Aboriginal and Non-Aboriginal
        Partnerships:

Building Blocks for Sustainable
   Community Development




            Submitted to: Brent Mueller & Dale Leitch
                          Community Transition
                          Ministry of Community, Aboriginal and
                           Women’s Services
                          #221 Market Square–560 Johnson Street
                          Victoria, British Columbia

            Date:         October, 2001

            Prepared by: Wayne Dunn & Bob Isbister
                          2457 Bakerview Road
                          Mill Bay, BC V0R 2P0
                          250.743.7619
                          wayne@waynedunn.com
i



Acknowledgements
The consulting team of Wayne Dunn & Associates Ltd. wish to acknowledge the sincere
co-operation and support they received from the Ministry of Community, Aboriginal and
Women’s Services, the Ministry of Water, Air and Land Protection, the Office of the
Provincial Health Officer, and the numerous individuals and organizations involved in
Aboriginal partnerships. While it is impossible to directly thank and acknowledge
everyone who was so generous with their time, information and ideas, a number of
individuals deserve special mention for their valuable contribution to this process.

We are grateful to the Project Team of Mr. Dale Leitch, Executive Director, Community
Transition Branch of the Ministry of Community, Aboriginal and Women’s Services and
to Mr. Brent Mueller, Ms. Catherine Rodgers, also of this Ministry, for their input
throughout this process. Their quick responses, insightful suggestions and ideas, and
their enthusiastic collaboration throughout this project have been extremely valuable.
Mr. Tim Cottrell, formerly Assistant Director of the Community Transition Branch was
also an indispensable contributor to the project prior to his transfer to the Ministry of
Sustainable Resource Management.

The Consultants and the Project Team would like to acknowledge the advice and
assistance from Ms. Lisa Nye and Mr. Graham Dragushan of the Ministry of Community
Aboriginal and Women's Services; Ms. Judy Birch of the Ministry of Water, Air and
Land Protection; and Cathy Hull of the Office of the Provincial Health Officer.
Throughout our research numerous individuals from various organizations throughout the
province made themselves available for interviews (many more than once). While we
cannot thank everyone directly, we would like to acknowledge Allan Pineo, Claire
Marshall, Steve Mazur, Tarel S. Quandt, Cameron Beck, Bill Cordoban, Gerry
Stelsmaschuk, Wayne d’Easum, Mathew Ney, Janice Rose, Robin True, Russ Helberg,
Doug Krogel, Ron Creber, Frankie Craig, Wanda Stachura, Richard Krentz, Darlene
Luke, Chief Sophie Pierre, Alex Wolf, Randall Martin, Bill Lee, Rob Enfield, Tina
Donald, Kevin Brown, Clarence Louie, Jeannine Cook, Lee-Anne Crane, Gerry Sanders,
Dave Monture, Mike Anderson, Georg Schurian, Jennifer Turner, Harvey Filger, Roger
Williams, Bob Sankey, Bernadette Spence, Alison McNeil, Frieda Enns, Clinton Mutch,
Diane St. Jacques and Steven James. To those we may have missed, please accept our
sincere apologies and our heartfelt thanks.

WDA Project Team:

  Wayne Dunn
  Bob Isbister
  Gifty Serbeh-Dunn
  Bernadette Spence
  Randall Levine




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
ii


Table of Contents
1     Introduction and Background .................................................................................. 1
2     Methodology and Approach ..................................................................................... 4
    2.1          Approach................................................................................................................... 4
       2.1.1     Data Sources and Collection Methodologies ............................................................. 5
       2.1.2     Data Collection Framework ....................................................................................... 5
    2.2          Limitations of Research ........................................................................................... 7
3     Case Studies and Individual Partnership Analysis .............................................. 10
    3.1          Summary of Partnership Case Studies................................................................. 10
    3.2          Individual Case Studies ......................................................................................... 11
       3.2.1     Carrier Sekani Family Services................................................................................ 11
       3.2.2     Gallagher Canyon Agreement .................................................................................. 14
       3.2.3     Greater Massett Development Corporation.............................................................. 17
       3.2.4     Iisaak Forest Resources ............................................................................................ 22
       3.2.5     Lakeview Meadows.................................................................................................. 26
       3.2.6     Monthly Licensee Meetings – North Thompson...................................................... 29
       3.2.7     Skwlax/Sanders Construction Ltd. ........................................................................... 32
       3.2.8     Sun Rivers Resort Community................................................................................. 36
       3.2.9     Tsilqot’in People of Xeni and BC Parks (Ts’yl-os Provincial Park)........................ 39
       3.2.10    West Chilcotin Forest Products................................................................................ 43
4     Lessons Learned....................................................................................................... 46
    4.1          Motivation of Partners and Stakeholders ............................................................ 46
    4.2          Critical Success Factors ......................................................................................... 49
    4.3          Conflict Management............................................................................................. 50
    4.4          Lessons Learned from Failed Partnerships ......................................................... 51
    4.5          Lessons Learned from other Initiatives................................................................ 53
       4.5.1     First Nations Summit of Chiefs and UBCM ............................................................ 54
       4.5.2     Knowledge Network Series...................................................................................... 55
5     From Individual to Community – The Case for Community Level Facilitated
      Partnership Development ....................................................................................... 56
6     Building on the Results: Recommendations for Developing a Community
      Partnership Initiative....................................................................................... 59
    6.1          Model Partnership and Bridge Building Process ................................................ 59
    6.2          Selecting Pilot Project Communities .................................................................... 62
    6.3          Next Steps - Launching a Pilot Project................................................................. 63
7     Conclusion ................................................................................................................ 69

Attachments
Table of Abbreviations and Acronyms
Information Sources and Bibliography

List of Exhibits
Exhibit 2-1 WDA Partnership Analysis Framework© ...................................................... 6
Exhibit 6-1 Community Transformation Process ............................................................. 61
Exhibit 6-2 Suggested Year 1 Activities and Financial Sources ..................................... 66
Exhibit 6-3 Analysis of Two Potential Pilot Communities ............................................. 67



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
iii


Executive Summary
In British Columbia, there is an ever-increasing need for First Nations to partner with
private industry as well as local and regional public sector entities, to enhance the
potential to achieve shared goals of diversification, sustainable employment and
community economic and social development. While there are an increasing number of
such partnerships being developed the authors argue that a facilitated process for
developing and supporting partnerships would substantially increase their number and
impact on the economy of British Columbia (especially rural and remote areas who have
been hardest hit by the downturn in traditional resource based economies).


The report which follows is the result of efforts by the British Columbia Ministry of
Community, Aboriginal and Women’s Services to gain a greater understanding of the
nature of existing partnerships of this type, as well as to develop an initiative for
identifying and supporting community-based collaboration efforts.


In the development of this report, several case analyses were undertaken within the
province, the results of which have provided a body of data and information which was
used to identify a number of lessons learned and critical success factors for
Aboriginal/non-Aboriginal partnerships. From the information collected, ten specific
studies were analyzed which reflect a level of regional coverage and industry variation
which cumulatively offer a valid and relevant cross-section of current partnership
activities.


The analysis of these various collaborations has highlighted the following critical success
factors in the development of an Aboriginal/non-Aboriginal partnership framework for
the future (see Section 4.2 for full information and text).


        All partners should have clear and appropriate motivation to collaborate
        Regular, effective and appropriate communications should be maintained
        Partners should have the capacity to finance their participation in projects




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
iv


        Roles and responsibilities within the partnership should be clearly outlined, with a
        strong commitment to mutual decision-making
        Partners should have committed leadership who will endeavour to keep politics
        out of the operations of the partnership
        An appropriate level of managerial and operational competence must be present,
        as well as technical capacity which meets the requirements of the project
        A sufficient amount of front-end negotiating time to ensure appropriate partner
        selection and mutual understanding of issues
        Partners should have qualified personnel to manage their activities
        Partnerships should have a clear, succinct vision and mandate as well as
        measurable objectives.


The findings also detail several challenges faced by collaborative endeavours, including
the need to develop sustainable revenue streams and ensure the effective management of
finances and resources. Further challenges included balancing the desire to maximize
employment with the economic realities faced by the communities, reconciling individual
autonomy to support effective partnerships, and ensuring the administrative and political
stability of partner First Nation(s) while keeping politics out of the negotiations and
operations.


The lessons learned through the examination of the case studies provide the basis for the
development of a community partnership initiative for the Province. Such a process
would involve two fundamental, concurrent activities to support collaborative efforts:
    •   Economic bridge building
    •   Social/community bridge building.


The economic bridge building component reflects the need to identify and foster
collaborative economic opportunities through joint ventures or partnerships. The process
should include the identification of potential partners and developing a mutual
understanding of the interests of stakeholders, as well as the delivery of highly practical
workshops on creating and negotiating the partnerships themselves.             Finally, the


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
v


provision of on-going support and consultation will be critical to ensure the development
of the partnerships.


The social/community bridge building aspect of the framework reflects the need for
sustained dialogue between stakeholders. The goal of this activity is to address long-
standing divisions in the community, and ultimately to change conflicting relationships,
and foster a level of trust and respect that would serve to increase collaboration and trust
(and thus increase the number and sustainability of Aboriginal/non-Aboriginal
partnerships).


In order to create this initiative, pilot communities should be identified and qualified
based upon the following recommended criteria:
    •   Community has been subjected to recent economic downturn
    •   Partners have access to sufficient financial resources to cover costs of project
    •   Community has proven history of collaboration between Aboriginal and non-
        Aboriginal community
    •   Community is comprised of sufficiently large groups of both populations
    •   All partners display commitment to project
    •   Strong leadership evident amongst partners
    •   Meaningful and practical economic opportunities available


Through the course of the creation of this report, two potential pilot communities have
been identified which meet the above criteria, with the exception of the level of
commitment made, which cannot be determined until later in the process. Both Port
Hardy and Ucluelet represent excellent examples of communities where pilot initiatives
of the provincial partnership framework could be developed.


The review and analysis of the case study partnerships identified in this report serve to
reinforce the belief that Aboriginal/non-Aboriginal partnerships offer a major economic
opportunity to several communities in the province, both in the expansion of existing



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
vi


partnerships, and in the identification and fostering of potential collaborations in the
future.   The suggested plan presents an opportunity for the Government of British
Columbia to work proactively with these community partners and take a leading role in
the fostering of such value-added initiatives.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
1


1 Introduction and Background


The Community Transition Branch of the Ministry of Community, Aboriginal and
Women’s Services of the Government of British Columbia (BC) initiated this Research
Project on Aboriginal and Non-Aboriginal Partnerships to develop an improved
understanding of such partnerships and identify opportunities for the Ministry to support
community level collaboration between Aboriginal and non-Aboriginal groups.                              A
Request for Proposals was issued and the BC firm Wayne Dunn & Associates Ltd.
(WDA) was engaged to undertake the project.


The project was launched in early February and a progress report was submitted on
February 23, 2001. The Progress Report included mini case studies and preliminary
analysis of sixty-four1 examples of collaboration between Aboriginal and non-Aboriginal
interests2. The Progress Report was circulated to various government stakeholders for
comment and observation. On March 9, 2001 the Consultants met with the Ministry to
discuss their comments on the Progress Report and identify those partnerships suitable
for more detailed study and analysis.


Aboriginal and non-Aboriginal communities alike face social and economic challenges
that require new approaches and innovative solutions. While in general terms, many
Aboriginal communities have improved their quality of life in recent years, in
comparison to the non-Aboriginal population they are more likely to be burdened by a
lack of employment opportunities, under-educated and living in poverty. Non-Aboriginal
communities also face difficult challenges in trying to secure a stronger social and
economic future, including recovery from economic downturns in the resource sector or
dealing with inner-city poverty. Improving relations between these two groups can help
BC communities overcome impediments to social and economic progress.

1
  Subsequent to the completion of the Progress Report, preliminary analysis was conducted on four additional
partnerships



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
2


Cooperation and collaboration between Aboriginal and non-Aboriginal communities can
mobilize and focus local and regional resources to affect positive change for all residents.
Insight on how these communities can work together to address common concerns in
building a healthy sustainable future can be provided through the profiling of best
practices of Aboriginal and non-Aboriginal partnerships.


This Report builds on and makes extensive use of prior research sponsored by the
Ministry and the Federal, Provincial and Territorial Ministers and National Aboriginal
Leaders report on Strengthening Aboriginal Participation in the Economy. Section 2
describes the methodology and approach employed by the Consultants to collect the data
and undertake the various analyses.


The following Section (3) presents ten case studies of Aboriginal and non-Aboriginal
partnerships in five different sectors of the BC economy. Section 4 summarizes the
lessons learned from these partnerships; examining in particular what motivated the
formation of the partnerships, what were the critical success factors and then discusses
how the issue of conflict management is addressed. As well, this Section reviews lessons
learned from ‘failed partnerships’ and discusses lessons learned from two other Ministry-
supported partnership initiatives.


In Section 5 the Consultants argue that, while individual and ad-hoc partnerships between
Aboriginal and non-Aboriginal citizens of BC have made a positive impact on the social
and economic fabric of BC, the impact could be significantly greater if a facilitated and
systematic partnership development and bridge building process was implemented at a
community level.




2
    A listing of the sixty-eight partnerships and the results of the analysis conducted on them is presented in Appendix 1.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
3


Section 6 outlines what such a process might look like and then goes on to list criteria
that would help to select potential pilot community sites. This section also presents a
detailed plan for launching and financing a pilot project that could, after testing and
refinement, be rolled out to communities across the province. The final section contains
the Consultants conclusions.


The following section summarizes the approach and methodology utilized by the
Consultants and discusses limitations of the research.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
4


2 Methodology and Approach

2.1 Approach


In order to achieve the objectives of the assignment within the time and budget
constraints, a two-stage research and analysis process was developed.          The initial
research stage involved the identification of partnerships, desktop research to gather
preliminary data on the identified partnerships, and preliminary analysis of each
partnership. A data collection framework was developed to ensure consistency of data
across the various partnerships reviewed.


The geographic focus of the research was on the province of British Columbia. However,
the Progress Report included several Aboriginal and Non-Aboriginal partnerships from
northern Saskatchewan, as this area has been particularly successful at the development
of economic and business collaboration between First Nations and other interests.
Anecdotal evidence suggests that Northern Saskatchewan is a world leader in Aboriginal
business and economic development. For this reason, the researchers felt that it was
worthwhile to review appropriate examples from this area. However, after consultation
with various stakeholders it was decided that due to: the unique history of Aboriginal
issues in BC; the ease with which BC examples can be followed-up by interested parties;
the fact that there may be historical and geographic challenges to applying lessons from
outside BC; and the project’s budgetary limitations, it was appropriate that detailed
research and analysis should focus exclusively on BC partnerships.


The Consultants and the Ministry team identified seventeen partnerships in five basic
sectors (Environment, Social, Economic, Municipal and Other) that were suitable for
further research and analysis. Recognizing that time and budget constraints, coupled with
the need to contact and interview major stakeholders in each partnership would make it
impossible to complete the research on all seventeen partnerships in the time available, it



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
5
was agreed that the Consultants should attempt to develop 6-10 detailed case studies,
with at least one from each sector. This report contains ten such case studies and further
analysis.



2.1.1 Data Sources and Collection Methodologies


Data sources and collection methodologies utilized by the Consultant included:
        •   Telephone interviews and meetings with First Nations officials, federal,
            provincial and municipal officials, representatives of non-Aboriginal partners,
            and other significant stakeholders in various partnerships;
        •   Review of published documents and reports; and
        •   Internet research.
A complete listing of information sources is presented in Attachment 2.


Data Verification and Crosschecking
Due to the preliminary nature of the information required, the 68 partnership overviews
that were reviewed in the initial stage did not necessarily include data crosschecking and
verification. Many of the overviews presented in the initial stage were based on only one
data source. However, the detailed partnership case studies presented in this report all
involved multiple data sources to ensure accuracy of data and to enable the Consultants to
synthesize the viewpoints of significant stakeholders.



2.1.2 Data Collection Framework


In order to ensure consistency of data, the Consultants developed a uniform data
collection framework for each Phase of the project (see Attachment 3 for the Data
Collection Frameworks utilized for each Phase). The Frameworks were designed to
allow researchers to quickly gather and organize pertinent information. The Phase I
Framework was designed to provide sufficient information to enable a preliminary


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
6
    analysis of each partnership and allow the project team and the client to identify which
    partnerships warranted further research and development as more detailed case studies.
    The Phase II Data Collection Framework, which was used for interviews with each
    partner and stakeholder, was designed to allow the Consultants to develop a more
    detailed understanding of each partnership and the factors that supported or inhibited its
    success. The project team recognized that even though it was unlikely that data on each
    item in the framework would be available for each partnership, it was useful to have a
    framework that could easily capture and organize whatever data was available. This
    enabled a more systematic and consistent analytical process, which allowed the
    identification of critical success factors across the range of partnerships reviewed. The
    overall data gathering and analysis process is summarized in Exhibit 2-1 below.


    Exhibit 2-1 WDA Partnership Analysis Framework©




                                                              Development
                                           Legal/Structural
                                                                                    Identification
                               Operational       Capacity
                                                                  Accomplishments                     Replicable
Partnership Research                                                                  of Critical
                            Stakeholders
                                                Development
                                                                     Aboriginal                      Partnership
    and Analysis                                                                       Success
                               Financial    External issues
                                                                    Employment                       Case Study
                                                                                       Factors
                                    Aboriginal            Barriers and
                                   Procurement            Constraints
                                               Community
                                             Characteristics




    The results from the data gathering and analysis are presented in Section 3 (Case Studies
    and Individual Partnership Analysis).


    Following the analysis of individual partnerships the Consultants undertook an integrated
    review of all ten partnerships to identify traits and characteristics that are generally
    applicable to successful partnerships, regardless of which sector they are in. This is
    presented in Section 4 (Lessons Learned).


    Aboriginal Partnerships – Building Blocks for
    Sustainable Community Development
7


The draft plan for a Community Bridge Building Initiative is presented in Section 6.



2.2 Limitations of Research
The consultants recognize that there are significant limitations on the preliminary
research and analysis. These limitations include:


    •   Partnership identification was not exhaustive – No effort was made to
        inventory every Aboriginal - Non-Aboriginal partnership in British Columbia.
        However, consultation was undertaken with key government contacts with
        extensive knowledge of Aboriginal partnerships. This consultation helped to
        identify important partnerships and focus the Consultants on those partnerships
        that the stakeholders felt most relevant.     While conducting an inventory of
        partnerships may well be a very useful exercise it was beyond the scope and
        budget of the current project. The objective of the Phase I research was simply to
        identify and collect information on enough partnerships to provide a pool from
        which partnerships could be selected for further research and analysis.


        This notwithstanding, the consultants would encourage the Government of BC to
        consider undertaking an exhaustive partnership inventory. This exercise would
        produce valuable information and data and would provide a baseline from which
        to measure the success of efforts to support and promote Aboriginal/non-
        Aboriginal partnerships.


    •   No crosschecking and data verification (Phase I) – For most partnerships only
        one data source was utilized to gather data and information.         However, the
        consulting team itself has considerable personal knowledge of many of the
        partnerships reviewed. This information was used to undertake a preliminary
        verification of data and information. Still, there could well be some inaccuracies



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
8
        in the data and information.        Phase II research methodology utilized a data
        checking and verification process as outlined in Section 2.1.


