SlideShare une entreprise Scribd logo
1  sur  8
WAYNE WEATHERSON
Wayne Weatherson Limited
MOB: 07525 195 399
EMAIL:wweatherson@gmail.com
I am responsible, an open-minded and resourceful individual with a practical approach to problem solving. I
possess excellent interpersonal skills. I enjoy learning new skills, I can work well under pressure and also
have the ability to communicate comfortably at all levels, therefore ensuring an excellent working environment
for all.
ITL – PCN November 2015 – present 2016
Beacon O2 / VF refresh / Darwin / MBNL
• Risk assessment / method statement
• Upgrade / swap PCN antenna
• Upgrade / swap amplifier
• Install new tails / jumpers
• SW pole swaps
• Install combiners
• Assist civil workers / ducts / feeder run
• Re-route and cut back feeder to demarcation point
• Connect new jumpers to new feeder within SW pole
• Test and label all feeder / jumpers / tails
• Install main feeder
• Terminate feeder / jumpers / tails
• Document / record all assets new to site
• Collect photographic evidence for HOP
• Daily updates
• Close of play statements
SGC construction October 2015 – November 2015
SGC construction serve the telecom industry with decommission of sites
• Risk assessment / method statement
• Decommission of cabinets / cabins (street works / green fields / roof top)
• Decommission of telecom towers / SW poles / stub masts
• Complete strip down of cabinets / cabins
• Decommission / salvage of PNC / Microwave antenna / ODU / amplifiers
• Decommission / salvage of BTS cabinets / Transmission rack unit’s / PSU units and batteries
• Assist crane operative / banks man with positions and carry
• Rigging of ropes / hoists / shackles / chains
• Photo evidence of decommission of site
• Site survey
• Record asset removal
Profile
Career Summary
• Uploading of survey documents / photos
• Complete and make good of all sites
September 2015 Microwave 2man
Dael
• Build microwave antenna
• ODU alignment
• Rigging ropes
• Erect WM Antenna
• Pan MW Antenna
• Run cables
• Studding / clamping
• Health and safety / risk assessment
• Connect earth cable
• Weatherproofing
August 2015 PCN 2/3 MAN
TRIL LTD
• Rigging ropes
• Erecting steel work
• Build / erect Antennas
• Terminate feeder connections
• Fit feeder
• Studding / clamping
• Health and safety / risk assessment
• Earth connections
• Weatherproofing
May 2015 – August 2015 LOS & PIV Team leader
(DEACOM)
• Use of laptop and spreadsheets
• Power survey
• Cabinet / cabin survey
• Provide new transmission location
• Provide cable route details
• Use of camera
• Uploading information
• Bearings
• Radio frequency awareness
• General inspection of site, tower, rooftop
• Panning lamp on bearing to confirm line of sight (LOS)
• Health and safety, risk assessments
• Liaising with site managers/point of contacts
April 2015 – May 2015 PPM survey (Kier) Project team leader
• Health and safety Risk assessment
• General inspection of site, tower, rooftop
• General clean up duties
• Inspection of site, tower, rooftop, ladder, fall arrest system
• Inspection of feeder, connections, weatherproofing, dish and antennas
• Site survey
• Uploading information and photos onto intercom system
• Updating site contact information
• Fault finding
• Lightning protection testing
• General site maintenance
• Liaising with site managers/point of contacts
March 2015 (2 weeks) DAB digital radio install (The Bridge Networks)
• Health and safety
• Risk assessment
• Build antenna / shield
• Erect dish mounting poles
• Use of ropes and pulleys
• Identify manageable feeder route
• Install feeder
• Install cleats
• Install gland
• Install steelwork
March 2015 (2 weeks) Fault finding Police network Ireland
• Police vetting / MOD cleared
• Reline dish
• Change LMR cable
• Change ODU
• Weatherproofing
• Change cable / feeder
• Ensure installed equipment is safe
• Photo evidence of swapped equipment
• End of day report and findings log
February 2015 – March 2015 Huawei PCN refresh surveys LCC
• Rams, method statement
• Risk assessment
• Collection of assets on site ( antenna / combiners / amplifiers)
• Health and safety
• Site drawings
• Identifying site technology
• Access / delivery route inspection
• Proposed equipment location
• Identifying power outages
• Use of laptop / spreadsheets
• Uploading data to server
• Use of camera
December 2014 February 2015 – Metro survey, LCC
• Health and safety
• Risk assessment
• Site inspection
• Site drawings
• Identifying technology
• Collection of data
• Feeder / fibre details collection
• Identify / collect antenna details
• Identify / collect MHA / splitter / combiner details
