SlideShare une entreprise Scribd logo
1  sur  26
Construction Supplier Selection
and Evaluation
1
Presented by Under guidance
Vishal.R.Kachwah Of
MIS :121420005 Prof. Dr.
N.A.Hedaoo
OBJECTIVE OF THE STUDY
 The main objective of the study is the following:
 To understand the mechanism of suppliers selection in Construction supply
chain management.
 To study the various supplier selection criterion to integrate suppliers in
construction supply chain.
2
The Supply Chain View
Suppliers Manufacturers Warehouses &
Distribution Centers
Customers
Material Costs
Transportation
Costs
Transportation
Costs Transportation
CostsInventory
Costs
Manufacturing
Costs
Source Make Deliver Buy
Supply chain management is a means for dealing with these processes in a
structured manner.
3
Flows in a Supply Chain
Customer
Material
Information
Funds
The flows resemble a chain reaction
Supplier
4
What Is Supply Chain Management (SCM)?
The right
Product
Higher
Profits
The right
Time
The right
Customer
The right
Quantity
The right
Store
The right
Price
=++ ++
Achieves
 A set of approaches used to efficiently
 Suppliers
 Manufacturers
 Warehouses
 Distribution centers
 So that the product is produced and distributed
 In the right quantities
 To the right locations
 And at the right time
 System costs are minimized and
 Service requirements are satisfied
+
5
Stages Of Supply Chain Management
 Stage 1 (Supply chain assessment)
This stage the existing work procedure and work methodology are accessed.
 Stage 2 (Supply chain redesign)
Existing work procedure are found out and steps are taken to improve the supply chain
 Stage 3 (Supply chain control)
Close control over the working and check if the desired goals are achieved or not.
 Stage 4 (Continuous supply chain improvement)
Keep on changing the supply chain the keep up with the changing requirements of the
organization.
6
Supply chain management in construction
7
General structure of construction supply chain (CSC)
CSC includes the flow of information ,materials, services or products, and the flow
funds between client, designer, contractor and supplier
8
Generic configuration of supply chain in construction industry
9
SUPPLIER SELECTION IN CONSRUCTION SUPPLY
CHAIN
10
Construction Purchasing Mistakes
11
 In most cases, construction organizations are not proficient at identifying
the capabilities of their suppliers.
 They sometimes rationalize supplier decisions based on convenience.
 They wait too late to assess the value added by suppliers and service
providers.
 They do not recognize the impact of the economic changes on bulk
materials prices.
Barriers to Supply Chain Management
12
 Failure to share project information
 Fear of loss of control
 Lack of self awareness
 Lack of partner awareness
 Inability to recognize project goals
 Lack of understanding project owner
 Lack of understanding of supply chain
13
 Process-based evaluations
assessment of the supplier’s production or service process
the construction organization will conduct an audit at the supplier’s
site to assess the supplier’s operating systems.
 Performance-based evaluations
Assessment of the supplier’s actual performance according to a
variety of criteria, such as:
delivery reliability, cost, and quality defect rate.
There are two main categories of supplier evaluations
Criteria for Supplier Evaluation
SUPPLIER SCORING AND ASSESSMENT
When scoring and assessing suppliers, the following factors other than quoted price must be
considered:
Replenishment lead time
On time performance
Supply flexibility
Delivery frequency/minimum lot size
Supply quality
Inbound transportation cost
Pricing terms
Information coordination capability
Design collaboration capability
Exchange rates, taxes and duties
Supplier viability
14
The impact of each factor on total cost is summarised in the
following
Purchase
Price of
Component
Inventory Transportatio
n Cost
Product
Introduction
Time
Cycle Safety
Replenishment Lead Time X
On time Performance X
Supply Flexibility X
Delivery Frequency X X X
Supply Quality X X
Inbound Transport Cost X
Pricing Terms X X
Information Coordination X X
Design Collaboration X X X X X
Exchange Rates and Taxes X
Supplier Viability X X
15
SUPPLIER EVALUATION SYSTEM
The three general types of supplier evaluation systems used today are
Categorical method,
Cost-Ration method,
Linear averaging method.
