PROJECT MANAGEMENT ?
Application of knowledge, skills and techniques to execute
projects effectively and efficiently.
PROCESS IN PM
EFFECTIVE MANAGEMENT
All projects are measured against some performance criteria
that indicate whether the project is successful or not.
The following are the most important performance criteria,
TIME
COST
QUALITY
SAFETY
COST EFFECTIVE
 For cost effective project management we should focus on
each and every aspects and the key point we have to focus is
wastage.
 Waste generated as a result of design & specifications
 Waste generated by construction activities
WASTAGE BY SPECIFICATION & DESIGN
 Design and the specifications can contribute
significantly to the amount of waste generated
during the construction of a project particularly
when uneconomical design solutions are
selected or when unsuitable materials are
specified.
 However once the design is in place, the waste
arising from the design can be estimated,
controlled and reduced at tender stage,
particularly for ‘area based’ packages such as
flooring, walling and ceilings or when off site
manufacture is used.
WASTAGE BY CONSTRUCTION
ACTIVITIES
 The way construction activities are
carried out during the construction
process also impacts on the quantity of
waste produced.
 This waste is more difficult to estimate at
tender stage as it is based upon events
that occur during construction that are
not foreseen at tender stage.
 Maximum wastage arises under this
category.
How to
reduce
these
waste?
??????
LEAN CONSTRUCTION
INSPIRATION
TOYATA PRODUCTION SYSTEM
(TPS)
DEFINITION
Lean construction is a “way to design production systems to
minimize waste of materials, time, and effort in order to
generate the maximum possible amount of value”
LEAN TOOLS
Value stream mapping
Waste walk & Reduction
Building Information
Modeling(BIM)
5 Whys
A3 reports
Poke-a-yoke
Partnering
Last Planner
TOOLS FOR REDUCTION OF WASTE
Value stream mapping –
identifying the waste.
Last Planner – minimizing the
waste.
IDENTIFY WASTE
??????????
VALUE STREAM MAPPING
VALUE STREAM MAPPING
 Value stream mapping is a lean-management method for
analyzing the current state and designing a future state for
the series of events that take a product or service from its
beginning through to the customer.
 At Toyota, it is known as "material and information flow
mapping".
VSM - PRINCIPLES
 Diagnostic Tool
– Reveals hidden symptoms of larger problems
 Strategic Planning Activity
– Helps priorities opportunities for improvement
– Results in an implementation plan
 Macro-Level - Visual Representation
– Information flow
– People and material flow
– Each process block represents a handoff or a break in the timeline
 Contains Relevant Metrics
– Lead time – throughput / turnaround / flow time
– Cycle time – touch / process time
HOW IT PROCESS?
Define value
from the
customer’s
perspective
Map the
value
stream
Create flow;
eliminate the
root causes
of waste
Create pull
where flow
is difficult
to achieve
Seek
perfection via
continuous
improvement
SIPOC - Process Map
S I O CP
Suppliers Inputs Process Outputs Customers
STANDARD SYMBOLS
21
VSM - Boundary
Current State
 Define the boundaries
 Define the value
 Identify the tasks and flows of material and information between them
 Identify resources for each task and flow
 Create the current state map
Future State (Design)
 Visualize the “Ideal State” and design the future state map
– Identify value added and waste from Current State
– Reconfigure the process to eliminate waste / Add Value
Implementation Plan
 Develop Action plans and track
VALUE ADD & NON VALUE ADD
 Value Add (VA)
• Any activity the customer values (and is willing to pay for)
– Who are your customers?
– What do they really want?
• To be considered “value add”, a process step must have YES to all these questions
– Does the customer care?
– Does it change the thing?
– Is it done right the first time?
– Is it required by law or regulation?
 Non Value Add (NVA)
• Any activity that consumes time and / or resources & does not add value to the
service or product for the customer. These activities should be eliminated, simplified,
reduced, or integrated.
– Necessary – Legal / regulatory requirements
– Unnecessary - Waiting, Unnecessary processing, Errors/defects, Motion (people),
Transportation (product), Underutilized people, Inventory
LAST PLANNER SYSTEM
 Last Planner is a short-term project planning system first used
in engineering construction 20 years ago.
 Glenn Ballard and Greg Howell created The Last Planner
System (LPS) to improve the predictability and reliability of
construction production.
 It continues to create significant improvements in project &
program safety, predictability, productivity, speed of delivery,
profit and feelings of wellbeing among project staff.
PROCESS IN LP
LEAN THINKER
The impossible is often the untried
Great ideas need
landing gears as well
as wings
Lean practices for effective project management

