• Area                 : 8440 Sq.Kms
• Villages             : 1063
• Taluks               : 06
• ULBs                 : 06
• Population (2011)    : 16,60,378
• No. of Households    : xxxxxxx
• No. of Urban Households : xxxxxxx
• Average Rainfall     : 486.7 mm
• Average Temperature : 30 to 32o C
• Total Forest Area    : 1,06,889.18 Ha 12.66 % of Total Dist. Area
• Major Industries     : Mining, Sponge Iron, Poultry and Cement

                                                                      3
(i)     Solid Waste Management
(ii)    Biomedical Waste Management
(iii)   Tanks, Underground Water Management and Restoration
(iv)    Drought Situation
(v)     Restoration of Green Cover and Degraded Lands
(vi)    Progress and Impact of TSC & MGNREGA
(vii) Mining in Chitradurga


                                                         4
5
Area Extent of
Sl.                                 Survey                            Total Quantity of Solid
         Name of the ULB’s                           Land(landfill)
No                                 Numbers                             waste generated TPD
                                                      Acre – Gunta
1     CMC-Chitradurga                456/P1               35-38                 44
2     TMC- Challakere              704 & 706              08-28                 17
3     TMC –Hiriyur                    195                 10-00                 17
4     TMC –Hosadurga                   31                 05-00                 09
5     TP -Holalkere                550 & 551              12-00                 06
6     TP-Molakalmuru                 3/PP1                03-39                03.5

• Landfill sites acquired and handed over to all ULBs
• Following activities completed in all Landfill Sites.
        o Approach Roads

        o Compound Walls

        o Drilling of Bore-wells

        o Construction of Watchman Shed

        o Plantation of Trees
                                                                                                6
•   As per samples collected in September 2011, the Respiratory
    Suspended    Particle   Matter   (RSPM)       was   below   the
    permissible limit of 100 mg/m3 in all ULBs.

•   The water quality tests have shown that all chemical
    compounds are below the permissible limits.




                                                                  7
8
9
10
11
12
13
• Has been developed in Chitradurga CMC under KMRP
 Project.
• Estimated Cost is Rs. 1.40 Crores.
• Proposal for inviting tender for Sanitary Landfill for all
 ULBs       has   been   sent   to   Directorate   of   Municipal
 Administration (DMA).
• Combined cost of Sanitary Landfill at 5 ULBs will be
 approximately Rs. 4.37 Crores.


                                                                    14
HDPE Liner
Bund Formation    (High Density Poly Ethylene)




 Filter Media    Leachet Treatment Tank
                                                 15
•   All ULBs have banned usage of Plastic Bags below 40 microns.

•   Inspections are carried out regularly with Pollution Control Board
    Officials.




     CMC, Chitradurga




     TMC, Hosadurga                                                      16
• Door to Door Collection is being undertaken in the ULBs as follows:
      o CMC, Chitradurga :18 of 35 Wards (52% Covered)
      o TMC, Challakere      :18 of 27 Wards (66% Covered)
      o TMC, Hiriyur         :12 of 27 Wards (44% Covered)
      o TMC, Hosadurga       :7 of 21 Wards (30% Covered)
      o TP, Holalkere        :5 of 15 Wards (33% Covered)
      o TP, Molakalmuru      :8 of 15 Wards (53% Covered)
• Proposal to purchase 25 Jeep Mounted Refuse Collectors and 17 Auto
  Tippers for all ULBs to ensure 100% waste collection is under scrutiny of
  DMA.
• Route maps for all the vehicles have been prepared alongwith existing
  vehicles to ensure 100% door to door waste collection.                17
18
Sl.    Name Of                           Door –Door Collection
                                                                        Transportation
No     The ULB
                              Existing                       Proposed
      CMC,                                                              2 compactor /
1                   Mahindra Jeep - 5 No’s
      Chitradurga                                                       3 Dumper Placer

      TMC,          Mahindra Jeep - 3 No’s
2                                                                       2 Tractor Placer
      Challakere    Auto tipper - 1 No
      TMC ,         Mahindra Jeep - 3 No’s                              1 Tractor Placer /
3
      Hiriyur       Auto tipper - 1 Nos                                 1 Dumper Placer
      TMC ,         Auto tipper - 1 No
4                                                                       1 Tractor Placer
      Hosadurga     Tractor – 1 No

      TP,
5                   Mahindra Jeep - 1 No                                1 Tractor Placer
      Holalkere

      TP,
6                 Tractor - 1 No                                        1 Tractor Placer
      Molakalmuru

                                                                                       19
• Safe gears, hand glows, boots,
  caps, masks etc.
• Uniforms, jacket reflectors and
  rain coats.
• Free bi-annual medical
  checkup.
• Performance incentives.
• 32 sites have been provided to
  pourkarmikas and 10 houses
  constructed in Challakere
  TMC.
                              20
Rs. in Crores
                                    Sewage      Capacity of STP  Details of
                      Present                                     Funds
S.     Name of                    Generation      in Ongoing /
                     Population                                 Required for           Remarks
No      ULB                       / Day (mld)       Proposed
                     (Approx.)                                  100% UGD
                                   (Approx.)     Scheme (Mld)    with STP
                                                                               Administrative  approval
                                                                               accorded by the Govt. on
     CMC,
1
     Chitradurga
                      150000        10.80            20.00         Rs. 94.92   15.11.2011. Works are
                                                                               expected to commence
                                                                               soon.
     TMC,
2
     Challakere
                       55000         1.54            9.72          Rs. 58.00   DPR prepared and private
                                                                               land identified, negotiation
     TMC,                                                                      is in progress
3
     Hiriyur
                       55000         3.52            9.72          Rs. 65.00

                                                                               80% of the work completed
     TMC,                                                                      on UGD, the negotiation
4
     Hosadurga
                       28000         1.57            3.33          Rs. 7.88
                                                                               with the land owners for
                                                                               the STP are in progress.

5    TP, Holalkere     17000         0.95            3.00          Rs. 25.00   Govt. land has been
                                                                               identified, survey under
     TP,                                                                       progress.
6
     Molakalmuru
                       16000         0.90            2.50          Rs. 22.00
                                                                                                       21
• In Chitradurga, land of 5.00 Acres identified and handed over

 to CMC.

• Negotiations with Karnataka Sheep and Wool Corporation in

 progress to set up a Scientific Slaughter House with a capacity

 of 400 animals per day.

• Project Cost of Rs. 8 Crores, with 50% of the funds expected

 from the Govt. of India.

                                                                   22
23
Bio Medical Waste Disposal Status

                             BMW Qty        Handling over   Deep Burial &
S.No   Type of HCE   Nos.   Generated in   to CBMWTF in      Sharp Pit in
                             Kg / Day          Kg / Day       Kg / Day


 1     Govt          94       490.50          375(17)        115.5 (77)


 2     Private       160      474.50        384.80 (96)       89.7 (64)


 3     Veterinary    143        143              -           143 (134)




                                                                          24
Bio Medical Waste Management Information
                                               Progress on Bio Medical Waste Handling Rules
                               No. of Health    Name of
 S.No    Levels of Hospitals       Care                    Liquid Waste       Deep Burial
                                               HCF Tie up
                                Facilities                Disinfection Unit   & Sharp Pit
                                                 with
                                                             Completed        Completed
                                               CBMWTF

   1    District Hospital           1              1           1(4 Units)           -

   2    Taluk Level Hospital        5              5               5                -

        Community Health
   3                                11             11             11                -
        Center
        Primary Health
   4                                77             -              77               77
        Center
        Total                       94            17              94               77
Note      (1) Liquid Bio-Medical Waste Disinfection unit installed by KHSDRP in all DH, GH &
              CHC within 31.03.2011.
          (2)Tie-up relating to Solid Waste Disposal with CBMWTF done with 31.03.2011

HCF : Health Care Facility
                                                                                          25
Taluk Level Community           Primary
S.No          Description            Dist. Hospital
                                                       Hospital   Health Centre     Health Centre

       Total No. of Health Care
 1                                         1                5            11               77
       Facilities

                                  Solid Biomedical Waste Disposal

       Quality of Bio-medical
 1                                   112.5 Kg/Day     125 Kg/Day     137.5 Kg/Day   115.5 Kg/Day
       Waste Generated (Avg.)
                                                                                    Deep burial pit
 2     Method of Treatment            CBMWTF           CBMWTF         CBMWTF
                                                                                     and sharp pit
                  Liquid Biomedical Waste Disposal( Treatment plant capacity )
       Quality of Bio-medical         1000 LPD
 1                                                    800 L/D/H       800 L/D/H       50 L/D/H
       waste generated (Avg.)          (4 Units)
       Bio-medical liquid waste      Disinfection     Disinfection   Disinfection    Disinfection
 2
       treatment facility provided       Unit             Unit           Unit            Unit