    •   Uneven geographic dispersion of partnerships. The project team attempted to
        identify examples that represented a wide range of foci and types of initiative
        rather than to undertake an exhaustive inventory of partnerships for any particular
        area or to ensure that there were partnerships identified and reviewed from
        throughout the entire province. While efforts were made to identify and gather
        information from all areas, challenges with having telephone calls returned
        limited the geographic dispersion in Phase I. Phase II research targets were, for
        the most part, selected from partnerships reviewed in Phase I. Information was
        not gathered on any partnerships in the far north of the province.      It should be
        noted that the research was conducted near the end of the fiscal year, a time that is
        particularly demanding for most informants.


    •   Some partnerships are of recent origin.           Generally, partnerships between
        Aboriginal and non-Aboriginal interests in BC are recent phenomena. Although
        some partnerships had several years of operating experience, most were originally
        formed within the past three years. As a result, some critical success factors and
        key challenges may have not yet become evident. To compensate for this the
        Consultants informally compared the results of the partnership analysis to their
        knowledge of partnerships in other areas that have been in existence for extended
        periods of time (e.g., Kitsaki Development Corporation/Trimac Transportation
        (1986); Meadow Lake Tribal Council/NorSask Forest Products (1988), etc.).


    •   No Research into Failed Partnerships. The research focused only on existing
        successful partnerships. In other words, it did not seek to review partnerships that
        had failed in order to glean learnings from them. However the researchers have
        had direct experience in partnerships that have failed and this has been factored
        into the Lessons Learned discussion in Section 4.



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
9
Despite the limitations noted above, the Consultants are confident that the research and
analysis has provided findings that are interesting and useful and which will serve to
guide the establishment of comprehensive partnership development and bridge building
initiatives in British Columbia. These findings and analyses are presented in subsequent
Sections.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
10


3 Case Studies and Individual Partnership Analysis

3.1 Summary of Partnership Case Studies
The following list summarizes the detailed case studies reviewed in this report and
specifies the sector that they are from.


1. Environment
   • Tsilqot'in People of Xeni and BC Parks

2. Social
   • Carrier Sekanni Family Services

3. Economic
   • West Chilcotin Forest Products Ltd.
   • Monthly Licensee Meetings – North Thompson
   • Skwalx/Sanders Construction Ltd – Little Shuswap Indian Band and Sanders
      Construction
   • Greater Masset Development Corporation
   • Iisaak Forest Resources

4. General
   • Sun Rivers Resort Community – Kamloops Indian Band and Sun Rivers

5. Other (Municipal)
   • Gallagher Canyon Agreement
   • Lake View Meadows

Detailed case studies of the above ten partnerships are presented in the following sub-
section. The case studies are arranged in alphabetical order.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
11


3.2 Individual Case Studies
The following ten sub-sections discuss the ten case studies referred to earlier. Specific
contacts and methods of data gathering utilized for gathering information are summarized
in the Appendix Information Sources.

3.2.1 Carrier Sekani Family Services


Parties to the Agreement:


    •   Carrier Sekani Family Services
        ⇒ Wet’suwet’en First Nation
        ⇒ Cheslatta First Nation
        ⇒ Burns Lake First Nation
        ⇒ Stellat’en First Nation
        ⇒ Nadleh Whut’en First Nation
        ⇒ Saik’us First Nation
        ⇒ Nak’azdli First Nation
        ⇒ Tl’azt’en First Nation
        ⇒ Takla Lake First Nation
        ⇒ Yekooche First Nation
    •   Indian and Northern Affairs Canada
    •   Ministry for Children and Family Services


Narrative Description of the Collaboration


Carrier Sekani Family Services is essentially a service delivery agreement entered into in
1991 between the Provincial Ministry of Child and Family Services, Indian and Northern
Affairs Canada (INAC) and the ten First Nations.         This is a multi-year financing
agreement that allows the First Nations to organize a service delivery agency (Carrier
Sekani Family Services) to deliver child and family service programs to First Nations
Peoples in the area. The agreement is similar to others that are negotiated throughout
Canada involving First Nations, INAC and the relevant provincial Ministry.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
12
INAC’s policy governing the
                                                           Mission Statement
financing of Child and Family
                                           "With the guidance of our elders, Carrier Sekani
Service Agency funding stipulates
                                           Family Services is committed to the healing and
that there must be a minimum of
                                           empowerment of Aboriginal Families by taking
500 children in the area before
                                           direct responsibilities for health, social and legal
they will enter into an agreement
                                           services for First Nations people residing in Carrier
(the purpose is to ensure effective
                                           Sekanni territory."
economies of scale).


Launched in 1990/91 the Mission Statement of Carrier Sekani Family Services is:


A 10 person Board of Directors, one from each member nation, oversees the operation of
Carrier Sekani.


Motivation of the Partners and Stakeholders


The First Nations’ interest was to ensure that their membership received child and family
services in a culturally appropriate manner. The Federal and Provincial government
recognized that traditional mechanisms for delivering child and family services to First
Nations Peoples was not working and that they could be enhanced through First Nations
controlled delivery structures.


Lessons Learned and Critical Success Factors


Interviews and research have identified several lessons learned and critical success
factors. They are:


    •   Secure financing is a critical issue, especially in an organization that has no
        mechanism for internally generated financing;
    •   A strong focus on acquiring, training and maintaining quality staff is fundamental.
        This is especially important when activities are located in relatively remote areas


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
13
        and there is a difficulty in attracting staff to move from the more populated areas
        like the lower mainland;
    •   There is value in delivering more services, as long as they are related in a general
        way. This provides the organization with improved economies of scale and
        greater visibility with its stakeholders.
    •   It is important to involve the communities and local stakeholders at the onset of
        the project. It allows the membership to define priorities and drive the process.
        This will ensure much more credibility when the organization is up and running.
    •   There is a need to develop as much information as possible and manage it in a
        way that it can be used to further the goals of the organization.


Bridge Building and Conflict Management Strategies


Due to the nature of the collaboration – an agreement with Federal and Provincial
governments to deliver specific services to specific clients, there did not appear to be any
overt bridge building strategies undertaken.         Conflicts with other governments are
addressed through negotiations; other conflicts (staff, member nations, etc.) are addressed
through the personnel manual and organization by-laws.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
14



3.2.2 Gallagher Canyon Agreement


Parties to the Agreement:
    •     Westbank First Nation, Kelowna, BC
    •     Central Okanagan Regional District (CORD), Kelowna, BC
    •     The Corporation of the City of Kelowna
    •     The Black Mountain Irrigation District
    •     The South East Kelowna Irrigation District

Narrative Description of the Collaboration


After nearly five years of negotiations the Westbank First Nation and the Central
Okanagan Regional District (CORD) signed a five-year services agreement (Gallagher
Canyon Agreement) in early 2000. The agreement includes other local stakeholders and
covers how services are provided to some fee simple land that the First Nation purchased
several years ago.


After purchasing the land the First Nation wanted to convert it to Reserve status.   The
land had several easements to local Improvement Districts to allow for the provision of
water to their constituents. As well, the City of Kelowna had constructed a road through
the land in question. In order to fully understand the implications for all stakeholders
CORD asked the Federal Government to undertake a thorough examination of the
situation prior to converting the land to Reserve Status.


In about 1995 CORD and Westbank began negotiations to develop a framework for
development of this land. While the original intent of the land purchase was to provide
land for First Nation’s housing, everyone recognized that the agreement needed to be
flexible enough to enable the stakeholders to accommodate changing requirements in the
future.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
15


The agreement addresses the allocation of various developmental costs, the number of
homes, types of buildings allowed and provides for the continuation of the easements. It
also protects the rights of the several service providers on this land.


CORD also has another agreement with Westbank which addresses payment for services
provided to approximately 7,000 non-Aboriginals who live on Reserve land but utilize
CORD services (recreation centre, emergency vehicles, etc.).              CORD felt that this
agreement did not provide the Regional District with adequate payment for services
provided so they took the First Nation to court to attempt to have the agreement
renegotiated.    The court case failed but relations between the parties remained cordial.
According to CORD the First Nation acknowledges that there is a problem with the
current agreement and that, in the interest of longer-term collaboration and relationships,
a new agreement should be developed.


Even though the Gallagher Canyon Agreement has been in place for only one year, the
stakeholders have already begun negotiations for a follow-up agreement that would also
address the issue of non-Aboriginals utilizing CORD services.


Motivation of the Partners and Stakeholders


    •   The primary motivation for each partner was the desire to develop a mutually
        agreeable framework for development and development services on the land
        acquired by the First Nation. Each party wanted the agreement to be structured so
        that it would support their longer-term development aspirations and provide a
        mechanism for fair allocation of costs and benefits.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
16


Lessons Learned and Critical Success Factors


    •   All parties were motivated to develop a legal agreement that could provide a
        framework to support their respective needs and development aspirations.
    •   The parties agreed to spend the time up-front (five-years) to ensure that all issues
        were raised in negotiations and that the final agreement would meet their needs.
    •   It is possible to have a ‘civilized disagreement’ and still remain as active
        collaborators on other fronts.
    •   When developing agreements it is critically important to openly communicate
        one’s needs and to be patient and keep the discussion going, even when some
        aspects of it are difficult and there is no evident path to an agreement.


Bridge Building and Conflict Management Strategies
The parties identified two specific bridge building and conflict management strategies
that worked for them. They were:
•   Keep the dialogue going even when there is conflict and the two sides don’t fully
    understand each other; and
•   Make the agreement comprehensive so that all foreseeable conflicts and issues have
    been addressed.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
17



3.2.3 Greater Massett Development Corporation


Parties to the Agreement:


    •   Old Masset First Nation
    •   Village of Masset


Narrative Description of the Collaboration


The Greater Massett Development Corporation (GMDC) had its genesis in 1994 when
the Federal Department of National Defense (DND) decided to close the local military
base (GMDC was incorporated in 1996). The base contained: 190 residences; barracks
that could accommodate up to 65 people; a recreation centre; a curling rink, and
administration buildings.      Costs to dismantle and decommission the facilities were
pegged at $3 million.


Coupled with significant downturns in the forestry and fisheries sectors, and the closure
of a local refueling station, the village of Massett and the Old Massett First Nation were
facing a major economic downturn. The military base had traditionally pumped about $5
million dollars per year into the local economy – its closure could be devastating. DND
was facing a major public relations challenge as the closure of the base could push the
local economy over the economic brink and DND could become the public scapegoat.


Necessity brought the three major stakeholders (Old Massett First Nation, Village of
Massett and DND) together to try and develop a scenario that would lessen the economic
and social impact of the base closure. The First Nation and the Village had prior
partnership experience with each other – two years earlier they had combined their sewer
and water systems. This benefited both parties by improving overall service and creating
operational efficiencies and economies of scale.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
18


The stakeholders decided that the economic impact of the base closure could be mitigated
somewhat with the formation of a development corporation that would be jointly owned
by the First Nation and the Village. DND agreed to transfer the base infrastructure and
fixed assets, along with the $3 million decommissioning budget to the newly formed
Greater Massett Development Corporation.


The GMDC was formed as the vehicle to liquidate the assets, and look after the funds
from the sales of Personnel Married Quarters (PMQs) and other former DND properties.
Approximately $8 million in revenue was generated through these sales. The GMDC was
to re-invest these funds into the two communities to enhance local economic
development activities. GMDC presently utilizes these funds to support the operations of
the Old and the New Massett Economic Development offices. DND also provided the
GMDC with a $3,000,000 barracks demolition fund which is presently invested in its
own account, the interest of which is only to be used to subsidise the operation of the
Massett recreation centre.


Each partner (the village and the First Nation) appointed five Directors to the GMDC
Board and they began the difficult process of launching a jointly owned corporation and
affecting the transfer of assets from DND. The partners spent considerable time at the
front end developing a strategic plan for GMDC. This afforded the opportunity to
surface potential conflict areas and fully discuss the strategic direction of the corporation
and the communities.


Transferring the assets from DND proved to be a Herculean challenge involving 11
different government departments and many layers of bureaucracy. The $3 million was
put into a GMDC managed ‘Greenfield Fund’ which is used to assist local entrepreneurs.
The former administration centre was converted into an incubator mall, which has
already spawned some successful local businesses. The GMDC operates the recreation
facilities for the benefit of the entire community.      Western Diversification provides
project specific financing to assist GMDC.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
19


GMDC holds monthly Board of Director meetings, and two large meetings per year that
are open to the general public; an Annual General Meeting and a Public Meeting.
Communication with the public and consistent attendance at Director’s meetings has
been a critical issue for GMDC.


Decisions are made by a ten-person Board of Directors (each partner appoints five Board
members). At one point GMDC undertook a major communication initiative, going
door-to-door in the community to inform community members of the corporation and its
strategic direction (they used the strategic plan as a guide).


Although there have been numerous challenges, including ensuring that there are revenue
streams to match expenses (e.g., operating community recreation facilities), and it is too
early to determine its long term success, GMDC has had a positive impact on the Greater
Massett community. It has inspired a can-do attitude and helped to mitigate the social
and economic impact of the base closure.             It has established infrastructure that is
dedicated to supporting the economic rejuvenation of the entire community. As well, it
has significantly increased cross-cultural interaction and fostered improved relations
between the First Nations and non-First Nations communities.


The main financial challenge facing GMDC is that there are no significant revenue
sources. The operations of the GMDC and the costs of operating the recreation center are
funded from the rapidly depleting capital base that was generated by the liquidation of
DND assets.


However, despite the intentions of all parties, there have been few jobs or entrepreneurs
created other than in the operation of the recreation centre. There have been few direct
benefits for the community, other than the 8 to 11 total employees of the GMDC. The
partnership appears to face serious challenges as the $11 Million in seed money that they
started with has been seriously eroded and continues to be burned at a high rate by the
costs of the recreation centre. Some people that were interviewed indicated that the


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
20
partnership has actually worsened relationships between the Aboriginal and non-
Aboriginal elements of the community.


Motivation of the Partners and Stakeholders


The partners and stakeholders were all motivated by enlightened self-interest.           Old
Massett First Nation and the Village of Massett were searching for opportunities to
mitigate major economic shocks to the community. DND and the Federal Government
sought to close the base with a minimum negative impact on the local economy and on
their reputation.


The original motivation was to split the DND assets equally between the two
communities. This has not changed since its inception; both communities would like to
share in the assets equally.


Lessons Learned and Critical Success Factors


The partners identified several lessons learned and critical success factors:


    •   It was vitally important to spend time at the onset in the development of a
        strategic plan. In addition to providing direction to the corporation, the process of
        developing the plan enabled the partners to address numerous issues that may
        have created serious problems if left un-addressed;
    •   Communication with community members is essential – do what it takes to
        ensure that the larger community is informed;
    •   Once you have a plan, stick to it. A well-developed strategic plan/vision can
        provide directional stability and allow an organization to proactively pursue its
        long-term vision. Conversely, failure to follow a plan/vision encourages reactive
        responses to the opportunity of the week;




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
21
    •   Solid financial plans, especially on the revenue side, are extremely important.
        Failure to adequately develop a sustainable financial plan can place extreme
        stresses on the partnership and the relationships between the partners;
    •   A committed Board of Directors who will attend all meetings, and provide
        strategic guidance and direction to the organization is of critical importance;
    •   Ensure that the operations of the development corporation are managed in a way
        that is consistent with the goals and objectives of the organization. This requires
        careful selection of a General Manager and ensuring that appropriate
        management, reporting and monitoring processes are in place that allow any
        deviations from the strategic plan to be quickly identified and corrected; and
    •   It is important to ensure that the Directors are qualified and well trained and that
        personal agendas do not interfere with the strategic direction of the organization.


Bridge Building and Conflict Management Strategies


There were a number of processes and strategies that helped to mitigate the impact of
conflicts and build bridges between the two communities. These included:
    •   A two-day strategic planning workshop at the start of the partnership to address
        outstanding issues and develop a strategic plan for the partnership;
    •   Decisions of the partnership are made by consensus;
    •   The partners have found that, as they come together for community activities in
        their jointly owned recreation facilities, they have developed better friendships
        with one and other on a personal level.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
22



3.2.4 Iisaak Forest Resources



Parties to the Agreement:


    •   Weyerhaeuser Canada Ltd. (formerly MacMillan Bloedel Ltd)
    •   Nuu-chah-nulth
    •   Ahousaht First Nation
    •   Hesquiaht First Nation
    •   Tla-o-qui-aht First Nation
    •   Ucluelet First Nation
    •   Toquaht First Nation

While not officially ‘partners’ in Iisaak, numerous international environmental
organizations such as Greenpeace were critical stakeholders who had shaped the
conditions that stimulated the creation of Iisaak.


Narrative Description of the Collaboration


Worldwide attention was brought to bear on the logging industry in Clayoquot Sound in
the 1990s.     International organizations applied tremendous pressure on companies
logging (clear-cutting) the old growth forests in the area, disrupting logging activities and
alienating markets in Europe and North America.


Clayoquot Sound is the traditional home of the Central Nuu-chah-nulth Aboriginal
people. They have an interest in reclaiming their lands to promote economic, social and
cultural development for their people. These people include five First Nations, with the
northern most three, the Hesquiaht, Ahousaht and Tla-o-qui-aht residing within
Clayoquot Sound with the Ucluelet and Toquaht bordering to the south.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
23
Before the escalation of conflict, Weyerhaeuser (MacMillan Bloedel (MB)) the operator
throughout the 1990s was purchased by Weyerhaeuser in 1999) had an annual harvest of
over 600,000 cubic metres in Clayoquot Sound, which generated over $100 million in
economic activity. This activity was a significant component of the local economy
supporting many local businesses and providing a revenue base to municipal, provincial
and federal governments.


Initially the local First Nations, who had been largely excluded from the economic
benefits associated Weyerhaeuser’s (MB) operation, supported and were supported by the
international organizations that were leading the anti-logging protest. In July 1996, First
Nations hosted an all-stakeholder meeting to discuss a resolution to Clayoquot
controversy. In January 1997, Weyerhaeuser (MB) laid off 110 workers with a decision
to stop logging in Clayoquot Sound for 18 months.


Iisaak Forest Resources was formed in March 1997, as a joint venture between Nuu-
chah-nulth people and Weyerhaeuser (MB). Iisaak (pronounced e-sock) would be 51%
First Nations owned and would take over Weyerhaeuser’s (MB’s) operations in
Clayoquot Sound. However harvests would be reduced to 40,000 cubic metres per year
and be put-off for three years while value-added forest product opportunities were
investigated. Harvesting resumed in Clayoquot in August 2000.


Iisaak Forest Resources will harvest up to 40,000 cubic metres per year. That is less than
10% of the volume that had been sustained before the dispute began. First Nations
control Iisaak, not Weyerhaeuser (MB), and they have options to increase their
ownership, to 100% at some point. Weyerhaeuser (MB) will continue to work with
Iisaak, providing start-up working capital and management experience.


The intent of the partners is that the area will be managed first for conservation values
and then for economic benefit. This enabled the support of many of the international
organizations that had previously led the protest against Clayoquot logging.