Contenu connexe

Tendances

Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...camunda services GmbH
 
20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagincamunda services GmbH
 
Six Sigma Tools Project Templates
Six Sigma Tools Project TemplatesSix Sigma Tools Project Templates
Six Sigma Tools Project Templatesacribe
 
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...Nesma
 
BCO Guide To Poe
BCO Guide To PoeBCO Guide To Poe
BCO Guide To PoeNigelO
 
Planning process
Planning   processPlanning   process
Planning processAkshay Vs
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction EngineersAmit Kumar Senapati, PMP®
 
Ac2017 3. cast software-metricsincontracts
Ac2017   3. cast software-metricsincontractsAc2017   3. cast software-metricsincontracts
Ac2017 3. cast software-metricsincontractsNesma
 
Why agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceWhy agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceGlen Alleman
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Avoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAvoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAconex
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1Aconex
 
8. how nesma can quick start your software estimate frank vogelezang
8. how nesma can quick start your software estimate   frank vogelezang8. how nesma can quick start your software estimate   frank vogelezang
8. how nesma can quick start your software estimate frank vogelezangNesma
 
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...TAUS - The Language Data Network
 

Tendances (19)

Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
Camunda Roadshow 2019, Praxisbericht Wien: Migration von Legacy workflow Syst...
 
20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin20182712 Camunda Meetup Berlin_Andrey Shchagin
20182712 Camunda Meetup Berlin_Andrey Shchagin
 
CMMI and Agile
CMMI and AgileCMMI and Agile
CMMI and Agile
 
Six Sigma Tools Project Templates
Six Sigma Tools Project TemplatesSix Sigma Tools Project Templates
Six Sigma Tools Project Templates
 
Qto
QtoQto
Qto
 
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...Nesma autumn conference  2015 - Agile may deliver but it does not win (yet) -...
Nesma autumn conference 2015 - Agile may deliver but it does not win (yet) -...
 
BCO Guide To Poe
BCO Guide To PoeBCO Guide To Poe
BCO Guide To Poe
 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
 
Planning process
Planning   processPlanning   process
Planning process
 
Cost management basics for Construction Engineers
Cost management basics for Construction EngineersCost management basics for Construction Engineers
Cost management basics for Construction Engineers
 
Ac2017 3. cast software-metricsincontracts
Ac2017   3. cast software-metricsincontractsAc2017   3. cast software-metricsincontracts
Ac2017 3. cast software-metricsincontracts
 
Why agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceWhy agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practice
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Avoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAvoid the risk and streamline your project controls
Avoid the risk and streamline your project controls
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1
 
Chap09
Chap09Chap09
Chap09
 
8. how nesma can quick start your software estimate frank vogelezang
8. how nesma can quick start your software estimate   frank vogelezang8. how nesma can quick start your software estimate   frank vogelezang
8. how nesma can quick start your software estimate frank vogelezang
 
Corporate Members Event June 2015
Corporate Members Event June 2015Corporate Members Event June 2015
Corporate Members Event June 2015
 
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...
Innovation should make you money. Peter Reynolds (Kilgray Translation Technol...
 