CBMWTF: Common Bio-Medical Waste Treatment Facility
                                                                                                 26
District Hospital, Chtiradurga



                                                       CENTRAL
                                                       STORAGE

Solid Waste                   Red Bin




              Autoclave                       CBMWTF             27
Bommagondana Kere (B G Kere) P H C




Liquid Disinfection Unit            Deep Burial Pit             Sharp Pit
                                                                            28
Solid BMW                                  Liquid BMW
                        No. of
    Type of HCE                  Handed over     Installed         LWTP      LWTP not      LWTP not
                        HCE’s                                                                            Remarks
                                 to CBMWTF     Captive facility   provided    provided      required

> 500 Bedded HCE          1          1                -              1           -             -       ETP Working
200-500 Bedded HCE        -           -               -              -           -             -             -
100-200 Bedded HCE        -           -               -              -           -             -             -
50-100 Bedded HCE         2          2                -              2           -             -             -
<50 Bedded HCE’s         42          23               19            37          5              -         Discharged
                                                                                                       into municipal
                                                                                                         drain after
Clinics                  109         66               43             -           -           109        pretreatment
                                                                                                            with
                                                                                                        hypochlorite
Blood Bank                2          2                -              1          1              -
                                                                                                          solution

Pathological              4          2                2              2          2              -
Lab/Diagnostic Centre


Others                    -           -               --             -           -             -             -


          Total         160          96               64            43          8            109
                                                                                                                 29
30
o No. of Villages                                : 1063
o No. of Habitations (in addition to Villages)   : 687
o No. of Rivers                                  :3
o No. of Tanks                                   : 300
o No. of MWSS                                    : 1635
o No. of PWSS                                    : 739




                                                          31
32
• Major drainage system falls under Krishna River Basin.
• Vedavathi, Tungabhadra, and Suvarnamukhi are the
 major rivers.
• Vedavathi river is the major river which covers 85% of
 the area covered by all rivers.
• VV Sagar is the major dam in the district having a
 capacity of 30TMC.
• VV Sagar provides drinking water to Chitradurga and
 Hiriyur Towns.
                                                           33
34
35
No. of Samples
                                                          Fluoride Affected
         No. of No. of No. of                  Tested
Populati                       No. of
         Village Habitatio MWS        Year  Pre     Post    Pre      Post           Remarks
  on                           PWSS
            s       ns      S              Monso Monsoo Monsoo Monsoo
                                            on        n      n        n


                                     2010-
                                           5720     4983     441     309
                                      11

 16.60
         1063    687    1635   739
 Lakhs
                                                                              The results is at the
                                     2011-                                    end of October-11
                                           3600       -      131      -
                                      12                                      samples testing is
                                                                              under progress




                                                                                              36
Total No. of Tanks in District                     : 300
• Tanks covered under JSYS                         : 98
• Tanks covered under RRR                          : 27
• Tanks covered under Tank Rejuvenate Scheme       : 90
                                     Total         : 215
 71.66 % of total tanks in the district are being restored under
 various schemes of the Central and the State Government.


                                                              37
• All 96 tanks are under implementation stage.
• Of the total cost of Rs. 27.42 Crores, Rs. 15.95 Crores have been spent.
• Target fixed for Rabi / Summer 2009-10 and Khariff 2010-10 with
  respect to the area covered have been met cumulatively.
• The components of the scheme are as follows:
    o Water Management Demonstration (WMD)
    o Arable Crop Demonstration (ACD)
    o Horticulture Crop Demonstration (HCD)
    o Integrated Farming System Demonstration (IFSD)
    o Fodder Crop Development Demonstration (FCDDD)
    o Farmers Field School (FFS)
                                                                             38
Silt Demonstration in Banjigere Tank




Fodder Crop Development Demonstration (FDD) In Chikkaemmiganuru Tank
                                                                 39
Finger Lings Seeding Raring in Fish Pond




   Fish Harvesting in Mallapura Tank       40
• No. of Tanks included       : 90
• Implementing Agencies Panchayat Raj Engineering Division and
  Minor Irrigation Departments.
• Total cost of the scheme    : 29.77 Crores
• 70% Progress has been achieved
• Works comprise
    o Improvement and Strengthening of bund
    o De-silting of tanks
    o Improvements to Canals and Feeder canals which helps in
      proper utilization of water stored in the tank.
                                                                 41
Kamasmudra Tank (Feeder Channel)




Katamdevarakote Tank (Embankment)   42
• Govt. Of India Scheme taken up by Minor Irrigation
  Department to Repair, Rejuvenation and Restoration of tanks.
• Total of 27 tanks covered with an outlay of Rs. 21.81 Crores.
• Of the total outlay Rs. 8.62 Crores has been spent.
• Basic Components
   o Improvement and Strengthening of bund
   o Improvements to Canals and Feeder canals which helps in
     proper utilization of water stored in the tank.
   o Formation of boundary trench and plantation all round the
     water spread area of tank to prevent the unauthorized
     cultivation and encroachment of tank bed.
   o Repairs to sluices and waste weirs

                                                             43
Sultanipura Tank (Desilting)




Sirigere Tank (Bund Improvement)   44
Watershed Development program
  The total geographical area 7.707 Lakh ha. has been demarcated in to
   203 sub-watershed and 1284 micro watersheds prioritized by
   Karnataka State Remote Sensing Application Center.

  88% of the land falls under dry land category.

  The area available for watershed development programmes is 6.944
   Lakh hectors.

  Out of which 2.375 lakh ha. has been treated in various watershed
   programmes since 2001, with financial expenditure of Rs 180.40
   Crores.

  Perspective plan has been prepared for treating remaining area of
   4.569 lakh ha. from 2009-10 to 2026-27, over a period of 18 years.
                                                                          45
Sujala – II and IWMP
  Under Prime Minister relief package (Sujala-II) the area
   sanctioned for treatment is 0.216 ha. for the period 2008-09 to
   2012-13 with the financial target of Rs. 26.26 Crores.

  The Integrated Watershed Management Programme projects
   (IWMP)sanctioned starts from 2009-10-IWMP Batch-1, 2010-
   11-IWMP Batch-2 and 2011-12 IWMP Batch-3.

  The total area of 0.795 Lakh ha. with the financial target of
   Rs. 96.24 Crores has been sanctioned by GOI in 3 Batches with
   the integrated development through people participation
   approach for a period of 5 to 7 years.
                                                                     46
Major Components of Sujala-II & IWMP
•   Improve the productive potentials of selected watershed and
    their associated natural resource base.
•   Sustainable alleviation of poverty.
•   Development and strengthen community based institutional
    arrangements for sustainable natural resource management.
•   Improved skills and employment opportunities for non farm
    sectors.
•   Involvement of village communities in participatory planning,
    Implementation,     Social   and      environmental   management,
    maintenance of assets and operate in a more socially inclusive
    manner.                                                         47
Ongoing Projects
Sujala – II (RIDF) Programme


                                                              In Ha.
      Sl.     Name of the         Name of the Sub-    Programme            Progress
      No.       Taluk               watershed        Phy.     Fin.      Phy.      Fin.
       1    Chitradurga           Kariobenahalli       2074    248.88     1016    121.94
       2    Challakere            Lakshmipura Nala     4165    499.80     1243    149.19
       3    Hiriyur               Nandihalli Nala      4390    526.80     1758    211.01
       4    Hosadurga             Kavalaramane         3634    436.08     1439    172.67
       5    Holalkere             Mugalikatte          4000   480.000     1416    166.99
       6    Molakalmuru           Murudi Nala          3624    434.88     1295    155.43
                          Total                       21887   2626.44     8167    977.23
RIDF: Rural Infrastructure Development Fund                                                48
Photographs of Sujala Works




        Gram Sabha            Trench cum Bund




      Dry Land Horticulture     Agro Forest
                                                49
Integrated Watershed
Management Programme
(2009-10 to 2016-17)




