10 MW Solar PV Power plant
Project Team | Nandhini | Nithya | Sowparanika | Ragul | Vignesh
Design & CPM, PERT
November 27 - Friday
Program
Evaluation &
Review
Technique
(PERT)
Network Model
Critical Path
Method (CPM)
Mode of
activities
Grid Connected
PV Design
SPV GRID TIE – Without Battery
Design Calculation
Total Plant Size - 10 MW
Individual Sections - 500 kW * 20 Sets
No.of DC Cabinet - 560 V * 20 Sets
No.of AC Cabinet - 380 V * 20 Sets
No.of Inverters - 500 kVA * 20 Sets
No.of Junction Boxes - 560 W * 320 Sets
Monitoring Devices - 1 Set
Protection Devices - 1 Set
Infrastructure - As required
Each 500 kW Set
PV Arrays - 16 Sets
Mounting Structure - 16 Sets
DC Junction Box (560 W) - 16 Sets
DC Cabinet (560 V) - 1 Set
Inverter (500 kVA) - 1 Set
AC Distribution Cabinet - 1 Set
15 PV Arrays - Has 8 Rows
Last PV Array - Has 5 Rows
Each Row - Has 16 Modules
Net Panels (500 kW) - (8*16) + (5*16) = 2000 Panels
Like 20 Sets (10 MW) - 20*2000 = 40000 Panels
PV Array – 16
250 Wp Si-Mono Panel
500 kW - Design layout
PV Array 1
DCDistributionBox
ACDistributionBox
Inverter
Junction Box 1PV Array 1
Junction Box 2PV Array 2
Junction Box 3PV Array 3
Junction Box 4PV Array 4
Junction Box 5PV Array 5
Junction Box 6PV Array 6
Junction Box 7PV Array 7
Junction Box 8PV Array 8
Junction Box 9PV Array 9
Junction Box 10PV Array 10
Junction Box 11PV Array 11
Junction Box 12PV Array 12
Junction Box 13PV Array 13
Junction Box 14PV Array 14
Junction Box 15PV Array 15
Junction Box 16PV Array 16
10 MW Design layout
DISTRIBUTION
BOARD
CPM & PERT
ACTIVITY DESCRIPTION PRECEEDING ACTIVITY
DURATION
(WEEKS)
A SITE ASSESSMENT - 1
B DESIGNING A 1
C LABOUR AND MACHINERY PLANNING B 1
D PROCUREMENT B 6
E MOUNTING STRUCTURE (ERECTION) C,D 2
F PANEL ERECTION E 3
G JUNCTION BOX F 1
H CABLING G 2
I INVERTER G 1
J TRANSFORMER H,I 2
K COMMISSIONING J 1
1
2 3
A B
5 4
6
D C
E
7
F
G
8
9
10
H
I
11
J
K
12
CPM
Possible pathways:
A-B-C-E-F-G-H-J-K =14 weeks
A-B-D-E-F-G-I-J-K =18 weeks

Contenu connexe

Tendances

Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuidePrivate Consultants
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantDr Naim R Kidwai
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsGensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportShrikant Hiremath
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installationAmitesh Kumar
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantGensol Engineering Limited
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Engineering Limited
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV systemRajesh Pindoriya
 
Solar pv – balance of systems
Solar pv – balance of systemsSolar pv – balance of systems
Solar pv – balance of systemsiplon
 

Tendances (20)

Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
Steinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design reportSteinbeis 1MW Grid Connected System design report
Steinbeis 1MW Grid Connected System design report
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power Plant
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
 
Solar rooftop presentation
Solar rooftop presentationSolar rooftop presentation
Solar rooftop presentation
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
Solar pv – balance of systems
Solar pv – balance of systemsSolar pv – balance of systems
Solar pv – balance of systems
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 

Similaire à 10 MW Solar PV power Plant - CPM & PERT, Design

Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysIRJET Journal
 
Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Timothy Johnson
 
Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Timothy Johnson
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Muzaffar Ahmad
 
Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designShrikant Hiremath
 
PV Project MENA (2)
PV Project MENA (2)PV Project MENA (2)
PV Project MENA (2)Hamid Nawaz
 
2012 deep research report on china pv inverter industry
2012 deep research report on china pv inverter industry2012 deep research report on china pv inverter industry
2012 deep research report on china pv inverter industrysmarter2011
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER EnergyRashmi Jeswani
 
1500V String Inverter Utility PV System Solution 2021.pdf
1500V String Inverter Utility PV System Solution 2021.pdf1500V String Inverter Utility PV System Solution 2021.pdf
1500V String Inverter Utility PV System Solution 2021.pdfgoangagoanga99
 
Ac supply system
Ac supply systemAc supply system
Ac supply systemankitankesh
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industrysmarter2011
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...Prannay Kumar Giri
 