En vedette

Adopting a Lean Approach to Improve Business Processes: A Case Report
Adopting a Lean Approach to Improve Business Processes: A Case ReportAdopting a Lean Approach to Improve Business Processes: A Case Report
Adopting a Lean Approach to Improve Business Processes: A Case ReportKarim Riad MAZOUNI
 
RoMT - Part 2 Marketing Technology Webinar
RoMT - Part 2 Marketing Technology WebinarRoMT - Part 2 Marketing Technology Webinar
RoMT - Part 2 Marketing Technology WebinarSmart Insights
 
The Basics of a Mutual Fund
The Basics of a Mutual FundThe Basics of a Mutual Fund
The Basics of a Mutual FundAbhimanyu Mathur
 
The importance of effective management
The importance of effective managementThe importance of effective management
The importance of effective managementLuke Sanders
 
THE PROSPECT OF KNOWLEDGE CREATION
THE PROSPECT OF KNOWLEDGE CREATIONTHE PROSPECT OF KNOWLEDGE CREATION
THE PROSPECT OF KNOWLEDGE CREATIONFrank Nyarko
 
Efficiency versus Effectiveness
Efficiency versus EffectivenessEfficiency versus Effectiveness
Efficiency versus EffectivenessPurva Verma
 
10 Steps to Actionable Analytics for Digital Marketing
10 Steps to Actionable Analytics for Digital Marketing10 Steps to Actionable Analytics for Digital Marketing
10 Steps to Actionable Analytics for Digital MarketingSmart Insights
 
4 branding trends to manage in 2018
4 branding trends to manage in 20184 branding trends to manage in 2018
4 branding trends to manage in 2018Smart Insights
 
Efficiency and effectiveness: Presentation with Examples
Efficiency and effectiveness: Presentation with ExamplesEfficiency and effectiveness: Presentation with Examples
Efficiency and effectiveness: Presentation with ExamplesAbhimanyu Mathur
 
The concept of efficiency and effectiveness
The concept of efficiency and effectivenessThe concept of efficiency and effectiveness
The concept of efficiency and effectivenessFrank Nyarko
 
Operational Marketing Excellence - MRMLOGIQ 2011
Operational Marketing Excellence - MRMLOGIQ 2011Operational Marketing Excellence - MRMLOGIQ 2011
Operational Marketing Excellence - MRMLOGIQ 2011MRMLOGIQ
 
Shift Gear in Marketing - MRMLOGIQ 2012
Shift Gear in Marketing - MRMLOGIQ 2012Shift Gear in Marketing - MRMLOGIQ 2012
Shift Gear in Marketing - MRMLOGIQ 2012MRMLOGIQ
 
Uk lean summit 2015 lean transformation developing the capability to improv...
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...Lean Enterprise Academy
 

En vedette (16)

Marketing skills 2020
Marketing skills 2020Marketing skills 2020
Marketing skills 2020
 
Adopting a Lean Approach to Improve Business Processes: A Case Report
Adopting a Lean Approach to Improve Business Processes: A Case ReportAdopting a Lean Approach to Improve Business Processes: A Case Report
Adopting a Lean Approach to Improve Business Processes: A Case Report
 
RoMT - Part 2 Marketing Technology Webinar
RoMT - Part 2 Marketing Technology WebinarRoMT - Part 2 Marketing Technology Webinar
RoMT - Part 2 Marketing Technology Webinar
 
Lean green stream in surgery
Lean green stream in surgery  Lean green stream in surgery
Lean green stream in surgery
 
The Basics of a Mutual Fund
The Basics of a Mutual FundThe Basics of a Mutual Fund
The Basics of a Mutual Fund
 
The importance of effective management
The importance of effective managementThe importance of effective management
The importance of effective management
 
Effectiveness and Efficiency
Effectiveness and EfficiencyEffectiveness and Efficiency
Effectiveness and Efficiency
 
THE PROSPECT OF KNOWLEDGE CREATION
THE PROSPECT OF KNOWLEDGE CREATIONTHE PROSPECT OF KNOWLEDGE CREATION
THE PROSPECT OF KNOWLEDGE CREATION
 