                                                             In Ha.
Sl.                            Programme              Progress
         Name of the Taluka                                                     Remarks
No.                           Phy.     Fin.      Phy.        Fin.
      Chitradurga                                                          Financial     Expenditure
1                              13640   1636.85        0        63.84
                                                                       included Adm. Cost, Capacity
2     Challakere               14419   1730.41        0        71.45   building and preliminary
                                                                       preparation of the project and
3     Hiriyur                  14409   1729.24        0        75.12   EPA activities.
                                                                           Net Planning and DPR
4     Hosadurga                13230   1587.77        0        64.79   preparation Process is under
                                                                       progress after these tasks the
5     Holalkere                13717   1646.16        0        65.30   actual implementation will be
                                                                       taken up.
6     Molakalmuru              10785   1294.20        0        41.34
                Total          80200   9624.63        0       381.84
                                                                                                50
Impacts of the Watershed Development Programmes /
Projects :
 Increase in ground water table due to soil and water coservation
    interventions.
   Increase in crop yield by 24%
   Improvement in waste lands /community lands.
   Improvement in livestock management and fodder production resulted
    in increase in live stock based production.
   Improvement in livelihoods of vulnerable & land less families of
    watershed community.
   Income from agriculture and non agricultural activities improved
    economic status of the watershed community.
   Fluoride content reduced 1.4 ppm to 0.4 ppm due to interventions of soil
    and water conservation activities.
   To adaption of forest and horticulture species it improves vegetation
    coverage as well as micro environmental climatic condition.
                                                                         51
• Providing Water Supply at Ravalkunte and Other villages
  from Rangaiahadurga Dam.
    o Project Cost is Rs. 9.30 Crores covering 27 villages and a
      population of 42,000 in Molakalmuru Taluk. The scheme
      is completed and 11 villages are already getting water.
      The balance are in the trial run stage.
• Providing Water Supply at Aimangala and other villages.
    o Project Cost is Rs. 39.00 Crores covering 77 villages and a
      population of 92,075 in Hiriyur Taluk , Govt. has
      accorded adminsitrative approval.
• Proposal has been submitted to Govt. for approval of Surface
  Water Supply Schemes of estimated Cost Rs. 64.97 Crores
  covering 110 villages of Chitradurga District.
                                                                    52
Surface Water Supply Scheme
Revalakunte And Other Villages (Rangaiahnadurga Project)




                                                           53
•   127 Villages , a population of 3,63,437 in Hospet, Kudligi,
    Molakalmuru, Challakere & Pavgada Town are covered.
•   Source –Tungabhadra Reservoir .

•   Total project cost Rs. 365 Crores.
•   The line estimate of the project has been submitted to the
    Govt. and the detailed estimates are under preparation.




                                                                  54
55
General Statistics Related to Agriculture

  1   Total Agriculture Land   - Rabi       358500 Ha
                               - Khariff     60000 Ha
  2   Total Average Annual Rainfall         486.7 mm
  3   Rainfall Until End of October 2011      269 mm
  4   Total No. of Hoblies                         22
      (a) Severe Drought Affected Hoblies          18
      (b) Medium Draught Affected Hoblies          03
      (c) Normal                                   01




                                                   56
Average Rainfall   Actual Rainfall
                            from June to       from June to     % of Rainfall
S.No.             Taluk
                             September          September        Deficiency
                               (in mm)            (in mm)

 1      Chitradurga              299               199               -34

 2      Challakere               187                93               -50

 3      Hiriyur                  190                94               -51

 4      Hosadurga                192               114               -41

 5      Holalkere                288               247               -14

 6      Molakalmuru              209               132               -37

          District Total         227               146              -38
                                                                            57
Minimum
                      Severe Drought     Medium Drought
S.No.         Taluk                                             Drought
                      Affected Hoblies   Affected Hoblies
                                                            Affected Hoblies
 1      Chitradurga          3                  1                  1
 2      Challakere           4                  -                  -

 3      Hiriyur              4                  -                  -

 4      Hosadurga            4                  -                  -
 5      Holalkere            1                  2                  1
 6      Molakalmuru          2                  -                  -
              Total         18                  3                  1

                                                                          58
20-08-2011    08-09-2011
Severe- 08    Severe - 13




14-09-2011    30-09-2011
Severe - 15   Severe - 18




                            59
•   The State Govt. has declared all six talukas of the district as
    drought hit.

•   The crop loss on account o the drought has been estimated at
    Rs. 450 Crores.

•   Efforts are on to expand the sowing during Rabi Season.

•   Amelioration measures such as running of Goshalas and
    providing Drinking Water are being undertaken by the District
    Administration.

•   Rainfall has improved during the month of November 2011

                                                                      60
61
2012-13
                                       2009-10   2010-11   2011-12
      Name of the Budget Head                                         (Proposed)
                                         (ha)      (ha)      (ha)
                                                                          (ha)
Central Sponsor Scheme (NAP, NBM
                                       525.00    100.00     70.00       60.00
and APRRFC)

Externally Aided Projects (KSFMBC)     1750.00   1475.00      0           0

Department Programmes (GUA, DDF,
                                        75.00    135.00     410.00      365.00
KFDF, C.O. and Devarakadu)

Other Programmes (13th Finance, Bio-
Fuel and CAMPA – [Road Side             40.00    303.49    725.179      209.95
Plantation 139, 422 and 423])

                             TOTAL     2390.00   2013.49   1205.179     634.95

                                                                              62
63
64
Sl.   Name of the
                        Name of the forestry activities          2011-12         2010-11        2009-10    Remarks
No     Scheme
1     Special        1. Raising of block plantation (in Ha)       113.50          151.50         470
      Development
                     2. Raising of Road Side Plantation (in         26              66             -
      Programme
                     KM)
                                                                                                              These
2     Greening       Raising of block plantation (in Ha)             -                -          120         forestry
      India & JBIC                                                                                        activities are
3     NREGA          1. Raising of block plantation (in Ha)       208.5             410            -          mainly
                                                                                                          concentrated
                     2. Raising of Road Side Plantation (in        62.5             372            -       in Gomals,
                     KM)                                                                                  Kaval lands,
                     3. Raising of school plantation (in Ha)         -              19             -       Karab land,
                                                                                                            Road side
                     4. Seedlings distributed to farmers         1068000          613800           -       like MDR,
                                                               (4389 farmers)   (1631 farmer)
                                                                                                          SH & Other
                     5. Seedlings distributed to schools           8500            9749            -       link roads,
                                                                (30 schools)    (46 schools)              Tankforeshor
                     6.Seedlings distributed to other              4500            3250            -          e etc.
                     institutions & public function
                     Total                                        410.5          1018.5          590
                                                                                                                   65
Primary Helath Center, Chitrahalli,   Neem Plants at Metikurki Nursery
        Holalkere Taluk




                                                                         66
No. of Schools
                              Total No. of
Sl.No.               Taluka                  having School
                                Schools
                                               Forestry
  1      Chitradurga              344             172
  2      Challakere               403             235
  3      Hiriyur                  355             249
  4      Hosadurga                312             165
  5      Holalkere                248             148
  6      Molakalmuru              152             90
                      Total      1814            1059




                                                              67
Activities Undertaken
•   Development of Adumalleshwara Zoo.
•   No. of visitors details as follows
    o 2008-09           : 60787
    o 2009-10           : 85905
    o 2010-11           : 97160
•   Development of eco-tourism by setting up Jogimatti Nature Camp
•   About 200 persons stayed in the Camp during November 2010 to
    October 2011.
                                                                 68
69
avÀæzÀÄUÀð ¥ÀlÖtzÀ J¯Áè ªÀUÀðzÀ d£ÀjUÀÆ, «zÁåyðUÀ½UÉ,
¥Àj¸ÀgÀ ¥ÉæëÄUÀ½UÉ, ZÁgÀt ²©ügÁyðUÀ½UÉ, avÀæzÀÄUÀð
CgÀtå    «¨sÁUÀ,    ¥Àj¸ÀgÀ,     ¥ÁætÂ,       ¥ÀQëUÀ¼À        ¸ÀAPÀ®
¥ÀjZÀ¬Ä¸ÀĪÀ       MAzÀÄ         ¥ÀæªÀiÁtÂPÀ           ¥ÀæAiÀÄvÀß
ªÀiÁrgÀĪÀÅzÀÄ       ±ÁèWÀ¤ÃAiÀÄ.          CzÀgÀAvÉ         EzÀ£ÀÄß
ªÀÄÄAzÀĪÀj¹PÉÆAqÀÄ ºÉÆÃUÀĪÀ - §gÀĪÀ CgÀtå «¨sÁUÀzÀ
MqÉAiÀÄjUÉ ¸ÀªÁ¯ÁV JzÀÄj¸À¨ÉÃPÁVzÉ.
ªÉÆzÀ® ¨ÁjUÉ E°èUÉ §AzÀÄ £ÉÆÃrzÁUÀ avÀæzÀÄUÀð ¨ÉAUÀ¼ÀÆgÀÄ
     ²æà PÉñÀªÀªÀÄÆwð, ªÀÄÄRå CgÀtå ¸ÀAgÀPÀëuÁ¢üPÁjUÀ¼ÀÄ, CAzÁPÀët
ªÀÄ£À¹ìUÉ §gÀĪÀ ¨ÉlÖUÀ¼À £ÀqÀÄ«£À §AiÀÄ®Ä avÀæ
ªÀiÁAiÀĪÁV ¨ÉlÖUÀ¼À £ÀqÀÄªÉ ªÀįɣÁqÀ ºÀ¹gÀÄ ªÉÄïÁÌt¹zÀ
¥Àj¸ÀgÀ PÀAqÀÄ D±ÀÑAiÀÄðªÁAiÀÄÄÛ, eÉÆvÉ EªÉ¯Áè EwÛa£À
¨É¼ÀªÀtÂUÉ JAzÀÄ w½zÀÄ E°è£À ªÀÄÄRå¸ÀÜgÀÄ ªÀÄvÀÄÛ
¹§âA¢UÀ¼À      ¥Àj±ÀæªÀĪÀÇ         vÉÆÃj¸ÀÄvÀÛzÉ.          CªÀjUÀÆ
C©ü£ÀAzÀ£ÉUÀ¼ÀÄ
We, from G.P.U. Collage Turuvanur, visited here for a picnic on: 18.08.2010. We
      ²æêÀÄw JA.J.±À²PÀ¯Á, place. I am visiting this place since 1990, but
feel very happy in this beautiful (¥ÀæzsÁ£À f¯Áè ºÁUÀÆ ¸ÀvÀæ £ÁåAiÀiÁ¢üñÀgÀÄ),
                                                                         avÀæzÀÄUÀð.
today it is very fine. I think it is due to the efforts of this staff and department.
We feel it is “Malanadu”. On behalf of the school every body’s effort is
appraisable.
                                           Vice Principal, Govt. Pre University College, Turuvanur.
                                                                                                70
71
Institutional Coverage            Target   Achievement   Percentage

