SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
5Echo
Amplifying Your Assets
Initial Observations of Just Culture Development for Vietnam
Airlines Paper presented August 2018
The frameworks selected are suitable for the task of providing a framework for VNA, although it was
noticed that VNA also has a modified model which it intends to retain (see notes from feedback). However,
the information provided from your desktop analysis (17 pages) covers the technical aspects of the project
and I suspect the greater challenges to shifting to a Just Safety Culture will include the following as with
other clients:
• Production of an outline plan covering the following as a minimum:
• The reason/benefits for moving to a Just Culture
• The legal imperative of a Just Culture
• Management expectations of adoption
• Key components - includes SMS and Safety Reporting
• The benchmarks for success
• Technical aspects
• Implementation strategy and schedule
• Financial support - budget and major expenses
• Changes required to key areas such as risk, investigations, reporting, discipline
• Incentives (positive as well as punishment)
• Required enhancements to technology
• Points of contact - must include staff from every key area of service from HR to flight line.
• Production of the Policies and Procedures to support a Just Safety Culture. This should be produced by
VNA staff.
• Adjusted safety statements to reflect a Just culture - printed and framed public statements supporting
a Just Culture.
• Ensuring a Just Safety Culture component is included in the employee culture questionnaire.
• Demonstration of management ‘buy in’ - this initiative must be driven from the top and reflect in KPIs.
• Change strategy for implementation - educating and implementing (posters, video, in meeting agendas
etc over an extended period of time).
• Implementation Plan - phased in over time.
• Communication Plan for monitoring and reporting of the new Just Safety Culture.
• Inserting Just Culture information into every single training course attended by VNA and related staff
City House
36 Robinson Road #13-01
Singapore 068877
Tel: +60 16 66 66930
5Echo
• Training packages for:
• Train the trainer - for those who will train and monitor the staff with safety related training
duties.
• Trainers.
• Retraining of all management and staff who are required to investigate safety related matters.
• Induction of new employees.
• Induction and briefings for all contractors.
• Continuation training - all staff (probably e-Learning with inbuilt assessment).
• e-Learning.
• Quality Control Plan including related measures to gauge progress/success, especially in the timely
reporting of near misses and actions to correct them. Another major area to be measured are trends.
How much of this work you are expected to deliver and how much needs to be addressed by VNA is probably
the next discussion. In other client organisations that team to implement such a large cultural shift are not
limited to those with Safety Management Responsibilities. Such experts are supported by people from all
areas giving fresh insight into implementation challenges as well as safety incidents.
It is our experience that unless the above foundation is completed (and is consistent) that the changes of a
successful cultural shift are greatly reduced.
Mark Dickson
Executive Director
5Echo Inc
13th August 2018
Page 2

Contenu connexe

Tendances

Impact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesImpact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesLeonardo ENERGY
 
Compliance Basics Presentation
Compliance Basics PresentationCompliance Basics Presentation
Compliance Basics PresentationCompliagent
 
SC Example A presentation (1)
SC Example A presentation (1)SC Example A presentation (1)
SC Example A presentation (1)Edwina Crowley
 
Introduction to supply Management
Introduction to supply ManagementIntroduction to supply Management
Introduction to supply ManagementDANIEL NDIGWA
 
Developing and implementing asset lifecycle management strategies
Developing and implementing asset lifecycle management strategiesDeveloping and implementing asset lifecycle management strategies
Developing and implementing asset lifecycle management strategiesBenjamin Mqenebe
 
Hi600 m1 u1_part2_instslides
Hi600 m1 u1_part2_instslidesHi600 m1 u1_part2_instslides
Hi600 m1 u1_part2_instslidesljmcneill33
 
IPM Intern Layout - GesTine Finley-3
IPM Intern Layout - GesTine Finley-3IPM Intern Layout - GesTine Finley-3
IPM Intern Layout - GesTine Finley-3GesTine Finley
 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509scottri
 
Stephen Nagy Resume Final1
Stephen Nagy Resume Final1Stephen Nagy Resume Final1
Stephen Nagy Resume Final1Stephen Nagy
 