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
24
Iisaak is committed to an eco-forestry approach, logging in second growth areas,
supplying wood to local value-added wood converters and pursuing eco-certifications
through a process agreed to by the international organizations. Some watersheds and
other areas will be set aside for non-timber uses including eco-tourism and spiritual uses.
The international organizations have committed to assist with marketing products from
Iisaak and to continue looking for other ways to stay positively involved.


Economically, Iisaak expects to operate at barely above break-even in 2000 and 2001. So
despite the positive feeling of the parties supporting Iisaak, it is clearly too early to
conclude whether Iisaak will grow to be an economically viable success.


Motivation of the Partners and Stakeholders


•   The First Nations involved were interested in both economic growth and development
    and in preserving Clayoquot Sound as one of the world’s special places.
•   Weyerhaeuser was interested in limiting the damage to its international
    reputation/brand equity and the alienation of markets for its other forest products.
    Additionally, Iisaak provides them with an opportunity to work directly in partnership
    with First Nations and will undoubtedly assist them in their relationships with First
    Nations Peoples in other areas where they work.
•   While many of the international organizations would have undoubtedly preferred an
    absolute moratorium on logging in Clayoquot Sound, they realized that for them to
    continue opposing a limited-impact logging program that was supported by local First
    Nations would be difficult.




Lessons Learned and Critical Success Factors


A number of lessons can be drawn from this experience:




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
25
    •   First Nations can have a strong influence on disputes between industry and
        environmentalists;
    •   Local issues can quickly become global problems for resource companies; and
    •   First Nations’ leadership and commitment were able to draw former combatants
        together and forge a common ground.


Bridge Building and Conflict Management Strategies


The Iisaak partnership grew out of one of the biggest conflicts in BC history. Partners
have learned to work together in support of their common interest. First Nations
leadership and moral commitment to balance environmental preservation with the
creation of economic opportunities for their members provided the catalyst to bridge the
chasm that had developed between the parties.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
26



3.2.5 Lakeview Meadows


Parties to the Agreement:
    •   Shuswap First Nation, Cranbrook, BC
    •   Regional District of East Kootenay, Cranbrook, BC
    •   Private Developer (Lakeview Meadows)


Narrative Description of the Collaboration


In the late 1990s the Regional District of East Kootenay (RDEK) and the Shuswap First
Nation faced some difficult challenges. The popularity of the area as a summer resort
resulted in extensive development along the shores of Lake Windermere. All of the
houses and cottages were on septic fields, which were causing pollution levels to rise to
unacceptable standards. RDEK recognized the need for a new sewer and water system,
but financing the $15 million cost of developing it would require an expensive and
lengthy referendum process, with no guarantee of receiving approval.


Due to geology, geographic proximity and a greater degree of regulatory autonomy, it
made sense to explore the option of having the Shuswap First Nation finance and
construct the sewer and water system and sell services to RDEK. The parties already had
a history of cooperating. The First Nation had a service agreement with the Regional
District for fire protection and the Regional District had a member on the First Nation’s
Development Review Board. As well, the First Nation saw this as a lucrative opportunity
to protect the environment and make a profit at the same time.


The situation came to a head when a private developer wanted to develop Lakeview
Meadows subdivision and needed sewer and water services in order to do so. The First
Nation negotiated a pre-payment of service fees and an agreement to pay design costs and
construction costs from the edge of the reserve to the Lakeview Meadows subdivision.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
27
They leveraged the prepayment and commitment to secure the capital to develop the
system. Today the First Nation supplies sewer and water services to the Lakeview
Meadows subdivision and has a new system for their own members. RDEK has a
management contract with the First Nation to manage the system for at least five years –
during this time it is expected that someone from the First Nation will be trained to
operate the system. Financing for the system was entirely private – the First Nation was
able to bypass traditional government financing processes for on-reserve infrastructure,
allowing them to proceed with the development in a timely fashion (sources indicated
that the average time to process government financing for on-reserve infrastructure is 36-
42 months).


Motivation of the Partners and Stakeholders


The partners had a history of working together and recognized that they could realize
advantages by collaborating on this initiative.      They both wanted to reverse the
environmental damage that was caused by septic systems. RDEK wanted to avoid the
challenges of securing regulatory approval and raising $15 million capital to finance a
new system.      The First Nation wanted to utilize their geographic and geological
advantages to develop a profitable business opportunity.


Lessons Learned and Critical Success Factors


A number of lessons learned and critical success factors emerged when reviewing this
partnership with the stakeholders:


    •   Leadership is critical. The First Nation had strong leadership with clear vision
        and goals (and an active process of consultation and communication with the FN
        community);
    •   Communication is essential. Each party involved the other in relevant decisions
        and there was a regular sharing of information;



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
28
    •   Both partners had clear goals and understood what they could do best to make the
        partnership work;
    •   Both partners stressed the importance of entering into negotiations with an open
        mind, a good understanding of the risks and a commitment to continue
        negotiations until all issues had been addressed and the best possible deal for
        everyone had been developed;
    •   Financing – developing and arranging the appropriate financial package allowed
        the development to proceed in a timely manner; and
    •   Shared interests – the parties needed each other to solve a common problem
        (pollution) and to achieve other party specific objectives (e.g., create a revenue
        opportunity, avoid a referendum and the need to raise a huge amount of capital).


Bridge Building and Conflict Management Strategies


In addition to a history of trust and collaboration developed through earlier initiatives the
partners stressed the importance of regular communication as a mechanism for bridge
building and managing potential conflict.            The agreement also included a clause
committing the parties to binding arbitration if they were unable to come to agreement on
a particular issue.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
29



3.2.6 Monthly Licensee Meetings – North Thompson


Parties to the Agreement (Process):


The participants are:
    •   North Thompson First Nation
    •   Ministry of Forests (MOF)
    •   Ministry of Environment (MOE)
    •   FRBC
    •   Tolco Industries
    •   Slocan Forest Products
    •   Weyerhaeuser Canada Ltd.
    •   Adams Lake Lumber (Division of Interfor)
    •   Gilbert Smith Forest Products
    •   Several small forest operators from the area


Guests and Environmental consultants sometimes participate in the meetings.


Narrative Description of the Collaboration


In the early 1990s the stakeholders in North Thompson’s forest and other natural
resources began meeting regularly (monthly) to exchange information and inform each
other of their plans and priorities. Although the meetings were nominally about all
resource sectors, forestry related issues were generally the primary focus.    These
meetings have continued over the past decade and have become an important and regular
feature of resource management and development in the North Thompson.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
30
A major benefit of the process is that it provides an ongoing opportunity for dialogue and
interaction amongst the stakeholders. This dialogue assists the stakeholders to get to
know each other and to increase the coordination and efficiency of projects and activities.
For example, if the First Nations require wood for its mill, the meetings provide a forum
where they can discuss the most efficient means to get it with the major industry
participants. In some cases it may be that TOLCO is harvesting the needed species in the
geographic area – in other cases it may be Weyerhaeuser. Regardless of which supplier,
the meetings provide a quick and efficient means to gathering this information and input.


An added benefit of the meetings is that they provide an opportunity for the stakeholders
to get to know each other better. For instance, several non-Aboriginal participants noted
that they have a greater appreciation for the range of issues and concerns being addressed
by First Nations – not just those directly related to local resources.        As well, the
participants in the meetings often get together for social events that help to further their
mutual understanding.


Motivation of the Partners and Stakeholders


There was and still is a plethora of motivations for the individual stakeholders to
participate. They include:
    •   To maintain effective information flow and communication – keeping abreast of
        each other’s activities and quickly identifying potential synergies and
        opportunities to increase efficiency;
    •   To build relationships and understanding with other stakeholders;
    •   To understand the concerns and priorities of the North Thompson First Nation in
        relation to forestry and other resource harvesting/management activities;
    •   To understand the capacity of local First Nation’s people and institutions and how
        they can add value to existing and planned activities;




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
31
    •   To maximize the employment, business and other benefits accruing to First
        Nation’s people from the harvesting and development of local forestry and other
        resources;
    •   To provide an opportunity for informal input into broad Provincial Government
        requirements on issues related to local resource management;


Lessons Learned and Critical Success Factors


    •   It is important that everyone participate with a spirit of openness and cooperation,
        ready to really listen to the viewpoints and concerns of the others;
    •   Perseverance is critical. It is important that the meetings be held regularly and
        that participants attend consistently; and
    •   It is critical that participants keep in mind the objective of the meetings –
        communication, dialogue and identification of opportunities for collaboration and
        synergy. It needs to be clearly understood that the meetings are not a political
        forum.


Bridge Building and Conflict Management Strategies


    •   The regularity of the meetings and the interaction between the participants has
        enabled them to get to know each other on many levels. When they are not in
        agreement on a particular issue there is a depth to the relationship that sustains
        them as they work through potential conflict(s);
    •   The participants regularly get together for social events such as a cultural day at
        the First Nation or renting the local ski hill and spending a family skiing day
        together; and
    •   The group tries to be proactive about identifying and addressing potential conflict
        issues and, if necessary, will hold weekly meetings on special occasions to ensure
        adequate communication and information flow amongst stakeholders.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
32
3.2.7 Skwlax/Sanders Construction Ltd.


Parties to the Agreement:


    •   Little Shuswap Indian Bank, Chase BC
    •   Sanders & Company, Merrit BC


Narrative Description of the Collaboration


Sanders and Company, a Merritt based road construction and heavy equipment company
had been successfully undertaking projects on the Little Shuswap Indian Band’s (LSIB)
Quaaout Reserve for about seven years. In 1999 LSIB and Sanders decided that it would
be beneficial for both parties to form a company to undertake smaller (under $10 million)
road construction and heavy equipment projects. Skwlax/Sanders Construction Ltd. was
formed with the LSIB holding a 51% interest. Each party nominated two persons to the
Board of Directors and the management agreement made a provision for a fifth,
independent, director to be appointed jointly (to date this position has not been filled).


The company bid on and secured several projects during their first year of operation,
generating over $1 million in revenue. Gerry Sanders and Stuart Adamson, a senior
manager with LSIB, make the day-to-day decisions of the company, on a collaborative
basis. Any projects that require financing must be approved by the LSIB. Project
managers make Day to day project decisions.


Sanders brought technical expertise and equipment to the partnership while LSIB brought
manpower, information on upcoming projects and the ability to meet Aboriginal
procurement guidelines. LSIB also brought administrative capacity and are tasked with
maintaining the company’s accounting system.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
33
The company had some initial challenges as it sought to balance First Nation member’s
desire to maximize employment with the economic reality of operating a project based
company in a cyclical sector.          After much discussion it was agreed that, while
employment and training opportunities for First Nation’s people is a strong priority,
employment must be based on project revenue.            The partners closely monitor the
financial profit and the employment and training that the projects generate.


In addition to the profits and employment, the partnership produced an unexpected
benefit in terms of addressing at least one person’s way of thinking about Aboriginal
peoples. On one project Skwlax Sanders deliberately engaged a subcontractor who had a
reputation as a vocal redneck and a staunch opponent of Aboriginal development. As a
result of working directly with the company and its Aboriginal workers, this person’s
attitude made a 180-degree shift.


Motivation of the Partners and Stakeholders


The motivations of both partners were enlightened self-interest. The LSIB wanted more
employment opportunities for First Nations members, an opportunity to share in the
profits of local construction work, and the ability to have a more substantial local
business presence. Sanders wanted to develop more work and to ensure that its work in
the area was sustainable by developing a partnership with a leading influencer of local
construction opportunities.


Lessons Learned and Critical Success Factors


Although the partnership is still in its early stages, a number of lessons learned and
critical success factors have been identified. They include:


    •   It is important to have strong technical skills in order to bid on and manage
        complex construction projects. If the First Nation does not have this capacity
        internally it is wise for them to select and twin with a partner who can provide it;


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
34
    •   In order to successfully execute construction projects it is important to have
        access to the appropriate equipment and the skills to complete the project
        effectively;
    •   Identifying and selecting the right partner requires a significant time commitment;
    •   It is important to allow enough time to thoroughly complete the due diligence;
    •   In order for a partnership to work effectively it must be financially self-sufficient
        with clear revenue streams and partners with the necessary financial resources to
        ensure adequate working capital;
    •   The parties must agree that there will be some limits on individual autonomy in
        order to support the partnership;
    •   The First Nation must have the political and administrative stability that will
        allow the partnership to operate without political interference and abrupt changes
        in administrative direction;
    •   The partnership should have a clear mission/mandate and keep focused on
        achieving it;
    •   The partners should strategically (and ethically) utilize all political relationships
        and influence available in order to market themselves and develop/secure
        projects; and
    •   It is critically important to invest the time at the front end of the partnership to
        clearly define the roles, expectations, mission and mandate of the relationship and
        be able to communicate it effectively to internal and external stakeholders.


Bridge Building and Conflict Management Strategies


In order to ensure a strong and sustainable relationship the partners have identified and
utilized a number of conflict management and bridge building strategies. These include:
    •   Strong/daily communication – the partners are in daily communication with each
        other. That way, when an issue comes up it can surface immediately and be
        addressed. They have committed to each other that, when a difficult issue arises




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
35
        they will address it head-on and get it resolved before it develops into something
        that could threaten their ongoing relationship;
    •   When a particular project requires debt to finance the initial working capital it
        requires formal approval from both parties;
    •   The potential conflict between employment/profits is mitigated by the strong
        leadership who ensure a separation between business and politics; and
    •   They have a provision to utilize a third-party mediator if a conflict arises that they
        are unable to settle amongst themselves.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
36



3.2.8 Sun Rivers Resort Community


Parties to the Agreement:


    •    The Sun Rivers Corporation, Kamloops BC
    •    Kamloops Indian Band, Kamloops BC


Narrative Description of the Collaboration


In 1997, the membership of the Kamloops Indian Band voted by a margin of 74% in
favour of surrendering3 a 480 acre parcel of their land to Sun Rivers Corporation for a
real estate development.             The property is located immediately east of the City of
Kamloops on the south-facing slope of the valley overlooking the city. The uses for this
land as approved in the Head Lease are for “developing 2,000 residential housing units, a
school, park, hotel, village centre and 18 hole golf course”.


The development utilizes thermal heat for the entire subdivision. It is one of the only
subdivisions in Canada to utilize this environmentally friendly energy source. When the
subdivision is fully developed it will provide the First Nation with annual tax revenues of
approximately $7-8 million per year.                  The remainder would accrue to the City of
Kamloops and to the developer for various services that they provide to the landowners.


With the prepaid lease and the market provided by the development, the First Nation was
able to finance and construct a state of the art water treatment facility that supplies
services to the Sun Rivers Resort Community and to many First Nations facilities.



3
 The surrender is a formal process wherein the land is assigned back to her Majesty the Queen’s representative – the
Government of Canada – who in turn provide a Head Lease (generally 99 years in duration) to the applicant First




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
37
Motivation of the Partners and Stakeholders


Sun Rivers was motivated by a desire to profitably develop a unique housing and
recreational facility. The First Nation realized that this transaction could provide them
with a number of immediate and ongoing benefits including:
    •    Upfront lease payment for the land and ongoing payments over the life of the
         lease;
    •    An ‘inside track’ on employment and business opportunities stemming from the
         development;
    •    An opportunity to increase the tax and revenue base of the First Nation;
    •    The development would increase the value of other First Nation’s land in the
         immediate vicinity; and
    •    An opportunity to increase the market for a state of the art water treatment facility
         to improve the water available to First Nations members.


As well, the City of Kamloops, which has signed on to provide sewer services to the
development, can amortize the cost of their existing system (which was not running to
capacity) across a broader tax base.


Lessons Learned and Critical Success Factors


    •    Leadership and communication is critical. The leadership of the Kamloops Indian
         Band were visionary and saw the benefits that the development could bring to
         their First Nation. They communicated this effectively to their membership who
         overwhelmingly endorsed it in a referendum;
    •    The developer had a clear vision and plan for the development and had the
         financial and managerial capacity to execute the plan effectively;




Nation or designate for the purpose of developing projects on this land that are not otherwise permitted under the
Indian Act.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
38
    •   Once the project had begun, the stakeholders recognized their common interest
        and worked in a spirit of cooperation and collaboration; and
    •   The Kamloops Indian Band had the technical expertise (in the land leasing
        department) and had good legal and professional advisers.


Bridge Building and Conflict Management Strategies


    •   The parties ensured that everything that was written into the agreement was
        achievable. They did not make any commitments that could not be kept;
    •   There is strong communication between the stakeholders. All employment and
        contracting opportunities are communicated to the First Nation. The developer
        works with them to help them to take advantage of as many opportunities as they
        have the capacity to undertake; and
    •   There are detailed records kept of agreements, commitments and of First Nations
        employment/business opportunities at the project. That helps to ensure that the
        facts are known and helps to eliminate rumour mongering.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
39

3.2.9 Tsilqot’in People of Xeni and BC Parks (Ts’yl-os Provincial Park)


Parties to the Agreement:
    •   The Xeni Gwet’in First Nations Government

    •   BC Parks (Ts’yl-os Provincial Park).


Narrative Description of the Collaboration


In the 1980s the Xeni Gwet’in Elders were becoming concerned that clear-cut areas were
getting very close to their traditional territory4. They were afraid that, if nothing were
done about non-Aboriginal land use practices in the area, it would severely limit the
traditional land use practices of the Xeni Gwet’in Peoples. A number of tribal meetings
were held to discuss the Elder’s concerns. In 1989 a Declaration stating that the Xeni
Gwet’in Peoples would not tolerate mining or clear-cut forestry practices on their
traditional lands was released at a press conference in Vancouver.


As a result of the Declaration the Xeni Gwet’in Peoples became involved with the
Government of British Columbia in a review of the Deferred Planning Area around
Chilco Lake (further development was frozen in this area pending additional studies). A
60 person Chilco Study Committee was formed in 1993/94. The Xeni Gwet’in were one
of three co-chairs (the Ministry of Parks and the Ministry of Municipal Affairs were the
other co-chairs). The Committee, which was made up of all stakeholders in the region,
recommended the establishment of a Provincial Park and a separate Tsilqot'in
Management Zone (TZM)


The recommendations of the Chilco Study became the basis for the development of a
Memorandum of Understanding (MOU) between Xeni Gwet’in and BC Parks. The
MOU set out in detail what can and cannot occur in the area, what the roles and




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
40
responsibilities of the respective stakeholders are, and established a monthly stakeholder
meeting process. The MOU, which was supported by the stakeholder group, was signed
in a ceremony in Victoria.


The scope of the agreement, which initially focused primarily on park management
issues, has been recently expanded to include issues on lands adjacent to the park. A
management group comprised of Xeni Gwet’in and BC Parks has been created to
consider applications and permits for a variety of land use applications and other matters
that routinely come up.


Motivation of the Partners and Stakeholders


The Xeni Gwet’in Peoples wanted to ensure that they had an active role in the
management of their traditional lands and that clear cutting and mining operations did not
decimate the lands. They also wanted to ensure that they would have access to the lands
for traditional purposes (e.g., hunting, gathering medicinal plants, fishing, ceremonies,
etc.).


The Government of BC wanted to ensure that the management of the area is consistent
with the mandate of BC Parks and to ensure that traditional land use practices of the First
Nations Peoples were allowed to continue. As well, they wanted to establish a process
that allowed input from other stakeholders in the region.




