SlideShare une entreprise Scribd logo
1  sur  7
COST CENTER ACCOUNTING
                            COST CENTER ACCOUNTING
                         END USER TRAINING DOCUMENTS


KA06 - KS01 - Create Cost Center


Functionality

Secondary cost element is used in controlling for the purpose of allocation of cost from one
cost object (cost center) to another cost object. Secondary cost element as such are not
created as General ledger code in FI.

Secondary cost elements are generally created under class 9 accounts. Means all the
secondary cost elements start with 9. E.g. Secondary cost element are in between 900000
– 999999.

Secondary cost elements are of the following categories:-
21 – Internal Settlement
31 – Order/Project Result Analysis
41 - Overheads
42 – Assessment
43 – Internal activity allocation

These categories are very important. Overhead cost element should be created with the
cost element category 41 only. A Secondary cost element which is required in the
assessment cycle should be created with category 42 only. Secondary cost element which
needs to be attached to the activity type should be created with the cost element category
43 only.


Scenario

This transaction code is used to create a secondary cost element in the controlling area.
We want to create a secondary cost element which is required to be attached to the activity
type.

Requirements

Controlling area is created


       Menu Path                 Accounting  Controlling  Cost Element Accounting 
                                 Master Data  Cost Element  Individual Processing 
                                 KA06 - Create Secondary Cost Element
       Transaction Code          KA06




                                                                       Page 1 of 7
COST CENTER ACCOUNTING
                             COST CENTER ACCOUNTING
                          END USER TRAINING DOCUMENTS
1.     Double Click on KA06 - Create Secondary Cost Element

     Create Cost Element: Initial screen




2.     Update the following fields:

             Field Name                        Field Description                     Values
        Cost element        Number of the Cost element.                     943202
        Valid from          Date indicating as of when an entry is valid.   01.01.2006
        To                  Date indicating up to when an entry is valid.   31.12.9999



3.     Click Master data Button                  .




                                                                            Page 2 of 7
COST CENTER ACCOUNTING
                             COST CENTER ACCOUNTING
                          END USER TRAINING DOCUMENTS
     Create Cost Element: Basic screen




4.     Update the following fields:

             Field Name                       Field Description                                Values
        Name                General description of the object.                      Labour hours
        Description         The cost element description is used for online         Labour hours
                            displays and evaluations which have sufficient space.
        CElem Category      Cost element category                                   43




                                                                                         Page 3 of 7
COST CENTER ACCOUNTING
                          COST CENTER ACCOUNTING
                       END USER TRAINING DOCUMENTS

5.   Click <tab button> Indicators     .




                                                     Page 4 of 7
COST CENTER ACCOUNTING
                      COST CENTER ACCOUNTING
                   END USER TRAINING DOCUMENTS
Create Cost Element: Indicator




                                                 Page 5 of 7
COST CENTER ACCOUNTING
                      COST CENTER ACCOUNTING
                   END USER TRAINING DOCUMENTS



Create Cost Element: Default account assignment




                                                  Page 6 of 7
COST CENTER ACCOUNTING
                           COST CENTER ACCOUNTING
                        END USER TRAINING DOCUMENTS
     Create Cost Element: History




6.     Click Save




                                                      Page 7 of 7

Contenu connexe

Similaire à Ka06 Create Secondary Cost Element

Kp06 Primary Cost Planning
Kp06 Primary Cost PlanningKp06 Primary Cost Planning
Kp06 Primary Cost Planning
whocanbe1
 
Ks01 Create Cost Center
Ks01 Create Cost CenterKs01 Create Cost Center
Ks01 Create Cost Center
whocanbe1
 
Kp06 primary cost planning
Kp06 primary cost planningKp06 primary cost planning
Kp06 primary cost planning
Zakir Chowdhury
 
Ksub Execute Plan Cost Assessment
Ksub Execute Plan Cost AssessmentKsub Execute Plan Cost Assessment
Ksub Execute Plan Cost Assessment
whocanbe1
 
Kl04 Delete Activity Type
Kl04 Delete Activity TypeKl04 Delete Activity Type
Kl04 Delete Activity Type
whocanbe1
 
Kl01 Create Activity Type
Kl01 Create Activity TypeKl01 Create Activity Type
Kl01 Create Activity Type
whocanbe1
 
Kspi Execute Plan Price Calculation
Kspi Execute Plan Price CalculationKspi Execute Plan Price Calculation
Kspi Execute Plan Price Calculation
whocanbe1
 
Kp97 Copy Plan To Plan
Kp97 Copy Plan To PlanKp97 Copy Plan To Plan
Kp97 Copy Plan To Plan
whocanbe1
 
Kp26 plan activity output on cost center
Kp26 plan activity output on cost centerKp26 plan activity output on cost center
Kp26 plan activity output on cost center
Zakir Chowdhury
 
Kss4 Execute Plan Cost Splitting
Kss4 Execute Plan Cost SplittingKss4 Execute Plan Cost Splitting
Kss4 Execute Plan Cost Splitting
whocanbe1
 
Kp26 Plan Activity Output On Cost Center
Kp26 Plan Activity Output On Cost CenterKp26 Plan Activity Output On Cost Center
Kp26 Plan Activity Output On Cost Center
whocanbe1
 
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
Ashish Gros Morceau
 
ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
Pepa Pencheva
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...
Katherine Alexander
 
Ksvb Execute Plan Cost Distribution
Ksvb Execute Plan Cost DistributionKsvb Execute Plan Cost Distribution
Ksvb Execute Plan Cost Distribution
whocanbe1
 
