SlideShare une entreprise Scribd logo
1  sur  32
Bottle Sourcing Project – Case study report
Dragon Sourcing - 龙 源
Delivering sustainable sourcing value from emerging markets
2
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
3
DS launched sourcing activities RFI and RFQ for Food Double wall Glass Bottle in China
Product & Country China
Double Wall
Glass Bottle
New thread design received
4
5
Specification of the product
Product Specifications Information Picture & Documents
Project Deadline Drawing asap / present product Feb
Target sourcing market China
Material Data
Glass must be arsenic and heavy metals free
Glass must pass the LFGB and FDA test
Current price (FOB US$), Target price Target price XXX USD
Annual Volume & P Frequency 15.000 pcs/year – First order: 5000
NDA needed (Y/N) No NDA
Suppliers NOT be included (Y/N)
None, but contact of current contacted supplier
was passed
Require a Sample Not discussed yet
Mention Client ? (Y/N)
No, since it is delivery in China from China, not
mention client name and keep local delivery
Technical information Product specifications document
Suppliers capabilities
- Certifications
- Production equipment/Process
- Final Testing requirement
Pass FDA tests (SGS)
Bottle needs to be clean, no heavy metal content, transparent (no arsenic use)
Packaging requirements Not discussed yet
4-5 criteria for phone pre-screening Not discussed yet
6
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
7
The project is scheduled on 8 weeks.
Not started Started Completed
Phase Process Steps Weeks
November December Jan
17 24 1 8 15 22 29 5
1
Demand &
Analysis
Collect information from client 1
Questions clarification with DS &
Client
1
Supplier
identification
Identify list of potential suppliers in
China
1
Launch supplier phone screening 2
Develop the RFI doc jointly with
Client
2
RFI/RFQ
process
RFI to finalize & approve by Client 1
RFI send out & follow-up 2
Develop the score card doc jointly
with Client
2
Analyze responses & rank suppliers 2
Supplier
selection
Recommend suppliers to be audited
/ samples ordering / drawing
confirmation
1
Sampling Collect and send supplier’s samples 3
2
Supplier
Audit
Client confirms what are the
suppliers to audit
2
Suppliers visit preparation 2
Suppliers audit 1
Final scoring report for audited
suppliers
2
42
38
25
18
12
0
5
10
15
20
25
30
35
40
45
# Suppliers identifed # RFI/RFQ sent # Confirmed ITR # Quotes received # RFI received
Scully project - supplier follow-up
8
Over 42 suppliers in China, 38 RFI/RFQ were sent, 24 suppliers intend to respond, 18
sent RFI and/or Quotation
# of Suppliers
Suppliers identified 42
Suppliers contacted 38
RFI/RFQ sent 38
Intend to respond 24
Sent RFI&RFQ completed
12
(18 only quote)
14 Suppliers gave up
- No reply, only focused on
steel or plastic products,
Traders, not interested
- Don’t make this product
• 4 suppliers not reachable
6 suppliers did not sent RFI
7 suppliers gave up
9
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
Among 18 quotations received, 13 suppliers quoted according to Client’s drawing (DS RFQ).
10
It was verified that all quotes exclude lid
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11 Supplier 12 Supplier 13
5 other suppliers quoted their current products only. Considering the short project timeline and
that supplier don’t fill in RFI/RFQ we’d suggest to exclude those suppliers for the next steps
Supplier Price (ex. Works) Production information
Supplier 14 16.2 RMB/ pcs • sample received quality of the thread not so good
Supplier 15 1.65 USD/ pcs
• Trader
• 410ml similar bottl
Supplier 16 2.72 USD/ pcs • 300 ML, it is coated, suitable for sublimation printing
Supplier 17
3.74 USD/ pcs
(incl. lid)
• 330ML Lid, 462g: Lid PP/PC
• Body: glass(food grade high borosilicate glass/HBG)
Supplier 18
4.40 USD/pcs
(incl. lid)
• 320ML
11
12
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
For the 9 suppliers who provided filled in RFI/RFQ, each 8 sections of the RFI/RFQ were scored and
weighted
13
Section Weight
Business information 20%
CSR 5%
Process and Technology 5%
Production Capability 5%
Quality control and equipment 15%
Certifications 20%
Cooperation 5%
Quotation 25%
Total 100%
Business information, CST, Process & Technology, Production capability
14
Business information Weight Scoring
Year founded 10%
1=After 2010
2=Between 2006 to 2010
3=Between 2000 to 2005
4=Between 1995 and 1999
5=Before 1995
Workfloor size (m²)? 5%
1=Less than 1,000m2
2=1,000m2