• Propose antenna location
• Propose RRU location
• Check feeder / fibre route free from obstruction
• Use of laptop
• Use of camera
• Uploading surveys
August 2014- December 2014 PSU power survey, LCC
• Site inspection
• Site survey
• Power inspection
• Breaker inspection
• Breaker details collection
• Identifying backup power resources
• Identifying technology
• Data logging
• Site drawings
• Use of laptop
• Use of camera
• Health and safety, risk assessments
• Liaising with site managers/point of contacts
• Use of online portals / servers
July 2014 – August 2014- Microwave, LCC (Telecoms dish installation)
2nd
man
• Equipment inspection
• Health and safety inspection
• Risk assessment
• Dish erection
• Dish positioning
• Dish panning
• Ensure dish is correctly installed
• Install feeder / fibre
• Establish connection
• Use of laptop
• Use of camera
• Data collection
May 2014 – July 2014 – Light of sight surveys Airwave (through LCC)
Team Leader
• Use of laptop and spreadsheets
• Use of camera
• Uploading information
• Bearings
• Radio frequency awareness
• General inspection of site, tower, rooftop
• Panning lamp on bearing to confirm line of sight (LOS)
• Health and safety, risk assessments
• Liaising with site managers/point of contacts
February 2014 – May 2014 PPM project through Fuel Recruitment (Clarke telecoms)
PPM project Team leader
• Health and safety Risk assessment
• General inspection of site, tower, rooftop
• General clean up duties
• Inspection of site, tower, rooftop, ladder, fall arrest system
• Inspection of feeder, connections, weatherproofing, dish and antennas
• Site survey
• Uploading information and photos onto intercom system
• Updating site contact information
• Fault finding
• Lightning protection testing
• General site maintenance
• Liaising with site managers/point of contacts
November 2013 – February 2014 PPM project Fuel / Mansell Recruitment
PPM project Team leader
• Health and safety Risk assessment
• General inspection of site, tower, rooftop
• General clean up duties
• Inspection of site, tower, rooftop, ladder, fall arrest system
• Inspection of feeder, connections, weatherproofing, dish and antennas
• Site survey
• Uploading information and photos onto intercom system
• Updating site contact information
• Fault finding
• Lightning protection testing
• General site maintenance
• Liaising with site managers/point of contacts
October 2013 PCN install (3rd
Man) PM Technical
• Beacon / PCN
• Weatherproofing
• Connections
• Earths
• Cable tray
• Instillation of feeder
• Assist with antenna install
May 2013 – October 2013 PM Technical LTD – LOS surveys (Airwaves / Sitec)
• Health and safety Risk assessment
• General knowledge of Telecoms cabin
• Use of laptop and spreadsheets
• Use of camera
• Uploading information
• Bearings
• Radio frequency awareness
• General inspection of site, tower, rooftop
• Panning lamp on bearing to confirm line of sight (LOS)
SEASONAL November-January 2011/ 2012 to Present: The Snow Globe – Owner of a giant
snow globe over the festive period.
• CRB checked as required
• Construction and dismantle of the globe
• Intermediate photography skills
• Knowledge of Picasa software
• Advertising and promotion
• Bookings and day events
• Cash handling
• Staff Rota
October 2011 – February 2013: The Gold Room – Whitefield and Wilmslow – Owner of
business for precious metal and jewelry buying shops.
• Buying and selling of jewelry/medals/watches
• Cash handling
• Advertising
• Customer service
• Interviewing skills i.e. new staff members
• Daily targets and weekly stock take
January 2009-September 2011: Northwest Bullion Ltd. Area Manager
• Extensive knowledge of precious metals, gems, medals and high end watches.
• Cash handling of large amounts of money on a daily basis.
• Customer service
• Dealing with enquires and complaints
• Banking
• Advertising and liaising with local newspapers
• Creating new artwork for the business i.e. booklets and leaflets
• Key holder to all shops
1996 – 2000 Cramlington community high school – All subjects
2000 – 2001 Cramlington community 6th
form – Sport/ PE, IT and Drama
2001 – 2002 Northumberland college – NVQ engineering mechanical & electrical
2011- Present BG Trampoline level 1 coach
• IT Profiency: Microsoft word, Excel, internet and email, Picasa
• British Gymnastics Trampolining level 1 coach
• Full current clean driving license
• Advanced climber
• First aid at heights
• Rooftop access
• Radio frequency awareness
• Police clearance (2018)
• MOD clearance (2018)
Education
Further Skills
Available on request