The guiding factor in deciding which system is best is;
•Ease of implementation
•Overall reliability of system.
It should be noted that implementation of the results is the matter of the buying
organization’s judgment.
16
Supplier Cost Material Quality Speed Total
A Good (+1) Unsatisfactory (-1) Neutral (0) (0)
B Neutral (0) Good (+1) Good (+1) (+2)
C Neutral (0) Good (+1) Neutral (0) (+1)
Example of categorical method
17
 The buyer develops a list of performance factors for each supplier
 track of each area by assigning a “grade” in simple terms such as:
“good,” “neutral,” and “unsatisfactory.”
 The advantages associated with, it can be implemented immediately
and is the least expensive
Example of cost ratio method
Supplier
Quality cost
ratio
Delivery cost
ratio
Service cost
ratio
Total
penalty
Quoted
Price/Unit
(Rs.)
Net adjusted
cost (Rs.)
AA 1% 1% 1% 3% 120 123.6
BB 2% 2% 3% 7% 115 123.05
CC 3% 1% 4% 8% 110 118.8
18
 The first step is to determine the
internal costs associated with quality,
delivery, and service each element is
converted to a cost ratio
 An example of quality costs follows:
Supplier1 Supplier 2
Material Quality (weight = 50)
Acceptable lot 50 35
Total lot received 58 40
Quality Rating 86.2 87.5
Service (weight = 35)
On time delivery 52 38
Total lot received 58 40
Service Rating 89.7 95.0
Price (weight = 15)
Lowest price 75 75
Price submitted 75 82
Price Rating 100 91.5
Total Performance Rating 89.5 90.7
This method is the most commonly
used evaluation method.
Specific quantitative performance
factors are used to evaluate supplier
performance.
The most commonly used factors
are quality, service (delivery) and
price
Linear averaging method
19
* 89.49 = (.5 × 86.2) + (.35 × 89.7) + (.15 × 100)
90.7 = (.5 × 87.5) + (.35 × 95.0) + (.15 × 91.5)
Internal financial problems
Working capital problems
Slow payment from project owner
Inferior plans and specifications
Inadequate technical capabilities
Insufficient information technology
Lack of communication between supply chain partners
Productivity inefficiencies
 Work quality problems
Work method problems
Delivery reliability problems
Bulk materials quality problems
20
Customer issue in supply chain management
21
Factor selected for study
Selection procedure Quality and timely work
Selection criteria Client briefing
Phase in which involvement Attitude of client
Technical expertise Minimum skill requirement
Testing capability Proper coordination
Relationship with supplier Frequent design changes
Waste elimination process Material availability
Suppliers’ geographical reach The incentives
Resourcefulness Complacency of suppliers
Transparency and openness Early participation of supplier
A SURVEY STUDY OF SUPPLIER SELECTION ISSUES IN
CONSTRUCTION SUPPLY CHAIN
22
Relative Importance Index (RII)
Is the process where weight is given to each type of response as per the judgment of
the user. In this case;
 Strongly Disagree = 1
 Disagree = 2
 Undecided = 3
 Agree = 4
 Strongly Agree = 5
Then RII for each option is calculated using the equation;
RII = (W1*n1 + W2*n2 + ….) / A*N
Where W = Weight of the option as decided by user,
n = Number of responses under each option,
A = Highest weight given and
N = Total number of respondents.
References
1. Benton W C, Jr & Linda F. McHenry., [2010]. “Construction Purchasing and Supply Chain
Management.” New Delhi: Tata McGraw Hill
2. O’Brein William.J., Formoso Carlos T., Vrijhoef Ruben and London Kerry A., [2009]. “Construction
Supply Chain Management Handbook.” New York: Taylor and Francis Group
3. Vrijhoef Ruben & Koskela Lauri., [1999]. Role of “Supply Chain Management In Construction.”
Research Paper. University of California
4. Study on “A SURVEY STUDY OF SUPPLIER SELECTION ISSUES IN CONSTRUCTION SUPPLY
CHAIN” By Rohan Choudhury and Pratik Dave PGP ACM 23rd Batch (2009- 2011) NICMR,Pune
0
0.25
0.5
0.75
1
Factors affecting Supplier Selection
RII
Understanding form study
While selecting supplier construction industry looks for consistent performance in terms of
quality and on time delivery.
 Client expect their suppliers to be responsive.
Supplier should have a good testing capability to finish project as per established QA & QC.
Frequent design changes the supplier and subcontractors are informed well in advance.
 Imposing penalty is the best way for preventing wastage at site.
Thank you