-5,000m2
3=5,000m2
-10,000m2
4=Above 10,000m2
Number of production facilities 2%
1=Only 1 facility
2= 2 facilities
3= 3 facilities
4= 4 facilities
5= 5 or more facilities
Number of employees 6%
1= Less than 50 employees
2= 50-100 employees
3= 100-300 employees
4= 300-500 employees
5= Above 500 employees
Number of employees with good english
communication skills
10%
1= 2 people
2= 3-5 people
3= 6-10 people
4= 10-15 people
5= above 15 people
Export experience 10%
0= No export, no license
1= Less than 5 years
2= 5-10 years
3= More than 10 years
Products specially developped for
international market
5%
0= No
1= Yes
Supplier has European customers 15%
0= No Only Chinese customers
1= Yes but no detailled provided
2 = Yes, detailled provided, small EU companies
3 = Yes, European /FR customers large corporations
Supplier provided e-catalogue 2%
0= No
1= Yes
2013 Turnover in USD 5%
1= Less than 3M
2= Between 4 to 10M
3= Between 10 to 20M
4= More than 20M
% of sales share 15%
0= No export
1= Export but not to Europe (<5%)
2= < 15% export to Europe
3= 15% to 30%
4 = 30% to 50% export to Europe
5= > 50% export to EU
Top 5 Customers 15%
0=Mainly Asian, small coprorations.
1= Wordwide large corporations
2= EU main customers, large corporations
CSR
Weight of
criteria
Scoring
Respect Child Labor Regulation 25%
0=No
1=Yes
Adhere to China Labor Law (36h) 25%
0=No
1=Yes
Adhere to all rules and regulation about
environmental issues
25%
0=No
1=Yes
Adhere to all rules and regulation on
safety issues
20%
0=No
1=Yes
Would sign a confidentiality agreement 5%
0=No
1=Yes
Process and Technology
Weight of
criteria
Scoring
Have stable and long-term partners to
supply raw material
30%
0=No
1=Yes
Have an equipment list 40%
0=No
1=Yes
2=Yes and provided
Production Process description
provided
30%
0= Not provided
1= Provided with detais
2 = Provided, majority of processes in-house
Production Capability
Weight of
criteria
Scoring
Annual supply capacity in 2014 30%
0 = not provided
1 = provided
Annual LVE supply capacity in 2013 20%
0 = not provided
1 = provided
Increase/decrease in supply capacity 10%
0=Decrease
1=Stable
2=Increase
% of Double wall glass bottles products
among all the categories you
manufacture
40%
1=Below 10%
2=Between 10-25%
3=Between 25-50%
4=Over 50%
Quality, Certifications, Cooperation and quotation
15
Quality control and equipment
Weight of
criteria
Scoring
Supplier has incoming material
inspection and report
5%
0=No
1=Yes
Supplier accepts 3rd Party QC 5%
0=No
1=Yes
Regularity of in-line quality inspection
(Y/N)
5%
0=None
1=Have, rdetails not provided
2=Have, regularity provided
3=Have, several times per dayd & at different points of
the production process
Type of inspection conducted for
finished goods
5%
0=None
1=Sample inspection following AQL
2=100% inspection
What is the rate of defect / rejected ? 5%
0=Above 5%
1=Between 2-5%
2=Between 1-2%
3=Below 1%
Process for treating defects found 5%
0=Nothing is done, no reply
1=Clear process to separate, discard or rework
What is your internal rule regarding
reaction time of quality claim?
5%
0 = No reply, no process
1 = Defined process detailled
2= Defined process including problemn solving options
provided (reparation, replacement, etc.)
For how long are the QC records
kept
5%
0=Below 6 months
1=Between 6 and 12 months
2=Between 12 and 24 months
3=Above 24 months
Quality Control equipment 5%
0=No details given
1=Between 1-3 equipment listed
2=4-6 equipment equipment listed
3=6-10 equipment listed
4=More then 10 equipment listed
Test the products before delivery 5%
0=No
1= Finished products Test listed
Can meet all requirements listed from
Client ?
50%
0 = Not replied
1 = <2
2 = between 2-4
3 = Can meet 4
4 =Yes can meet all important (not sleeve, lightweight,
5 = Yes, all of them
Certifications
Weight of
criteria
Scoring
Have ISO 9001 20%
0=No
1=Yes
Have ISO 14001 20%
0=No
1=Yes
Other International Standards
applied
25%
0=No
1=Yes
Agree to send product to SGS
laboratory for FDA certiification
35%
0=No
1=Yes
Cooperation
Weight of
criteria
Scoring
Cooperation during RFI 50%
1= Poor
2= Satisfactory
3= Excellent
Completeness of RFI 50%
1= Poor
2= Satisfactory
3= Excellent
Quotation
Weight of
criteria
Scoring
Quotation competitiveness 100%
0 = Quotes highest (20%)
1 = Above average price (20%-50%)
2 = 20%-50% lowest prices
3 = 20% lowest prices Below 1.20 USD Target price
The 11 suppliers who submitted RFI reply were scored. Average score is 63 %, 7