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...Probability Statistics, Learning for Reliability and Reliability Growth, Tone...
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...Bryan Len
 

Tendances (17)

Impact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesImpact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmes
 
EPR Updated OECD Guidance
EPR Updated OECD GuidanceEPR Updated OECD Guidance
EPR Updated OECD Guidance
 
Compliance Basics Presentation
Compliance Basics PresentationCompliance Basics Presentation
Compliance Basics Presentation
 
SC Example A presentation (1)
SC Example A presentation (1)SC Example A presentation (1)
SC Example A presentation (1)
 
Introduction to supply Management
Introduction to supply ManagementIntroduction to supply Management
Introduction to supply Management
 
Delivering the London 2012 venues & infrastructure
Delivering the London 2012 venues & infrastructureDelivering the London 2012 venues & infrastructure
Delivering the London 2012 venues & infrastructure
 
Controling implementation
Controling implementationControling implementation
Controling implementation
 
The construction programme - assurance and controls
The construction programme - assurance and controlsThe construction programme - assurance and controls
The construction programme - assurance and controls
 
P ex cost management-1
P ex cost management-1P ex cost management-1
P ex cost management-1
 
Developing and implementing asset lifecycle management strategies
Developing and implementing asset lifecycle management strategiesDeveloping and implementing asset lifecycle management strategies
Developing and implementing asset lifecycle management strategies
 
Evaluating innovation in the 2007-13 RDPE
Evaluating innovation in the 2007-13 RDPEEvaluating innovation in the 2007-13 RDPE
Evaluating innovation in the 2007-13 RDPE
 
Bright
BrightBright
Bright
 
Hi600 m1 u1_part2_instslides
Hi600 m1 u1_part2_instslidesHi600 m1 u1_part2_instslides
Hi600 m1 u1_part2_instslides
 
IPM Intern Layout - GesTine Finley-3
IPM Intern Layout - GesTine Finley-3IPM Intern Layout - GesTine Finley-3
IPM Intern Layout - GesTine Finley-3
 
6 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 0705096 Sigma 10 Min Interview Presentation 070509
6 Sigma 10 Min Interview Presentation 070509
 
Stephen Nagy Resume Final1
Stephen Nagy Resume Final1Stephen Nagy Resume Final1
Stephen Nagy Resume Final1
 
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...Probability Statistics, Learning for Reliability and Reliability Growth, Tone...
Probability Statistics, Learning for Reliability and Reliability Growth, Tone...
 

Similaire à Observations on just culture development for VNA

Management model for exploratory investment in IT
Management model for exploratory investment in IT Management model for exploratory investment in IT
Management model for exploratory investment in IT WGroup
 
The moving force behind IT decisions are variable as to what context.pdf
The moving force behind IT decisions are variable as to what context.pdfThe moving force behind IT decisions are variable as to what context.pdf
The moving force behind IT decisions are variable as to what context.pdfsanjeevtandonsre
 
Unit 7 implementation phase of strategic management
Unit 7 implementation phase of strategic managementUnit 7 implementation phase of strategic management
Unit 7 implementation phase of strategic managementRoshan Pant
 
Module-7-Program-Monitoring-and-Evaluation.pptx
Module-7-Program-Monitoring-and-Evaluation.pptxModule-7-Program-Monitoring-and-Evaluation.pptx
Module-7-Program-Monitoring-and-Evaluation.pptxmusicearphone
 
Stage 4 and 5 technology planning
Stage 4 and 5 technology planningStage 4 and 5 technology planning
Stage 4 and 5 technology planningLem CHen
 
Spm ksp
Spm kspSpm ksp
Spm kspktosri
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemKetan Parekh
 
Ahmed EL Kholy Resume-Updated 17-12-16
Ahmed EL Kholy Resume-Updated 17-12-16Ahmed EL Kholy Resume-Updated 17-12-16
Ahmed EL Kholy Resume-Updated 17-12-16Ahmed Kholy
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docxteresehearn
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docxkarisariddell
 
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...Sayeh Majzoob
 
Implementation roadmap.docx
Implementation roadmap.docxImplementation roadmap.docx
Implementation roadmap.docxssuserf1bae5
 