Contenu connexe

Tendances

7 step strategic sourcing
7 step strategic sourcing7 step strategic sourcing
7 step strategic sourcingNimisis
 
Top 10 Procurement KPI\'s
Top 10 Procurement KPI\'sTop 10 Procurement KPI\'s
Top 10 Procurement KPI\'samberkar
 
Construction Supply Chain Management
Construction Supply Chain ManagementConstruction Supply Chain Management
Construction Supply Chain ManagementFayssal AL-KILANI
 
Strategic Sourcing
Strategic SourcingStrategic Sourcing
Strategic SourcingBrett Allen
 
SUPPLY CHAIN PERFORMANCE MEASUREMENT
SUPPLY CHAIN PERFORMANCE MEASUREMENTSUPPLY CHAIN PERFORMANCE MEASUREMENT
SUPPLY CHAIN PERFORMANCE MEASUREMENTAshish Hande
 
Supply chain management presentation
Supply chain management presentationSupply chain management presentation
Supply chain management presentationveer03
 
Unit 1 Supply Chain management
Unit 1 Supply Chain managementUnit 1 Supply Chain management
Unit 1 Supply Chain managementRamachandran S
 
Introduction to supply chain management
Introduction to supply chain managementIntroduction to supply chain management
Introduction to supply chain managementAhmed Gamal
 
Procurement
ProcurementProcurement
Procurementasim78
 
Supplier selection
Supplier selectionSupplier selection
Supplier selectionjoecobe
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction siteRonak Jain
 
Strategic Purchasing Supply Initiatives
Strategic Purchasing Supply InitiativesStrategic Purchasing Supply Initiatives
Strategic Purchasing Supply Initiativesignasuhe
 
Lean logistics and warehousing final
Lean logistics and warehousing finalLean logistics and warehousing final
Lean logistics and warehousing finalCody White
 
Supply chain operations reference Model
Supply chain operations reference ModelSupply chain operations reference Model
Supply chain operations reference ModelOlivia Rodrigues
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteriaArt Acosta
 

Tendances (20)

7 step strategic sourcing
7 step strategic sourcing7 step strategic sourcing
7 step strategic sourcing
 
Procurement
ProcurementProcurement
Procurement
 
Procurement Presentation
Procurement PresentationProcurement Presentation
Procurement Presentation
 
Top 10 Procurement KPI\'s
Top 10 Procurement KPI\'sTop 10 Procurement KPI\'s
Top 10 Procurement KPI\'s
 
Construction Supply Chain Management
Construction Supply Chain ManagementConstruction Supply Chain Management
Construction Supply Chain Management
 
Strategic Sourcing
Strategic SourcingStrategic Sourcing
Strategic Sourcing
 
SUPPLY CHAIN PERFORMANCE MEASUREMENT
SUPPLY CHAIN PERFORMANCE MEASUREMENTSUPPLY CHAIN PERFORMANCE MEASUREMENT
SUPPLY CHAIN PERFORMANCE MEASUREMENT
 
Supply chain management presentation
Supply chain management presentationSupply chain management presentation
Supply chain management presentation
 
Supplier Relationship Management
Supplier Relationship ManagementSupplier Relationship Management
Supplier Relationship Management
 
Unit 1 Supply Chain management
Unit 1 Supply Chain managementUnit 1 Supply Chain management
Unit 1 Supply Chain management
 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Introduction to supply chain management
Introduction to supply chain managementIntroduction to supply chain management
Introduction to supply chain management
 
Procurement
ProcurementProcurement
Procurement
 
Procurement- Contract Management
Procurement- Contract ManagementProcurement- Contract Management
Procurement- Contract Management
 
Supplier selection
Supplier selectionSupplier selection
Supplier selection
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction site
 
Strategic Purchasing Supply Initiatives
Strategic Purchasing Supply InitiativesStrategic Purchasing Supply Initiatives
Strategic Purchasing Supply Initiatives
 
Lean logistics and warehousing final
Lean logistics and warehousing finalLean logistics and warehousing final
Lean logistics and warehousing final
 
Supply chain operations reference Model
Supply chain operations reference ModelSupply chain operations reference Model
Supply chain operations reference Model
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteria
 