Efficiency versus Effectiveness
Efficiency versus EffectivenessEfficiency versus Effectiveness
Efficiency versus Effectiveness
 
10 Steps to Actionable Analytics for Digital Marketing
10 Steps to Actionable Analytics for Digital Marketing10 Steps to Actionable Analytics for Digital Marketing
10 Steps to Actionable Analytics for Digital Marketing
 
4 branding trends to manage in 2018
4 branding trends to manage in 20184 branding trends to manage in 2018
4 branding trends to manage in 2018
 
Efficiency and effectiveness: Presentation with Examples
Efficiency and effectiveness: Presentation with ExamplesEfficiency and effectiveness: Presentation with Examples
Efficiency and effectiveness: Presentation with Examples
 
The concept of efficiency and effectiveness
The concept of efficiency and effectivenessThe concept of efficiency and effectiveness
The concept of efficiency and effectiveness
 
Operational Marketing Excellence - MRMLOGIQ 2011
Operational Marketing Excellence - MRMLOGIQ 2011Operational Marketing Excellence - MRMLOGIQ 2011
Operational Marketing Excellence - MRMLOGIQ 2011
 
Shift Gear in Marketing - MRMLOGIQ 2012
Shift Gear in Marketing - MRMLOGIQ 2012Shift Gear in Marketing - MRMLOGIQ 2012
Shift Gear in Marketing - MRMLOGIQ 2012
 
Uk lean summit 2015 lean transformation developing the capability to improv...
Uk lean summit 2015   lean transformation developing the capability to improv...Uk lean summit 2015   lean transformation developing the capability to improv...
Uk lean summit 2015 lean transformation developing the capability to improv...
 

Similaire à Lean practices for effective project management

041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)drdej19
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementAbbas Ali
 
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudCloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudPoornima N
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Skillogic Solutions
 
Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Mani Maun
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptxabdullahmohamed10900
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Alan Kan
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Alan Kan
 
PMI-ACP: Domain II - Value Driven Delivery v1.0
PMI-ACP: Domain II - Value Driven Delivery v1.0PMI-ACP: Domain II - Value Driven Delivery v1.0
PMI-ACP: Domain II - Value Driven Delivery v1.0PhuocNT (Fresher.VN)
 
Integrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudIntegrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudPoornima N
 
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Agile ME
 
Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Association for Project Management
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017Daniel Thuraiappah
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.pptProfDrAnbalaganChinn
 

Similaire à Lean practices for effective project management (20)

041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)
 
define phase.pptx
define phase.pptxdefine phase.pptx
define phase.pptx
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloudCloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
Cloudbyz PPM - Integrated Enterprise PPM, ALM and APM on force.com cloud
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
Michigan Agile Presentation
Michigan Agile PresentationMichigan Agile Presentation
Michigan Agile Presentation
 
Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery Why Value Stream is key to Digital Product Delivery
Why Value Stream is key to Digital Product Delivery
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...
 
Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...Business and IT alignment through effective Project & Program Portfolio Manag...
Business and IT alignment through effective Project & Program Portfolio Manag...
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 
PMI-ACP: Domain II - Value Driven Delivery v1.0
PMI-ACP: Domain II - Value Driven Delivery v1.0PMI-ACP: Domain II - Value Driven Delivery v1.0
PMI-ACP: Domain II - Value Driven Delivery v1.0
 
Integrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloudIntegrated Enterprise PPM, ALM and APM on force.com cloud
Integrated Enterprise PPM, ALM and APM on force.com cloud
 
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
 
Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
LeanSigma for IW 2005
LeanSigma for IW 2005LeanSigma for IW 2005
LeanSigma for IW 2005
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
Importance of Adaptive Planning in Agile
Importance of Adaptive Planning in AgileImportance of Adaptive Planning in Agile
Importance of Adaptive Planning in Agile
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
 

Dernier

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Dernier (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Lean practices for effective project management