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docx
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docxFacilitator Guide Marking Guide BSBADM504 Plan and impleme.docx
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docxssuser454af01
 

Similaire à Observations on just culture development for VNA (20)

JohanCVJuly2015
JohanCVJuly2015JohanCVJuly2015
JohanCVJuly2015
 
BUSINESS ANALYST
BUSINESS ANALYSTBUSINESS ANALYST
BUSINESS ANALYST
 
Management model for exploratory investment in IT
Management model for exploratory investment in IT Management model for exploratory investment in IT
Management model for exploratory investment in IT
 
The moving force behind IT decisions are variable as to what context.pdf
The moving force behind IT decisions are variable as to what context.pdfThe moving force behind IT decisions are variable as to what context.pdf
The moving force behind IT decisions are variable as to what context.pdf
 
Unit 7 implementation phase of strategic management
Unit 7 implementation phase of strategic managementUnit 7 implementation phase of strategic management
Unit 7 implementation phase of strategic management
 
Module-7-Program-Monitoring-and-Evaluation.pptx
Module-7-Program-Monitoring-and-Evaluation.pptxModule-7-Program-Monitoring-and-Evaluation.pptx
Module-7-Program-Monitoring-and-Evaluation.pptx
 
Stage 4 and 5 technology planning
Stage 4 and 5 technology planningStage 4 and 5 technology planning
Stage 4 and 5 technology planning
 
Spm ksp
Spm kspSpm ksp
Spm ksp
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
Ahmed EL Kholy Resume-Updated 17-12-16
Ahmed EL Kholy Resume-Updated 17-12-16Ahmed EL Kholy Resume-Updated 17-12-16
Ahmed EL Kholy Resume-Updated 17-12-16
 
GTSC Transportation Security Day - Enterprise Support
GTSC Transportation Security Day - Enterprise SupportGTSC Transportation Security Day - Enterprise Support
GTSC Transportation Security Day - Enterprise Support
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx
 
1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx1 ISM645 Strategic Information Technology Planning v1.1 .docx
1 ISM645 Strategic Information Technology Planning v1.1 .docx
 
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...
Technology Transfer and Under-License Manufacturing in Pharmaceutical Industr...
 
Andrew Buck Cv11
Andrew Buck Cv11Andrew Buck Cv11
Andrew Buck Cv11
 
Implementation roadmap.docx
Implementation roadmap.docxImplementation roadmap.docx
Implementation roadmap.docx
 
Sherif_CV_
Sherif_CV_Sherif_CV_
Sherif_CV_
 
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docx
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docxFacilitator Guide Marking Guide BSBADM504 Plan and impleme.docx
Facilitator Guide Marking Guide BSBADM504 Plan and impleme.docx
 
Ibrahim alamri cv 20
Ibrahim alamri cv 20Ibrahim alamri cv 20
Ibrahim alamri cv 20
 

Plus de DigitalPower

Incident decision tree following james reason
Incident decision tree following james reasonIncident decision tree following james reason
Incident decision tree following james reasonDigitalPower
 
Just safety master 180814 v2
Just safety master 180814 v2Just safety master 180814 v2
Just safety master 180814 v2DigitalPower
 
Just culture roadmap
Just culture roadmapJust culture roadmap
Just culture roadmapDigitalPower
 
SAG3 tham luan VHAT Da nang
SAG3 tham luan VHAT Da nangSAG3 tham luan VHAT Da nang
SAG3 tham luan VHAT Da nangDigitalPower
 
VHAT safety culture presentation hv dzung dang
VHAT safety culture presentation hv dzung dangVHAT safety culture presentation hv dzung dang
VHAT safety culture presentation hv dzung dangDigitalPower
 
VHAT Tham luan bao cao trung tam
VHAT Tham luan bao cao trung tamVHAT Tham luan bao cao trung tam
VHAT Tham luan bao cao trung tamDigitalPower
 
VHAT Tong hop mr trung mr son
VHAT Tong hop mr trung mr sonVHAT Tong hop mr trung mr son
VHAT Tong hop mr trung mr sonDigitalPower
 
Jame willis safety conference
Jame willis   safety conferenceJame willis   safety conference
Jame willis safety conferenceDigitalPower
 