4
    The park that was established is located about 220 kilometers west of Williams Lake


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
41


Lessons Learned and Critical Success Factors


    •   The leadership demonstrated by the Xeni Gwet’in Peoples to identify their issues
        and priorities and communicate them effectively provided the catalyst for this
        collaboration to develop;
    •   The openness and willingness of BC Parks personnel to consider the priorities of
        the Xeni Gwet’in Peoples and work with them to develop a mechanism to allow
        the Park to be developed.
    •   Regular, structured interaction amongst the stakeholders (e.g., the monthly
        meetings) and ensuring that all parties attend on a regular basis;
    •   Developing a specific focus and sticking to it. This keeps potentially divisive
        issues like the Treaty Land Entitlement process out of the regular meetings and
        park management process;
    •   A commitment to shared decision-making. The parties stressed that this has to be
        a real commitment and a recognition that it may mean that you have to give up
        authority in some areas. They also stressed the importance of clearly identifying
        the areas of shared decision making so there is a common understanding; and
    •   A mechanism for other stakeholders to have input into the process (e.g., the
        Chilcotin Advisory Group, which acts as a third-party watchdog)


Bridge Building and Conflict Management Strategies


    •   Regular meetings of the stakeholders are held.             Between meetings the
        stakeholders regularly contact each other to discuss issues and other aspects of
        Park management;

    •   The regular meetings of the Working Group are open to the public and individuals
        are encouraged to attend;

    •   There is ongoing, informal contact between the stakeholders.          (e.g., Parks
        personnel and others often drop by the Band Office for coffee); and


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
42
    •   The First Nation has a regular and consistent communication process to ensure
        that their membership is well informed of issues and opportunities emanating
        from the management of the Park.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
43



3.2.10          West Chilcotin Forest Products


Parties to the Agreement


    •   Ulkatcho First Nation, Anahim Lake, B.C.
    •   CAT Resources Ltd. Anahim Lake, B.C.
    •   Carrier Lumber Ltd., Prince George, B.C.


Narrative Description of the Collaboration


Carrier Lumber of Prince George, B.C. had operated a sawmill in the community of
Anahim Lake for a number of years. In 1993 they were forced to close their mill when
they lost their Timber Supply License (TSL) due to a controversial decision by the
Government of the day.


The loss of the Carrier mill was potentially devastating. While the region had a
smattering of tourism outfitters and ranchers, the mill and associated logging operations
was the economic mainstay of Anahim Lake. The loss of the TSL was a significant blow
to Carrier Lumber as it literally reduced the value of their sawmill facility in Anahim
Lake to zero. It was also a huge loss to the residents of Anahim Lake as the mill, its
associated logging operations and spin off businesses was the economic lifeblood of the
community.


The leadership of one individual in the community was responsible for the formation of a
tripartite partnership involving Carrier Lumber, the Ulkatcho First Nation and a group of
50 investors from the community to form West Chilcotin Lumber. This partnership was
uniquely positioned to resuscitate the economy. Carrier Lumber had the facility and
infrastructure. The involvement of the fifty local investors provided both Carrier and the



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
44
Government with a concrete demonstration of local commitment and support for the
Ulkatcho First Nation’s (the third partner) application for a TSL.


West Chilcotin commenced operations in 1996 and manufactures studs (2in X 4in X 8ft
lumber), which they sell all over the world.


Motivation of the Partners and Stakeholders


All parties to the agreement were highly motivated. The Ulkatcho First Nation had been
pursuing a TSL for years, but the Government had always declined, telling them to ‘go
find a partner’. The First Nation has always viewed a TSL as a means for them to
achieve a significant share of the work in the forest sector and to establish a base for their
economy.


Lessons Learned and Critical Success Factors


    •   All partners must enter into the deal with the view and commitment that it is
        better to own a portion of a success story than 100% of a failure;
    •   The non-Aboriginal partner must recognize, that while every effort will be made
        to keep politics out of the deal, that the reality is that is difficult to keep entirely
        out;
    •   All parties must be prepared to compromise on issues and recognize the items that
        are important to the other partners and stakeholders, e.g., Chief & Council;
    •   If all the parties are responsible to a large constituency, then they will work hard
        to get a project done. It took approximately one year to put this partnership
        together; and
    •   All partners and stakeholders should be treated with respect.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
45


Bridge Building and Conflict Management Strategies
    •   Be prepared to deal with the tough issues at the negotiation table and invest the
        time to get through the difficult issues. Putting them off will not make them easier
        nor will it cause them to go away;
    •   Identify and put mechanisms in place at the start to deal with tough issues that
        may crop up later, e.g., the First Nation’s expectation regarding employment;
    •   When all parties have equal share in the project and therefore equal to lose, they
        are all highly motivated to search for win-win solutions to conflict situations; and
    •   Include conflict resolution clauses in all formal agreements.




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
46


4 Lessons Learned


The preceding ten case studies supply data and information that can provide insights into
characteristics of successful partnerships and critical issues that influence the success of
partnerships between Aboriginal and non-Aboriginal interests. These lessons learned
may help existing and future partnerships to enhance their potential for success. The
following analysis, drawn from the preceding case studies, discusses and presents the
lessons learned in three key areas: the motivation of partners and stakeholders; crucial
success factors, and conflict management strategies. This analysis is followed by a
discussion on lessons learned from failed partnerships and an overview of two innovative
projects   aimed     at   encouraging      and    understanding      Aboriginal/non-Aboriginal
partnerships.



4.1 Motivation of Partners and Stakeholders


The partners in the above cases consistently cited motivational factors that are rooted in
self-interest. Of course, in many instances it was enlightened self-interest. For example,
Weyerhaeuser’s collaboration in the Iisaak partnership may have been driven by a need
to mitigate damage and make the best of a difficult situation. Our conclusion is that self-
interest is the motivator in virtually every case we examined.               There is nothing
fundamentally wrong with this.         In fact, we would argue that a partnership is not
sustainable if it is not in the self-interests of each of the partners.


Our analysis identified five different motivations5 for the ten cases we reviewed. This is
not to suggest that these are the only motivations that can result in successful
partnerships, rather these are simply the motivations that spurred the creation of these




Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
47
partnerships. Nonetheless, the presence of one or more of these motivators can signal an
opportunity to develop a partnership.


1. Mitigating the impact of an economic downturn – A downturn in one or more
     sectors of the local economy can help create conditions where there is an active
     search for opportunities to rejuvenate, or at least mitigate the decline in the local
     economy. This type of situation can stimulate creativity and encourage Aboriginals
     and non-Aboriginals to seek out opportunities for collaboration, with the expectation
     that the collaboration will help each partner to adjust more effectively to the changing
     conditions.


2. Make services work better – Federal and provincial governments are recognizing
     that many of the services they have traditionally delivered to Aboriginal Peoples are
     less effective than they would be if they were delivered directly by Aboriginal
     organizations. There are numerous cultural and logical reasons for this, including the
     fact that delivery by Aboriginal People is generally done in a more culturally
     sensitive manner and with improved community ownership of the process and results.
     As well, there is a growing expectation that Aboriginal Peoples have the right to
     deliver services to their people.


3. Synergies – Many partnerships are launched because the partners, by working
     collaboratively, are able to accomplish much more than they could by working alone
     i.e., generating a one plus one equals three phenomenon. This often happens when
     one partner has access to financial and operational capacity and the other partner has
     an enhanced position in the market and access to labour, natural resources and other
     inputs. For example, a non-Aboriginal partner may have the financial and technical
     capacity to bid on a contract or launch a project, while the Aboriginal partner has
     preferred access to contracts and/or natural resources, access to local labour or other


5
  As all of the motivations are basically linked through the self-interest of the parties, the division into five different
types of motivation may be seen as arbitrary. However, we believe that it is useful in that it sets out a more systematic
process against which the motivation for establishing new partnerships can be reviewed.


Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
48
    inputs. For instance, in the Gallagher Canyon Development none of the parties,
    working independently, could have hoped to achieve a solution as effective as the
    agreement that they worked out together. Similarly, it is unlikely that either of the
    partners in the Greater Massett Development Corporation could have been successful
    in persuading the Department of National Defense to make the financial and asset
    commitment that they did. As well, it is extremely doubtful that either party working
    alone could have successfully maneuvered the agreement through the eleven different
    government departments.


    Other examples include the establishment of a park through the collaborative efforts
    of the Tsilqot’in People of Xeni and BC Parks, Skwlax Sanders, which was able to
    secure and execute construction contracts that neither party could have gotten on their
    own, and Iisaak Forest Resources, where a range of environmental and economic
    objectives was able to be addressed through collaboration.


4. Environmental and economic opportunities – The opportunity to develop and
    implement environmental and/or economic initiatives is often a significant motivator
    for Aboriginal/non-Aboriginal partnerships. Often there are opportunities that are
    difficult or impossible for one party to develop on their own, but through
    collaboration with other stakeholders they can achieve critical objectives. This was
    the case with Iisaak Forest Resources and the Tsilqot’in People of Xeni and BC
    Parks. In both cases it is doubtful that the environmental or economic objectives of
    the parties could have been achieved without systematic collaboration and
    partnership.


5. Improve communication and collaboration – For example, participation in the
    North Thompson Monthly Licensee Meetings is motivated by the parties’ recognition
    that a regular, structured forum that enables them to exchange information on
    activities and issues will facilitate improved collaboration and synergies, and
    minimize the potential for conflict, making all of their operations more efficient.



Aboriginal Partnerships – Building Blocks for
Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development
Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development

Contenu connexe

Tendances

FinalReportPC2015May2016
FinalReportPC2015May2016FinalReportPC2015May2016
FinalReportPC2015May2016Melissa Burek
 
South Hills Summer 2011 Program Guide
South Hills Summer 2011 Program GuideSouth Hills Summer 2011 Program Guide
South Hills Summer 2011 Program Guidejccpgh
 
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of Alabama
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of AlabamaCampaign for Glenwood, Inc. The Autism and Behavioral Health Center of Alabama
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of AlabamaDana Lewis
 
Infrastructure Financing Options for Transit-Oriented Development
Infrastructure Financing Options for Transit-Oriented DevelopmentInfrastructure Financing Options for Transit-Oriented Development
Infrastructure Financing Options for Transit-Oriented DevelopmentJesse Budlong
 
2011 Jenner Block Privilege Outline
2011 Jenner  Block Privilege Outline2011 Jenner  Block Privilege Outline
2011 Jenner Block Privilege OutlineDavidGreenwald
 
Participatory context and needs analysis in transitional recovery by munas ka...
Participatory context and needs analysis in transitional recovery by munas ka...Participatory context and needs analysis in transitional recovery by munas ka...
Participatory context and needs analysis in transitional recovery by munas ka...Munas Kalden
 
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...Clifton M. Hasegawa & Associates, LLC
 
Drivers and barriers_to_sustainability_in_local_government[1]
Drivers and barriers_to_sustainability_in_local_government[1]Drivers and barriers_to_sustainability_in_local_government[1]
Drivers and barriers_to_sustainability_in_local_government[1]frankcoluccio
 
Wtvac 2019-20 news articles
Wtvac 2019-20 news articlesWtvac 2019-20 news articles
Wtvac 2019-20 news articlesJustin G Tsai
 
Composite index as a way of measuring economic distress in nebraska
Composite index as a way of measuring economic distress in nebraskaComposite index as a way of measuring economic distress in nebraska
Composite index as a way of measuring economic distress in nebraskaCornelius Simon Okumu
 
Urban Planning for City Leaders
Urban Planning for City LeadersUrban Planning for City Leaders
Urban Planning for City LeadersOswar Mungkasa
 
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-Blind
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-BlindBetter Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-Blind
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-BlindYing Lee
 
Final land-mapping-guide by Anyona Simon Gichuru - 2015
Final land-mapping-guide by Anyona Simon Gichuru - 2015Final land-mapping-guide by Anyona Simon Gichuru - 2015
Final land-mapping-guide by Anyona Simon Gichuru - 2015anyonasimon
 
Kprm siaga makassar reportage hc-un escap - egm sby
Kprm siaga makassar reportage hc-un escap - egm sbyKprm siaga makassar reportage hc-un escap - egm sby
Kprm siaga makassar reportage hc-un escap - egm sbyAwi Mn
 

Tendances (17)

FinalReportPC2015May2016
FinalReportPC2015May2016FinalReportPC2015May2016
FinalReportPC2015May2016
 
HUD FINAL_1e_print
HUD FINAL_1e_printHUD FINAL_1e_print
HUD FINAL_1e_print
 
South Hills Summer 2011 Program Guide
South Hills Summer 2011 Program GuideSouth Hills Summer 2011 Program Guide
South Hills Summer 2011 Program Guide
 
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of Alabama
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of AlabamaCampaign for Glenwood, Inc. The Autism and Behavioral Health Center of Alabama
Campaign for Glenwood, Inc. The Autism and Behavioral Health Center of Alabama
 
Infrastructure Financing Options for Transit-Oriented Development
Infrastructure Financing Options for Transit-Oriented DevelopmentInfrastructure Financing Options for Transit-Oriented Development
Infrastructure Financing Options for Transit-Oriented Development
 
2011 Jenner Block Privilege Outline
2011 Jenner  Block Privilege Outline2011 Jenner  Block Privilege Outline
2011 Jenner Block Privilege Outline
 
Participatory context and needs analysis in transitional recovery by munas ka...
Participatory context and needs analysis in transitional recovery by munas ka...Participatory context and needs analysis in transitional recovery by munas ka...
Participatory context and needs analysis in transitional recovery by munas ka...
 
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...
Maui Mayor - Changing Times, Changing Lanes - To Self Be True - The Paradox o...
 
Drivers and barriers_to_sustainability_in_local_government[1]
Drivers and barriers_to_sustainability_in_local_government[1]Drivers and barriers_to_sustainability_in_local_government[1]
Drivers and barriers_to_sustainability_in_local_government[1]
 
Wtvac 2019-20 news articles
Wtvac 2019-20 news articlesWtvac 2019-20 news articles
Wtvac 2019-20 news articles
 
Composite index as a way of measuring economic distress in nebraska
Composite index as a way of measuring economic distress in nebraskaComposite index as a way of measuring economic distress in nebraska
Composite index as a way of measuring economic distress in nebraska
 
Urban Planning for City Leaders
Urban Planning for City LeadersUrban Planning for City Leaders
Urban Planning for City Leaders
 
SWO Annual Report 2010-11
SWO Annual Report 2010-11SWO Annual Report 2010-11
SWO Annual Report 2010-11
 
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-Blind
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-BlindBetter Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-Blind
Better Access to Hospitals for the Deaf, Hard of Hearing and the Deaf-Blind
 
Shadrack dessert final
Shadrack dessert finalShadrack dessert final
Shadrack dessert final
 
Final land-mapping-guide by Anyona Simon Gichuru - 2015
Final land-mapping-guide by Anyona Simon Gichuru - 2015Final land-mapping-guide by Anyona Simon Gichuru - 2015
Final land-mapping-guide by Anyona Simon Gichuru - 2015
 
Kprm siaga makassar reportage hc-un escap - egm sby
Kprm siaga makassar reportage hc-un escap - egm sbyKprm siaga makassar reportage hc-un escap - egm sby
Kprm siaga makassar reportage hc-un escap - egm sby
 

En vedette

Writing up the final report (narrated)
Writing up the final report (narrated)Writing up the final report (narrated)
Writing up the final report (narrated)Rachel Chung
 
Eagle Regulations and Energy Generation and Transmission
Eagle Regulations and Energy Generation and TransmissionEagle Regulations and Energy Generation and Transmission
Eagle Regulations and Energy Generation and Transmissionplumpton
 
Mass, Volume and Density Labs -Day 1
Mass, Volume and Density Labs -Day 1Mass, Volume and Density Labs -Day 1
Mass, Volume and Density Labs -Day 1jmori1
 
Thong diep cua Duc Da Lai La Ma 2009
Thong diep cua Duc Da Lai La Ma 2009Thong diep cua Duc Da Lai La Ma 2009
Thong diep cua Duc Da Lai La Ma 2009Nguyễn Khang
 
1041 Sophomores LR Lecture 1
1041 Sophomores LR Lecture 11041 Sophomores LR Lecture 1
1041 Sophomores LR Lecture 1Les Davy
 
Educ6706 literate environment analysis
Educ6706 literate environment analysisEduc6706 literate environment analysis
Educ6706 literate environment analysislivepeace
 
Manpower group idm-platform
Manpower group idm-platformManpower group idm-platform
Manpower group idm-platformOracleIDM
 
Juveline Crime in Bulgaria
Juveline Crime in BulgariaJuveline Crime in Bulgaria
Juveline Crime in BulgariaTanya Madjarova
 
Literate environment presentation
Literate environment presentationLiterate environment presentation
Literate environment presentationbrklyn09
 
Golf Center Kiev
Golf Center KievGolf Center Kiev
Golf Center Kievjshappo
 

En vedette (20)

C 2
C 2C 2
C 2
 
Kotak warna
Kotak warnaKotak warna
Kotak warna
 
Innovator cx brochure
Innovator cx brochureInnovator cx brochure
Innovator cx brochure
 
Writing up the final report (narrated)
Writing up the final report (narrated)Writing up the final report (narrated)
Writing up the final report (narrated)
 
Eagle Regulations and Energy Generation and Transmission
Eagle Regulations and Energy Generation and TransmissionEagle Regulations and Energy Generation and Transmission
Eagle Regulations and Energy Generation and Transmission
 
Дживаноблисс
ДживаноблиссДживаноблисс
Дживаноблисс
 
Menciones
MencionesMenciones
Menciones
 
Mass, Volume and Density Labs -Day 1
Mass, Volume and Density Labs -Day 1Mass, Volume and Density Labs -Day 1
Mass, Volume and Density Labs -Day 1
 
Thong diep cua Duc Da Lai La Ma 2009
Thong diep cua Duc Da Lai La Ma 2009Thong diep cua Duc Da Lai La Ma 2009
Thong diep cua Duc Da Lai La Ma 2009
 
Visual media
Visual mediaVisual media
Visual media
 
Brandy lee tuhiwai pp
Brandy lee tuhiwai ppBrandy lee tuhiwai pp
Brandy lee tuhiwai pp
 
1041 Sophomores LR Lecture 1
1041 Sophomores LR Lecture 11041 Sophomores LR Lecture 1
1041 Sophomores LR Lecture 1
 
Educ6706 literate environment analysis
Educ6706 literate environment analysisEduc6706 literate environment analysis
Educ6706 literate environment analysis
 
Hieroglyphs
HieroglyphsHieroglyphs
Hieroglyphs
 
Manpower group idm-platform
Manpower group idm-platformManpower group idm-platform
Manpower group idm-platform
 
Juveline Crime in Bulgaria
Juveline Crime in BulgariaJuveline Crime in Bulgaria
Juveline Crime in Bulgaria
 
Literate environment presentation
Literate environment presentationLiterate environment presentation
Literate environment presentation
 