Contenu connexe

Tendances (19)

Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev b
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
 
Iain Palmer Resume 29012015
Iain Palmer Resume 29012015Iain Palmer Resume 29012015
Iain Palmer Resume 29012015
 
Robert Burns CV 2015
Robert Burns CV 2015Robert Burns CV 2015
Robert Burns CV 2015
 
RESUME (01-26-16)
RESUME (01-26-16)RESUME (01-26-16)
RESUME (01-26-16)
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
CV of Tahir Mahmood
CV of Tahir MahmoodCV of Tahir Mahmood
CV of Tahir Mahmood
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Description
 
Resume Wynn R Pettitt
Resume Wynn R PettittResume Wynn R Pettitt
Resume Wynn R Pettitt
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
 
S. Bould CV
S. Bould CV S. Bould CV
S. Bould CV
 
ANDY CV
ANDY CVANDY CV
ANDY CV
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
MNC-14
MNC-14MNC-14
MNC-14
 
Tabrez
TabrezTabrez
Tabrez
 

En vedette

En vedette (10)

Long Resume
Long ResumeLong Resume
Long Resume
 
Jugando Por La Vida
Jugando Por La VidaJugando Por La Vida
Jugando Por La Vida
 
Primers auxilis apunts willy
Primers auxilis apunts willyPrimers auxilis apunts willy
Primers auxilis apunts willy
 
SMART DUST
SMART DUSTSMART DUST
SMART DUST
 
Tinc valor per a docents
Tinc valor per a docentsTinc valor per a docents
Tinc valor per a docents
 
Programa atenció comunitària 2016
Programa atenció comunitària 2016Programa atenció comunitària 2016
Programa atenció comunitària 2016
 
Pràctiques icam dispositiu docent mir familia 3 dies
Pràctiques icam dispositiu docent mir familia 3 diesPràctiques icam dispositiu docent mir familia 3 dies
Pràctiques icam dispositiu docent mir familia 3 dies
 
Appendix how to break bad news buckman[1]
Appendix how to break bad news buckman[1]Appendix how to break bad news buckman[1]
Appendix how to break bad news buckman[1]
 
Actualització en terapèutica farmacològica i pràctica clínica
Actualització en terapèutica farmacològica i pràctica clínicaActualització en terapèutica farmacològica i pràctica clínica
Actualització en terapèutica farmacològica i pràctica clínica
 
Become a MySQL DBA: performing live database upgrades - webinar slides
Become a MySQL DBA: performing live database upgrades - webinar slidesBecome a MySQL DBA: performing live database upgrades - webinar slides
Become a MySQL DBA: performing live database upgrades - webinar slides
 

Similaire à wayne weatherson cv 14.02.16 for linkedin

Matthew Foster Resume
Matthew Foster ResumeMatthew Foster Resume
Matthew Foster ResumeMatt Foster
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV NewSteven Wilson
 
Debbie Wakefield Resume 2015
Debbie Wakefield Resume 2015Debbie Wakefield Resume 2015
Debbie Wakefield Resume 2015Debbie Wakefield
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume ARocky Nash
 
What LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedWhat LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedHoracio Guillen
 
CellSpectrum - An universal solution essential for advanced wireless deployments
CellSpectrum - An universal solution essential for advanced wireless deploymentsCellSpectrum - An universal solution essential for advanced wireless deployments
CellSpectrum - An universal solution essential for advanced wireless deploymentsCPqD
 
Updated CV Linus Bassey)
Updated CV  Linus Bassey)Updated CV  Linus Bassey)
Updated CV Linus Bassey)Linus Bassey
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
Charles Phillips CV new (2)
Charles Phillips CV new (2)Charles Phillips CV new (2)
Charles Phillips CV new (2)John Phillips
 

Similaire à wayne weatherson cv 14.02.16 for linkedin (20)

Matthew Foster Resume
Matthew Foster ResumeMatthew Foster Resume
Matthew Foster Resume
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
Debbie Wakefield Resume 2015
Debbie Wakefield Resume 2015Debbie Wakefield Resume 2015
Debbie Wakefield Resume 2015
 
