1. WAQARZEB
Plant Maintenance, Construction, Commissioning, Stationary & Rotary equipment specialist
OBJECTIVE:
To obtaina challengingmanagerial levelpositioninareputedgloballyrecognizedorganization, this utilizes my skills
and helps me in climbing the ladder of success in this competitive world.
JOBE PROFILE:
Construction,Commissioning&Maintenance Engineerhaving17years’experience inthe fieldof Projectconstruction
and Plant Shutdown/Turnaround/Maintenance. Worked at various Oil & Gas fields, Fertilizer, Power Plant,
Petrochemical and oil Refineries.
Having Skills,
Independentlyable toevaluate,organizeandprioritizeworkwithinthe time period
Havinggood ProjectManagement,ConstructionandCoordinationSkills.
Havinggood knowledge of overhaulingandMaintenance inShutdown&Turnaround.
Soundworkingknowledge of RotatingMachineryMaintenance, Monitoring,Troubleshooting,
Construction&Commissioning.Specialties:GasTurbines,SteamTurbines,CentrifugalCompressors,
ReciprocatingcompressorCentrifugalPumps,coolingtowersandotherrotatingMachinery.
SoundknowledgeinpipingFabrication& Erection,P&ID,preparingBOM&BOQ.
Good interpersonal,communication&teamworkSkills
Professionalattitudetowardsjobresponsibilities
JOB EXPERIENCES
DESCON ENGINEERING LIMITED April 2004 to Till date as Manager Construction andPlantservices.
DesconEngineeringLimitedisanintegratedengineering servicesandmanufacturing company operating in Pakistan
and the Middle East. The integrated package of services encompasses engineering, procurement, construction,
manufacturing and Shutdown and maintenance. With Descon I have been working, at different projects.
Project manager at Takreer Refinery Al Ruwais. June 2015 to till date
Job description : Replacementof outlet header and rectification of support problem in hydrogen reformer
furnace 102-B-01.
Location : Al Ruwais Abu Dhabi.
Annual Turn Round at National Refinery Limited (Dec 2014 to Jan 2015)
Client : National Refinery Limited
Position : Turn Round Manager
Job description : Inspection, cleaning, general overhauling, and replacement of damage parts, box up
With required tests and final painting/insulation of Heat exchangers, columns, fin fan
coolers, furnace, vessels, tanks and flare.
CPL jobincluded10,000 inchdia. pipingof differentboresfabrication, welding, installation
and hydro test.
Location : Karachi
Job Type : Turn round 2014
Annual Turn Round at Pakistan Refinery Limited (Oct 2014 to Dec 2014)
Client : Pakistan refinery Limited
Position : Turn round Manager
CURRENT DETAILS
Organization : DESCON EngineeringLimited.
Position : Manager Plantservices andShutDown
Project : Abu Dhabi RefiningCompany (TAKREER) Al Ruwais.
Email : waqar.zeb@descon.com,waqarzeb@gmail.com
Mobile : +971 565720353, +91 333 7977009
2. Location : Karachi
Job Type : Turn round 2014
400 MW IPP UCH-IIExpansion Project ( March 2012 to Feb 2014)
Client : Hyundai EngineeringCompanyLimited
Position : ConstructionManager
Location : Dera Murad Jamali Baluchistan
JobType : EPC Project
PARCO Mid-CountryRefineryPakistan (Feb2012 to March 2012)
Client : PARCO
Position : Rotary equipmentSpecialist
JobType : Shutdown2012 (5 yearlyT/A)
48 MW CogenerationPowerPlant (Nov2011 to Jan 2012)
Client : Lotte PPTA Karachi,Pakistan
Position : ConstructionManager
JobType : ConstructionProject
Pakistan Oil RefineryLimitedTA-2011 (Sep2011 to Nov 2011)
Client : PakistanRefinerylimited(PRL)
Position : DeputyShutDown Manager
JobType : PRL TurnaroundTA-2011
Revamp of Fertilizerplant (June 2011 to Sep 2011)
Client : Pak AmericanFertilizer&Mitsubishi Japan
Position : Construction ManagerRotary equipment
JobType : RevampConstructionProject
Engro Expansion EnVen1.3 Project (2008 to 2011)
Client : enVen1.3 Engro FertilizerLtd/Snamproggetti
Position : DeputyConstruction ManagerMechanical
JobType : EPC Project
BHP Zamzama LNG Project Dadu.
Client : BHP BillitonAustralia (2006 to 2008)
Position : DeputyConstruction ManagerMechanical
Jobtype : EPCProject
Bosicar oil refineryLimitedPakistan (2004 to 2006)
Client : Bosicaroil refinery
Position : AreaEngineer
JobType : Refurbishment/overhaulingand installation
PREVIOUS JOB EXPERIENCES
International Free Company
Position : ConstructionManagerMechanical
Tenure : March 2014 to October2014
Location : Iraq (Basra)
3. WorkinginInternational Free Company(IFC) throughVoyage GlobalEnergyEnglandatSHATT AL BASRA 1250 MW
powerProjectBasra IRAQas ConstructionManagerMechanical fromMarch 2014 to October2014.
10 Gas turbinesGEMS9001E 125 MW each withall accessories,installationandcommissioning.
Utilities Equipment(pumps,compressors,chillers,andHVACsystem).
Pipingoverhead,trenchesandundergroundfordifferentsystems.