Golf Center Kiev
Golf Center KievGolf Center Kiev
Golf Center Kiev
 
Kites
KitesKites
Kites
 
Cis068 08
Cis068 08Cis068 08
Cis068 08
 

Similaire à Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development

BP Venezuela Indigenous Relations: Meeting the Challenge – Responsibly and S...
BP Venezuela Indigenous Relations:  Meeting the Challenge – Responsibly and S...BP Venezuela Indigenous Relations:  Meeting the Challenge – Responsibly and S...
BP Venezuela Indigenous Relations: Meeting the Challenge – Responsibly and S...Wayne Dunn
 
The Practice of Low Impact Development -PATH
The Practice of Low Impact Development -PATHThe Practice of Low Impact Development -PATH
The Practice of Low Impact Development -PATHSotirakou964
 
Digital Sustainability Conversations How Local Governments can Engage Resid...
Digital Sustainability  Conversations How Local Governments can  Engage Resid...Digital Sustainability  Conversations How Local Governments can  Engage Resid...
Digital Sustainability Conversations How Local Governments can Engage Resid...CollectiveKnowledge
 
Conservation easements and Oregon's land use program
Conservation easements and Oregon's land use programConservation easements and Oregon's land use program
Conservation easements and Oregon's land use programMike Running
 
VicgovtabledreportMental_Health_Report_FCDC2012
VicgovtabledreportMental_Health_Report_FCDC2012VicgovtabledreportMental_Health_Report_FCDC2012
VicgovtabledreportMental_Health_Report_FCDC2012Ingrid Ozols
 
SPC WOCRC ROI report_dec2016
SPC WOCRC ROI report_dec2016SPC WOCRC ROI report_dec2016
SPC WOCRC ROI report_dec2016Julie McKercher
 
Decentralization briefing notes wb
Decentralization briefing notes   wbDecentralization briefing notes   wb
Decentralization briefing notes wbsabrinaakmala
 
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...Rachel Lindt
 
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?Soren Gigler
 
The Changing Resource Development Paradigm: Maximizing Sustainable Local Be...
The Changing Resource Development Paradigm:   Maximizing Sustainable Local Be...The Changing Resource Development Paradigm:   Maximizing Sustainable Local Be...
The Changing Resource Development Paradigm: Maximizing Sustainable Local Be...Wayne Dunn
 
Health perceptions and expectations
Health perceptions and expectationsHealth perceptions and expectations
Health perceptions and expectationsSari Damar Ratri
 
An evaluation framework of state building peace-building and service delivery...
An evaluation framework of state building peace-building and service delivery...An evaluation framework of state building peace-building and service delivery...
An evaluation framework of state building peace-building and service delivery...Malik Khalid Mehmood
 
Community based approaches guidelines 2017
Community based approaches guidelines 2017Community based approaches guidelines 2017
Community based approaches guidelines 2017Dominique Thaly
 
Total Craigroyston draft road map
Total Craigroyston draft road mapTotal Craigroyston draft road map
Total Craigroyston draft road mapSnook
 
LAFCO_October_21_guidelines
LAFCO_October_21_guidelinesLAFCO_October_21_guidelines
LAFCO_October_21_guidelinestes47
 
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...Yoofi Ansah
 
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...Planning for Agriculture: A Guide for Connecticut Municipalities | American F...
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...American Farmland Trust
 

Similaire à Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development (20)

BP Venezuela Indigenous Relations: Meeting the Challenge – Responsibly and S...
BP Venezuela Indigenous Relations:  Meeting the Challenge – Responsibly and S...BP Venezuela Indigenous Relations:  Meeting the Challenge – Responsibly and S...
BP Venezuela Indigenous Relations: Meeting the Challenge – Responsibly and S...
 
The Practice of Low Impact Development -PATH
The Practice of Low Impact Development -PATHThe Practice of Low Impact Development -PATH
The Practice of Low Impact Development -PATH
 
Digital Sustainability Conversations How Local Governments can Engage Resid...
Digital Sustainability  Conversations How Local Governments can  Engage Resid...Digital Sustainability  Conversations How Local Governments can  Engage Resid...
Digital Sustainability Conversations How Local Governments can Engage Resid...
 
Conservation easements and Oregon's land use program
Conservation easements and Oregon's land use programConservation easements and Oregon's land use program
Conservation easements and Oregon's land use program
 
VicgovtabledreportMental_Health_Report_FCDC2012
VicgovtabledreportMental_Health_Report_FCDC2012VicgovtabledreportMental_Health_Report_FCDC2012
VicgovtabledreportMental_Health_Report_FCDC2012
 
SPC WOCRC ROI report_dec2016
SPC WOCRC ROI report_dec2016SPC WOCRC ROI report_dec2016
SPC WOCRC ROI report_dec2016
 
2013 Point-in-Time Orange County Final Report
2013 Point-in-Time Orange County Final Report2013 Point-in-Time Orange County Final Report
2013 Point-in-Time Orange County Final Report
 
Decentralization briefing notes wb
Decentralization briefing notes   wbDecentralization briefing notes   wb
Decentralization briefing notes wb
 
Housing Opportunities Toronto
Housing Opportunities TorontoHousing Opportunities Toronto
Housing Opportunities Toronto
 
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...
Los Angeles’ Untapped Resource: Recommendations to Streamline and Standardize...
 
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?
The Loch Ness Model-Can ICTs Bridge the “Accountability Gap”?
 
The Changing Resource Development Paradigm: Maximizing Sustainable Local Be...
The Changing Resource Development Paradigm:   Maximizing Sustainable Local Be...The Changing Resource Development Paradigm:   Maximizing Sustainable Local Be...
The Changing Resource Development Paradigm: Maximizing Sustainable Local Be...
 
ttw2010
ttw2010ttw2010
ttw2010
 
Health perceptions and expectations
Health perceptions and expectationsHealth perceptions and expectations
Health perceptions and expectations
 
An evaluation framework of state building peace-building and service delivery...
An evaluation framework of state building peace-building and service delivery...An evaluation framework of state building peace-building and service delivery...
An evaluation framework of state building peace-building and service delivery...
 
Community based approaches guidelines 2017
Community based approaches guidelines 2017Community based approaches guidelines 2017
Community based approaches guidelines 2017
 
Total Craigroyston draft road map
Total Craigroyston draft road mapTotal Craigroyston draft road map
Total Craigroyston draft road map
 
LAFCO_October_21_guidelines
LAFCO_October_21_guidelinesLAFCO_October_21_guidelines
LAFCO_October_21_guidelines
 
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...
THE USE OF METHANE GAS HARVESTED FROM WASTE AS A BENEFICIAL RESOURCE TO THE S...
 
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...Planning for Agriculture: A Guide for Connecticut Municipalities | American F...
Planning for Agriculture: A Guide for Connecticut Municipalities | American F...
 

Plus de Wayne Dunn

CSR Impact Measurement & Management
CSR Impact Measurement & ManagementCSR Impact Measurement & Management
CSR Impact Measurement & ManagementWayne Dunn
 
CSR Reporting & Communications
CSR Reporting & CommunicationsCSR Reporting & Communications
CSR Reporting & CommunicationsWayne Dunn
 
Free Zones, Social Responsibility & Strategic Advantage
Free Zones, Social Responsibility & Strategic AdvantageFree Zones, Social Responsibility & Strategic Advantage
Free Zones, Social Responsibility & Strategic AdvantageWayne Dunn
 
CSR-Zero Sum, Charity or Strategic Opportunity
CSR-Zero Sum, Charity or Strategic OpportunityCSR-Zero Sum, Charity or Strategic Opportunity
CSR-Zero Sum, Charity or Strategic OpportunityWayne Dunn
 
Integrating social and business value through the SDGs
Integrating social and business value through the SDGsIntegrating social and business value through the SDGs
Integrating social and business value through the SDGsWayne Dunn
 
The SDGs: A framework for social and business value
The SDGs: A framework for social and business valueThe SDGs: A framework for social and business value
The SDGs: A framework for social and business valueWayne Dunn
 
CSR: Charity? Strategy? Or what?
CSR: Charity? Strategy? Or what?CSR: Charity? Strategy? Or what?
CSR: Charity? Strategy? Or what?Wayne Dunn
 
CSR: Strategy? or Charity?
CSR: Strategy? or Charity?CSR: Strategy? or Charity?
CSR: Strategy? or Charity?Wayne Dunn
 
SDGs: A framework for multi-sector CSR partnerships and value creation
SDGs: A framework for multi-sector CSR partnerships and value creationSDGs: A framework for multi-sector CSR partnerships and value creation
SDGs: A framework for multi-sector CSR partnerships and value creationWayne Dunn
 
Budget Crunch Sustainability: Effective CSR in economically challenging times
Budget Crunch Sustainability: Effective CSR in economically challenging timesBudget Crunch Sustainability: Effective CSR in economically challenging times
Budget Crunch Sustainability: Effective CSR in economically challenging timesWayne Dunn
 
Csr training: Seven strategies to make it work for participants
Csr training:  Seven strategies to make it work for participantsCsr training:  Seven strategies to make it work for participants
Csr training: Seven strategies to make it work for participantsWayne Dunn
 
Social Value Brand
Social Value BrandSocial Value Brand
Social Value BrandWayne Dunn
 
CSR-friendly tax policy: Unlocking value and aligning interests
CSR-friendly tax policy: Unlocking value and aligning interestsCSR-friendly tax policy: Unlocking value and aligning interests
CSR-friendly tax policy: Unlocking value and aligning interestsWayne Dunn
 
CSR Skills: What you need and why
CSR Skills: What you need and whyCSR Skills: What you need and why
CSR Skills: What you need and whyWayne Dunn
 
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2Wayne Dunn
 
Business Innovation, CSR and Competitive Advantage: Strategic pathways to value
Business Innovation, CSR and Competitive Advantage: Strategic pathways to valueBusiness Innovation, CSR and Competitive Advantage: Strategic pathways to value
Business Innovation, CSR and Competitive Advantage: Strategic pathways to valueWayne Dunn
 
Ethics, expectations and profits: Managing in complex environments
Ethics, expectations and profits: Managing in complex environments Ethics, expectations and profits: Managing in complex environments
Ethics, expectations and profits: Managing in complex environments Wayne Dunn
 
Hockey taught me this: NHL Alumni Breakaway Symposium
Hockey taught me this: NHL Alumni Breakaway SymposiumHockey taught me this: NHL Alumni Breakaway Symposium
Hockey taught me this: NHL Alumni Breakaway SymposiumWayne Dunn
 
Time for a more nuanced debate on child labour
Time for a more nuanced debate on child labourTime for a more nuanced debate on child labour
Time for a more nuanced debate on child labourWayne Dunn
 
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...Wayne Dunn
 

Plus de Wayne Dunn (20)

CSR Impact Measurement & Management
CSR Impact Measurement & ManagementCSR Impact Measurement & Management
CSR Impact Measurement & Management
 
CSR Reporting & Communications
CSR Reporting & CommunicationsCSR Reporting & Communications
CSR Reporting & Communications
 
Free Zones, Social Responsibility & Strategic Advantage
Free Zones, Social Responsibility & Strategic AdvantageFree Zones, Social Responsibility & Strategic Advantage
Free Zones, Social Responsibility & Strategic Advantage
 
CSR-Zero Sum, Charity or Strategic Opportunity
CSR-Zero Sum, Charity or Strategic OpportunityCSR-Zero Sum, Charity or Strategic Opportunity
CSR-Zero Sum, Charity or Strategic Opportunity
 
Integrating social and business value through the SDGs
Integrating social and business value through the SDGsIntegrating social and business value through the SDGs
Integrating social and business value through the SDGs
 
The SDGs: A framework for social and business value
The SDGs: A framework for social and business valueThe SDGs: A framework for social and business value
The SDGs: A framework for social and business value
 
CSR: Charity? Strategy? Or what?
CSR: Charity? Strategy? Or what?CSR: Charity? Strategy? Or what?
CSR: Charity? Strategy? Or what?
 
CSR: Strategy? or Charity?
CSR: Strategy? or Charity?CSR: Strategy? or Charity?
CSR: Strategy? or Charity?
 
SDGs: A framework for multi-sector CSR partnerships and value creation
SDGs: A framework for multi-sector CSR partnerships and value creationSDGs: A framework for multi-sector CSR partnerships and value creation
SDGs: A framework for multi-sector CSR partnerships and value creation
 
Budget Crunch Sustainability: Effective CSR in economically challenging times
Budget Crunch Sustainability: Effective CSR in economically challenging timesBudget Crunch Sustainability: Effective CSR in economically challenging times
Budget Crunch Sustainability: Effective CSR in economically challenging times
 
Csr training: Seven strategies to make it work for participants
Csr training:  Seven strategies to make it work for participantsCsr training:  Seven strategies to make it work for participants
Csr training: Seven strategies to make it work for participants
 
Social Value Brand
Social Value BrandSocial Value Brand
Social Value Brand
 
CSR-friendly tax policy: Unlocking value and aligning interests
CSR-friendly tax policy: Unlocking value and aligning interestsCSR-friendly tax policy: Unlocking value and aligning interests
CSR-friendly tax policy: Unlocking value and aligning interests
 
CSR Skills: What you need and why
CSR Skills: What you need and whyCSR Skills: What you need and why
CSR Skills: What you need and why
 
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2
Business Innovation& CSR Masterclass | Dubai, Jan 31-Feb 2
 
Business Innovation, CSR and Competitive Advantage: Strategic pathways to value
Business Innovation, CSR and Competitive Advantage: Strategic pathways to valueBusiness Innovation, CSR and Competitive Advantage: Strategic pathways to value
Business Innovation, CSR and Competitive Advantage: Strategic pathways to value
 
Ethics, expectations and profits: Managing in complex environments
Ethics, expectations and profits: Managing in complex environments Ethics, expectations and profits: Managing in complex environments
Ethics, expectations and profits: Managing in complex environments
 
Hockey taught me this: NHL Alumni Breakaway Symposium
Hockey taught me this: NHL Alumni Breakaway SymposiumHockey taught me this: NHL Alumni Breakaway Symposium
Hockey taught me this: NHL Alumni Breakaway Symposium
 
Time for a more nuanced debate on child labour
Time for a more nuanced debate on child labourTime for a more nuanced debate on child labour
Time for a more nuanced debate on child labour
 
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...
This time it is in my backyard! A major LNG project and I'm a Stakeholder ins...
 

Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development

  • 1. Aboriginal and Non-Aboriginal Partnerships: Building Blocks for Sustainable Community Development Submitted to: Brent Mueller & Dale Leitch Community Transition Ministry of Community, Aboriginal and Women’s Services #221 Market Square–560 Johnson Street Victoria, British Columbia Date: October, 2001 Prepared by: Wayne Dunn & Bob Isbister 2457 Bakerview Road Mill Bay, BC V0R 2P0 250.743.7619 wayne@waynedunn.com
  • 2. i Acknowledgements The consulting team of Wayne Dunn & Associates Ltd. wish to acknowledge the sincere co-operation and support they received from the Ministry of Community, Aboriginal and Women’s Services, the Ministry of Water, Air and Land Protection, the Office of the Provincial Health Officer, and the numerous individuals and organizations involved in Aboriginal partnerships. While it is impossible to directly thank and acknowledge everyone who was so generous with their time, information and ideas, a number of individuals deserve special mention for their valuable contribution to this process. We are grateful to the Project Team of Mr. Dale Leitch, Executive Director, Community Transition Branch of the Ministry of Community, Aboriginal and Women’s Services and to Mr. Brent Mueller, Ms. Catherine Rodgers, also of this Ministry, for their input throughout this process. Their quick responses, insightful suggestions and ideas, and their enthusiastic collaboration throughout this project have been extremely valuable. Mr. Tim Cottrell, formerly Assistant Director of the Community Transition Branch was also an indispensable contributor to the project prior to his transfer to the Ministry of Sustainable Resource Management. The Consultants and the Project Team would like to acknowledge the advice and assistance from Ms. Lisa Nye and Mr. Graham Dragushan of the Ministry of Community Aboriginal and Women's Services; Ms. Judy Birch of the Ministry of Water, Air and Land Protection; and Cathy Hull of the Office of the Provincial Health Officer. Throughout our research numerous individuals from various organizations throughout the province made themselves available for interviews (many more than once). While we cannot thank everyone directly, we would like to acknowledge Allan Pineo, Claire Marshall, Steve Mazur, Tarel S. Quandt, Cameron Beck, Bill Cordoban, Gerry Stelsmaschuk, Wayne d’Easum, Mathew Ney, Janice Rose, Robin True, Russ Helberg, Doug Krogel, Ron Creber, Frankie Craig, Wanda Stachura, Richard Krentz, Darlene Luke, Chief Sophie Pierre, Alex Wolf, Randall Martin, Bill Lee, Rob Enfield, Tina Donald, Kevin Brown, Clarence Louie, Jeannine Cook, Lee-Anne Crane, Gerry Sanders, Dave Monture, Mike Anderson, Georg Schurian, Jennifer Turner, Harvey Filger, Roger Williams, Bob Sankey, Bernadette Spence, Alison McNeil, Frieda Enns, Clinton Mutch, Diane St. Jacques and Steven James. To those we may have missed, please accept our sincere apologies and our heartfelt thanks. WDA Project Team: Wayne Dunn Bob Isbister Gifty Serbeh-Dunn Bernadette Spence Randall Levine Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 3. ii Table of Contents 1 Introduction and Background .................................................................................. 1 2 Methodology and Approach ..................................................................................... 4 2.1 Approach................................................................................................................... 4 2.1.1 Data Sources and Collection Methodologies ............................................................. 5 2.1.2 Data Collection Framework ....................................................................................... 5 2.2 Limitations of Research ........................................................................................... 7 3 Case Studies and Individual Partnership Analysis .............................................. 10 3.1 Summary of Partnership Case Studies................................................................. 10 3.2 Individual Case Studies ......................................................................................... 11 3.2.1 Carrier Sekani Family Services................................................................................ 11 3.2.2 Gallagher Canyon Agreement .................................................................................. 14 3.2.3 Greater Massett Development Corporation.............................................................. 17 3.2.4 Iisaak Forest Resources ............................................................................................ 22 3.2.5 Lakeview Meadows.................................................................................................. 26 3.2.6 Monthly Licensee Meetings – North Thompson...................................................... 29 3.2.7 Skwlax/Sanders Construction Ltd. ........................................................................... 32 3.2.8 Sun Rivers Resort Community................................................................................. 36 3.2.9 Tsilqot’in People of Xeni and BC Parks (Ts’yl-os Provincial Park)........................ 39 3.2.10 West Chilcotin Forest Products................................................................................ 43 4 Lessons Learned....................................................................................................... 46 4.1 Motivation of Partners and Stakeholders ............................................................ 46 4.2 Critical Success Factors ......................................................................................... 49 4.3 Conflict Management............................................................................................. 50 4.4 Lessons Learned from Failed Partnerships ......................................................... 51 4.5 Lessons Learned from other Initiatives................................................................ 53 4.5.1 First Nations Summit of Chiefs and UBCM ............................................................ 54 4.5.2 Knowledge Network Series...................................................................................... 55 5 From Individual to Community – The Case for Community Level Facilitated Partnership Development ....................................................................................... 56 6 Building on the Results: Recommendations for Developing a Community Partnership Initiative....................................................................................... 59 6.1 Model Partnership and Bridge Building Process ................................................ 59 6.2 Selecting Pilot Project Communities .................................................................... 62 6.3 Next Steps - Launching a Pilot Project................................................................. 63 7 Conclusion ................................................................................................................ 69 Attachments Table of Abbreviations and Acronyms Information Sources and Bibliography List of Exhibits Exhibit 2-1 WDA Partnership Analysis Framework© ...................................................... 6 Exhibit 6-1 Community Transformation Process ............................................................. 61 Exhibit 6-2 Suggested Year 1 Activities and Financial Sources ..................................... 66 Exhibit 6-3 Analysis of Two Potential Pilot Communities ............................................. 67 Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 4. iii Executive Summary In British Columbia, there is an ever-increasing need for First Nations to partner with private industry as well as local and regional public sector entities, to enhance the potential to achieve shared goals of diversification, sustainable employment and community economic and social development. While there are an increasing number of such partnerships being developed the authors argue that a facilitated process for developing and supporting partnerships would substantially increase their number and impact on the economy of British Columbia (especially rural and remote areas who have been hardest hit by the downturn in traditional resource based economies). The report which follows is the result of efforts by the British Columbia Ministry of Community, Aboriginal and Women’s Services to gain a greater understanding of the nature of existing partnerships of this type, as well as to develop an initiative for identifying and supporting community-based collaboration efforts. In the development of this report, several case analyses were undertaken within the province, the results of which have provided a body of data and information which was used to identify a number of lessons learned and critical success factors for Aboriginal/non-Aboriginal partnerships. From the information collected, ten specific studies were analyzed which reflect a level of regional coverage and industry variation which cumulatively offer a valid and relevant cross-section of current partnership activities. The analysis of these various collaborations has highlighted the following critical success factors in the development of an Aboriginal/non-Aboriginal partnership framework for the future (see Section 4.2 for full information and text). All partners should have clear and appropriate motivation to collaborate Regular, effective and appropriate communications should be maintained Partners should have the capacity to finance their participation in projects Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 5. iv Roles and responsibilities within the partnership should be clearly outlined, with a strong commitment to mutual decision-making Partners should have committed leadership who will endeavour to keep politics out of the operations of the partnership An appropriate level of managerial and operational competence must be present, as well as technical capacity which meets the requirements of the project A sufficient amount of front-end negotiating time to ensure appropriate partner selection and mutual understanding of issues Partners should have qualified personnel to manage their activities Partnerships should have a clear, succinct vision and mandate as well as measurable objectives. The findings also detail several challenges faced by collaborative endeavours, including the need to develop sustainable revenue streams and ensure the effective management of finances and resources. Further challenges included balancing the desire to maximize employment with the economic realities faced by the communities, reconciling individual autonomy to support effective partnerships, and ensuring the administrative and political stability of partner First Nation(s) while keeping politics out of the negotiations and operations. The lessons learned through the examination of the case studies provide the basis for the development of a community partnership initiative for the Province. Such a process would involve two fundamental, concurrent activities to support collaborative efforts: • Economic bridge building • Social/community bridge building. The economic bridge building component reflects the need to identify and foster collaborative economic opportunities through joint ventures or partnerships. The process should include the identification of potential partners and developing a mutual understanding of the interests of stakeholders, as well as the delivery of highly practical workshops on creating and negotiating the partnerships themselves. Finally, the Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 6. v provision of on-going support and consultation will be critical to ensure the development of the partnerships. The social/community bridge building aspect of the framework reflects the need for sustained dialogue between stakeholders. The goal of this activity is to address long- standing divisions in the community, and ultimately to change conflicting relationships, and foster a level of trust and respect that would serve to increase collaboration and trust (and thus increase the number and sustainability of Aboriginal/non-Aboriginal partnerships). In order to create this initiative, pilot communities should be identified and qualified based upon the following recommended criteria: • Community has been subjected to recent economic downturn • Partners have access to sufficient financial resources to cover costs of project • Community has proven history of collaboration between Aboriginal and non- Aboriginal community • Community is comprised of sufficiently large groups of both populations • All partners display commitment to project • Strong leadership evident amongst partners • Meaningful and practical economic opportunities available Through the course of the creation of this report, two potential pilot communities have been identified which meet the above criteria, with the exception of the level of commitment made, which cannot be determined until later in the process. Both Port Hardy and Ucluelet represent excellent examples of communities where pilot initiatives of the provincial partnership framework could be developed. The review and analysis of the case study partnerships identified in this report serve to reinforce the belief that Aboriginal/non-Aboriginal partnerships offer a major economic opportunity to several communities in the province, both in the expansion of existing Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 7. vi partnerships, and in the identification and fostering of potential collaborations in the future. The suggested plan presents an opportunity for the Government of British Columbia to work proactively with these community partners and take a leading role in the fostering of such value-added initiatives. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 8. 1 1 Introduction and Background The Community Transition Branch of the Ministry of Community, Aboriginal and Women’s Services of the Government of British Columbia (BC) initiated this Research Project on Aboriginal and Non-Aboriginal Partnerships to develop an improved understanding of such partnerships and identify opportunities for the Ministry to support community level collaboration between Aboriginal and non-Aboriginal groups. A Request for Proposals was issued and the BC firm Wayne Dunn & Associates Ltd. (WDA) was engaged to undertake the project. The project was launched in early February and a progress report was submitted on February 23, 2001. The Progress Report included mini case studies and preliminary analysis of sixty-four1 examples of collaboration between Aboriginal and non-Aboriginal interests2. The Progress Report was circulated to various government stakeholders for comment and observation. On March 9, 2001 the Consultants met with the Ministry to discuss their comments on the Progress Report and identify those partnerships suitable for more detailed study and analysis. Aboriginal and non-Aboriginal communities alike face social and economic challenges that require new approaches and innovative solutions. While in general terms, many Aboriginal communities have improved their quality of life in recent years, in comparison to the non-Aboriginal population they are more likely to be burdened by a lack of employment opportunities, under-educated and living in poverty. Non-Aboriginal communities also face difficult challenges in trying to secure a stronger social and economic future, including recovery from economic downturns in the resource sector or dealing with inner-city poverty. Improving relations between these two groups can help BC communities overcome impediments to social and economic progress. 1 Subsequent to the completion of the Progress Report, preliminary analysis was conducted on four additional partnerships Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 9. 2 Cooperation and collaboration between Aboriginal and non-Aboriginal communities can mobilize and focus local and regional resources to affect positive change for all residents. Insight on how these communities can work together to address common concerns in building a healthy sustainable future can be provided through the profiling of best practices of Aboriginal and non-Aboriginal partnerships. This Report builds on and makes extensive use of prior research sponsored by the Ministry and the Federal, Provincial and Territorial Ministers and National Aboriginal Leaders report on Strengthening Aboriginal Participation in the Economy. Section 2 describes the methodology and approach employed by the Consultants to collect the data and undertake the various analyses. The following Section (3) presents ten case studies of Aboriginal and non-Aboriginal partnerships in five different sectors of the BC economy. Section 4 summarizes the lessons learned from these partnerships; examining in particular what motivated the formation of the partnerships, what were the critical success factors and then discusses how the issue of conflict management is addressed. As well, this Section reviews lessons learned from ‘failed partnerships’ and discusses lessons learned from two other Ministry- supported partnership initiatives. In Section 5 the Consultants argue that, while individual and ad-hoc partnerships between Aboriginal and non-Aboriginal citizens of BC have made a positive impact on the social and economic fabric of BC, the impact could be significantly greater if a facilitated and systematic partnership development and bridge building process was implemented at a community level. 2 A listing of the sixty-eight partnerships and the results of the analysis conducted on them is presented in Appendix 1. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 10. 3 Section 6 outlines what such a process might look like and then goes on to list criteria that would help to select potential pilot community sites. This section also presents a detailed plan for launching and financing a pilot project that could, after testing and refinement, be rolled out to communities across the province. The final section contains the Consultants conclusions. The following section summarizes the approach and methodology utilized by the Consultants and discusses limitations of the research. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 11. 4 2 Methodology and Approach 2.1 Approach In order to achieve the objectives of the assignment within the time and budget constraints, a two-stage research and analysis process was developed. The initial research stage involved the identification of partnerships, desktop research to gather preliminary data on the identified partnerships, and preliminary analysis of each partnership. A data collection framework was developed to ensure consistency of data across the various partnerships reviewed. The geographic focus of the research was on the province of British Columbia. However, the Progress Report included several Aboriginal and Non-Aboriginal partnerships from northern Saskatchewan, as this area has been particularly successful at the development of economic and business collaboration between First Nations and other interests. Anecdotal evidence suggests that Northern Saskatchewan is a world leader in Aboriginal business and economic development. For this reason, the researchers felt that it was worthwhile to review appropriate examples from this area. However, after consultation with various stakeholders it was decided that due to: the unique history of Aboriginal issues in BC; the ease with which BC examples can be followed-up by interested parties; the fact that there may be historical and geographic challenges to applying lessons from outside BC; and the project’s budgetary limitations, it was appropriate that detailed research and analysis should focus exclusively on BC partnerships. The Consultants and the Ministry team identified seventeen partnerships in five basic sectors (Environment, Social, Economic, Municipal and Other) that were suitable for further research and analysis. Recognizing that time and budget constraints, coupled with the need to contact and interview major stakeholders in each partnership would make it impossible to complete the research on all seventeen partnerships in the time available, it Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 12. 5 was agreed that the Consultants should attempt to develop 6-10 detailed case studies, with at least one from each sector. This report contains ten such case studies and further analysis. 2.1.1 Data Sources and Collection Methodologies Data sources and collection methodologies utilized by the Consultant included: • Telephone interviews and meetings with First Nations officials, federal, provincial and municipal officials, representatives of non-Aboriginal partners, and other significant stakeholders in various partnerships; • Review of published documents and reports; and • Internet research. A complete listing of information sources is presented in Attachment 2. Data Verification and Crosschecking Due to the preliminary nature of the information required, the 68 partnership overviews that were reviewed in the initial stage did not necessarily include data crosschecking and verification. Many of the overviews presented in the initial stage were based on only one data source. However, the detailed partnership case studies presented in this report all involved multiple data sources to ensure accuracy of data and to enable the Consultants to synthesize the viewpoints of significant stakeholders. 2.1.2 Data Collection Framework In order to ensure consistency of data, the Consultants developed a uniform data collection framework for each Phase of the project (see Attachment 3 for the Data Collection Frameworks utilized for each Phase). The Frameworks were designed to allow researchers to quickly gather and organize pertinent information. The Phase I Framework was designed to provide sufficient information to enable a preliminary Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 13. 6 analysis of each partnership and allow the project team and the client to identify which partnerships warranted further research and development as more detailed case studies. The Phase II Data Collection Framework, which was used for interviews with each partner and stakeholder, was designed to allow the Consultants to develop a more detailed understanding of each partnership and the factors that supported or inhibited its success. The project team recognized that even though it was unlikely that data on each item in the framework would be available for each partnership, it was useful to have a framework that could easily capture and organize whatever data was available. This enabled a more systematic and consistent analytical process, which allowed the identification of critical success factors across the range of partnerships reviewed. The overall data gathering and analysis process is summarized in Exhibit 2-1 below. Exhibit 2-1 WDA Partnership Analysis Framework© Development Legal/Structural Identification Operational Capacity Accomplishments Replicable Partnership Research of Critical Stakeholders Development Aboriginal Partnership and Analysis Success Financial External issues Employment Case Study Factors Aboriginal Barriers and Procurement Constraints Community Characteristics The results from the data gathering and analysis are presented in Section 3 (Case Studies and Individual Partnership Analysis). Following the analysis of individual partnerships the Consultants undertook an integrated review of all ten partnerships to identify traits and characteristics that are generally applicable to successful partnerships, regardless of which sector they are in. This is presented in Section 4 (Lessons Learned). Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 14. 7 The draft plan for a Community Bridge Building Initiative is presented in Section 6. 2.2 Limitations of Research The consultants recognize that there are significant limitations on the preliminary research and analysis. These limitations include: • Partnership identification was not exhaustive – No effort was made to inventory every Aboriginal - Non-Aboriginal partnership in British Columbia. However, consultation was undertaken with key government contacts with extensive knowledge of Aboriginal partnerships. This consultation helped to identify important partnerships and focus the Consultants on those partnerships that the stakeholders felt most relevant. While conducting an inventory of partnerships may well be a very useful exercise it was beyond the scope and budget of the current project. The objective of the Phase I research was simply to identify and collect information on enough partnerships to provide a pool from which partnerships could be selected for further research and analysis. This notwithstanding, the consultants would encourage the Government of BC to consider undertaking an exhaustive partnership inventory. This exercise would produce valuable information and data and would provide a baseline from which to measure the success of efforts to support and promote Aboriginal/non- Aboriginal partnerships. • No crosschecking and data verification (Phase I) – For most partnerships only one data source was utilized to gather data and information. However, the consulting team itself has considerable personal knowledge of many of the partnerships reviewed. This information was used to undertake a preliminary verification of data and information. Still, there could well be some inaccuracies Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 15. 8 in the data and information. Phase II research methodology utilized a data checking and verification process as outlined in Section 2.1. • Uneven geographic dispersion of partnerships. The project team attempted to identify examples that represented a wide range of foci and types of initiative rather than to undertake an exhaustive inventory of partnerships for any particular area or to ensure that there were partnerships identified and reviewed from throughout the entire province. While efforts were made to identify and gather information from all areas, challenges with having telephone calls returned limited the geographic dispersion in Phase I. Phase II research targets were, for the most part, selected from partnerships reviewed in Phase I. Information was not gathered on any partnerships in the far north of the province. It should be noted that the research was conducted near the end of the fiscal year, a time that is particularly demanding for most informants. • Some partnerships are of recent origin. Generally, partnerships between Aboriginal and non-Aboriginal interests in BC are recent phenomena. Although some partnerships had several years of operating experience, most were originally formed within the past three years. As a result, some critical success factors and key challenges may have not yet become evident. To compensate for this the Consultants informally compared the results of the partnership analysis to their knowledge of partnerships in other areas that have been in existence for extended periods of time (e.g., Kitsaki Development Corporation/Trimac Transportation (1986); Meadow Lake Tribal Council/NorSask Forest Products (1988), etc.). • No Research into Failed Partnerships. The research focused only on existing successful partnerships. In other words, it did not seek to review partnerships that had failed in order to glean learnings from them. However the researchers have had direct experience in partnerships that have failed and this has been factored into the Lessons Learned discussion in Section 4. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 16. 9 Despite the limitations noted above, the Consultants are confident that the research and analysis has provided findings that are interesting and useful and which will serve to guide the establishment of comprehensive partnership development and bridge building initiatives in British Columbia. These findings and analyses are presented in subsequent Sections. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 17. 10 3 Case Studies and Individual Partnership Analysis 3.1 Summary of Partnership Case Studies The following list summarizes the detailed case studies reviewed in this report and specifies the sector that they are from. 1. Environment • Tsilqot'in People of Xeni and BC Parks 2. Social • Carrier Sekanni Family Services 3. Economic • West Chilcotin Forest Products Ltd. • Monthly Licensee Meetings – North Thompson • Skwalx/Sanders Construction Ltd – Little Shuswap Indian Band and Sanders Construction • Greater Masset Development Corporation • Iisaak Forest Resources 4. General • Sun Rivers Resort Community – Kamloops Indian Band and Sun Rivers 5. Other (Municipal) • Gallagher Canyon Agreement • Lake View Meadows Detailed case studies of the above ten partnerships are presented in the following sub- section. The case studies are arranged in alphabetical order. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 18. 