Kapil_Garg_C.V.
Kapil_Garg_C.V.Kapil_Garg_C.V.
Kapil_Garg_C.V.
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
MarcusResume
MarcusResumeMarcusResume
MarcusResume
 
What LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and OptimizedWhat LTE Parameters need to be Dimensioned and Optimized
What LTE Parameters need to be Dimensioned and Optimized
 
mike cv
mike cvmike cv
mike cv
 
Barry-Knight-5
Barry-Knight-5Barry-Knight-5
Barry-Knight-5
 
CellSpectrum - An universal solution essential for advanced wireless deployments
CellSpectrum - An universal solution essential for advanced wireless deploymentsCellSpectrum - An universal solution essential for advanced wireless deployments
CellSpectrum - An universal solution essential for advanced wireless deployments
 
Resume 5
Resume 5Resume 5
Resume 5
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
 
2015_J_Kilmister_Resume
2015_J_Kilmister_Resume2015_J_Kilmister_Resume
2015_J_Kilmister_Resume
 
Updated CV Linus Bassey)
Updated CV  Linus Bassey)Updated CV  Linus Bassey)
Updated CV Linus Bassey)
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
John Resume 2015-4
John Resume 2015-4John Resume 2015-4
John Resume 2015-4
 
Charles Phillips CV new (2)
Charles Phillips CV new (2)Charles Phillips CV new (2)
Charles Phillips CV new (2)
 

