2. BIDAR
GULBARGA
BIJAPUR
BAGALKOT RAICHUR
BELGAUM
DHARWAD KOPPAL
GADAG
BELLARY
UTTAR
KANNADA HAVERI
DAVANAGE
RE
SHIMOGA
UDUPI CHIKKAMANGAL TUMKUR KOLAR
UR
DAKSHINA HASSAN
KANNADA BANGALO
MANDYA RE
KODAGU
MYSORE
CHAMARAJ
NAGARA
2
3. • Area : 8440 Sq.Kms
• Villages : 1063
• Taluks : 06
• ULBs : 06
• Population (2011) : 16,60,378
• No. of Households : xxxxxxx
• No. of Urban Households : xxxxxxx
• Average Rainfall : 486.7 mm
• Average Temperature : 30 to 32o C
• Total Forest Area : 1,06,889.18 Ha 12.66 % of Total Dist. Area
• Major Industries : Mining, Sponge Iron, Poultry and Cement
3
4. (i) Solid Waste Management
(ii) Biomedical Waste Management
(iii) Tanks, Underground Water Management and Restoration
(iv) Drought Situation
(v) Restoration of Green Cover and Degraded Lands
(vi) Progress and Impact of TSC & MGNREGA
(vii) Mining in Chitradurga
4
6. Area Extent of
Sl. Survey Total Quantity of Solid
Name of the ULB’s Land(landfill)
No Numbers waste generated TPD
Acre – Gunta
1 CMC-Chitradurga 456/P1 35-38 44
2 TMC- Challakere 704 & 706 08-28 17
3 TMC –Hiriyur 195 10-00 17
4 TMC –Hosadurga 31 05-00 09
5 TP -Holalkere 550 & 551 12-00 06
6 TP-Molakalmuru 3/PP1 03-39 03.5
• Landfill sites acquired and handed over to all ULBs
• Following activities completed in all Landfill Sites.
o Approach Roads
o Compound Walls
o Drilling of Bore-wells
o Construction of Watchman Shed
o Plantation of Trees
6
7. • As per samples collected in September 2011, the Respiratory
Suspended Particle Matter (RSPM) was below the
permissible limit of 100 mg/m3 in all ULBs.
• The water quality tests have shown that all chemical
compounds are below the permissible limits.
7
14. • Has been developed in Chitradurga CMC under KMRP
Project.
• Estimated Cost is Rs. 1.40 Crores.
• Proposal for inviting tender for Sanitary Landfill for all
ULBs has been sent to Directorate of Municipal
Administration (DMA).
• Combined cost of Sanitary Landfill at 5 ULBs will be
approximately Rs. 4.37 Crores.
14
16. • All ULBs have banned usage of Plastic Bags below 40 microns.
• Inspections are carried out regularly with Pollution Control Board
Officials.
CMC, Chitradurga
TMC, Hosadurga 16
17. • Door to Door Collection is being undertaken in the ULBs as follows:
o CMC, Chitradurga :18 of 35 Wards (52% Covered)
o TMC, Challakere :18 of 27 Wards (66% Covered)
o TMC, Hiriyur :12 of 27 Wards (44% Covered)
o TMC, Hosadurga :7 of 21 Wards (30% Covered)
o TP, Holalkere :5 of 15 Wards (33% Covered)
o TP, Molakalmuru :8 of 15 Wards (53% Covered)
• Proposal to purchase 25 Jeep Mounted Refuse Collectors and 17 Auto
Tippers for all ULBs to ensure 100% waste collection is under scrutiny of
DMA.
• Route maps for all the vehicles have been prepared alongwith existing
vehicles to ensure 100% door to door waste collection. 17
19. Sl. Name Of Door –Door Collection
Transportation
No The ULB
Existing Proposed
CMC, 2 compactor /
1 Mahindra Jeep - 5 No’s
Chitradurga 3 Dumper Placer
TMC, Mahindra Jeep - 3 No’s
2 2 Tractor Placer
Challakere Auto tipper - 1 No
TMC , Mahindra Jeep - 3 No’s 1 Tractor Placer /
3
Hiriyur Auto tipper - 1 Nos 1 Dumper Placer
TMC , Auto tipper - 1 No
4 1 Tractor Placer
Hosadurga Tractor – 1 No
TP,
5 Mahindra Jeep - 1 No 1 Tractor Placer
Holalkere
TP,
6 Tractor - 1 No 1 Tractor Placer
Molakalmuru
19
20. • Safe gears, hand glows, boots,
caps, masks etc.
