17. Hardware List $8,990 Total equipment cost for the project $700 $700 HP T1500 XR UPS G2 1 $200 $200 17” LCD Monitor 1 $15 $15 Halogen light(USB) 1 $1,875 $1,875 SSD Flash memory(64GB) 1 $200 $100 External HDD 320G(USB) 2 $6,000 $6,000 Standalone Server (HP Prolian ML 370 G5) CPU: Quad Core Processor 2 GHz RAM: 2G 1 Total cost Unit cost Description Quantity Equipment needed Timing
18. Software List $5,591 Total software cost for the project $38 $38 Power saving application 1 $0 $0 Recording power consumption software 1 $1,583 $1,583 Windows Server 2003(5CAL) 1 $0 $0 Ubuntu Server 1 $570 $570 Windows2000 Advanced Server(5CAL) 1 $3,400 $3,400 VMware GSX 1 Total cost Unit cost Description Quantity Software needed Timing
19. MS Project 1day? Audit 15 7DAY Total 0.5 days Closeout Report 14 1.5 days? Closing 0.3 days Sketch of Change 13 0.5 days Change Control 12 0.8 days Control 1 day? Training 11 0.5 days Test 10 1 day? Installation 9 2.5 days? Executing 0.3 days Service 8 0.3 days Software 7 0.3 days Hardware 6 0.2 days Sketch 5 0.1 days MS Project 4 0.5 days WBS 3 1.7 days Planning 0.2 days Feasibility study 2 0.3 days Project Charter 1 0.5 days Initiate Duration Task_Name ID