Ht and lt scheme dc system
Ht and lt scheme dc systemHt and lt scheme dc system
Ht and lt scheme dc systemShashi Katiyar
 
Three phase BLDC motor
Three phase BLDC motorThree phase BLDC motor
Three phase BLDC motorAnoop S
 
Conceptual Electrical Systems of a CANDU 80 Small Modular Reactor
Conceptual Electrical Systems of a CANDU 80 Small Modular ReactorConceptual Electrical Systems of a CANDU 80 Small Modular Reactor
Conceptual Electrical Systems of a CANDU 80 Small Modular ReactorKandarp Mehta
 

Similaire à 10 MW Solar PV power Plant - CPM & PERT, Design (20)

ABB 太阳能解决方案_ENG
ABB 太阳能解决方案_ENGABB 太阳能解决方案_ENG
ABB 太阳能解决方案_ENG
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
 
Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809
 
Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809Introducing ten ksolar rais inverter bus 130809
Introducing ten ksolar rais inverter bus 130809
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
Steinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system designSteinbeis 1MW Grid connected system design
Steinbeis 1MW Grid connected system design
 
PV Project MENA (2)
PV Project MENA (2)PV Project MENA (2)
PV Project MENA (2)
 
2012 deep research report on china pv inverter industry
2012 deep research report on china pv inverter industry2012 deep research report on china pv inverter industry
2012 deep research report on china pv inverter industry
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER Energy
 
1500V String Inverter Utility PV System Solution 2021.pdf
1500V String Inverter Utility PV System Solution 2021.pdf1500V String Inverter Utility PV System Solution 2021.pdf
1500V String Inverter Utility PV System Solution 2021.pdf
 
Ac supply system
Ac supply systemAc supply system
Ac supply system
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
Chave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geralChave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geral
 
2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry2012 deep research report on global and china pv inverter industry
2012 deep research report on global and china pv inverter industry
 
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
Ht and lt scheme dc system
Ht and lt scheme dc systemHt and lt scheme dc system
Ht and lt scheme dc system
 
Rahimo
RahimoRahimo
Rahimo
 
Three phase BLDC motor
Three phase BLDC motorThree phase BLDC motor
Three phase BLDC motor
 
Conceptual Electrical Systems of a CANDU 80 Small Modular Reactor
Conceptual Electrical Systems of a CANDU 80 Small Modular ReactorConceptual Electrical Systems of a CANDU 80 Small Modular Reactor
Conceptual Electrical Systems of a CANDU 80 Small Modular Reactor
 

Plus de Vignesh Sekar

Wind Power Generation Schemes
Wind Power Generation SchemesWind Power Generation Schemes
Wind Power Generation SchemesVignesh Sekar
 
Ultimate Analysis of Coal
Ultimate Analysis of CoalUltimate Analysis of Coal
Ultimate Analysis of CoalVignesh Sekar
 
Wastewater Recycling
Wastewater RecyclingWastewater Recycling
Wastewater RecyclingVignesh Sekar
 
Treated wastewater for Irrigation
Treated wastewater for IrrigationTreated wastewater for Irrigation
Treated wastewater for IrrigationVignesh Sekar
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CityVignesh Sekar
 
Plastic Waste Management and Recycling Technology : P2
Plastic Waste Management and Recycling Technology : P2Plastic Waste Management and Recycling Technology : P2
Plastic Waste Management and Recycling Technology : P2Vignesh Sekar
 
Plastic Waste Management and Recycling Technology : P1
Plastic Waste Management and Recycling Technology : P1Plastic Waste Management and Recycling Technology : P1
Plastic Waste Management and Recycling Technology : P1Vignesh Sekar
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 
Industrial energy auditing and reporting
Industrial energy auditing and reportingIndustrial energy auditing and reporting
Industrial energy auditing and reportingVignesh Sekar
 
Direct and Bending stresses
Direct and Bending stressesDirect and Bending stresses
Direct and Bending stressesVignesh Sekar
 
Delineation and Comparison of Urban Heat Islands in Tamilnadu
Delineation and Comparison of Urban Heat Islands in TamilnaduDelineation and Comparison of Urban Heat Islands in Tamilnadu
Delineation and Comparison of Urban Heat Islands in TamilnaduVignesh Sekar
 
Applications of GIS in Public Health Engineering
Applications of GIS in Public Health EngineeringApplications of GIS in Public Health Engineering
Applications of GIS in Public Health EngineeringVignesh Sekar
 
Applications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste ManagementApplications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste ManagementVignesh Sekar
 

Plus de Vignesh Sekar (14)

Wind Power Generation Schemes
Wind Power Generation SchemesWind Power Generation Schemes
Wind Power Generation Schemes
 