wayne weatherson cv 14.02.16 for linkedin

  • 1. WAYNE WEATHERSON Wayne Weatherson Limited MOB: 07525 195 399 EMAIL:wweatherson@gmail.com I am responsible, an open-minded and resourceful individual with a practical approach to problem solving. I possess excellent interpersonal skills. I enjoy learning new skills, I can work well under pressure and also have the ability to communicate comfortably at all levels, therefore ensuring an excellent working environment for all. ITL – PCN November 2015 – present 2016 Beacon O2 / VF refresh / Darwin / MBNL • Risk assessment / method statement • Upgrade / swap PCN antenna • Upgrade / swap amplifier • Install new tails / jumpers • SW pole swaps • Install combiners • Assist civil workers / ducts / feeder run • Re-route and cut back feeder to demarcation point • Connect new jumpers to new feeder within SW pole • Test and label all feeder / jumpers / tails • Install main feeder • Terminate feeder / jumpers / tails • Document / record all assets new to site • Collect photographic evidence for HOP • Daily updates • Close of play statements SGC construction October 2015 – November 2015 SGC construction serve the telecom industry with decommission of sites • Risk assessment / method statement • Decommission of cabinets / cabins (street works / green fields / roof top) • Decommission of telecom towers / SW poles / stub masts • Complete strip down of cabinets / cabins • Decommission / salvage of PNC / Microwave antenna / ODU / amplifiers • Decommission / salvage of BTS cabinets / Transmission rack unit’s / PSU units and batteries • Assist crane operative / banks man with positions and carry • Rigging of ropes / hoists / shackles / chains • Photo evidence of decommission of site • Site survey • Record asset removal Profile Career Summary
  • 2. • Uploading of survey documents / photos • Complete and make good of all sites September 2015 Microwave 2man Dael • Build microwave antenna • ODU alignment • Rigging ropes • Erect WM Antenna • Pan MW Antenna • Run cables • Studding / clamping • Health and safety / risk assessment • Connect earth cable • Weatherproofing August 2015 PCN 2/3 MAN TRIL LTD • Rigging ropes • Erecting steel work • Build / erect Antennas • Terminate feeder connections • Fit feeder • Studding / clamping • Health and safety / risk assessment • Earth connections • Weatherproofing May 2015 – August 2015 LOS & PIV Team leader (DEACOM) • Use of laptop and spreadsheets • Power survey • Cabinet / cabin survey • Provide new transmission location • Provide cable route details • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) • Health and safety, risk assessments • Liaising with site managers/point of contacts April 2015 – May 2015 PPM survey (Kier) Project team leader
  • 3. • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts March 2015 (2 weeks) DAB digital radio install (The Bridge Networks) • Health and safety • Risk assessment • Build antenna / shield • Erect dish mounting poles • Use of ropes and pulleys • Identify manageable feeder route • Install feeder • Install cleats • Install gland • Install steelwork March 2015 (2 weeks) Fault finding Police network Ireland • Police vetting / MOD cleared • Reline dish • Change LMR cable • Change ODU • Weatherproofing • Change cable / feeder • Ensure installed equipment is safe • Photo evidence of swapped equipment • End of day report and findings log February 2015 – March 2015 Huawei PCN refresh surveys LCC • Rams, method statement • Risk assessment • Collection of assets on site ( antenna / combiners / amplifiers) • Health and safety • Site drawings • Identifying site technology • Access / delivery route inspection • Proposed equipment location
  • 4. • Identifying power outages • Use of laptop / spreadsheets • Uploading data to server • Use of camera December 2014 February 2015 – Metro survey, LCC • Health and safety • Risk assessment • Site inspection • Site drawings • Identifying technology • Collection of data • Feeder / fibre details collection • Identify / collect antenna details • Identify / collect MHA / splitter / combiner details • Propose antenna location • Propose RRU location • Check feeder / fibre route free from obstruction • Use of laptop • Use of camera • Uploading surveys August 2014- December 2014 PSU power survey, LCC • Site inspection • Site survey • Power inspection • Breaker inspection • Breaker details collection • Identifying backup power resources • Identifying technology • Data logging • Site drawings • Use of laptop • Use of camera • Health and safety, risk assessments • Liaising with site managers/point of contacts • Use of online portals / servers July 2014 – August 2014- Microwave, LCC (Telecoms dish installation) 2nd man • Equipment inspection • Health and safety inspection • Risk assessment
  • 5. • Dish erection • Dish positioning • Dish panning • Ensure dish is correctly installed • Install feeder / fibre • Establish connection • Use of laptop • Use of camera • Data collection May 2014 – July 2014 – Light of sight surveys Airwave (through LCC) Team Leader • Use of laptop and spreadsheets • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) • Health and safety, risk assessments • Liaising with site managers/point of contacts February 2014 – May 2014 PPM project through Fuel Recruitment (Clarke telecoms) PPM project Team leader • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts November 2013 – February 2014 PPM project Fuel / Mansell Recruitment PPM project Team leader • Health and safety Risk assessment • General inspection of site, tower, rooftop • General clean up duties • Inspection of site, tower, rooftop, ladder, fall arrest system • Inspection of feeder, connections, weatherproofing, dish and antennas • Site survey • Uploading information and photos onto intercom system • Updating site contact information
  • 6. • Fault finding • Lightning protection testing • General site maintenance • Liaising with site managers/point of contacts October 2013 PCN install (3rd Man) PM Technical • Beacon / PCN • Weatherproofing • Connections • Earths • Cable tray • Instillation of feeder • Assist with antenna install May 2013 – October 2013 PM Technical LTD – LOS surveys (Airwaves / Sitec) • Health and safety Risk assessment • General knowledge of Telecoms cabin • Use of laptop and spreadsheets • Use of camera • Uploading information • Bearings • Radio frequency awareness • General inspection of site, tower, rooftop • Panning lamp on bearing to confirm line of sight (LOS) SEASONAL November-January 2011/ 2012 to Present: The Snow Globe – Owner of a giant snow globe over the festive period. • CRB checked as required • Construction and dismantle of the globe • Intermediate photography skills • Knowledge of Picasa software • Advertising and promotion • Bookings and day events • Cash handling • Staff Rota October 2011 – February 2013: The Gold Room – Whitefield and Wilmslow – Owner of business for precious metal and jewelry buying shops. • Buying and selling of jewelry/medals/watches • Cash handling • Advertising • Customer service
  • 7. • Interviewing skills i.e. new staff members • Daily targets and weekly stock take January 2009-September 2011: Northwest Bullion Ltd. Area Manager • Extensive knowledge of precious metals, gems, medals and high end watches. • Cash handling of large amounts of money on a daily basis. • Customer service • Dealing with enquires and complaints • Banking • Advertising and liaising with local newspapers • Creating new artwork for the business i.e. booklets and leaflets • Key holder to all shops 1996 – 2000 Cramlington community high school – All subjects 2000 – 2001 Cramlington community 6th form – Sport/ PE, IT and Drama 2001 – 2002 Northumberland college – NVQ engineering mechanical & electrical 2011- Present BG Trampoline level 1 coach • IT Profiency: Microsoft word, Excel, internet and email, Picasa • British Gymnastics Trampolining level 1 coach • Full current clean driving license • Advanced climber • First aid at heights • Rooftop access • Radio frequency awareness • Police clearance (2018) • MOD clearance (2018) Education Further Skills