No. of Schools                           1734       1696        97.81 %

No. of Anganavadis                       1383       1009        72.96 %
(Own Buildings)

         I H H L coverage               Target   Achievement   Percentage
     (Individual House Hold Latrine )

BPL (Below Poverty Level)               75400       50895       67.50%

APL (Above Poverty Level)               130585      5671        42.63%

•   7 Gram Panchayath’s of district have awarded the National Gramin
    Puraskar


                                                                            72
•   TRSC is extended up to March-2017 by Central Govt., and
    maximum coverage is being undertaken through

       o   Convergence With MGNREGS

       o   Suvarna Gramodaya Scheme

       o   Swachcha Grama Scheme

       o   Participation of local NGOs

       o   Community – Led Approach




                                                          73
School Community Toilets    Community Toilets




 Group Individual Toilets   Individual Toilets




                                                 74
MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT 2010-11 (Up to 31st March 2011) (As per MIS)
 1   Total Registered Families                      2,35,223
 2   Job Cards Issued                               2,35,223
 3   Labour Budget for 2010-11                  Rs. 180.63 Crore
 4   Completed Works                                 8,084
 5   Ongoing Works                                   2,498
 6   No. of families completed 100 days              8,417
 7   Total Generated Mandays                     80.62 Lakhs
 8   Amount Released by Govt.                   Rs. 113.16 Crore
 9   Total Expenditure                          Rs. 101.19 Crore
 10 Total Achievement                          Rs. 195.38 Crore
 11 Amount to be Released by Govt.              Rs. 82.22 Crore
                                                               75
MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT
GUARANTEE ACT 2011-12 (Up to 28 Nov -2011) (As per MIS)
 1 Total Registered Families                        2,35,223
 2 Job Cards Issued                                 2,35,223
 3 Labour Budget for 2011-12                    Rs.148.54 Crores
 4 Amount Released by Govt.                     Rs. 114.75 Crores

 5 Amount to be paid for 2010-11 works          Rs. 94.19 Crores

 6 Expenditure incurred for 2010-11 works       Rs. 84.68 Crores

 7 Expenditure incurred for 2011-12 works       Rs. 2.91 Crores

 8 No. of New Works under progress in 2011-12
                                                      813
 9   Total Generated Mandays                         59,206
                                                               76
2010- 11 No. of works completed under MGNREGA
                                Works under different category (As per MIS)
                                                                                        Total
S.    Block
                 Rural Flood      Water    Renovation                                   no of
No    Name                                            Drought Irrigation Land     Other works
                Connect Contro Conservation of Water
                                                      Proofing  works Development Works
                 ivity    l    & Harvesting Bodies


1 Chitradurga    304     74       71          16        254       369         194   243    1525

2 Challakere     350    187      560          60        19         38         48    119    1381

3 Hiriyur        305     5       307          4         280       434         171   381    1887

4 Holalkere      448     19      472          43        20         21         32    467    1522

5 Hosadurga       117   311       65          4         70         43         329   196    1135

6 Molakalmuru     96    137       83          6         28         92         28    164    634


      Total      1620   733      1558        133        671       997         802   1570   8084




                                                                                            77
Renovation of traditional water bodies
Drainage work Under MGNREGA at   Under MGNREGA at Kodihlli Village,
           Kainadu GP                          Bagur GP
                                                                          78
Rain water stored in Gokatta, at Madhure GP
                                              79
80
• Total Geographical area : 8440 Sq. Km

• Forest area (Reserve)   : 77670 ha (9.25% of total area)

• Total Mining Leases     : 58 in 3639.75ha (0.43% of total area)

• ML in Forest Land       : 14 in 599.11ha (0.77% of forest area)

• ML in Revenue Land : 34 in 2255.80 ha

• ML area in Forest and revenue Land : 5 in 761.43 ha

• ML area in Patta Land : 5 in 23.41 ha


ML : Mining Lease
                                                               81
Proposed
                                                                           Actual Production
                                                        Production for
Sl.                Total   Working   Idle   Expired                        for 2010-11 in lakh
       Minerals                                       2010-11 as per IBM
No.                 ML      ML       ML      ML                                   MT
                                                         In lakh MT
                                                                            (Working Mines)
                                                       (Working Mines)

1     Iron Ore      23       09      10       04            99.75                59.41

      Manganese
2                   11       01      03       07             0.14                 0.03
      Ore

3     Lime Stone    16       02      10       04             5.66                 1.89


4     Others        08       --      07       01              --                   --


        Total       58       12      30       16           105.56                61.33




                                                                                            82
83
84
WASTE DUMP COVERED WITH
GEO-COIR MATS TO CONTROL
EROSION IN SESA GOA LTD., M.L.
NO. 2236




AFFORISTRATION      CARRIEDOUT
ON WASTE DUMP IN SESA GOA
LTD., M.L. NO. 2236




                                 85
•   Transportation of Mineral restricted between 6.00 AM to 6.00 PM
•   Complete coverage of mineral with tarpal during transportation
•   All mining vehicles originating from Chitradurga to be colour coded
    (yellow) to enable the identification of source district
•   2 composite check posts established and 1 additional check post has been
    established.
•   E-Permit and RFID is being introduced in 3 major iron ore mines
    comprising 90 per cent of the total iron ore production in the district
•   All weigh bridges in the ML area have been integrated with the DMG
    server.

    RFID: Radio Frequency Identification Device
                                                                          86
Terracing & Planting on inactive portion of   Geo-textile coir mats on sub grade dumps at
     the Dumps at MEL Mines M.L. 2346                   MEL Mines M.L. No. 2346




Geo-textile Coir mat on Subgrade Dumps Grass     Geo-textile Coir mat on Sub grade Dumps
      grown at MEL Mines M.L. No. 2346           Grass grown at MEL Mines M.L. No. 2346




                                                                                             87
REFILLING CARRIED OUT
PARTIALLY IN THE WORKED
PIT IN ANJANA MINERALS
M.L. NO. 2519




PLANTATION AFTER REFILLING
THE MINING PIT IN G.J. KUMAR
MINES M.L. NO. 2499




                               88
89

Contenu connexe

En vedette

Lokadalath udupi part 1
Lokadalath udupi part 1Lokadalath udupi part 1
Lokadalath udupi part 1dcudupi
 
Information Legal Services
Information Legal ServicesInformation Legal Services
Information Legal Serviceslegal1
 
Right to information Act(India)
Right to information Act(India)Right to information Act(India)
Right to information Act(India)Linel Dias
 
Women's welfare & legal provisions
Women's welfare & legal provisionsWomen's welfare & legal provisions
Women's welfare & legal provisionsVIBHUTI PATEL
 
E banking recent trends in indian banking sector
E banking recent trends in indian banking sectorE banking recent trends in indian banking sector
E banking recent trends in indian banking sectorShireen Bobade
 
Right to information act, 2005
Right to information act, 2005Right to information act, 2005
Right to information act, 2005Altacit Global
 
New innovations in banking industry
New innovations in banking industryNew innovations in banking industry
New innovations in banking industryHemanth Shenoy
 
Public interest litigation
Public interest litigationPublic interest litigation
Public interest litigationbhagya913
 
Right To Information Act 2005
Right To Information Act 2005Right To Information Act 2005
Right To Information Act 2005Ashish Kumar
 
New trends in indian banking system
New trends in indian banking systemNew trends in indian banking system
New trends in indian banking systemRoy Thomas
 