• Uniforms, jacket reflectors and
rain coats.
• Free bi-annual medical
checkup.
• Performance incentives.
• 32 sites have been provided to
pourkarmikas and 10 houses
constructed in Challakere
TMC.
20
21. Rs. in Crores
Sewage Capacity of STP Details of
Present Funds
S. Name of Generation in Ongoing /
Population Required for Remarks
No ULB / Day (mld) Proposed
(Approx.) 100% UGD
(Approx.) Scheme (Mld) with STP
Administrative approval
accorded by the Govt. on
CMC,
1
Chitradurga
150000 10.80 20.00 Rs. 94.92 15.11.2011. Works are
expected to commence
soon.
TMC,
2
Challakere
55000 1.54 9.72 Rs. 58.00 DPR prepared and private
land identified, negotiation
TMC, is in progress
3
Hiriyur
55000 3.52 9.72 Rs. 65.00
80% of the work completed
TMC, on UGD, the negotiation
4
Hosadurga
28000 1.57 3.33 Rs. 7.88
with the land owners for
the STP are in progress.
5 TP, Holalkere 17000 0.95 3.00 Rs. 25.00 Govt. land has been
identified, survey under
TP, progress.
6
Molakalmuru
16000 0.90 2.50 Rs. 22.00
21
22. • In Chitradurga, land of 5.00 Acres identified and handed over
to CMC.
• Negotiations with Karnataka Sheep and Wool Corporation in
progress to set up a Scientific Slaughter House with a capacity
of 400 animals per day.
• Project Cost of Rs. 8 Crores, with 50% of the funds expected
from the Govt. of India.
22
24. Bio Medical Waste Disposal Status
BMW Qty Handling over Deep Burial &
S.No Type of HCE Nos. Generated in to CBMWTF in Sharp Pit in
Kg / Day Kg / Day Kg / Day
1 Govt 94 490.50 375(17) 115.5 (77)
2 Private 160 474.50 384.80 (96) 89.7 (64)
3 Veterinary 143 143 - 143 (134)
24
25. Bio Medical Waste Management Information
Progress on Bio Medical Waste Handling Rules
No. of Health Name of
S.No Levels of Hospitals Care Liquid Waste Deep Burial
HCF Tie up
Facilities Disinfection Unit & Sharp Pit
with
Completed Completed
CBMWTF
1 District Hospital 1 1 1(4 Units) -
2 Taluk Level Hospital 5 5 5 -
Community Health
3 11 11 11 -
Center
Primary Health
4 77 - 77 77
Center
Total 94 17 94 77
Note (1) Liquid Bio-Medical Waste Disinfection unit installed by KHSDRP in all DH, GH &
CHC within 31.03.2011.
(2)Tie-up relating to Solid Waste Disposal with CBMWTF done with 31.03.2011
HCF : Health Care Facility
25
26. Taluk Level Community Primary
S.No Description Dist. Hospital
Hospital Health Centre Health Centre
Total No. of Health Care
1 1 5 11 77
Facilities
Solid Biomedical Waste Disposal
Quality of Bio-medical
1 112.5 Kg/Day 125 Kg/Day 137.5 Kg/Day 115.5 Kg/Day
Waste Generated (Avg.)
Deep burial pit
2 Method of Treatment CBMWTF CBMWTF CBMWTF
and sharp pit
Liquid Biomedical Waste Disposal( Treatment plant capacity )
Quality of Bio-medical 1000 LPD
1 800 L/D/H 800 L/D/H 50 L/D/H
waste generated (Avg.) (4 Units)
Bio-medical liquid waste Disinfection Disinfection Disinfection Disinfection
2
treatment facility provided Unit Unit Unit Unit
CBMWTF: Common Bio-Medical Waste Treatment Facility
26
31. o No. of Villages : 1063
o No. of Habitations (in addition to Villages) : 687
o No. of Rivers :3
o No. of Tanks : 300
o No. of MWSS : 1635
o No. of PWSS : 739
31
33. • Major drainage system falls under Krishna River Basin.