Similaire à Suppliers selection in construction supply chain management

Supplier Classification and Selecetion With Artificial Neural Network
Supplier Classification and Selecetion With Artificial Neural NetworkSupplier Classification and Selecetion With Artificial Neural Network
Supplier Classification and Selecetion With Artificial Neural NetworkVOLKAN YILDIRIM
 
shahank soni vendor evaluation presentation
shahank soni   vendor evaluation presentationshahank soni   vendor evaluation presentation
shahank soni vendor evaluation presentationAkash Maurya
 
Vendor evaluation shashank
Vendor evaluation shashankVendor evaluation shashank
Vendor evaluation shashankAkash Maurya
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementPRIYABAMBALE
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...IJERA Editor
 
Supplier ranking and selection in a bakery
Supplier ranking and selection in a bakerySupplier ranking and selection in a bakery
Supplier ranking and selection in a bakeryIOSR Journals
 
journal for research
journal for researchjournal for research
journal for researchrikaseorika
 
Utilitas mathematica
Utilitas mathematicaUtilitas mathematica
Utilitas mathematicarikaseorika
 
mathematica journal
mathematica journal mathematica journal
mathematica journal rikaseorika
 
Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...inventionjournals
 
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...Steven Wallach
 
A Supplier Selection Criteria Using Boolean Association Rule Mining
A Supplier Selection Criteria Using Boolean Association Rule MiningA Supplier Selection Criteria Using Boolean Association Rule Mining
A Supplier Selection Criteria Using Boolean Association Rule MiningWaqas Tariq
 
Comprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in ConstructionComprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in ConstructionGHARBANWAO
 
Supply Chain Management
Supply Chain Management Supply Chain Management
Supply Chain Management Faisal Hayat
 
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...Chandra Shekar Immani
 
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier Selection
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier SelectionIRJET-An Entropy-Weight Based TOPSIS Approach for Supplier Selection
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier SelectionIRJET Journal
 
Vendordevelopment
VendordevelopmentVendordevelopment
VendordevelopmentSwe Zin Lei
 

Similaire à Suppliers selection in construction supply chain management (20)

Supplier Classification and Selecetion With Artificial Neural Network
Supplier Classification and Selecetion With Artificial Neural NetworkSupplier Classification and Selecetion With Artificial Neural Network
Supplier Classification and Selecetion With Artificial Neural Network
 
Supply Chain Management & new trends
Supply Chain Management & new trendsSupply Chain Management & new trends
Supply Chain Management & new trends
 
shahank soni vendor evaluation presentation
shahank soni   vendor evaluation presentationshahank soni   vendor evaluation presentation
shahank soni vendor evaluation presentation
 
Vendor evaluation shashank
Vendor evaluation shashankVendor evaluation shashank
Vendor evaluation shashank
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
 
Supplier ranking and selection in a bakery
Supplier ranking and selection in a bakerySupplier ranking and selection in a bakery
Supplier ranking and selection in a bakery
 
journal for research
journal for researchjournal for research
journal for research
 
journal research paper
journal research paperjournal research paper
journal research paper
 
Utilitas mathematica
Utilitas mathematicaUtilitas mathematica
Utilitas mathematica
 
mathematica journal
mathematica journal mathematica journal
mathematica journal
 
Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...Relationships among Supplier Selection Criteria using Interpretive Structural...
Relationships among Supplier Selection Criteria using Interpretive Structural...
 
5 procurement-management
5 procurement-management5 procurement-management
5 procurement-management
 
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
A Review Of Multi-Criteria Decision Making Techniques For Supplier Evaluation...
 
A Supplier Selection Criteria Using Boolean Association Rule Mining
A Supplier Selection Criteria Using Boolean Association Rule MiningA Supplier Selection Criteria Using Boolean Association Rule Mining
A Supplier Selection Criteria Using Boolean Association Rule Mining
 
Comprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in ConstructionComprehensive Guide to Supply Chain Management in Construction
Comprehensive Guide to Supply Chain Management in Construction
 
Supply Chain Management
Supply Chain Management Supply Chain Management
Supply Chain Management
 
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...
Logistics & Supply Chain Management(LSCM)- Sourcing Decisions& Transportation...
 