Ultimate Analysis of Coal
Ultimate Analysis of CoalUltimate Analysis of Coal
Ultimate Analysis of Coal
 
Wastewater Recycling
Wastewater RecyclingWastewater Recycling
Wastewater Recycling
 
Treated wastewater for Irrigation
Treated wastewater for IrrigationTreated wastewater for Irrigation
Treated wastewater for Irrigation
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar City
 
Plastic Waste Management and Recycling Technology : P2
Plastic Waste Management and Recycling Technology : P2Plastic Waste Management and Recycling Technology : P2
Plastic Waste Management and Recycling Technology : P2
 
Plastic Waste Management and Recycling Technology : P1
Plastic Waste Management and Recycling Technology : P1Plastic Waste Management and Recycling Technology : P1
Plastic Waste Management and Recycling Technology : P1
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
Industrial energy auditing and reporting
Industrial energy auditing and reportingIndustrial energy auditing and reporting
Industrial energy auditing and reporting
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
Direct and Bending stresses
Direct and Bending stressesDirect and Bending stresses
Direct and Bending stresses
 
Delineation and Comparison of Urban Heat Islands in Tamilnadu
Delineation and Comparison of Urban Heat Islands in TamilnaduDelineation and Comparison of Urban Heat Islands in Tamilnadu
Delineation and Comparison of Urban Heat Islands in Tamilnadu
 
Applications of GIS in Public Health Engineering
Applications of GIS in Public Health EngineeringApplications of GIS in Public Health Engineering
Applications of GIS in Public Health Engineering
 
Applications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste ManagementApplications of GIS in Municipal Solid Waste Management
Applications of GIS in Municipal Solid Waste Management
 

Dernier

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Dernier (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

10 MW Solar PV power Plant - CPM & PERT, Design

  • 1. 10 MW Solar PV Power plant Project Team | Nandhini | Nithya | Sowparanika | Ragul | Vignesh
  • 2. Design & CPM, PERT November 27 - Friday Program Evaluation & Review Technique (PERT) Network Model Critical Path Method (CPM) Mode of activities Grid Connected PV Design
  • 3. SPV GRID TIE – Without Battery
  • 4. Design Calculation Total Plant Size - 10 MW Individual Sections - 500 kW * 20 Sets No.of DC Cabinet - 560 V * 20 Sets No.of AC Cabinet - 380 V * 20 Sets No.of Inverters - 500 kVA * 20 Sets No.of Junction Boxes - 560 W * 320 Sets Monitoring Devices - 1 Set Protection Devices - 1 Set Infrastructure - As required
  • 5. Each 500 kW Set PV Arrays - 16 Sets Mounting Structure - 16 Sets DC Junction Box (560 W) - 16 Sets DC Cabinet (560 V) - 1 Set Inverter (500 kVA) - 1 Set AC Distribution Cabinet - 1 Set 15 PV Arrays - Has 8 Rows Last PV Array - Has 5 Rows Each Row - Has 16 Modules Net Panels (500 kW) - (8*16) + (5*16) = 2000 Panels Like 20 Sets (10 MW) - 20*2000 = 40000 Panels PV Array – 16
  • 7. 500 kW - Design layout PV Array 1 DCDistributionBox ACDistributionBox Inverter Junction Box 1PV Array 1 Junction Box 2PV Array 2 Junction Box 3PV Array 3 Junction Box 4PV Array 4 Junction Box 5PV Array 5 Junction Box 6PV Array 6 Junction Box 7PV Array 7 Junction Box 8PV Array 8 Junction Box 9PV Array 9 Junction Box 10PV Array 10 Junction Box 11PV Array 11 Junction Box 12PV Array 12 Junction Box 13PV Array 13 Junction Box 14PV Array 14 Junction Box 15PV Array 15 Junction Box 16PV Array 16
  • 8. 10 MW Design layout DISTRIBUTION BOARD
  • 9. CPM & PERT ACTIVITY DESCRIPTION PRECEEDING ACTIVITY DURATION (WEEKS) A SITE ASSESSMENT - 1 B DESIGNING A 1 C LABOUR AND MACHINERY PLANNING B 1 D PROCUREMENT B 6 E MOUNTING STRUCTURE (ERECTION) C,D 2 F PANEL ERECTION E 3 G JUNCTION BOX F 1 H CABLING G 2 I INVERTER G 1 J TRANSFORMER H,I 2 K COMMISSIONING J 1
  • 10. 1 2 3 A B 5 4 6 D C E 7 F G 8 9 10 H I 11 J K 12
  • 11. CPM Possible pathways: A-B-C-E-F-G-H-J-K =14 weeks A-B-D-E-F-G-I-J-K =18 weeks