• Vedavathi, Tungabhadra, and Suvarnamukhi are the
major rivers.
• Vedavathi river is the major river which covers 85% of
the area covered by all rivers.
• VV Sagar is the major dam in the district having a
capacity of 30TMC.
• VV Sagar provides drinking water to Chitradurga and
Hiriyur Towns.
33
36. No. of Samples
Fluoride Affected
No. of No. of No. of Tested
Populati No. of
Village Habitatio MWS Year Pre Post Pre Post Remarks
on PWSS
s ns S Monso Monsoo Monsoo Monsoo
on n n n
2010-
5720 4983 441 309
11
16.60
1063 687 1635 739
Lakhs
The results is at the
2011- end of October-11
3600 - 131 -
12 samples testing is
under progress
36
37. Total No. of Tanks in District : 300
• Tanks covered under JSYS : 98
• Tanks covered under RRR : 27
• Tanks covered under Tank Rejuvenate Scheme : 90
Total : 215
71.66 % of total tanks in the district are being restored under
various schemes of the Central and the State Government.
37
38. • All 96 tanks are under implementation stage.
• Of the total cost of Rs. 27.42 Crores, Rs. 15.95 Crores have been spent.
• Target fixed for Rabi / Summer 2009-10 and Khariff 2010-10 with
respect to the area covered have been met cumulatively.
• The components of the scheme are as follows:
o Water Management Demonstration (WMD)
o Arable Crop Demonstration (ACD)
o Horticulture Crop Demonstration (HCD)
o Integrated Farming System Demonstration (IFSD)
o Fodder Crop Development Demonstration (FCDDD)
o Farmers Field School (FFS)
38
39. Silt Demonstration in Banjigere Tank
Fodder Crop Development Demonstration (FDD) In Chikkaemmiganuru Tank
39
41. • No. of Tanks included : 90
• Implementing Agencies Panchayat Raj Engineering Division and
Minor Irrigation Departments.
• Total cost of the scheme : 29.77 Crores
• 70% Progress has been achieved
• Works comprise
o Improvement and Strengthening of bund
o De-silting of tanks
o Improvements to Canals and Feeder canals which helps in
proper utilization of water stored in the tank.
41
43. • Govt. Of India Scheme taken up by Minor Irrigation
Department to Repair, Rejuvenation and Restoration of tanks.
• Total of 27 tanks covered with an outlay of Rs. 21.81 Crores.
• Of the total outlay Rs. 8.62 Crores has been spent.
• Basic Components
o Improvement and Strengthening of bund
o Improvements to Canals and Feeder canals which helps in
proper utilization of water stored in the tank.
o Formation of boundary trench and plantation all round the
water spread area of tank to prevent the unauthorized
cultivation and encroachment of tank bed.
o Repairs to sluices and waste weirs
43
45. Watershed Development program
The total geographical area 7.707 Lakh ha. has been demarcated in to
203 sub-watershed and 1284 micro watersheds prioritized by
Karnataka State Remote Sensing Application Center.
88% of the land falls under dry land category.
The area available for watershed development programmes is 6.944
Lakh hectors.
Out of which 2.375 lakh ha. has been treated in various watershed
programmes since 2001, with financial expenditure of Rs 180.40
Crores.
Perspective plan has been prepared for treating remaining area of
4.569 lakh ha. from 2009-10 to 2026-27, over a period of 18 years.
45
46. Sujala – II and IWMP
Under Prime Minister relief package (Sujala-II) the area
sanctioned for treatment is 0.216 ha. for the period 2008-09 to
2012-13 with the financial target of Rs. 26.26 Crores.
The Integrated Watershed Management Programme projects
(IWMP)sanctioned starts from 2009-10-IWMP Batch-1, 2010-
11-IWMP Batch-2 and 2011-12 IWMP Batch-3.
The total area of 0.795 Lakh ha. with the financial target of
Rs. 96.24 Crores has been sanctioned by GOI in 3 Batches with
the integrated development through people participation
approach for a period of 5 to 7 years.