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier Selection
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier SelectionIRJET-An Entropy-Weight Based TOPSIS Approach for Supplier Selection
IRJET-An Entropy-Weight Based TOPSIS Approach for Supplier Selection
 
Vendordevelopment
VendordevelopmentVendordevelopment
Vendordevelopment
 

Dernier

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 

Suppliers selection in construction supply chain management

  • 1. Construction Supplier Selection and Evaluation 1 Presented by Under guidance Vishal.R.Kachwah Of MIS :121420005 Prof. Dr. N.A.Hedaoo
  • 2. OBJECTIVE OF THE STUDY  The main objective of the study is the following:  To understand the mechanism of suppliers selection in Construction supply chain management.  To study the various supplier selection criterion to integrate suppliers in construction supply chain. 2
  • 3. The Supply Chain View Suppliers Manufacturers Warehouses & Distribution Centers Customers Material Costs Transportation Costs Transportation Costs Transportation CostsInventory Costs Manufacturing Costs Source Make Deliver Buy Supply chain management is a means for dealing with these processes in a structured manner. 3
  • 4. Flows in a Supply Chain Customer Material Information Funds The flows resemble a chain reaction Supplier 4
  • 5. What Is Supply Chain Management (SCM)? The right Product Higher Profits The right Time The right Customer The right Quantity The right Store The right Price =++ ++ Achieves  A set of approaches used to efficiently  Suppliers  Manufacturers  Warehouses  Distribution centers  So that the product is produced and distributed  In the right quantities  To the right locations  And at the right time  System costs are minimized and  Service requirements are satisfied + 5
  • 6. Stages Of Supply Chain Management  Stage 1 (Supply chain assessment) This stage the existing work procedure and work methodology are accessed.  Stage 2 (Supply chain redesign) Existing work procedure are found out and steps are taken to improve the supply chain  Stage 3 (Supply chain control) Close control over the working and check if the desired goals are achieved or not.  Stage 4 (Continuous supply chain improvement) Keep on changing the supply chain the keep up with the changing requirements of the organization. 6
  • 7. Supply chain management in construction 7
  • 8. General structure of construction supply chain (CSC) CSC includes the flow of information ,materials, services or products, and the flow funds between client, designer, contractor and supplier 8
  • 9. Generic configuration of supply chain in construction industry 9
  • 10. SUPPLIER SELECTION IN CONSRUCTION SUPPLY CHAIN 10
  • 11. Construction Purchasing Mistakes 11  In most cases, construction organizations are not proficient at identifying the capabilities of their suppliers.  They sometimes rationalize supplier decisions based on convenience.  They wait too late to assess the value added by suppliers and service providers.  They do not recognize the impact of the economic changes on bulk materials prices.
  • 12. Barriers to Supply Chain Management 12  Failure to share project information  Fear of loss of control  Lack of self awareness  Lack of partner awareness  Inability to recognize project goals  Lack of understanding project owner  Lack of understanding of supply chain
  • 13. 13  Process-based evaluations assessment of the supplier’s production or service process the construction organization will conduct an audit at the supplier’s site to assess the supplier’s operating systems.  Performance-based evaluations Assessment of the supplier’s actual performance according to a variety of criteria, such as: delivery reliability, cost, and quality defect rate. There are two main categories of supplier evaluations Criteria for Supplier Evaluation
  • 14. SUPPLIER SCORING AND ASSESSMENT When scoring and assessing suppliers, the following factors other than quoted price must be considered: Replenishment lead time On time performance Supply flexibility Delivery frequency/minimum lot size Supply quality Inbound transportation cost Pricing terms Information coordination capability Design collaboration capability Exchange rates, taxes and duties Supplier viability 14
  • 15. The impact of each factor on total cost is summarised in the following Purchase Price of Component Inventory Transportatio n Cost Product Introduction Time Cycle Safety Replenishment Lead Time X On time Performance X Supply Flexibility X Delivery Frequency X X X Supply Quality X X Inbound Transport Cost X Pricing Terms X X Information Coordination X X Design Collaboration X X X X X Exchange Rates and Taxes X Supplier Viability X X 15
