover To HVO To BDK To SBA IEC safety factor 15% makes admissible overvoltage level NVV Area 1 for transformers 565 kV. This is seen to be exceeded! Area 3 VHA To DYB Area 2 Effects of surge front time, soil resistivity and length of cable leading to ABØ the transformer are investigated: Aalborg HVV Surge front time Soil resistivity ADL Limfjord Varying lightning front time, Varying lightning front time, Varying soil resistivity, SF, Varying soil resistivity, SF, SF, closed breaker. SF, open breaker. closed breaker. open breaker. Denmark Cable length between GIS busbar and transformer Area 4 FER 170 kV outdoor substation 170 kV gas insulated substation To MOS To THØ Overhead lines 5 km Underground cables Planned 170 kV network 2014 Varying cable length to transformer, SF, closed breaker. Varying cable length to transformer, SF, open breaker. SBA C2 3,5 km DYB 420 kV JER Risk Assessment HVO S1 NVV S1 S1 S1 S1 S1 S1 S1 VHA S1 S1 S2 Soil resistivity 60 kV HVV ADL 60 kV T2 T2 S2 S2 S2 T1 T1 S3 ABØ 60 kV C2 1,8 km T1 T1 C2 C1 C1 10,6 km 8,7 km 1 km C1 C2 14,7 km 6 km R1 S2 S2 Transformer LIWL: S1 T3 S2 S2 60 kV MTBF vs. soil resistivity, BFO, MTBF vs. soil resistivity, SF, MTBF vs. soil resistivity, BFO, 650 kV open breaker. closed breaker. R2 C2 open breaker. 20 km S2 FER MOS THØ Front time Cable length Simulation taking into account: -Lightning parameters -Lightning current magnitude and rate of rise I tfront = - ÅBØ substation layout 1  24 ⋅  − 1 0.25 - Underground cable ÅBØ-NVV P  - Limfjord high tower crossing ABØ - Indoor GIS 60 kV busbar 170 kV busbar - Surge arrester precise model TF2 s.a. NVV -Dynamic grounding impedance Busbar 1 km UC breaker 1,5 km OHL MTBF vs. front time, SF, open MTBF vs. distance, SF, open MTBF vs. distance, BFO, open TF1 VHA breaker. breaker. breaker. -Voltage-time characteristics of insulators 6 km ADL 14,7 km -Implemented in PSCAD/EMTDC Conclusion Shielding failure and back flashover •MTBF above the acceptable limit of 1.000 years was obtained considered for Limfjord high tower for all cases. crossing •The steepness of the lightning surge did not prove to be a parameter of significance for this system. •Improved grounding resulted in a decrease of the voltage appearing at the transformer terminals. •Increased cable length yielded increased voltage magnitude to appear at the transformer terminals, for cable lengths up to 50 m.