  • 2. PROJECT MANAGEMENT ? Application of knowledge, skills and techniques to execute projects effectively and efficiently.
  • 4. EFFECTIVE MANAGEMENT All projects are measured against some performance criteria that indicate whether the project is successful or not. The following are the most important performance criteria, TIME COST QUALITY SAFETY
  • 5. COST EFFECTIVE  For cost effective project management we should focus on each and every aspects and the key point we have to focus is wastage.  Waste generated as a result of design & specifications  Waste generated by construction activities
  • 6. WASTAGE BY SPECIFICATION & DESIGN  Design and the specifications can contribute significantly to the amount of waste generated during the construction of a project particularly when uneconomical design solutions are selected or when unsuitable materials are specified.  However once the design is in place, the waste arising from the design can be estimated, controlled and reduced at tender stage, particularly for ‘area based’ packages such as flooring, walling and ceilings or when off site manufacture is used.
  • 7. WASTAGE BY CONSTRUCTION ACTIVITIES  The way construction activities are carried out during the construction process also impacts on the quantity of waste produced.  This waste is more difficult to estimate at tender stage as it is based upon events that occur during construction that are not foreseen at tender stage.  Maximum wastage arises under this category.
  • 8.
  • 10.
  • 12. DEFINITION Lean construction is a “way to design production systems to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value”
  • 13. LEAN TOOLS Value stream mapping Waste walk & Reduction Building Information Modeling(BIM) 5 Whys A3 reports Poke-a-yoke Partnering Last Planner
  • 14. TOOLS FOR REDUCTION OF WASTE Value stream mapping – identifying the waste. Last Planner – minimizing the waste.
  • 16. VALUE STREAM MAPPING  Value stream mapping is a lean-management method for analyzing the current state and designing a future state for the series of events that take a product or service from its beginning through to the customer.  At Toyota, it is known as "material and information flow mapping".
  • 17. VSM - PRINCIPLES  Diagnostic Tool – Reveals hidden symptoms of larger problems  Strategic Planning Activity – Helps priorities opportunities for improvement – Results in an implementation plan  Macro-Level - Visual Representation – Information flow – People and material flow – Each process block represents a handoff or a break in the timeline  Contains Relevant Metrics – Lead time – throughput / turnaround / flow time – Cycle time – touch / process time
  • 18. HOW IT PROCESS? Define value from the customer’s perspective Map the value stream Create flow; eliminate the root causes of waste Create pull where flow is difficult to achieve Seek perfection via continuous improvement
  • 19. SIPOC - Process Map S I O CP Suppliers Inputs Process Outputs Customers
  • 21. 21 VSM - Boundary Current State  Define the boundaries  Define the value  Identify the tasks and flows of material and information between them  Identify resources for each task and flow  Create the current state map Future State (Design)  Visualize the “Ideal State” and design the future state map – Identify value added and waste from Current State – Reconfigure the process to eliminate waste / Add Value Implementation Plan  Develop Action plans and track
  • 22. VALUE ADD & NON VALUE ADD  Value Add (VA) • Any activity the customer values (and is willing to pay for) – Who are your customers? – What do they really want? • To be considered “value add”, a process step must have YES to all these questions – Does the customer care? – Does it change the thing? – Is it done right the first time? – Is it required by law or regulation?  Non Value Add (NVA) • Any activity that consumes time and / or resources & does not add value to the service or product for the customer. These activities should be eliminated, simplified, reduced, or integrated. – Necessary – Legal / regulatory requirements – Unnecessary - Waiting, Unnecessary processing, Errors/defects, Motion (people), Transportation (product), Underutilized people, Inventory
  • 23.
  • 24.
  • 25. LAST PLANNER SYSTEM  Last Planner is a short-term project planning system first used in engineering construction 20 years ago.  Glenn Ballard and Greg Howell created The Last Planner System (LPS) to improve the predictability and reliability of construction production.  It continues to create significant improvements in project & program safety, predictability, productivity, speed of delivery, profit and feelings of wellbeing among project staff.
  • 28. The impossible is often the untried Great ideas need landing gears as well as wings