suppliers are above the average
16
Average 63%
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11
17
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
10 suppliers were shortlisted as they provided quotation, RFI and mould information. Mould price
is stable between 800 to 1,000 RMB, lead time could be decreased to 10-15 days for most suppliers
18
Based on scoring, pricing and mould information, DS recommends to move forward with the 6 following suppliers
1, 6, 7
Others suppliers (2,3,4,5,8,9) could be interesting as well depending on priotiry on price or quality/scoring
# Supplier Name
RFI
received
RFQ
received
Can make
Mould
Scoring
results
Scoring %
OK Thread
3D ?
Mould cost
Mould Lead
time
Existing samples
shipment status
Excl. lid
Incl.
Tranport
Quotation /
bottle
(incl. delivery &
excl. lid)
RMB/pcs
1 Supplier 1 YES YES YES 6 67% TBC 1,000 RMB 15 days Received ok ok 6.16 RMB
2 Supplier 2 YES YES YES 8 63%
Can’t open
AI
No mould
Hand made
85USD sample
15 days Client has sample ok ok 8.7 RMB
3 Supplier 3 YES YES YES 7 65% OK
100$ sample
100$ mould
1,300 TOTAL
10 days N/A ok ok 9.8 RMB
4 Supplier 4 YES YES YES 2 71% OK 950 RMB 11 days On the way to DS ok ok 10.47 RMB
5 Supplier 5 YES YES YES 4 68% TBC TBC NA TBC TBC ok 11.8 RMB
6 Supplier 6 YES YES YES 3 70% OK 800 RMB 8 days Received ok ok 12.7 RMB
7 Supplier 7 YES YES YES 1 76% OK 1,000 RMB 7-10 days Received ok ok 13.95 RMB
8 Supplier 8 YES YES YES 9 61% TBC 1,000 RMB
40 days
(TBC)
Will be sent to DS on
Friday
ok No 14.5 RMB
9 Supplier 9 YES YES YES 5 68% Ok 800 RMB 15 days TBC ok ok 15.8 RMB
10 Supplier 10 YES YES YES 10 54% Ok 6000 RMB 30 days Received ok No 27.5 RMB
Not recommended for next steps (low score, difficult communication, high price, long lead time low reactivity)
Recommended for next steps (score, reactivity, price, lead time)
5 Suppliers sent samples of their current product to DS, then sent to client
19
20
Agenda
1. Project scope
2. Project planning & progress
3. Quotation sum up
4. Suppliers scoring
5. Summary and recommendation
6. Relevant QC job for bottles
21
QC job - General information and Sampling standard
Product Name Bottle
Order quantity (units) 7404 Pcs
CTN 1234 cartons
Supplier FG
Inspection date Mar 30th
, 2018
Inspection type Random Inspection
Sampling standard MIL-STD-105E
Sampling level General Inspection LEVEL II
Inspected sample size 200pcs+80 pcs(80 pcs measured dimensions)
Approval sample(s) available No
Inspection location Yongkang
Factory cooperation during the inspection Good
Factory Quality organization Good
Inspector’s general opinion on the factory Good
22
Product Details: Bottle
Dimension in mm (body)
Height 213.7 +/- 1.0 mm
Diameter outside 71.6 + 0.1 / - 0 mm
Height innerpipe 199.7 +/- 0.3 mm
Logo Height 13.0+0/-1.0 mm
Diameter neck 41.1 + 0 /- 0.3 mm Gauge
Liquid content / water level 0.5 l +/- 5%
Picture
23
Defects analysis - summary
Defect Description CRI MAJ MIN Comments
Log printing defect - 1 -
Scratch and caved - 1
Push Button lock - 1 Push Button lock system loosen
Push button and printing Logo not
align
- - 1
Polishing defect - - 1 The bottle neck dusty due to polishing defect
Non-slip bottom - 1 - Non-slip bottom not in right place
# Total of defectives found - 3 3
24
Defect pictures
Logo printing defect Scratch and caved
25
Defect pictures
Non-slip bottom not in right place. Push button and Logo not align.
26
Defect pictures
Push Button lock system loosen .Polishing defect.
27
Packing, storage and shipping marks inspection
Storage condition .
28
Packing, storage and shipping marks inspection
Master Carton Sample 1 Sample 2 Sample 3 Sample 4 Sample 5
Size(cm) 25*18.5*30.5 25*18.3*30.5 24.8*18.4*30.5 25.1*18.1*30.6 24.9*18.3*30.7
G.W(kg) 2.90 2.91 2.90 2.91 2.90
29
Inner Packing, Bar code , Mater carton and inner box product instructions inspection
Master carton and inner box bar code are the same.6 inner boxes/carton.
30
Leaking Test, Sampling size: 13 bottles
Fill in carbonated Drinks
Bottles placed on its side and keeping 60
minutes,
Test result: Not found leaking
31
Dropping and leaking Test, Sampling size: 5 bottles
From 0.75m height drop bottles to surface 3 times( onetime lid, on time side and one time base), Fill
in water and placed on its side 30 minutes After dropping test,
Test result: Not found plastic parts separate from bottle, Not found leaking
32
Printing stability test, Sampling size: 5 bottles
Printing stability test
Test result: Not found printing fade