Tai lieu hoi thao VHAT VNA Da Nang 2018-BW
Tai lieu hoi thao VHAT VNA Da Nang 2018-BWTai lieu hoi thao VHAT VNA Da Nang 2018-BW
Tai lieu hoi thao VHAT VNA Da Nang 2018-BWDigitalPower
 
Eurocontrol on just culture
Eurocontrol on just cultureEurocontrol on just culture
Eurocontrol on just cultureDigitalPower
 
Safety culture definition and enhancement process- CANSO
Safety culture definition and enhancement process- CANSOSafety culture definition and enhancement process- CANSO
Safety culture definition and enhancement process- CANSODigitalPower
 
New model for a just and fair culture april 2008 posted april 2011
New model for a just and fair culture april 2008 posted april 2011New model for a just and fair culture april 2008 posted april 2011
New model for a just and fair culture april 2008 posted april 2011DigitalPower
 
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)DigitalPower
 
IATA safety culture from the top down
IATA safety culture from the top downIATA safety culture from the top down
IATA safety culture from the top downDigitalPower
 
Just culture commitment by canso
Just culture commitment by cansoJust culture commitment by canso
Just culture commitment by cansoDigitalPower
 
Just Safety Master - Mark Dickson
Just Safety Master - Mark DicksonJust Safety Master - Mark Dickson
Just Safety Master - Mark DicksonDigitalPower
 
Bộ định nghĩa hành vi Just Culture
Bộ định nghĩa hành vi Just CultureBộ định nghĩa hành vi Just Culture
Bộ định nghĩa hành vi Just CultureDigitalPower
 
20180511 tham luan sag2 r04
20180511 tham luan sag2 r0420180511 tham luan sag2 r04
20180511 tham luan sag2 r04DigitalPower
 
SAG2 Ket qua thao luan ap dung bos
SAG2 Ket qua thao luan ap dung bosSAG2 Ket qua thao luan ap dung bos
SAG2 Ket qua thao luan ap dung bosDigitalPower
 
SAG1- VHAT Seminiar 2018
SAG1- VHAT Seminiar 2018SAG1- VHAT Seminiar 2018
SAG1- VHAT Seminiar 2018DigitalPower
 

Plus de DigitalPower (20)

Incident decision tree following james reason
Incident decision tree following james reasonIncident decision tree following james reason
Incident decision tree following james reason
 
Just safety master 180814 v2
Just safety master 180814 v2Just safety master 180814 v2
Just safety master 180814 v2
 
Just culture roadmap
Just culture roadmapJust culture roadmap
Just culture roadmap
 
SAG3 tham luan VHAT Da nang
SAG3 tham luan VHAT Da nangSAG3 tham luan VHAT Da nang
SAG3 tham luan VHAT Da nang
 
VHAT safety culture presentation hv dzung dang
VHAT safety culture presentation hv dzung dangVHAT safety culture presentation hv dzung dang
VHAT safety culture presentation hv dzung dang
 
VHAT Tham luan bao cao trung tam
VHAT Tham luan bao cao trung tamVHAT Tham luan bao cao trung tam
VHAT Tham luan bao cao trung tam
 
VHAT Tong hop mr trung mr son
VHAT Tong hop mr trung mr sonVHAT Tong hop mr trung mr son
VHAT Tong hop mr trung mr son
 
Jame willis safety conference
Jame willis   safety conferenceJame willis   safety conference
Jame willis safety conference
 
Tai lieu hoi thao VHAT VNA Da Nang 2018-BW
Tai lieu hoi thao VHAT VNA Da Nang 2018-BWTai lieu hoi thao VHAT VNA Da Nang 2018-BW
Tai lieu hoi thao VHAT VNA Da Nang 2018-BW
 
Eurocontrol on just culture
Eurocontrol on just cultureEurocontrol on just culture
Eurocontrol on just culture
 
Safety culture definition and enhancement process- CANSO
Safety culture definition and enhancement process- CANSOSafety culture definition and enhancement process- CANSO
Safety culture definition and enhancement process- CANSO
 