Presentation on Right to Information Act : by Hemant Goswami
Presentation on Right to Information Act : by Hemant GoswamiPresentation on Right to Information Act : by Hemant Goswami
Presentation on Right to Information Act : by Hemant GoswamiBurning Brain Society
 
2016 Banking Trends
2016 Banking Trends2016 Banking Trends
2016 Banking TrendsMX
 

En vedette (15)

Lokadalath udupi part 1
Lokadalath udupi part 1Lokadalath udupi part 1
Lokadalath udupi part 1
 
Information Legal Services
Information Legal ServicesInformation Legal Services
Information Legal Services
 
Indu mehta pil
Indu mehta pilIndu mehta pil
Indu mehta pil
 
Rti Act
Rti ActRti Act
Rti Act
 
Public interest litigation
Public interest litigationPublic interest litigation
Public interest litigation
 
Right to information Act(India)
Right to information Act(India)Right to information Act(India)
Right to information Act(India)
 
Women's welfare & legal provisions
Women's welfare & legal provisionsWomen's welfare & legal provisions
Women's welfare & legal provisions
 
E banking recent trends in indian banking sector
E banking recent trends in indian banking sectorE banking recent trends in indian banking sector
E banking recent trends in indian banking sector
 
Right to information act, 2005
Right to information act, 2005Right to information act, 2005
Right to information act, 2005
 
New innovations in banking industry
New innovations in banking industryNew innovations in banking industry
New innovations in banking industry
 
Public interest litigation
Public interest litigationPublic interest litigation
Public interest litigation
 
Right To Information Act 2005
Right To Information Act 2005Right To Information Act 2005
Right To Information Act 2005
 
New trends in indian banking system
New trends in indian banking systemNew trends in indian banking system
New trends in indian banking system
 
Presentation on Right to Information Act : by Hemant Goswami
Presentation on Right to Information Act : by Hemant GoswamiPresentation on Right to Information Act : by Hemant Goswami
Presentation on Right to Information Act : by Hemant Goswami
 
2016 Banking Trends
2016 Banking Trends2016 Banking Trends
2016 Banking Trends
 

Similaire à Lok adalat presentation (corrected on 30.11.2011)

Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath prakash_dcpa
 
Namami gange in bihar
Namami gange in biharNamami gange in bihar
Namami gange in biharArvind kumar
 
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxMining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxPramitPattanayak
 
Urban infrastructure case study of Vadodara - word no 8
Urban infrastructure case study of Vadodara - word no 8Urban infrastructure case study of Vadodara - word no 8
Urban infrastructure case study of Vadodara - word no 8MIRAL SONI
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern projectManveer Shetty
 
India`s hydropower potential
India`s hydropower potentialIndia`s hydropower potential
India`s hydropower potentialAmalkrishnakl
 
Post earthquake debris management in Nepal: Challenges and Opportunities
Post earthquake debris management in Nepal: Challenges and OpportunitiesPost earthquake debris management in Nepal: Challenges and Opportunities
Post earthquake debris management in Nepal: Challenges and OpportunitiesSaroj Upadhyay
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxcircle28ghmc
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCInfotrex Services Pvt. Ltd.
 

Similaire à Lok adalat presentation (corrected on 30.11.2011) (11)

Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath
 
Namami gange in bihar
Namami gange in biharNamami gange in bihar
Namami gange in bihar
 
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptxMining Overview For Coal And Bauxite Mine of Nalco.pptx
Mining Overview For Coal And Bauxite Mine of Nalco.pptx
 
Urban infrastructure case study of Vadodara - word no 8
Urban infrastructure case study of Vadodara - word no 8Urban infrastructure case study of Vadodara - word no 8
Urban infrastructure case study of Vadodara - word no 8
 
Underground cavern project
Underground cavern projectUnderground cavern project
Underground cavern project
 
India`s hydropower potential
India`s hydropower potentialIndia`s hydropower potential
India`s hydropower potential
 
Post earthquake debris management in Nepal: Challenges and Opportunities
Post earthquake debris management in Nepal: Challenges and OpportunitiesPost earthquake debris management in Nepal: Challenges and Opportunities
Post earthquake debris management in Nepal: Challenges and Opportunities
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMC
 
Chikkaballapur Surprise Town
Chikkaballapur Surprise TownChikkaballapur Surprise Town
Chikkaballapur Surprise Town
 
Eia sujawal
Eia sujawalEia sujawal
Eia sujawal
 

Dernier

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 

Dernier (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Lok adalat presentation (corrected on 30.11.2011)