11 3.2 Individual Case Studies The following ten sub-sections discuss the ten case studies referred to earlier. Specific contacts and methods of data gathering utilized for gathering information are summarized in the Appendix Information Sources. 3.2.1 Carrier Sekani Family Services Parties to the Agreement: • Carrier Sekani Family Services ⇒ Wet’suwet’en First Nation ⇒ Cheslatta First Nation ⇒ Burns Lake First Nation ⇒ Stellat’en First Nation ⇒ Nadleh Whut’en First Nation ⇒ Saik’us First Nation ⇒ Nak’azdli First Nation ⇒ Tl’azt’en First Nation ⇒ Takla Lake First Nation ⇒ Yekooche First Nation • Indian and Northern Affairs Canada • Ministry for Children and Family Services Narrative Description of the Collaboration Carrier Sekani Family Services is essentially a service delivery agreement entered into in 1991 between the Provincial Ministry of Child and Family Services, Indian and Northern Affairs Canada (INAC) and the ten First Nations. This is a multi-year financing agreement that allows the First Nations to organize a service delivery agency (Carrier Sekani Family Services) to deliver child and family service programs to First Nations Peoples in the area. The agreement is similar to others that are negotiated throughout Canada involving First Nations, INAC and the relevant provincial Ministry. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 19. 12 INAC’s policy governing the Mission Statement financing of Child and Family "With the guidance of our elders, Carrier Sekani Service Agency funding stipulates Family Services is committed to the healing and that there must be a minimum of empowerment of Aboriginal Families by taking 500 children in the area before direct responsibilities for health, social and legal they will enter into an agreement services for First Nations people residing in Carrier (the purpose is to ensure effective Sekanni territory." economies of scale). Launched in 1990/91 the Mission Statement of Carrier Sekani Family Services is: A 10 person Board of Directors, one from each member nation, oversees the operation of Carrier Sekani. Motivation of the Partners and Stakeholders The First Nations’ interest was to ensure that their membership received child and family services in a culturally appropriate manner. The Federal and Provincial government recognized that traditional mechanisms for delivering child and family services to First Nations Peoples was not working and that they could be enhanced through First Nations controlled delivery structures. Lessons Learned and Critical Success Factors Interviews and research have identified several lessons learned and critical success factors. They are: • Secure financing is a critical issue, especially in an organization that has no mechanism for internally generated financing; • A strong focus on acquiring, training and maintaining quality staff is fundamental. This is especially important when activities are located in relatively remote areas Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 20. 13 and there is a difficulty in attracting staff to move from the more populated areas like the lower mainland; • There is value in delivering more services, as long as they are related in a general way. This provides the organization with improved economies of scale and greater visibility with its stakeholders. • It is important to involve the communities and local stakeholders at the onset of the project. It allows the membership to define priorities and drive the process. This will ensure much more credibility when the organization is up and running. • There is a need to develop as much information as possible and manage it in a way that it can be used to further the goals of the organization. Bridge Building and Conflict Management Strategies Due to the nature of the collaboration – an agreement with Federal and Provincial governments to deliver specific services to specific clients, there did not appear to be any overt bridge building strategies undertaken. Conflicts with other governments are addressed through negotiations; other conflicts (staff, member nations, etc.) are addressed through the personnel manual and organization by-laws. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 21. 14 3.2.2 Gallagher Canyon Agreement Parties to the Agreement: • Westbank First Nation, Kelowna, BC • Central Okanagan Regional District (CORD), Kelowna, BC • The Corporation of the City of Kelowna • The Black Mountain Irrigation District • The South East Kelowna Irrigation District Narrative Description of the Collaboration After nearly five years of negotiations the Westbank First Nation and the Central Okanagan Regional District (CORD) signed a five-year services agreement (Gallagher Canyon Agreement) in early 2000. The agreement includes other local stakeholders and covers how services are provided to some fee simple land that the First Nation purchased several years ago. After purchasing the land the First Nation wanted to convert it to Reserve status. The land had several easements to local Improvement Districts to allow for the provision of water to their constituents. As well, the City of Kelowna had constructed a road through the land in question. In order to fully understand the implications for all stakeholders CORD asked the Federal Government to undertake a thorough examination of the situation prior to converting the land to Reserve Status. In about 1995 CORD and Westbank began negotiations to develop a framework for development of this land. While the original intent of the land purchase was to provide land for First Nation’s housing, everyone recognized that the agreement needed to be flexible enough to enable the stakeholders to accommodate changing requirements in the future. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 22. 15 The agreement addresses the allocation of various developmental costs, the number of homes, types of buildings allowed and provides for the continuation of the easements. It also protects the rights of the several service providers on this land. CORD also has another agreement with Westbank which addresses payment for services provided to approximately 7,000 non-Aboriginals who live on Reserve land but utilize CORD services (recreation centre, emergency vehicles, etc.). CORD felt that this agreement did not provide the Regional District with adequate payment for services provided so they took the First Nation to court to attempt to have the agreement renegotiated. The court case failed but relations between the parties remained cordial. According to CORD the First Nation acknowledges that there is a problem with the current agreement and that, in the interest of longer-term collaboration and relationships, a new agreement should be developed. Even though the Gallagher Canyon Agreement has been in place for only one year, the stakeholders have already begun negotiations for a follow-up agreement that would also address the issue of non-Aboriginals utilizing CORD services. Motivation of the Partners and Stakeholders • The primary motivation for each partner was the desire to develop a mutually agreeable framework for development and development services on the land acquired by the First Nation. Each party wanted the agreement to be structured so that it would support their longer-term development aspirations and provide a mechanism for fair allocation of costs and benefits. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 23. 16 Lessons Learned and Critical Success Factors • All parties were motivated to develop a legal agreement that could provide a framework to support their respective needs and development aspirations. • The parties agreed to spend the time up-front (five-years) to ensure that all issues were raised in negotiations and that the final agreement would meet their needs. • It is possible to have a ‘civilized disagreement’ and still remain as active collaborators on other fronts. • When developing agreements it is critically important to openly communicate one’s needs and to be patient and keep the discussion going, even when some aspects of it are difficult and there is no evident path to an agreement. Bridge Building and Conflict Management Strategies The parties identified two specific bridge building and conflict management strategies that worked for them. They were: • Keep the dialogue going even when there is conflict and the two sides don’t fully understand each other; and • Make the agreement comprehensive so that all foreseeable conflicts and issues have been addressed. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 24. 17 3.2.3 Greater Massett Development Corporation Parties to the Agreement: • Old Masset First Nation • Village of Masset Narrative Description of the Collaboration The Greater Massett Development Corporation (GMDC) had its genesis in 1994 when the Federal Department of National Defense (DND) decided to close the local military base (GMDC was incorporated in 1996). The base contained: 190 residences; barracks that could accommodate up to 65 people; a recreation centre; a curling rink, and administration buildings. Costs to dismantle and decommission the facilities were pegged at $3 million. Coupled with significant downturns in the forestry and fisheries sectors, and the closure of a local refueling station, the village of Massett and the Old Massett First Nation were facing a major economic downturn. The military base had traditionally pumped about $5 million dollars per year into the local economy – its closure could be devastating. DND was facing a major public relations challenge as the closure of the base could push the local economy over the economic brink and DND could become the public scapegoat. Necessity brought the three major stakeholders (Old Massett First Nation, Village of Massett and DND) together to try and develop a scenario that would lessen the economic and social impact of the base closure. The First Nation and the Village had prior partnership experience with each other – two years earlier they had combined their sewer and water systems. This benefited both parties by improving overall service and creating operational efficiencies and economies of scale. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 25. 18 The stakeholders decided that the economic impact of the base closure could be mitigated somewhat with the formation of a development corporation that would be jointly owned by the First Nation and the Village. DND agreed to transfer the base infrastructure and fixed assets, along with the $3 million decommissioning budget to the newly formed Greater Massett Development Corporation. The GMDC was formed as the vehicle to liquidate the assets, and look after the funds from the sales of Personnel Married Quarters (PMQs) and other former DND properties. Approximately $8 million in revenue was generated through these sales. The GMDC was to re-invest these funds into the two communities to enhance local economic development activities. GMDC presently utilizes these funds to support the operations of the Old and the New Massett Economic Development offices. DND also provided the GMDC with a $3,000,000 barracks demolition fund which is presently invested in its own account, the interest of which is only to be used to subsidise the operation of the Massett recreation centre. Each partner (the village and the First Nation) appointed five Directors to the GMDC Board and they began the difficult process of launching a jointly owned corporation and affecting the transfer of assets from DND. The partners spent considerable time at the front end developing a strategic plan for GMDC. This afforded the opportunity to surface potential conflict areas and fully discuss the strategic direction of the corporation and the communities. Transferring the assets from DND proved to be a Herculean challenge involving 11 different government departments and many layers of bureaucracy. The $3 million was put into a GMDC managed ‘Greenfield Fund’ which is used to assist local entrepreneurs. The former administration centre was converted into an incubator mall, which has already spawned some successful local businesses. The GMDC operates the recreation facilities for the benefit of the entire community. Western Diversification provides project specific financing to assist GMDC. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 26. 19 GMDC holds monthly Board of Director meetings, and two large meetings per year that are open to the general public; an Annual General Meeting and a Public Meeting. Communication with the public and consistent attendance at Director’s meetings has been a critical issue for GMDC. Decisions are made by a ten-person Board of Directors (each partner appoints five Board members). At one point GMDC undertook a major communication initiative, going door-to-door in the community to inform community members of the corporation and its strategic direction (they used the strategic plan as a guide). Although there have been numerous challenges, including ensuring that there are revenue streams to match expenses (e.g., operating community recreation facilities), and it is too early to determine its long term success, GMDC has had a positive impact on the Greater Massett community. It has inspired a can-do attitude and helped to mitigate the social and economic impact of the base closure. It has established infrastructure that is dedicated to supporting the economic rejuvenation of the entire community. As well, it has significantly increased cross-cultural interaction and fostered improved relations between the First Nations and non-First Nations communities. The main financial challenge facing GMDC is that there are no significant revenue sources. The operations of the GMDC and the costs of operating the recreation center are funded from the rapidly depleting capital base that was generated by the liquidation of DND assets. However, despite the intentions of all parties, there have been few jobs or entrepreneurs created other than in the operation of the recreation centre. There have been few direct benefits for the community, other than the 8 to 11 total employees of the GMDC. The partnership appears to face serious challenges as the $11 Million in seed money that they started with has been seriously eroded and continues to be burned at a high rate by the costs of the recreation centre. Some people that were interviewed indicated that the Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 27. 20 partnership has actually worsened relationships between the Aboriginal and non- Aboriginal elements of the community. Motivation of the Partners and Stakeholders The partners and stakeholders were all motivated by enlightened self-interest. Old Massett First Nation and the Village of Massett were searching for opportunities to mitigate major economic shocks to the community. DND and the Federal Government sought to close the base with a minimum negative impact on the local economy and on their reputation. The original motivation was to split the DND assets equally between the two communities. This has not changed since its inception; both communities would like to share in the assets equally. Lessons Learned and Critical Success Factors The partners identified several lessons learned and critical success factors: • It was vitally important to spend time at the onset in the development of a strategic plan. In addition to providing direction to the corporation, the process of developing the plan enabled the partners to address numerous issues that may have created serious problems if left un-addressed; • Communication with community members is essential – do what it takes to ensure that the larger community is informed; • Once you have a plan, stick to it. A well-developed strategic plan/vision can provide directional stability and allow an organization to proactively pursue its long-term vision. Conversely, failure to follow a plan/vision encourages reactive responses to the opportunity of the week; Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 28. 21 • Solid financial plans, especially on the revenue side, are extremely important. Failure to adequately develop a sustainable financial plan can place extreme stresses on the partnership and the relationships between the partners; • A committed Board of Directors who will attend all meetings, and provide strategic guidance and direction to the organization is of critical importance; • Ensure that the operations of the development corporation are managed in a way that is consistent with the goals and objectives of the organization. This requires careful selection of a General Manager and ensuring that appropriate management, reporting and monitoring processes are in place that allow any deviations from the strategic plan to be quickly identified and corrected; and • It is important to ensure that the Directors are qualified and well trained and that personal agendas do not interfere with the strategic direction of the organization. Bridge Building and Conflict Management Strategies There were a number of processes and strategies that helped to mitigate the impact of conflicts and build bridges between the two communities. These included: • A two-day strategic planning workshop at the start of the partnership to address outstanding issues and develop a strategic plan for the partnership; • Decisions of the partnership are made by consensus; • The partners have found that, as they come together for community activities in their jointly owned recreation facilities, they have developed better friendships with one and other on a personal level. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 29. 22 3.2.4 Iisaak Forest Resources Parties to the Agreement: • Weyerhaeuser Canada Ltd. (formerly MacMillan Bloedel Ltd) • Nuu-chah-nulth • Ahousaht First Nation • Hesquiaht First Nation • Tla-o-qui-aht First Nation • Ucluelet First Nation • Toquaht First Nation While not officially ‘partners’ in Iisaak, numerous international environmental organizations such as Greenpeace were critical stakeholders who had shaped the conditions that stimulated the creation of Iisaak. Narrative Description of the Collaboration Worldwide attention was brought to bear on the logging industry in Clayoquot Sound in the 1990s. International organizations applied tremendous pressure on companies logging (clear-cutting) the old growth forests in the area, disrupting logging activities and alienating markets in Europe and North America. Clayoquot Sound is the traditional home of the Central Nuu-chah-nulth Aboriginal people. They have an interest in reclaiming their lands to promote economic, social and cultural development for their people. These people include five First Nations, with the northern most three, the Hesquiaht, Ahousaht and Tla-o-qui-aht residing within Clayoquot Sound with the Ucluelet and Toquaht bordering to the south. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 30. 23 Before the escalation of conflict, Weyerhaeuser (MacMillan Bloedel (MB)) the operator throughout the 1990s was purchased by Weyerhaeuser in 1999) had an annual harvest of over 600,000 cubic metres in Clayoquot Sound, which generated over $100 million in economic activity. This activity was a significant component of the local economy supporting many local businesses and providing a revenue base to municipal, provincial and federal governments. Initially the local First Nations, who had been largely excluded from the economic benefits associated Weyerhaeuser’s (MB) operation, supported and were supported by the international organizations that were leading the anti-logging protest. In July 1996, First Nations hosted an all-stakeholder meeting to discuss a resolution to Clayoquot controversy. In January 1997, Weyerhaeuser (MB) laid off 110 workers with a decision to stop logging in Clayoquot Sound for 18 months. Iisaak Forest Resources was formed in March 1997, as a joint venture between Nuu- chah-nulth people and Weyerhaeuser (MB). Iisaak (pronounced e-sock) would be 51% First Nations owned and would take over Weyerhaeuser’s (MB’s) operations in Clayoquot Sound. However harvests would be reduced to 40,000 cubic metres per year and be put-off for three years while value-added forest product opportunities were investigated. Harvesting resumed in Clayoquot in August 2000. Iisaak Forest Resources will harvest up to 40,000 cubic metres per year. That is less than 10% of the volume that had been sustained before the dispute began. First Nations control Iisaak, not Weyerhaeuser (MB), and they have options to increase their ownership, to 100% at some point. Weyerhaeuser (MB) will continue to work with Iisaak, providing start-up working capital and management experience. The intent of the partners is that the area will be managed first for conservation values and then for economic benefit. This enabled the support of many of the international organizations that had previously led the protest against Clayoquot logging. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 31. 24 Iisaak is committed to an eco-forestry approach, logging in second growth areas, supplying wood to local value-added wood converters and pursuing eco-certifications through a process agreed to by the international organizations. Some watersheds and other areas will be set aside for non-timber uses including eco-tourism and spiritual uses. The international organizations have committed to assist with marketing products from Iisaak and to continue looking for other ways to stay positively involved. Economically, Iisaak expects to operate at barely above break-even in 2000 and 2001. So despite the positive feeling of the parties supporting Iisaak, it is clearly too early to conclude whether Iisaak will grow to be an economically viable success. Motivation of the Partners and Stakeholders • The First Nations involved were interested in both economic growth and development and in preserving Clayoquot Sound as one of the world’s special places. • Weyerhaeuser was interested in limiting the damage to its international reputation/brand equity and the alienation of markets for its other forest products. Additionally, Iisaak provides them with an opportunity to work directly in partnership with First Nations and will undoubtedly assist them in their relationships with First Nations Peoples in other areas where they work. • While many of the international organizations would have undoubtedly preferred an absolute moratorium on logging in Clayoquot Sound, they realized that for them to continue opposing a limited-impact logging program that was supported by local First Nations would be difficult. Lessons Learned and Critical Success Factors A number of lessons can be drawn from this experience: Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 32. 25 • First Nations can have a strong influence on disputes between industry and environmentalists; • Local issues can quickly become global problems for resource companies; and • First Nations’ leadership and commitment were able to draw former combatants together and forge a common ground. Bridge Building and Conflict Management Strategies The Iisaak partnership grew out of one of the biggest conflicts in BC history. Partners have learned to work together in support of their common interest. First Nations leadership and moral commitment to balance environmental preservation with the creation of economic opportunities for their members provided the catalyst to bridge the chasm that had developed between the parties. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 33. 26 3.2.5 Lakeview Meadows Parties to the Agreement: • Shuswap First Nation, Cranbrook, BC • Regional District of East Kootenay, Cranbrook, BC • Private Developer (Lakeview Meadows) Narrative Description of the Collaboration In the late 1990s the Regional District of East Kootenay (RDEK) and the Shuswap First Nation faced some difficult challenges. The popularity of the area as a summer resort resulted in extensive development along the shores of Lake Windermere. All of the houses and cottages were on septic fields, which were causing pollution levels to rise to unacceptable standards. RDEK recognized the need for a new sewer and water system, but financing the $15 million cost of developing it would require an expensive and lengthy referendum process, with no guarantee of receiving approval. Due to geology, geographic proximity and a greater degree of regulatory autonomy, it made sense to explore the option of having the Shuswap First Nation finance and construct the sewer and water system and sell services to RDEK. The parties already had a history of cooperating. The First Nation had a service agreement with the Regional District for fire protection and the Regional District had a member on the First Nation’s Development Review Board. As well, the First Nation saw this as a lucrative opportunity to protect the environment and make a profit at the same time. The situation came to a head when a private developer wanted to develop Lakeview Meadows subdivision and needed sewer and water services in order to do so. The First Nation negotiated a pre-payment of service fees and an agreement to pay design costs and construction costs from the edge of the reserve to the Lakeview Meadows subdivision. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 34. 27 They leveraged the prepayment and commitment to secure the capital to develop the system. Today the First Nation supplies sewer and water services to the Lakeview Meadows subdivision and has a new system for their own members. RDEK has a management contract with the First Nation to manage the system for at least five years – during this time it is expected that someone from the First Nation will be trained to operate the system. Financing for the system was entirely private – the First Nation was able to bypass traditional government financing processes for on-reserve infrastructure, allowing them to proceed with the development in a timely fashion (sources indicated that the average time to process government financing for on-reserve infrastructure is 36- 42 months). Motivation of the Partners and Stakeholders The partners had a history of working together and recognized that they could realize advantages by collaborating on this initiative. They both wanted to reverse the environmental damage that was caused by septic systems. RDEK wanted to avoid the challenges of securing regulatory approval and raising $15 million capital to finance a new system. The First Nation wanted to utilize their geographic and geological advantages to develop a profitable business opportunity. Lessons Learned and Critical Success Factors A number of lessons learned and critical success factors emerged when reviewing this partnership with the stakeholders: • Leadership is critical. The First Nation had strong leadership with clear vision and goals (and an active process of consultation and communication with the FN community); • Communication is essential. Each party involved the other in relevant decisions and there was a regular sharing of information; Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 35. 28 • Both partners had clear goals and understood what they could do best to make the partnership work; • Both partners stressed the importance of entering into negotiations with an open mind, a good understanding of the risks and a commitment to continue negotiations until all issues had been addressed and the best possible deal for everyone had been developed; • Financing – developing and arranging the appropriate financial package allowed the development to proceed in a timely manner; and • Shared interests – the parties needed each other to solve a common problem (pollution) and to achieve other party specific objectives (e.g., create a revenue opportunity, avoid a referendum and the need to raise a huge amount of capital). Bridge Building and Conflict Management Strategies In addition to a history of trust and collaboration developed through earlier initiatives the partners stressed the importance of regular communication as a mechanism for bridge building and managing potential conflict. The agreement also included a clause committing the parties to binding arbitration if they were unable to come to agreement on a particular issue. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 36. 29 3.2.6 Monthly Licensee Meetings – North Thompson Parties to the Agreement (Process): The participants are: • North Thompson First Nation • Ministry of Forests (MOF) • Ministry of Environment (MOE) • FRBC • Tolco Industries • Slocan Forest Products • Weyerhaeuser Canada Ltd. • Adams Lake Lumber (Division of Interfor) • Gilbert Smith Forest Products • Several small forest operators from the area Guests and Environmental consultants sometimes participate in the meetings. Narrative Description of the Collaboration In the early 1990s the stakeholders in North Thompson’s forest and other natural resources began meeting regularly (monthly) to exchange information and inform each other of their plans and priorities. Although the meetings were nominally about all resource sectors, forestry related issues were generally the primary focus. These meetings have continued over the past decade and have become an important and regular feature of resource management and development in the North Thompson. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 37. 30 A major benefit of the process is that it provides an ongoing opportunity for dialogue and interaction amongst the stakeholders. This dialogue assists the stakeholders to get to know each other and to increase the coordination and efficiency of projects and activities. For example, if the First Nations require wood for its mill, the meetings provide a forum where they can discuss the most efficient means to get it with the major industry participants. In some cases it may be that TOLCO is harvesting the needed species in the geographic area – in other cases it may be Weyerhaeuser. Regardless of which supplier, the meetings provide a quick and efficient means to gathering this information and input. An added benefit of the meetings is that they provide an opportunity for the stakeholders to get to know each other better. For instance, several non-Aboriginal participants noted that they have a greater appreciation for the range of issues and concerns being addressed by First Nations – not just those directly related to local resources. As well, the participants in the meetings often get together for social events that help to further their mutual understanding. Motivation of the Partners and Stakeholders There was and still is a plethora of motivations for the individual stakeholders to participate. They include: • To maintain effective information flow and communication – keeping abreast of each other’s activities and quickly identifying potential synergies and opportunities to increase efficiency; • To build relationships and understanding with other stakeholders; • To understand the concerns and priorities of the North Thompson First Nation in relation to forestry and other resource harvesting/management activities; • To understand the capacity of local First Nation’s people and institutions and how they can add value to existing and planned activities; Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 38. 31 • To maximize the employment, business and other benefits accruing to First Nation’s people from the harvesting and development of local forestry and other resources; • To provide an opportunity for informal input into broad Provincial Government requirements on issues related to local resource management; Lessons Learned and Critical Success Factors • It is important that everyone participate with a spirit of openness and cooperation, ready to really listen to the viewpoints and concerns of the others; • Perseverance is critical. It is important that the meetings be held regularly and that participants attend consistently; and • It is critical that participants keep in mind the objective of the meetings – communication, dialogue and identification of opportunities for collaboration and synergy. It needs to be clearly understood that the meetings are not a political forum. Bridge Building and Conflict Management Strategies • The regularity of the meetings and the interaction between the participants has enabled them to get to know each other on many levels. When they are not in agreement on a particular issue there is a depth to the relationship that sustains them as they work through potential conflict(s); • The participants regularly get together for social events such as a cultural day at the First Nation or renting the local ski hill and spending a family skiing day together; and • The group tries to be proactive about identifying and addressing potential conflict issues and, if necessary, will hold weekly meetings on special occasions to ensure adequate communication and information flow amongst stakeholders. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 39. 32 3.2.7 Skwlax/Sanders Construction Ltd. Parties to the Agreement: • Little Shuswap Indian Bank, Chase BC • Sanders & Company, Merrit BC Narrative Description of the Collaboration Sanders and Company, a Merritt based road construction and heavy equipment company had been successfully undertaking projects on the Little Shuswap Indian Band’s (LSIB) Quaaout Reserve for about seven years. In 1999 LSIB and Sanders decided that it would be beneficial for both parties to form a company to undertake smaller (under $10 million) road construction and heavy equipment projects. Skwlax/Sanders Construction Ltd. was formed with the LSIB holding a 51% interest. Each party nominated two persons to the Board of Directors and the management agreement made a provision for a fifth, independent, director to be appointed jointly (to date this position has not been filled). The company bid on and secured several projects during their first year of operation, generating over $1 million in revenue. Gerry Sanders and Stuart Adamson, a senior manager with LSIB, make the day-to-day decisions of the company, on a collaborative basis. Any projects that require financing must be approved by the LSIB. Project managers make Day to day project decisions. Sanders brought technical expertise and equipment to the partnership while LSIB brought manpower, information on upcoming projects and the ability to meet Aboriginal procurement guidelines. LSIB also brought administrative capacity and are tasked with maintaining the company’s accounting system. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 40. 33 The company had some initial challenges as it sought to balance First Nation member’s desire to maximize employment with the economic reality of operating a project based company in a cyclical sector. After much discussion it was agreed that, while employment and training opportunities for First Nation’s people is a strong priority, employment must be based on project revenue. The partners closely monitor the financial profit and the employment and training that the projects generate. In addition to the profits and employment, the partnership produced an unexpected benefit in terms of addressing at least one person’s way of thinking about Aboriginal peoples. On one project Skwlax Sanders deliberately engaged a subcontractor who had a reputation as a vocal redneck and a staunch opponent of Aboriginal development. As a result of working directly with the company and its Aboriginal workers, this person’s attitude made a 180-degree shift. Motivation of the Partners and Stakeholders The motivations of both partners were enlightened self-interest. The LSIB wanted more employment opportunities for First Nations members, an opportunity to share in the profits of local construction work, and the ability to have a more substantial local business presence. Sanders wanted to develop more work and to ensure that its work in the area was sustainable by developing a partnership with a leading influencer of local construction opportunities. Lessons Learned and Critical Success Factors Although the partnership is still in its early stages, a number of lessons learned and critical success factors have been identified. They include: • It is important to have strong technical skills in order to bid on and manage complex construction projects. If the First Nation does not have this capacity internally it is wise for them to select and twin with a partner who can provide it; Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 41. 34 • In order to successfully execute construction projects it is important to have access to the appropriate equipment and the skills to complete the project effectively; • Identifying and selecting the right partner requires a significant time commitment; • It is important to allow enough time to thoroughly complete the due diligence; • In order for a partnership to work effectively it must be financially self-sufficient with clear revenue streams and partners with the necessary financial resources to ensure adequate working capital; • The parties must agree that there will be some limits on individual autonomy in order to support the partnership; • The First Nation must have the political and administrative stability that will allow the partnership to operate without political interference and abrupt changes in administrative direction; • The partnership should have a clear mission/mandate and keep focused on achieving it; • The partners should strategically (and ethically) utilize all political relationships and influence available in order to market themselves and develop/secure projects; and • It is critically important to invest the time at the front end of the partnership to clearly define the roles, expectations, mission and mandate of the relationship and be able to communicate it effectively to internal and external stakeholders. Bridge Building and Conflict Management Strategies In order to ensure a strong and sustainable relationship the partners have identified and utilized a number of conflict management and bridge building strategies. These include: • Strong/daily communication – the partners are in daily communication with each other. That way, when an issue comes up it can surface immediately and be addressed. They have committed to each other that, when a difficult issue arises Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 42. 35 they will address it head-on and get it resolved before it develops into something that could threaten their ongoing relationship; • When a particular project requires debt to finance the initial working capital it requires formal approval from both parties; • The potential conflict between employment/profits is mitigated by the strong leadership who ensure a separation between business and politics; and • They have a provision to utilize a third-party mediator if a conflict arises that they are unable to settle amongst themselves. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 43. 36 3.2.8 Sun Rivers Resort Community Parties to the Agreement: • The Sun Rivers Corporation, Kamloops BC • Kamloops Indian Band, Kamloops BC Narrative Description of the Collaboration In 1997, the membership of the Kamloops Indian Band voted by a margin of 74% in favour of surrendering3 a 480 acre parcel of their land to Sun Rivers Corporation for a real estate development. The property is located immediately east of the City of Kamloops on the south-facing slope of the valley overlooking the city. The uses for this land as approved in the Head Lease are for “developing 2,000 residential housing units, a school, park, hotel, village centre and 18 hole golf course”. The development utilizes thermal heat for the entire subdivision. It is one of the only subdivisions in Canada to utilize this environmentally friendly energy source. When the subdivision is fully developed it will provide the First Nation with annual tax revenues of approximately $7-8 million per year. The remainder would accrue to the City of Kamloops and to the developer for various services that they provide to the landowners. With the prepaid lease and the market provided by the development, the First Nation was able to finance and construct a state of the art water treatment facility that supplies services to the Sun Rivers Resort Community and to many First Nations facilities. 3 The surrender is a formal process wherein the land is assigned back to her Majesty the Queen’s representative – the Government of Canada – who in turn provide a Head Lease (generally 99 years in duration) to the applicant First Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 44. 37 Motivation of the Partners and Stakeholders Sun Rivers was motivated by a desire to profitably develop a unique housing and recreational facility. The First Nation realized that this transaction could provide them with a number of immediate and ongoing benefits including: • Upfront lease payment for the land and ongoing payments over the life of the lease; • An ‘inside track’ on employment and business opportunities stemming from the development; • An opportunity to increase the tax and revenue base of the First Nation; • The development would increase the value of other First Nation’s land in the immediate vicinity; and • An opportunity to increase the market for a state of the art water treatment facility to improve the water available to First Nations members. As well, the City of Kamloops, which has signed on to provide sewer services to the development, can amortize the cost of their existing system (which was not running to capacity) across a broader tax base. Lessons Learned and Critical Success Factors • Leadership and communication is critical. The leadership of the Kamloops Indian Band were visionary and saw the benefits that the development could bring to their First Nation. They communicated this effectively to their membership who overwhelmingly endorsed it in a referendum; • The developer had a clear vision and plan for the development and had the financial and managerial capacity to execute the plan effectively; Nation or designate for the purpose of developing projects on this land that are not otherwise permitted under the Indian Act. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 45. 38 • Once the project had begun, the stakeholders recognized their common interest and worked in a spirit of cooperation and collaboration; and • The Kamloops Indian Band had the technical expertise (in the land leasing department) and had good legal and professional advisers. Bridge Building and Conflict Management Strategies • The parties ensured that everything that was written into the agreement was achievable. They did not make any commitments that could not be kept; • There is strong communication between the stakeholders. All employment and contracting opportunities are communicated to the First Nation. The developer works with them to help them to take advantage of as many opportunities as they have the capacity to undertake; and • There are detailed records kept of agreements, commitments and of First Nations employment/business opportunities at the project. That helps to ensure that the facts are known and helps to eliminate rumour mongering. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 46. 39 3.2.9 Tsilqot’in People of Xeni and BC Parks (Ts’yl-os Provincial Park) Parties to the Agreement: • The Xeni Gwet’in First Nations Government • BC Parks (Ts’yl-os Provincial Park). Narrative Description of the Collaboration In the 1980s the Xeni Gwet’in Elders were becoming concerned that clear-cut areas were getting very close to their traditional territory4. They were afraid that, if nothing were done about non-Aboriginal land use practices in the area, it would severely limit the traditional land use practices of the Xeni Gwet’in Peoples. A number of tribal meetings were held to discuss the Elder’s concerns. In 1989 a Declaration stating that the Xeni Gwet’in Peoples would not tolerate mining or clear-cut forestry practices on their traditional lands was released at a press conference in Vancouver. As a result of the Declaration the Xeni Gwet’in Peoples became involved with the Government of British Columbia in a review of the Deferred Planning Area around Chilco Lake (further development was frozen in this area pending additional studies). A 60 person Chilco Study Committee was formed in 1993/94. The Xeni Gwet’in were one of three co-chairs (the Ministry of Parks and the Ministry of Municipal Affairs were the other co-chairs). The Committee, which was made up of all stakeholders in the region, recommended the establishment of a Provincial Park and a separate Tsilqot'in Management Zone (TZM) The recommendations of the Chilco Study became the basis for the development of a Memorandum of Understanding (MOU) between Xeni Gwet’in and BC Parks. The MOU set out in detail what can and cannot occur in the area, what the roles and Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 47. 40 responsibilities of the respective stakeholders are, and established a monthly stakeholder meeting process. The MOU, which was supported by the stakeholder group, was signed in a ceremony in Victoria. The scope of the agreement, which initially focused primarily on park management issues, has been recently expanded to include issues on lands adjacent to the park. A management group comprised of Xeni Gwet’in and BC Parks has been created to consider applications and permits for a variety of land use applications and other matters that routinely come up. Motivation of the Partners and Stakeholders The Xeni Gwet’in Peoples wanted to ensure that they had an active role in the management of their traditional lands and that clear cutting and mining operations did not decimate the lands. They also wanted to ensure that they would have access to the lands for traditional purposes (e.g., hunting, gathering medicinal plants, fishing, ceremonies, etc.). The Government of BC wanted to ensure that the management of the area is consistent with the mandate of BC Parks and to ensure that traditional land use practices of the First Nations Peoples were allowed to continue. As well, they wanted to establish a process that allowed input from other stakeholders in the region. 4 The park that was established is located about 220 kilometers west of Williams Lake Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 48. 41 Lessons Learned and Critical Success Factors • The leadership demonstrated by the Xeni Gwet’in Peoples to identify their issues and priorities and communicate them effectively provided the catalyst for this collaboration to develop; • The openness and willingness of BC Parks personnel to consider the priorities of the Xeni Gwet’in Peoples and work with them to develop a mechanism to allow the Park to be developed. • Regular, structured interaction amongst the stakeholders (e.g., the monthly meetings) and ensuring that all parties attend on a regular basis; • Developing a specific focus and sticking to it. This keeps potentially divisive issues like the Treaty Land Entitlement process out of the regular meetings and park management process; • A commitment to shared decision-making. The parties stressed that this has to be a real commitment and a recognition that it may mean that you have to give up authority in some areas. They also stressed the importance of clearly identifying the areas of shared decision making so there is a common understanding; and • A mechanism for other stakeholders to have input into the process (e.g., the Chilcotin Advisory Group, which acts as a third-party watchdog) Bridge Building and Conflict Management Strategies • Regular meetings of the stakeholders are held. Between meetings the stakeholders regularly contact each other to discuss issues and other aspects of Park management; • The regular meetings of the Working Group are open to the public and individuals are encouraged to attend; • There is ongoing, informal contact between the stakeholders. (e.g., Parks personnel and others often drop by the Band Office for coffee); and Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 49. 42 • The First Nation has a regular and consistent communication process to ensure that their membership is well informed of issues and opportunities emanating from the management of the Park. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 50. 43 3.2.10 West Chilcotin Forest Products Parties to the Agreement • Ulkatcho First Nation, Anahim Lake, B.C. • CAT Resources Ltd. Anahim Lake, B.C. • Carrier Lumber Ltd., Prince George, B.C. Narrative Description of the Collaboration Carrier Lumber of Prince George, B.C. had operated a sawmill in the community of Anahim Lake for a number of years. In 1993 they were forced to close their mill when they lost their Timber Supply License (TSL) due to a controversial decision by the Government of the day. The loss of the Carrier mill was potentially devastating. While the region had a smattering of tourism outfitters and ranchers, the mill and associated logging operations was the economic mainstay of Anahim Lake. The loss of the TSL was a significant blow to Carrier Lumber as it literally reduced the value of their sawmill facility in Anahim Lake to zero. It was also a huge loss to the residents of Anahim Lake as the mill, its associated logging operations and spin off businesses was the economic lifeblood of the community. The leadership of one individual in the community was responsible for the formation of a tripartite partnership involving Carrier Lumber, the Ulkatcho First Nation and a group of 50 investors from the community to form West Chilcotin Lumber. This partnership was uniquely positioned to resuscitate the economy. Carrier Lumber had the facility and infrastructure. The involvement of the fifty local investors provided both Carrier and the Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 51. 44 Government with a concrete demonstration of local commitment and support for the Ulkatcho First Nation’s (the third partner) application for a TSL. West Chilcotin commenced operations in 1996 and manufactures studs (2in X 4in X 8ft lumber), which they sell all over the world. Motivation of the Partners and Stakeholders All parties to the agreement were highly motivated. The Ulkatcho First Nation had been pursuing a TSL for years, but the Government had always declined, telling them to ‘go find a partner’. The First Nation has always viewed a TSL as a means for them to achieve a significant share of the work in the forest sector and to establish a base for their economy. Lessons Learned and Critical Success Factors • All partners must enter into the deal with the view and commitment that it is better to own a portion of a success story than 100% of a failure; • The non-Aboriginal partner must recognize, that while every effort will be made to keep politics out of the deal, that the reality is that is difficult to keep entirely out; • All parties must be prepared to compromise on issues and recognize the items that are important to the other partners and stakeholders, e.g., Chief & Council; • If all the parties are responsible to a large constituency, then they will work hard to get a project done. It took approximately one year to put this partnership together; and • All partners and stakeholders should be treated with respect. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 52. 45 Bridge Building and Conflict Management Strategies • Be prepared to deal with the tough issues at the negotiation table and invest the time to get through the difficult issues. Putting them off will not make them easier nor will it cause them to go away; • Identify and put mechanisms in place at the start to deal with tough issues that may crop up later, e.g., the First Nation’s expectation regarding employment; • When all parties have equal share in the project and therefore equal to lose, they are all highly motivated to search for win-win solutions to conflict situations; and • Include conflict resolution clauses in all formal agreements. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 53. 46 4 Lessons Learned The preceding ten case studies supply data and information that can provide insights into characteristics of successful partnerships and critical issues that influence the success of partnerships between Aboriginal and non-Aboriginal interests. These lessons learned may help existing and future partnerships to enhance their potential for success. The following analysis, drawn from the preceding case studies, discusses and presents the lessons learned in three key areas: the motivation of partners and stakeholders; crucial success factors, and conflict management strategies. This analysis is followed by a discussion on lessons learned from failed partnerships and an overview of two innovative projects aimed at encouraging and understanding Aboriginal/non-Aboriginal partnerships. 4.1 Motivation of Partners and Stakeholders The partners in the above cases consistently cited motivational factors that are rooted in self-interest. Of course, in many instances it was enlightened self-interest. For example, Weyerhaeuser’s collaboration in the Iisaak partnership may have been driven by a need to mitigate damage and make the best of a difficult situation. Our conclusion is that self- interest is the motivator in virtually every case we examined. There is nothing fundamentally wrong with this. In fact, we would argue that a partnership is not sustainable if it is not in the self-interests of each of the partners. Our analysis identified five different motivations5 for the ten cases we reviewed. This is not to suggest that these are the only motivations that can result in successful partnerships, rather these are simply the motivations that spurred the creation of these Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 54. 47 partnerships. Nonetheless, the presence of one or more of these motivators can signal an opportunity to develop a partnership. 1. Mitigating the impact of an economic downturn – A downturn in one or more sectors of the local economy can help create conditions where there is an active search for opportunities to rejuvenate, or at least mitigate the decline in the local economy. This type of situation can stimulate creativity and encourage Aboriginals and non-Aboriginals to seek out opportunities for collaboration, with the expectation that the collaboration will help each partner to adjust more effectively to the changing conditions. 2. Make services work better – Federal and provincial governments are recognizing that many of the services they have traditionally delivered to Aboriginal Peoples are less effective than they would be if they were delivered directly by Aboriginal organizations. There are numerous cultural and logical reasons for this, including the fact that delivery by Aboriginal People is generally done in a more culturally sensitive manner and with improved community ownership of the process and results. As well, there is a growing expectation that Aboriginal Peoples have the right to deliver services to their people. 3. Synergies – Many partnerships are launched because the partners, by working collaboratively, are able to accomplish much more than they could by working alone i.e., generating a one plus one equals three phenomenon. This often happens when one partner has access to financial and operational capacity and the other partner has an enhanced position in the market and access to labour, natural resources and other inputs. For example, a non-Aboriginal partner may have the financial and technical capacity to bid on a contract or launch a project, while the Aboriginal partner has preferred access to contracts and/or natural resources, access to local labour or other 5 As all of the motivations are basically linked through the self-interest of the parties, the division into five different types of motivation may be seen as arbitrary. However, we believe that it is useful in that it sets out a more systematic process against which the motivation for establishing new partnerships can be reviewed. Aboriginal Partnerships – Building Blocks for Sustainable Community Development
  • 55. 48 inputs. For instance, in the Gallagher Canyon Development none of the parties, working independently, could have hoped to achieve a solution as effective as the agreement that they worked out together. Similarly, it is unlikely that either of the partners in the Greater Massett Development Corporation could have been successful in persuading the Department of National Defense to make the financial and asset commitment that they did. As well, it is extremely doubtful that either party working alone could have successfully maneuvered the agreement through the eleven different government departments. Other examples include the establishment of a park through the collaborative efforts of the Tsilqot’in People of Xeni and BC Parks, Skwlax Sanders, which was able to secure and execute construction contracts that neither party could have gotten on their own, and Iisaak Forest Resources, where a range of environmental and economic objectives was able to be addressed through collaboration. 4. Environmental and economic opportunities – The opportunity to develop and implement environmental and/or economic initiatives is often a significant motivator for Aboriginal/non-Aboriginal partnerships. Often there are opportunities that are difficult or impossible for one party to develop on their own, but through collaboration with other stakeholders they can achieve critical objectives. This was the case with Iisaak Forest Resources and the Tsilqot’in People of Xeni and BC Parks. In both cases it is doubtful that the environmental or economic objectives of the parties could have been achieved without systematic collaboration and partnership. 5. Improve communication and collaboration – For example, participation in the North Thompson Monthly Licensee Meetings is motivated by the parties’ recognition that a regular, structured forum that enables them to exchange information on activities and issues will facilitate improved collaboration and synergies, and minimize the potential for conflict, making all of their operations more efficient. Aboriginal Partnerships – Building Blocks for Sustainable Community Development