Okp1 Period Lock Unlock
Okp1 Period Lock UnlockOkp1 Period Lock Unlock
Okp1 Period Lock Unlock
whocanbe1
 
Application of marginal costing technique &amp; its limitations
Application of marginal costing technique &amp; its limitationsApplication of marginal costing technique &amp; its limitations
Application of marginal costing technique &amp; its limitations
Vivek Mahajan
 

Similaire à Ka06 Create Secondary Cost Element (20)

Kp06 Primary Cost Planning
Kp06 Primary Cost PlanningKp06 Primary Cost Planning
Kp06 Primary Cost Planning
 
Ks01 Create Cost Center
Ks01 Create Cost CenterKs01 Create Cost Center
Ks01 Create Cost Center
 
Kp06 primary cost planning
Kp06 primary cost planningKp06 primary cost planning
Kp06 primary cost planning
 
Ksub Execute Plan Cost Assessment
Ksub Execute Plan Cost AssessmentKsub Execute Plan Cost Assessment
Ksub Execute Plan Cost Assessment
 
Kl04 Delete Activity Type
Kl04 Delete Activity TypeKl04 Delete Activity Type
Kl04 Delete Activity Type
 
Kl01 Create Activity Type
Kl01 Create Activity TypeKl01 Create Activity Type
Kl01 Create Activity Type
 
Kspi Execute Plan Price Calculation
Kspi Execute Plan Price CalculationKspi Execute Plan Price Calculation
Kspi Execute Plan Price Calculation
 
Kp97 Copy Plan To Plan
Kp97 Copy Plan To PlanKp97 Copy Plan To Plan
Kp97 Copy Plan To Plan
 
Kp26 plan activity output on cost center
Kp26 plan activity output on cost centerKp26 plan activity output on cost center
Kp26 plan activity output on cost center
 
Kss4 Execute Plan Cost Splitting
Kss4 Execute Plan Cost SplittingKss4 Execute Plan Cost Splitting
Kss4 Execute Plan Cost Splitting
 
11 job costing
11 job costing11 job costing
11 job costing
 
Kp26 Plan Activity Output On Cost Center
Kp26 Plan Activity Output On Cost CenterKp26 Plan Activity Output On Cost Center
Kp26 Plan Activity Output On Cost Center
 
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
Ac fr ogahtrvphwaee1e8gutdnexalzr6og7ijdtzjl_phlut4glpu9b3si-jfuc1bukldiyan6a...
 
ck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instructionck40 n-edit-costing-run-instruction
ck40 n-edit-costing-run-instruction
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...
 
CM Training Catalogue
CM Training CatalogueCM Training Catalogue
CM Training Catalogue
 
Ksvb Execute Plan Cost Distribution
Ksvb Execute Plan Cost DistributionKsvb Execute Plan Cost Distribution
Ksvb Execute Plan Cost Distribution
 
Okp1 Period Lock Unlock
Okp1 Period Lock UnlockOkp1 Period Lock Unlock
Okp1 Period Lock Unlock
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accounting
 
Application of marginal costing technique &amp; its limitations
Application of marginal costing technique &amp; its limitationsApplication of marginal costing technique &amp; its limitations
Application of marginal costing technique &amp; its limitations
 

Dernier

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Dernier (20)

Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Ka06 Create Secondary Cost Element

  • 1. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS KA06 - KS01 - Create Cost Center Functionality Secondary cost element is used in controlling for the purpose of allocation of cost from one cost object (cost center) to another cost object. Secondary cost element as such are not created as General ledger code in FI. Secondary cost elements are generally created under class 9 accounts. Means all the secondary cost elements start with 9. E.g. Secondary cost element are in between 900000 – 999999. Secondary cost elements are of the following categories:- 21 – Internal Settlement 31 – Order/Project Result Analysis 41 - Overheads 42 – Assessment 43 – Internal activity allocation These categories are very important. Overhead cost element should be created with the cost element category 41 only. A Secondary cost element which is required in the assessment cycle should be created with category 42 only. Secondary cost element which needs to be attached to the activity type should be created with the cost element category 43 only. Scenario This transaction code is used to create a secondary cost element in the controlling area. We want to create a secondary cost element which is required to be attached to the activity type. Requirements Controlling area is created Menu Path Accounting  Controlling  Cost Element Accounting  Master Data  Cost Element  Individual Processing  KA06 - Create Secondary Cost Element Transaction Code KA06 Page 1 of 7
  • 2. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 1. Double Click on KA06 - Create Secondary Cost Element Create Cost Element: Initial screen 2. Update the following fields: Field Name Field Description Values Cost element Number of the Cost element. 943202 Valid from Date indicating as of when an entry is valid. 01.01.2006 To Date indicating up to when an entry is valid. 31.12.9999 3. Click Master data Button . Page 2 of 7
  • 3. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Create Cost Element: Basic screen 4. Update the following fields: Field Name Field Description Values Name General description of the object. Labour hours Description The cost element description is used for online Labour hours displays and evaluations which have sufficient space. CElem Category Cost element category 43 Page 3 of 7
  • 4. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS 5. Click <tab button> Indicators . Page 4 of 7
  • 5. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Create Cost Element: Indicator Page 5 of 7
  • 6. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Create Cost Element: Default account assignment Page 6 of 7
  • 7. COST CENTER ACCOUNTING COST CENTER ACCOUNTING END USER TRAINING DOCUMENTS Create Cost Element: History 6. Click Save Page 7 of 7