  • 1. 1
  • 2. BIDAR GULBARGA BIJAPUR BAGALKOT RAICHUR BELGAUM DHARWAD KOPPAL GADAG BELLARY UTTAR KANNADA HAVERI DAVANAGE RE SHIMOGA UDUPI CHIKKAMANGAL TUMKUR KOLAR UR DAKSHINA HASSAN KANNADA BANGALO MANDYA RE KODAGU MYSORE CHAMARAJ NAGARA 2
  • 3. • Area : 8440 Sq.Kms • Villages : 1063 • Taluks : 06 • ULBs : 06 • Population (2011) : 16,60,378 • No. of Households : xxxxxxx • No. of Urban Households : xxxxxxx • Average Rainfall : 486.7 mm • Average Temperature : 30 to 32o C • Total Forest Area : 1,06,889.18 Ha 12.66 % of Total Dist. Area • Major Industries : Mining, Sponge Iron, Poultry and Cement 3
  • 4. (i) Solid Waste Management (ii) Biomedical Waste Management (iii) Tanks, Underground Water Management and Restoration (iv) Drought Situation (v) Restoration of Green Cover and Degraded Lands (vi) Progress and Impact of TSC & MGNREGA (vii) Mining in Chitradurga 4
  • 5. 5
  • 6. Area Extent of Sl. Survey Total Quantity of Solid Name of the ULB’s Land(landfill) No Numbers waste generated TPD Acre – Gunta 1 CMC-Chitradurga 456/P1 35-38 44 2 TMC- Challakere 704 & 706 08-28 17 3 TMC –Hiriyur 195 10-00 17 4 TMC –Hosadurga 31 05-00 09 5 TP -Holalkere 550 & 551 12-00 06 6 TP-Molakalmuru 3/PP1 03-39 03.5 • Landfill sites acquired and handed over to all ULBs • Following activities completed in all Landfill Sites. o Approach Roads o Compound Walls o Drilling of Bore-wells o Construction of Watchman Shed o Plantation of Trees 6
  • 7. As per samples collected in September 2011, the Respiratory Suspended Particle Matter (RSPM) was below the permissible limit of 100 mg/m3 in all ULBs. • The water quality tests have shown that all chemical compounds are below the permissible limits. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. • Has been developed in Chitradurga CMC under KMRP Project. • Estimated Cost is Rs. 1.40 Crores. • Proposal for inviting tender for Sanitary Landfill for all ULBs has been sent to Directorate of Municipal Administration (DMA). • Combined cost of Sanitary Landfill at 5 ULBs will be approximately Rs. 4.37 Crores. 14
  • 15. HDPE Liner Bund Formation (High Density Poly Ethylene) Filter Media Leachet Treatment Tank 15
  • 16. All ULBs have banned usage of Plastic Bags below 40 microns. • Inspections are carried out regularly with Pollution Control Board Officials. CMC, Chitradurga TMC, Hosadurga 16
  • 17. • Door to Door Collection is being undertaken in the ULBs as follows: o CMC, Chitradurga :18 of 35 Wards (52% Covered) o TMC, Challakere :18 of 27 Wards (66% Covered) o TMC, Hiriyur :12 of 27 Wards (44% Covered) o TMC, Hosadurga :7 of 21 Wards (30% Covered) o TP, Holalkere :5 of 15 Wards (33% Covered) o TP, Molakalmuru :8 of 15 Wards (53% Covered) • Proposal to purchase 25 Jeep Mounted Refuse Collectors and 17 Auto Tippers for all ULBs to ensure 100% waste collection is under scrutiny of DMA. • Route maps for all the vehicles have been prepared alongwith existing vehicles to ensure 100% door to door waste collection. 17
  • 18. 18
  • 19. Sl. Name Of Door –Door Collection Transportation No The ULB Existing Proposed CMC, 2 compactor / 1 Mahindra Jeep - 5 No’s Chitradurga 3 Dumper Placer TMC, Mahindra Jeep - 3 No’s 2 2 Tractor Placer Challakere Auto tipper - 1 No TMC , Mahindra Jeep - 3 No’s 1 Tractor Placer / 3 Hiriyur Auto tipper - 1 Nos 1 Dumper Placer TMC , Auto tipper - 1 No 4 1 Tractor Placer Hosadurga Tractor – 1 No TP, 5 Mahindra Jeep - 1 No 1 Tractor Placer Holalkere TP, 6 Tractor - 1 No 1 Tractor Placer Molakalmuru 19
  • 20. • Safe gears, hand glows, boots, caps, masks etc. • Uniforms, jacket reflectors and rain coats. • Free bi-annual medical checkup. • Performance incentives. • 32 sites have been provided to pourkarmikas and 10 houses constructed in Challakere TMC. 20
  • 21. Rs. in Crores Sewage Capacity of STP Details of Present Funds S. Name of Generation in Ongoing / Population Required for Remarks No ULB / Day (mld) Proposed (Approx.) 100% UGD (Approx.) Scheme (Mld) with STP Administrative approval accorded by the Govt. on CMC, 1 Chitradurga 150000 10.80 20.00 Rs. 94.92 15.11.2011. Works are expected to commence soon. TMC, 2 Challakere 55000 1.54 9.72 Rs. 58.00 DPR prepared and private land identified, negotiation TMC, is in progress 3 Hiriyur 55000 3.52 9.72 Rs. 65.00 80% of the work completed TMC, on UGD, the negotiation 4 Hosadurga 28000 1.57 3.33 Rs. 7.88 with the land owners for the STP are in progress. 5 TP, Holalkere 17000 0.95 3.00 Rs. 25.00 Govt. land has been identified, survey under TP, progress. 6 Molakalmuru 16000 0.90 2.50 Rs. 22.00 21
  • 22. • In Chitradurga, land of 5.00 Acres identified and handed over to CMC. • Negotiations with Karnataka Sheep and Wool Corporation in progress to set up a Scientific Slaughter House with a capacity of 400 animals per day. • Project Cost of Rs. 8 Crores, with 50% of the funds expected from the Govt. of India. 22
  • 23. 23
  • 24. Bio Medical Waste Disposal Status BMW Qty Handling over Deep Burial & S.No Type of HCE Nos. Generated in to CBMWTF in Sharp Pit in Kg / Day Kg / Day Kg / Day 1 Govt 94 490.50 375(17) 115.5 (77) 2 Private 160 474.50 384.80 (96) 89.7 (64) 3 Veterinary 143 143 - 143 (134) 24
  • 25. Bio Medical Waste Management Information Progress on Bio Medical Waste Handling Rules No. of Health Name of S.No Levels of Hospitals Care Liquid Waste Deep Burial HCF Tie up Facilities Disinfection Unit & Sharp Pit with Completed Completed CBMWTF 1 District Hospital 1 1 1(4 Units) - 2 Taluk Level Hospital 5 5 5 - Community Health 3 11 11 11 - Center Primary Health 4 77 - 77 77 Center Total 94 17 94 77 Note (1) Liquid Bio-Medical Waste Disinfection unit installed by KHSDRP in all DH, GH & CHC within 31.03.2011. (2)Tie-up relating to Solid Waste Disposal with CBMWTF done with 31.03.2011 HCF : Health Care Facility 25
  • 26. Taluk Level Community Primary S.No Description Dist. Hospital Hospital Health Centre Health Centre Total No. of Health Care 1 1 5 11 77 Facilities Solid Biomedical Waste Disposal Quality of Bio-medical 1 112.5 Kg/Day 125 Kg/Day 137.5 Kg/Day 115.5 Kg/Day Waste Generated (Avg.) Deep burial pit 2 Method of Treatment CBMWTF CBMWTF CBMWTF and sharp pit Liquid Biomedical Waste Disposal( Treatment plant capacity ) Quality of Bio-medical 1000 LPD 1 800 L/D/H 800 L/D/H 50 L/D/H waste generated (Avg.) (4 Units) Bio-medical liquid waste Disinfection Disinfection Disinfection Disinfection 2 treatment facility provided Unit Unit Unit Unit CBMWTF: Common Bio-Medical Waste Treatment Facility 26
  • 27. District Hospital, Chtiradurga CENTRAL STORAGE Solid Waste Red Bin Autoclave CBMWTF 27
  • 28. Bommagondana Kere (B G Kere) P H C Liquid Disinfection Unit Deep Burial Pit Sharp Pit 28
  • 29. Solid BMW Liquid BMW No. of Type of HCE Handed over Installed LWTP LWTP not LWTP not HCE’s Remarks to CBMWTF Captive facility provided provided required > 500 Bedded HCE 1 1 - 1 - - ETP Working 200-500 Bedded HCE - - - - - - - 100-200 Bedded HCE - - - - - - - 50-100 Bedded HCE 2 2 - 2 - - - <50 Bedded HCE’s 42 23 19 37 5 - Discharged into municipal drain after Clinics 109 66 43 - - 109 pretreatment with hypochlorite Blood Bank 2 2 - 1 1 - solution Pathological 4 2 2 2 2 - Lab/Diagnostic Centre Others - - -- - - - - Total 160 96 64 43 8 109 29
  • 30. 30
  • 31. o No. of Villages : 1063 o No. of Habitations (in addition to Villages) : 687 o No. of Rivers :3 o No. of Tanks : 300 o No. of MWSS : 1635 o No. of PWSS : 739 31
  • 32. 32
  • 33. • Major drainage system falls under Krishna River Basin. • Vedavathi, Tungabhadra, and Suvarnamukhi are the major rivers. • Vedavathi river is the major river which covers 85% of the area covered by all rivers. • VV Sagar is the major dam in the district having a capacity of 30TMC. • VV Sagar provides drinking water to Chitradurga and Hiriyur Towns. 33
  • 34. 34
  • 35. 35
  • 36. No. of Samples Fluoride Affected No. of No. of No. of Tested Populati No. of Village Habitatio MWS Year Pre Post Pre Post Remarks on PWSS s ns S Monso Monsoo Monsoo Monsoo on n n n 2010- 5720 4983 441 309 11 16.60 1063 687 1635 739 Lakhs The results is at the 2011- end of October-11 3600 - 131 - 12 samples testing is under progress 36