Tanks fabricationandweldingLDO,potable,fire waterandde mineralized water.
International Engineeringltd.at National refinery Karachi ( 2001 to 2003)
Client : National RefineryLimitedKarachi
Position : Mechanical discipline Engineer
Jobtype : PreventiveMaintenance contractfor3 years.
SS EngineeringLimitedat Parco oil refineryQasba Gujrat Pakistan (April 1997 to Nov 2000)
Client : Pak Araboil refineryLimited.
Position : Trainee Engineer
Jobtype : Constructionof new refinery,equipmentinstallation.
Job ResponsibilitiesasConstruction Manager.
PreparingProjectplan,schedulingandmonitoringbyutilizingPrimaveraandMS project
Preparingmobilizationplanandarrangementof resourcesonsite
Monitorand analyse discipline-wise progress.
Assistconstructionteaminidentificationof extraworkandKeepsaclose watchon man-hoursbookingto
appropriate costcentre.
Two Gas turbinesGE E9 134 MW each Installationandcommissioning.
1 Steamturbine FUJI134 MW Installationandcommissioning.
Gas Turbine 48 MW GE LM 6000 Installationand commissioning.
Gas Turbine 25 MW GE 5001 Installationandcommissioning alongwithHRSG systemmanufacturedbyms
DESCON manufacturingworkshopPakistan
Centrifugal pumps,screw pumps,multistage pumps,Gear pumpsinstallationandcommissioning.
Compressors(CO2Compressor,AmmoniaCompressor,SynthesisgasCompressor,Processaircompressor
etc. and reciprocationtype boostercompressorinstallationandcommissioning MitsubishiandGE.
2 HRSG systemof DKME Korea.Installation,relatedpipingandcommissioning.
1 HRSG systemof DKME Korea,Installation,relatedpipingandcommissioning.
PM&S & baggingarea.Installationof autodispatch&conveyorsbeltsystemforfertilizerandcementplants.
Pipingfabrication,erectionandweldingof CarbonSteel,StainlessSteelandAlloySteel
Provide technical SupporttoPlanningDepartmentduringpreparationof projectsSchedule,duringRe-
Schedulingandpreparationof weeklyandmonthlyreports
Job ResponsibilitiesduringShutdown, Operationand maintenance.
Responsible forthe maintenance andupkeepof all majorequipmentandsupportaccessoriestomaintain
the plantsreliabilityandavailability.
Mechanical leadduringturbine maintenance interfacing betweenthe site andclient.
Prepare & assistto the shutdownplanningincharge forPre shutdown,shutdownandPostshutdown
activities.
Coordinate withAreaengineersandSupervisorstoensure thatdailyshutdownactivitiesinthe assigned
areas beencarriedoutina safe and timelyasperthe schedule.
Assistthe shutdownexecutionteaminunderstandingscope of worksandmethodstatementfor equipment.
Maintainedcompliance listforall turbineswhile keepinguptodate withapplicable service bulletins,product
bulletins,technical informationletters,andalerts.Ensuredall were documentedforeachspecificengine for
internal andinsurance purposes.
Replacementof furnace tubesof convectionsection.
Replacementof tubesof finfancoolers.
4. Tube cleaningandinspection andhydro testof heatexchangers.
Operatedandmonitoredall powerplantequipmentincluding3GE 9000E gas turbinesalongwithHRSG's,
steamturbinesandall applicable equipment.
Operatorfor Zerodischarge facilitytoprocessall facilitywaterforthe sitescoolingtowers.
Replacementof Mechanical seals,Hydraulicseals,Drygasseal,rollerandgeneral bearingsof pumps,
turbinesandcompressors.
Balancingof rotor, rollerandimpellersby SchenkGermanybalancingmachine.
EDUCATION QUALIFICATION:
1991 to 1996 Bachelor of EngineeringinMechanical
Mehran Universityof Engineering&TechnologyJamshoro,Pakistan. (www.muet.edu.pk)
TECHNICAL and PROFESSIONALTRAINING:
Training /Courses Company /Institute
Installationof Windturbine DesconEngineeringCompanyLimited
HeavyRigging DesconEngineeringCompanyLimited
ConstructionTechnology,Management&Planning DesconEngineeringCompanyLimited
UsingPrimaveraP3 DesconEngineeringCompanyLimited
PermittoWork Acceptor PTA Petrochemical PlantLtdKarachi
BearingMaintenance andreplacement FAG
InternshipTrainingonmaintenance &workingof Fauji FertilizerCompanyLimited(FFC)
Rotary & Stationary Equipment(SteamTurbines Mirpur Mathelo.
CentrifugalCompressor,Pumps,&Valves)
Industrial lubricantsawarenesscourse Caltex lubricants
COMPUTER SKILLS:
MicrosoftOffice (MicrosoftWord,Excel,PowerPoint),
AUTO CAD 2007, Operating System(WindowsXP,Vista&DOS)
InternetBrowsing.
PERSONAL PARTICULARS:
Father name : Aurang Zeb
Date & place of Birth : April 25, 1971, Mirpurkhas Pakistan
Marital status : Married
Blood group : B+ve
Nationality : Pakistani
National ID No. : 44103-7763746-3
PEC Reg: No. : MECH/14594
Passport details : Passport no: AU9597462 (Hyderabad Pakistan)
Permanent Address : House No. 60, Street 3 Karimabad Distt: Mirpurkhas, SindhState,
Pakistan (Post Code. 69000)