46
47. Major Components of Sujala-II & IWMP
• Improve the productive potentials of selected watershed and
their associated natural resource base.
• Sustainable alleviation of poverty.
• Development and strengthen community based institutional
arrangements for sustainable natural resource management.
• Improved skills and employment opportunities for non farm
sectors.
• Involvement of village communities in participatory planning,
Implementation, Social and environmental management,
maintenance of assets and operate in a more socially inclusive
manner. 47
48. Ongoing Projects
Sujala – II (RIDF) Programme
In Ha.
Sl. Name of the Name of the Sub- Programme Progress
No. Taluk watershed Phy. Fin. Phy. Fin.
1 Chitradurga Kariobenahalli 2074 248.88 1016 121.94
2 Challakere Lakshmipura Nala 4165 499.80 1243 149.19
3 Hiriyur Nandihalli Nala 4390 526.80 1758 211.01
4 Hosadurga Kavalaramane 3634 436.08 1439 172.67
5 Holalkere Mugalikatte 4000 480.000 1416 166.99
6 Molakalmuru Murudi Nala 3624 434.88 1295 155.43
Total 21887 2626.44 8167 977.23
RIDF: Rural Infrastructure Development Fund 48
49. Photographs of Sujala Works
Gram Sabha Trench cum Bund
Dry Land Horticulture Agro Forest
49
50. Integrated Watershed
Management Programme
(2009-10 to 2016-17)
In Ha.
Sl. Programme Progress
Name of the Taluka Remarks
No. Phy. Fin. Phy. Fin.
Chitradurga Financial Expenditure
1 13640 1636.85 0 63.84
included Adm. Cost, Capacity
2 Challakere 14419 1730.41 0 71.45 building and preliminary
preparation of the project and
3 Hiriyur 14409 1729.24 0 75.12 EPA activities.
Net Planning and DPR
4 Hosadurga 13230 1587.77 0 64.79 preparation Process is under
progress after these tasks the
5 Holalkere 13717 1646.16 0 65.30 actual implementation will be
taken up.
6 Molakalmuru 10785 1294.20 0 41.34
Total 80200 9624.63 0 381.84
50
51. Impacts of the Watershed Development Programmes /
Projects :
Increase in ground water table due to soil and water coservation
interventions.
Increase in crop yield by 24%
Improvement in waste lands /community lands.
Improvement in livestock management and fodder production resulted
in increase in live stock based production.
Improvement in livelihoods of vulnerable & land less families of
watershed community.
Income from agriculture and non agricultural activities improved
economic status of the watershed community.
Fluoride content reduced 1.4 ppm to 0.4 ppm due to interventions of soil
and water conservation activities.
To adaption of forest and horticulture species it improves vegetation
coverage as well as micro environmental climatic condition.
51
52. • Providing Water Supply at Ravalkunte and Other villages
from Rangaiahadurga Dam.
o Project Cost is Rs. 9.30 Crores covering 27 villages and a
population of 42,000 in Molakalmuru Taluk. The scheme
is completed and 11 villages are already getting water.
The balance are in the trial run stage.
• Providing Water Supply at Aimangala and other villages.
o Project Cost is Rs. 39.00 Crores covering 77 villages and a
population of 92,075 in Hiriyur Taluk , Govt. has
accorded adminsitrative approval.
• Proposal has been submitted to Govt. for approval of Surface
Water Supply Schemes of estimated Cost Rs. 64.97 Crores
covering 110 villages of Chitradurga District.
52
53. Surface Water Supply Scheme
Revalakunte And Other Villages (Rangaiahnadurga Project)
53
54. • 127 Villages , a population of 3,63,437 in Hospet, Kudligi,
Molakalmuru, Challakere & Pavgada Town are covered.
• Source –Tungabhadra Reservoir .
• Total project cost Rs. 365 Crores.
• The line estimate of the project has been submitted to the
Govt. and the detailed estimates are under preparation.