  • 37. Total No. of Tanks in District : 300 • Tanks covered under JSYS : 98 • Tanks covered under RRR : 27 • Tanks covered under Tank Rejuvenate Scheme : 90 Total : 215 71.66 % of total tanks in the district are being restored under various schemes of the Central and the State Government. 37
  • 38. • All 96 tanks are under implementation stage. • Of the total cost of Rs. 27.42 Crores, Rs. 15.95 Crores have been spent. • Target fixed for Rabi / Summer 2009-10 and Khariff 2010-10 with respect to the area covered have been met cumulatively. • The components of the scheme are as follows: o Water Management Demonstration (WMD) o Arable Crop Demonstration (ACD) o Horticulture Crop Demonstration (HCD) o Integrated Farming System Demonstration (IFSD) o Fodder Crop Development Demonstration (FCDDD) o Farmers Field School (FFS) 38
  • 39. Silt Demonstration in Banjigere Tank Fodder Crop Development Demonstration (FDD) In Chikkaemmiganuru Tank 39
  • 40. Finger Lings Seeding Raring in Fish Pond Fish Harvesting in Mallapura Tank 40
  • 41. • No. of Tanks included : 90 • Implementing Agencies Panchayat Raj Engineering Division and Minor Irrigation Departments. • Total cost of the scheme : 29.77 Crores • 70% Progress has been achieved • Works comprise o Improvement and Strengthening of bund o De-silting of tanks o Improvements to Canals and Feeder canals which helps in proper utilization of water stored in the tank. 41
  • 42. Kamasmudra Tank (Feeder Channel) Katamdevarakote Tank (Embankment) 42
  • 43. • Govt. Of India Scheme taken up by Minor Irrigation Department to Repair, Rejuvenation and Restoration of tanks. • Total of 27 tanks covered with an outlay of Rs. 21.81 Crores. • Of the total outlay Rs. 8.62 Crores has been spent. • Basic Components o Improvement and Strengthening of bund o Improvements to Canals and Feeder canals which helps in proper utilization of water stored in the tank. o Formation of boundary trench and plantation all round the water spread area of tank to prevent the unauthorized cultivation and encroachment of tank bed. o Repairs to sluices and waste weirs 43
  • 44. Sultanipura Tank (Desilting) Sirigere Tank (Bund Improvement) 44
  • 45. Watershed Development program  The total geographical area 7.707 Lakh ha. has been demarcated in to 203 sub-watershed and 1284 micro watersheds prioritized by Karnataka State Remote Sensing Application Center.  88% of the land falls under dry land category.  The area available for watershed development programmes is 6.944 Lakh hectors.  Out of which 2.375 lakh ha. has been treated in various watershed programmes since 2001, with financial expenditure of Rs 180.40 Crores.  Perspective plan has been prepared for treating remaining area of 4.569 lakh ha. from 2009-10 to 2026-27, over a period of 18 years. 45
  • 46. Sujala – II and IWMP  Under Prime Minister relief package (Sujala-II) the area sanctioned for treatment is 0.216 ha. for the period 2008-09 to 2012-13 with the financial target of Rs. 26.26 Crores.  The Integrated Watershed Management Programme projects (IWMP)sanctioned starts from 2009-10-IWMP Batch-1, 2010- 11-IWMP Batch-2 and 2011-12 IWMP Batch-3.  The total area of 0.795 Lakh ha. with the financial target of Rs. 96.24 Crores has been sanctioned by GOI in 3 Batches with the integrated development through people participation approach for a period of 5 to 7 years. 46
  • 47. Major Components of Sujala-II & IWMP • Improve the productive potentials of selected watershed and their associated natural resource base. • Sustainable alleviation of poverty. • Development and strengthen community based institutional arrangements for sustainable natural resource management. • Improved skills and employment opportunities for non farm sectors. • Involvement of village communities in participatory planning, Implementation, Social and environmental management, maintenance of assets and operate in a more socially inclusive manner. 47
  • 48. Ongoing Projects Sujala – II (RIDF) Programme In Ha. Sl. Name of the Name of the Sub- Programme Progress No. Taluk watershed Phy. Fin. Phy. Fin. 1 Chitradurga Kariobenahalli 2074 248.88 1016 121.94 2 Challakere Lakshmipura Nala 4165 499.80 1243 149.19 3 Hiriyur Nandihalli Nala 4390 526.80 1758 211.01 4 Hosadurga Kavalaramane 3634 436.08 1439 172.67 5 Holalkere Mugalikatte 4000 480.000 1416 166.99 6 Molakalmuru Murudi Nala 3624 434.88 1295 155.43 Total 21887 2626.44 8167 977.23 RIDF: Rural Infrastructure Development Fund 48
  • 49. Photographs of Sujala Works Gram Sabha Trench cum Bund Dry Land Horticulture Agro Forest 49
  • 50. Integrated Watershed Management Programme (2009-10 to 2016-17) In Ha. Sl. Programme Progress Name of the Taluka Remarks No. Phy. Fin. Phy. Fin. Chitradurga Financial Expenditure 1 13640 1636.85 0 63.84 included Adm. Cost, Capacity 2 Challakere 14419 1730.41 0 71.45 building and preliminary preparation of the project and 3 Hiriyur 14409 1729.24 0 75.12 EPA activities. Net Planning and DPR 4 Hosadurga 13230 1587.77 0 64.79 preparation Process is under progress after these tasks the 5 Holalkere 13717 1646.16 0 65.30 actual implementation will be taken up. 6 Molakalmuru 10785 1294.20 0 41.34 Total 80200 9624.63 0 381.84 50
  • 51. Impacts of the Watershed Development Programmes / Projects :  Increase in ground water table due to soil and water coservation interventions.  Increase in crop yield by 24%  Improvement in waste lands /community lands.  Improvement in livestock management and fodder production resulted in increase in live stock based production.  Improvement in livelihoods of vulnerable & land less families of watershed community.  Income from agriculture and non agricultural activities improved economic status of the watershed community.  Fluoride content reduced 1.4 ppm to 0.4 ppm due to interventions of soil and water conservation activities.  To adaption of forest and horticulture species it improves vegetation coverage as well as micro environmental climatic condition. 51
  • 52. • Providing Water Supply at Ravalkunte and Other villages from Rangaiahadurga Dam. o Project Cost is Rs. 9.30 Crores covering 27 villages and a population of 42,000 in Molakalmuru Taluk. The scheme is completed and 11 villages are already getting water. The balance are in the trial run stage. • Providing Water Supply at Aimangala and other villages. o Project Cost is Rs. 39.00 Crores covering 77 villages and a population of 92,075 in Hiriyur Taluk , Govt. has accorded adminsitrative approval. • Proposal has been submitted to Govt. for approval of Surface Water Supply Schemes of estimated Cost Rs. 64.97 Crores covering 110 villages of Chitradurga District. 52
  • 53. Surface Water Supply Scheme Revalakunte And Other Villages (Rangaiahnadurga Project) 53
  • 54. 127 Villages , a population of 3,63,437 in Hospet, Kudligi, Molakalmuru, Challakere & Pavgada Town are covered. • Source –Tungabhadra Reservoir . • Total project cost Rs. 365 Crores. • The line estimate of the project has been submitted to the Govt. and the detailed estimates are under preparation. 54
  • 55. 55
  • 56. General Statistics Related to Agriculture 1 Total Agriculture Land - Rabi 358500 Ha - Khariff 60000 Ha 2 Total Average Annual Rainfall 486.7 mm 3 Rainfall Until End of October 2011 269 mm 4 Total No. of Hoblies 22 (a) Severe Drought Affected Hoblies 18 (b) Medium Draught Affected Hoblies 03 (c) Normal 01 56
  • 57. Average Rainfall Actual Rainfall from June to from June to % of Rainfall S.No. Taluk September September Deficiency (in mm) (in mm) 1 Chitradurga 299 199 -34 2 Challakere 187 93 -50 3 Hiriyur 190 94 -51 4 Hosadurga 192 114 -41 5 Holalkere 288 247 -14 6 Molakalmuru 209 132 -37 District Total 227 146 -38 57
  • 58. Minimum Severe Drought Medium Drought S.No. Taluk Drought Affected Hoblies Affected Hoblies Affected Hoblies 1 Chitradurga 3 1 1 2 Challakere 4 - - 3 Hiriyur 4 - - 4 Hosadurga 4 - - 5 Holalkere 1 2 1 6 Molakalmuru 2 - - Total 18 3 1 58
  • 59. 20-08-2011 08-09-2011 Severe- 08 Severe - 13 14-09-2011 30-09-2011 Severe - 15 Severe - 18 59