New model for a just and fair culture april 2008 posted april 2011
New model for a just and fair culture april 2008 posted april 2011New model for a just and fair culture april 2008 posted april 2011
New model for a just and fair culture april 2008 posted april 2011
 
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)
JUST CULTURE IN AVIATION SAFETY MANAGEMENT (ASM)
 
IATA safety culture from the top down
IATA safety culture from the top downIATA safety culture from the top down
IATA safety culture from the top down
 
Just culture commitment by canso
Just culture commitment by cansoJust culture commitment by canso
Just culture commitment by canso
 
Just Safety Master - Mark Dickson
Just Safety Master - Mark DicksonJust Safety Master - Mark Dickson
Just Safety Master - Mark Dickson
 
Bộ định nghĩa hành vi Just Culture
Bộ định nghĩa hành vi Just CultureBộ định nghĩa hành vi Just Culture
Bộ định nghĩa hành vi Just Culture
 
20180511 tham luan sag2 r04
20180511 tham luan sag2 r0420180511 tham luan sag2 r04
20180511 tham luan sag2 r04
 
SAG2 Ket qua thao luan ap dung bos
SAG2 Ket qua thao luan ap dung bosSAG2 Ket qua thao luan ap dung bos
SAG2 Ket qua thao luan ap dung bos
 
SAG1- VHAT Seminiar 2018
SAG1- VHAT Seminiar 2018SAG1- VHAT Seminiar 2018
SAG1- VHAT Seminiar 2018
 

Dernier

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 

Dernier (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 

Observations on just culture development for VNA

  • 1. 5Echo Amplifying Your Assets Initial Observations of Just Culture Development for Vietnam Airlines Paper presented August 2018 The frameworks selected are suitable for the task of providing a framework for VNA, although it was noticed that VNA also has a modified model which it intends to retain (see notes from feedback). However, the information provided from your desktop analysis (17 pages) covers the technical aspects of the project and I suspect the greater challenges to shifting to a Just Safety Culture will include the following as with other clients: • Production of an outline plan covering the following as a minimum: • The reason/benefits for moving to a Just Culture • The legal imperative of a Just Culture • Management expectations of adoption • Key components - includes SMS and Safety Reporting • The benchmarks for success • Technical aspects • Implementation strategy and schedule • Financial support - budget and major expenses • Changes required to key areas such as risk, investigations, reporting, discipline • Incentives (positive as well as punishment) • Required enhancements to technology • Points of contact - must include staff from every key area of service from HR to flight line. • Production of the Policies and Procedures to support a Just Safety Culture. This should be produced by VNA staff. • Adjusted safety statements to reflect a Just culture - printed and framed public statements supporting a Just Culture. • Ensuring a Just Safety Culture component is included in the employee culture questionnaire. • Demonstration of management ‘buy in’ - this initiative must be driven from the top and reflect in KPIs. • Change strategy for implementation - educating and implementing (posters, video, in meeting agendas etc over an extended period of time). • Implementation Plan - phased in over time. • Communication Plan for monitoring and reporting of the new Just Safety Culture. • Inserting Just Culture information into every single training course attended by VNA and related staff City House 36 Robinson Road #13-01 Singapore 068877 Tel: +60 16 66 66930
  • 2. 5Echo • Training packages for: • Train the trainer - for those who will train and monitor the staff with safety related training duties. • Trainers. • Retraining of all management and staff who are required to investigate safety related matters. • Induction of new employees. • Induction and briefings for all contractors. • Continuation training - all staff (probably e-Learning with inbuilt assessment). • e-Learning. • Quality Control Plan including related measures to gauge progress/success, especially in the timely reporting of near misses and actions to correct them. Another major area to be measured are trends. How much of this work you are expected to deliver and how much needs to be addressed by VNA is probably the next discussion. In other client organisations that team to implement such a large cultural shift are not limited to those with Safety Management Responsibilities. Such experts are supported by people from all areas giving fresh insight into implementation challenges as well as safety incidents. It is our experience that unless the above foundation is completed (and is consistent) that the changes of a successful cultural shift are greatly reduced. Mark Dickson Executive Director 5Echo Inc 13th August 2018 Page 2