54
56. General Statistics Related to Agriculture
1 Total Agriculture Land - Rabi 358500 Ha
- Khariff 60000 Ha
2 Total Average Annual Rainfall 486.7 mm
3 Rainfall Until End of October 2011 269 mm
4 Total No. of Hoblies 22
(a) Severe Drought Affected Hoblies 18
(b) Medium Draught Affected Hoblies 03
(c) Normal 01
56
57. Average Rainfall Actual Rainfall
from June to from June to % of Rainfall
S.No. Taluk
September September Deficiency
(in mm) (in mm)
1 Chitradurga 299 199 -34
2 Challakere 187 93 -50
3 Hiriyur 190 94 -51
4 Hosadurga 192 114 -41
5 Holalkere 288 247 -14
6 Molakalmuru 209 132 -37
District Total 227 146 -38
57
59. 20-08-2011 08-09-2011
Severe- 08 Severe - 13
14-09-2011 30-09-2011
Severe - 15 Severe - 18
59
60. • The State Govt. has declared all six talukas of the district as
drought hit.
• The crop loss on account o the drought has been estimated at
Rs. 450 Crores.
• Efforts are on to expand the sowing during Rabi Season.
• Amelioration measures such as running of Goshalas and
providing Drinking Water are being undertaken by the District
Administration.
• Rainfall has improved during the month of November 2011
60
65. Sl. Name of the
Name of the forestry activities 2011-12 2010-11 2009-10 Remarks
No Scheme
1 Special 1. Raising of block plantation (in Ha) 113.50 151.50 470
Development
2. Raising of Road Side Plantation (in 26 66 -
Programme
KM)
These
2 Greening Raising of block plantation (in Ha) - - 120 forestry
India & JBIC activities are
3 NREGA 1. Raising of block plantation (in Ha) 208.5 410 - mainly
concentrated
2. Raising of Road Side Plantation (in 62.5 372 - in Gomals,
KM) Kaval lands,
3. Raising of school plantation (in Ha) - 19 - Karab land,
Road side
4. Seedlings distributed to farmers 1068000 613800 - like MDR,
(4389 farmers) (1631 farmer)
SH & Other
5. Seedlings distributed to schools 8500 9749 - link roads,
(30 schools) (46 schools) Tankforeshor
6.Seedlings distributed to other 4500 3250 - e etc.
institutions & public function
Total 410.5 1018.5 590
65
67. No. of Schools
Total No. of
Sl.No. Taluka having School
Schools
Forestry
1 Chitradurga 344 172
2 Challakere 403 235
3 Hiriyur 355 249
4 Hosadurga 312 165
5 Holalkere 248 148
6 Molakalmuru 152 90
Total 1814 1059
67
68. Activities Undertaken
• Development of Adumalleshwara Zoo.
• No. of visitors details as follows
o 2008-09 : 60787
o 2009-10 : 85905
o 2010-11 : 97160
• Development of eco-tourism by setting up Jogimatti Nature Camp
• About 200 persons stayed in the Camp during November 2010 to
October 2011.
68
72. Institutional Coverage Target Achievement Percentage
No. of Schools 1734 1696 97.81 %
No. of Anganavadis 1383 1009 72.96 %
(Own Buildings)
I H H L coverage Target Achievement Percentage
(Individual House Hold Latrine )
BPL (Below Poverty Level) 75400 50895 67.50%
APL (Above Poverty Level) 130585 5671 42.63%
• 7 Gram Panchayath’s of district have awarded the National Gramin
Puraskar
72
73. • TRSC is extended up to March-2017 by Central Govt., and
maximum coverage is being undertaken through
o Convergence With MGNREGS
o Suvarna Gramodaya Scheme
o Swachcha Grama Scheme
o Participation of local NGOs
o Community – Led Approach
73
75. MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT 2010-11 (Up to 31st March 2011) (As per MIS)
1 Total Registered Families 2,35,223
2 Job Cards Issued 2,35,223
3 Labour Budget for 2010-11 Rs. 180.63 Crore
4 Completed Works 8,084
5 Ongoing Works 2,498
6 No. of families completed 100 days 8,417