  • 60. The State Govt. has declared all six talukas of the district as drought hit. • The crop loss on account o the drought has been estimated at Rs. 450 Crores. • Efforts are on to expand the sowing during Rabi Season. • Amelioration measures such as running of Goshalas and providing Drinking Water are being undertaken by the District Administration. • Rainfall has improved during the month of November 2011 60
  • 61. 61
  • 62. 2012-13 2009-10 2010-11 2011-12 Name of the Budget Head (Proposed) (ha) (ha) (ha) (ha) Central Sponsor Scheme (NAP, NBM 525.00 100.00 70.00 60.00 and APRRFC) Externally Aided Projects (KSFMBC) 1750.00 1475.00 0 0 Department Programmes (GUA, DDF, 75.00 135.00 410.00 365.00 KFDF, C.O. and Devarakadu) Other Programmes (13th Finance, Bio- Fuel and CAMPA – [Road Side 40.00 303.49 725.179 209.95 Plantation 139, 422 and 423]) TOTAL 2390.00 2013.49 1205.179 634.95 62
  • 63. 63
  • 64. 64
  • 65. Sl. Name of the Name of the forestry activities 2011-12 2010-11 2009-10 Remarks No Scheme 1 Special 1. Raising of block plantation (in Ha) 113.50 151.50 470 Development 2. Raising of Road Side Plantation (in 26 66 - Programme KM) These 2 Greening Raising of block plantation (in Ha) - - 120 forestry India & JBIC activities are 3 NREGA 1. Raising of block plantation (in Ha) 208.5 410 - mainly concentrated 2. Raising of Road Side Plantation (in 62.5 372 - in Gomals, KM) Kaval lands, 3. Raising of school plantation (in Ha) - 19 - Karab land, Road side 4. Seedlings distributed to farmers 1068000 613800 - like MDR, (4389 farmers) (1631 farmer) SH & Other 5. Seedlings distributed to schools 8500 9749 - link roads, (30 schools) (46 schools) Tankforeshor 6.Seedlings distributed to other 4500 3250 - e etc. institutions & public function Total 410.5 1018.5 590 65
  • 66. Primary Helath Center, Chitrahalli, Neem Plants at Metikurki Nursery Holalkere Taluk 66
  • 67. No. of Schools Total No. of Sl.No. Taluka having School Schools Forestry 1 Chitradurga 344 172 2 Challakere 403 235 3 Hiriyur 355 249 4 Hosadurga 312 165 5 Holalkere 248 148 6 Molakalmuru 152 90 Total 1814 1059 67
  • 68. Activities Undertaken • Development of Adumalleshwara Zoo. • No. of visitors details as follows o 2008-09 : 60787 o 2009-10 : 85905 o 2010-11 : 97160 • Development of eco-tourism by setting up Jogimatti Nature Camp • About 200 persons stayed in the Camp during November 2010 to October 2011. 68
  • 69. 69
  • 70. avÀæzÀÄUÀð ¥ÀlÖtzÀ J¯Áè ªÀUÀðzÀ d£ÀjUÀÆ, «zÁåyðUÀ½UÉ, ¥Àj¸ÀgÀ ¥ÉæëÄUÀ½UÉ, ZÁgÀt ²©ügÁyðUÀ½UÉ, avÀæzÀÄUÀð CgÀtå «¨sÁUÀ, ¥Àj¸ÀgÀ, ¥ÁætÂ, ¥ÀQëUÀ¼À ¸ÀAPÀ® ¥ÀjZÀ¬Ä¸ÀĪÀ MAzÀÄ ¥ÀæªÀiÁtÂPÀ ¥ÀæAiÀÄvÀß ªÀiÁrgÀĪÀÅzÀÄ ±ÁèWÀ¤ÃAiÀÄ. CzÀgÀAvÉ EzÀ£ÀÄß ªÀÄÄAzÀĪÀj¹PÉÆAqÀÄ ºÉÆÃUÀĪÀ - §gÀĪÀ CgÀtå «¨sÁUÀzÀ MqÉAiÀÄjUÉ ¸ÀªÁ¯ÁV JzÀÄj¸À¨ÉÃPÁVzÉ. ªÉÆzÀ® ¨ÁjUÉ E°èUÉ §AzÀÄ £ÉÆÃrzÁUÀ avÀæzÀÄUÀð ¨ÉAUÀ¼ÀÆgÀÄ ²æà PÉñÀªÀªÀÄÆwð, ªÀÄÄRå CgÀtå ¸ÀAgÀPÀëuÁ¢üPÁjUÀ¼ÀÄ, CAzÁPÀët ªÀÄ£À¹ìUÉ §gÀĪÀ ¨ÉlÖUÀ¼À £ÀqÀÄ«£À §AiÀÄ®Ä avÀæ ªÀiÁAiÀĪÁV ¨ÉlÖUÀ¼À £ÀqÀÄªÉ ªÀįɣÁqÀ ºÀ¹gÀÄ ªÉÄïÁÌt¹zÀ ¥Àj¸ÀgÀ PÀAqÀÄ D±ÀÑAiÀÄðªÁAiÀÄÄÛ, eÉÆvÉ EªÉ¯Áè EwÛa£À ¨É¼ÀªÀtÂUÉ JAzÀÄ w½zÀÄ E°è£À ªÀÄÄRå¸ÀÜgÀÄ ªÀÄvÀÄÛ ¹§âA¢UÀ¼À ¥Àj±ÀæªÀĪÀÇ vÉÆÃj¸ÀÄvÀÛzÉ. CªÀjUÀÆ C©ü£ÀAzÀ£ÉUÀ¼ÀÄ We, from G.P.U. Collage Turuvanur, visited here for a picnic on: 18.08.2010. We ²æêÀÄw JA.J.±À²PÀ¯Á, place. I am visiting this place since 1990, but feel very happy in this beautiful (¥ÀæzsÁ£À f¯Áè ºÁUÀÆ ¸ÀvÀæ £ÁåAiÀiÁ¢üñÀgÀÄ), avÀæzÀÄUÀð. today it is very fine. I think it is due to the efforts of this staff and department. We feel it is “Malanadu”. On behalf of the school every body’s effort is appraisable. Vice Principal, Govt. Pre University College, Turuvanur. 70
  • 71. 71
  • 72. Institutional Coverage Target Achievement Percentage No. of Schools 1734 1696 97.81 % No. of Anganavadis 1383 1009 72.96 % (Own Buildings) I H H L coverage Target Achievement Percentage (Individual House Hold Latrine ) BPL (Below Poverty Level) 75400 50895 67.50% APL (Above Poverty Level) 130585 5671 42.63% • 7 Gram Panchayath’s of district have awarded the National Gramin Puraskar 72
  • 73. TRSC is extended up to March-2017 by Central Govt., and maximum coverage is being undertaken through o Convergence With MGNREGS o Suvarna Gramodaya Scheme o Swachcha Grama Scheme o Participation of local NGOs o Community – Led Approach 73
  • 74. School Community Toilets Community Toilets Group Individual Toilets Individual Toilets 74
  • 75. MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2010-11 (Up to 31st March 2011) (As per MIS) 1 Total Registered Families 2,35,223 2 Job Cards Issued 2,35,223 3 Labour Budget for 2010-11 Rs. 180.63 Crore 4 Completed Works 8,084 5 Ongoing Works 2,498 6 No. of families completed 100 days 8,417 7 Total Generated Mandays 80.62 Lakhs 8 Amount Released by Govt. Rs. 113.16 Crore 9 Total Expenditure Rs. 101.19 Crore 10 Total Achievement Rs. 195.38 Crore 11 Amount to be Released by Govt. Rs. 82.22 Crore 75
  • 76. MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2011-12 (Up to 28 Nov -2011) (As per MIS) 1 Total Registered Families 2,35,223 2 Job Cards Issued 2,35,223 3 Labour Budget for 2011-12 Rs.148.54 Crores 4 Amount Released by Govt. Rs. 114.75 Crores 5 Amount to be paid for 2010-11 works Rs. 94.19 Crores 6 Expenditure incurred for 2010-11 works Rs. 84.68 Crores 7 Expenditure incurred for 2011-12 works Rs. 2.91 Crores 8 No. of New Works under progress in 2011-12 813 9 Total Generated Mandays 59,206 76
  • 77. 2010- 11 No. of works completed under MGNREGA Works under different category (As per MIS) Total S. Block Rural Flood Water Renovation no of No Name Drought Irrigation Land Other works Connect Contro Conservation of Water Proofing works Development Works ivity l & Harvesting Bodies 1 Chitradurga 304 74 71 16 254 369 194 243 1525 2 Challakere 350 187 560 60 19 38 48 119 1381 3 Hiriyur 305 5 307 4 280 434 171 381 1887 4 Holalkere 448 19 472 43 20 21 32 467 1522 5 Hosadurga 117 311 65 4 70 43 329 196 1135 6 Molakalmuru 96 137 83 6 28 92 28 164 634 Total 1620 733 1558 133 671 997 802 1570 8084 77
  • 78. Renovation of traditional water bodies Drainage work Under MGNREGA at Under MGNREGA at Kodihlli Village, Kainadu GP Bagur GP 78
  • 79. Rain water stored in Gokatta, at Madhure GP 79
  • 80. 80
  • 81. • Total Geographical area : 8440 Sq. Km • Forest area (Reserve) : 77670 ha (9.25% of total area) • Total Mining Leases : 58 in 3639.75ha (0.43% of total area) • ML in Forest Land : 14 in 599.11ha (0.77% of forest area) • ML in Revenue Land : 34 in 2255.80 ha • ML area in Forest and revenue Land : 5 in 761.43 ha • ML area in Patta Land : 5 in 23.41 ha ML : Mining Lease 81
  • 82. Proposed Actual Production Production for Sl. Total Working Idle Expired for 2010-11 in lakh Minerals 2010-11 as per IBM No. ML ML ML ML MT In lakh MT (Working Mines) (Working Mines) 1 Iron Ore 23 09 10 04 99.75 59.41 Manganese 2 11 01 03 07 0.14 0.03 Ore 3 Lime Stone 16 02 10 04 5.66 1.89 4 Others 08 -- 07 01 -- -- Total 58 12 30 16 105.56 61.33 82
  • 83. 83
  • 84. 84
  • 85. WASTE DUMP COVERED WITH GEO-COIR MATS TO CONTROL EROSION IN SESA GOA LTD., M.L. NO. 2236 AFFORISTRATION CARRIEDOUT ON WASTE DUMP IN SESA GOA LTD., M.L. NO. 2236 85
  • 86. Transportation of Mineral restricted between 6.00 AM to 6.00 PM • Complete coverage of mineral with tarpal during transportation • All mining vehicles originating from Chitradurga to be colour coded (yellow) to enable the identification of source district • 2 composite check posts established and 1 additional check post has been established. • E-Permit and RFID is being introduced in 3 major iron ore mines comprising 90 per cent of the total iron ore production in the district • All weigh bridges in the ML area have been integrated with the DMG server. RFID: Radio Frequency Identification Device 86
  • 87. Terracing & Planting on inactive portion of Geo-textile coir mats on sub grade dumps at the Dumps at MEL Mines M.L. 2346 MEL Mines M.L. No. 2346 Geo-textile Coir mat on Subgrade Dumps Grass Geo-textile Coir mat on Sub grade Dumps grown at MEL Mines M.L. No. 2346 Grass grown at MEL Mines M.L. No. 2346 87
  • 88. REFILLING CARRIED OUT PARTIALLY IN THE WORKED PIT IN ANJANA MINERALS M.L. NO. 2519 PLANTATION AFTER REFILLING THE MINING PIT IN G.J. KUMAR MINES M.L. NO. 2499 88
  • 89. 89