  • 16. SUPPLIER EVALUATION SYSTEM The three general types of supplier evaluation systems used today are Categorical method, Cost-Ration method, Linear averaging method. The guiding factor in deciding which system is best is; •Ease of implementation •Overall reliability of system. It should be noted that implementation of the results is the matter of the buying organization’s judgment. 16
  • 17. Supplier Cost Material Quality Speed Total A Good (+1) Unsatisfactory (-1) Neutral (0) (0) B Neutral (0) Good (+1) Good (+1) (+2) C Neutral (0) Good (+1) Neutral (0) (+1) Example of categorical method 17  The buyer develops a list of performance factors for each supplier  track of each area by assigning a “grade” in simple terms such as: “good,” “neutral,” and “unsatisfactory.”  The advantages associated with, it can be implemented immediately and is the least expensive
  • 18. Example of cost ratio method Supplier Quality cost ratio Delivery cost ratio Service cost ratio Total penalty Quoted Price/Unit (Rs.) Net adjusted cost (Rs.) AA 1% 1% 1% 3% 120 123.6 BB 2% 2% 3% 7% 115 123.05 CC 3% 1% 4% 8% 110 118.8 18  The first step is to determine the internal costs associated with quality, delivery, and service each element is converted to a cost ratio  An example of quality costs follows:
  • 19. Supplier1 Supplier 2 Material Quality (weight = 50) Acceptable lot 50 35 Total lot received 58 40 Quality Rating 86.2 87.5 Service (weight = 35) On time delivery 52 38 Total lot received 58 40 Service Rating 89.7 95.0 Price (weight = 15) Lowest price 75 75 Price submitted 75 82 Price Rating 100 91.5 Total Performance Rating 89.5 90.7 This method is the most commonly used evaluation method. Specific quantitative performance factors are used to evaluate supplier performance. The most commonly used factors are quality, service (delivery) and price Linear averaging method 19 * 89.49 = (.5 × 86.2) + (.35 × 89.7) + (.15 × 100) 90.7 = (.5 × 87.5) + (.35 × 95.0) + (.15 × 91.5)
  • 20. Internal financial problems Working capital problems Slow payment from project owner Inferior plans and specifications Inadequate technical capabilities Insufficient information technology Lack of communication between supply chain partners Productivity inefficiencies  Work quality problems Work method problems Delivery reliability problems Bulk materials quality problems 20 Customer issue in supply chain management
  • 21. 21 Factor selected for study Selection procedure Quality and timely work Selection criteria Client briefing Phase in which involvement Attitude of client Technical expertise Minimum skill requirement Testing capability Proper coordination Relationship with supplier Frequent design changes Waste elimination process Material availability Suppliers’ geographical reach The incentives Resourcefulness Complacency of suppliers Transparency and openness Early participation of supplier A SURVEY STUDY OF SUPPLIER SELECTION ISSUES IN CONSTRUCTION SUPPLY CHAIN
  • 22. 22 Relative Importance Index (RII) Is the process where weight is given to each type of response as per the judgment of the user. In this case;  Strongly Disagree = 1  Disagree = 2  Undecided = 3  Agree = 4  Strongly Agree = 5 Then RII for each option is calculated using the equation; RII = (W1*n1 + W2*n2 + ….) / A*N Where W = Weight of the option as decided by user, n = Number of responses under each option, A = Highest weight given and N = Total number of respondents.
  • 23. References 1. Benton W C, Jr & Linda F. McHenry., [2010]. “Construction Purchasing and Supply Chain Management.” New Delhi: Tata McGraw Hill 2. O’Brein William.J., Formoso Carlos T., Vrijhoef Ruben and London Kerry A., [2009]. “Construction Supply Chain Management Handbook.” New York: Taylor and Francis Group 3. Vrijhoef Ruben & Koskela Lauri., [1999]. Role of “Supply Chain Management In Construction.” Research Paper. University of California 4. Study on “A SURVEY STUDY OF SUPPLIER SELECTION ISSUES IN CONSTRUCTION SUPPLY CHAIN” By Rohan Choudhury and Pratik Dave PGP ACM 23rd Batch (2009- 2011) NICMR,Pune
  • 25. Understanding form study While selecting supplier construction industry looks for consistent performance in terms of quality and on time delivery.  Client expect their suppliers to be responsive. Supplier should have a good testing capability to finish project as per established QA & QC. Frequent design changes the supplier and subcontractors are informed well in advance.  Imposing penalty is the best way for preventing wastage at site.