7 Total Generated Mandays 80.62 Lakhs
8 Amount Released by Govt. Rs. 113.16 Crore
9 Total Expenditure Rs. 101.19 Crore
10 Total Achievement Rs. 195.38 Crore
11 Amount to be Released by Govt. Rs. 82.22 Crore
75
76. MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT 2011-12 (Up to 28 Nov -2011) (As per MIS)
1 Total Registered Families 2,35,223
2 Job Cards Issued 2,35,223
3 Labour Budget for 2011-12 Rs.148.54 Crores
4 Amount Released by Govt. Rs. 114.75 Crores
5 Amount to be paid for 2010-11 works Rs. 94.19 Crores
6 Expenditure incurred for 2010-11 works Rs. 84.68 Crores
7 Expenditure incurred for 2011-12 works Rs. 2.91 Crores
8 No. of New Works under progress in 2011-12
813
9 Total Generated Mandays 59,206
76
77. 2010- 11 No. of works completed under MGNREGA
Works under different category (As per MIS)
Total
S. Block
Rural Flood Water Renovation no of
No Name Drought Irrigation Land Other works
Connect Contro Conservation of Water
Proofing works Development Works
ivity l & Harvesting Bodies
1 Chitradurga 304 74 71 16 254 369 194 243 1525
2 Challakere 350 187 560 60 19 38 48 119 1381
3 Hiriyur 305 5 307 4 280 434 171 381 1887
4 Holalkere 448 19 472 43 20 21 32 467 1522
5 Hosadurga 117 311 65 4 70 43 329 196 1135
6 Molakalmuru 96 137 83 6 28 92 28 164 634
Total 1620 733 1558 133 671 997 802 1570 8084
77
78. Renovation of traditional water bodies
Drainage work Under MGNREGA at Under MGNREGA at Kodihlli Village,
Kainadu GP Bagur GP
78
81. • Total Geographical area : 8440 Sq. Km
• Forest area (Reserve) : 77670 ha (9.25% of total area)
• Total Mining Leases : 58 in 3639.75ha (0.43% of total area)
• ML in Forest Land : 14 in 599.11ha (0.77% of forest area)
• ML in Revenue Land : 34 in 2255.80 ha
• ML area in Forest and revenue Land : 5 in 761.43 ha
• ML area in Patta Land : 5 in 23.41 ha
ML : Mining Lease
81
82. Proposed
Actual Production
Production for
Sl. Total Working Idle Expired for 2010-11 in lakh
Minerals 2010-11 as per IBM
No. ML ML ML ML MT
In lakh MT
(Working Mines)
(Working Mines)
1 Iron Ore 23 09 10 04 99.75 59.41
Manganese
2 11 01 03 07 0.14 0.03
Ore
3 Lime Stone 16 02 10 04 5.66 1.89
4 Others 08 -- 07 01 -- --
Total 58 12 30 16 105.56 61.33
82
85. WASTE DUMP COVERED WITH
GEO-COIR MATS TO CONTROL
EROSION IN SESA GOA LTD., M.L.
NO. 2236
AFFORISTRATION CARRIEDOUT
ON WASTE DUMP IN SESA GOA
LTD., M.L. NO. 2236
85
86. • Transportation of Mineral restricted between 6.00 AM to 6.00 PM
• Complete coverage of mineral with tarpal during transportation
• All mining vehicles originating from Chitradurga to be colour coded
(yellow) to enable the identification of source district
• 2 composite check posts established and 1 additional check post has been
established.
• E-Permit and RFID is being introduced in 3 major iron ore mines
comprising 90 per cent of the total iron ore production in the district
• All weigh bridges in the ML area have been integrated with the DMG
server.
RFID: Radio Frequency Identification Device
86
87. Terracing & Planting on inactive portion of Geo-textile coir mats on sub grade dumps at
the Dumps at MEL Mines M.L. 2346 MEL Mines M.L. No. 2346
Geo-textile Coir mat on Subgrade Dumps Grass Geo-textile Coir mat on Sub grade Dumps
grown at MEL Mines M.L. No. 2346 Grass grown at MEL Mines M.L. No. 2346
87
88. REFILLING CARRIED OUT
PARTIALLY IN THE WORKED
PIT IN ANJANA MINERALS
M.L. NO. 2519
PLANTATION AFTER REFILLING
THE MINING PIT IN G.J. KUMAR
MINES M.L. NO. 2499
88