Contenu connexe

Tendances

PPTJuyan英文
PPTJuyan英文PPTJuyan英文
PPTJuyan英文Amy Zhou
 
Graphenstone Cradle To Cradle Gold Certified
Graphenstone Cradle To Cradle Gold Certified Graphenstone Cradle To Cradle Gold Certified
Graphenstone Cradle To Cradle Gold Certified Calvin Degroodt
 
ISO/IEC 17025
ISO/IEC 17025 ISO/IEC 17025
ISO/IEC 17025 Akma Ija
 
Accreditation of Research Laboratories: An Awareness Creation
Accreditation of Research Laboratories: An Awareness CreationAccreditation of Research Laboratories: An Awareness Creation
Accreditation of Research Laboratories: An Awareness CreationSolomon Abate
 
Blue tech presentation.pdf
Blue tech presentation.pdfBlue tech presentation.pdf
Blue tech presentation.pdfDorisWang33
 
Jin Huang Plastics medical
Jin Huang Plastics medicalJin Huang Plastics medical
Jin Huang Plastics medicalJin Huang
 
General requirements for the competence of testing and calibration laboratories
General requirements for the competence of testing and calibration laboratories General requirements for the competence of testing and calibration laboratories
General requirements for the competence of testing and calibration laboratories Hadi Akbar
 
ISO 17025
ISO 17025 ISO 17025
ISO 17025 Akma Ija
 
Vendor qualification flow chart
Vendor qualification flow chartVendor qualification flow chart
Vendor qualification flow chartBangaluru
 
Guide25 vs ISO/IEC17025
Guide25 vs ISO/IEC17025Guide25 vs ISO/IEC17025
Guide25 vs ISO/IEC17025SEREE NET
 
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationaleDavid Menezes
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing John William
 
Pharma quality assurance and control
Pharma quality assurance and controlPharma quality assurance and control
Pharma quality assurance and controlRafat Abedi (IGMPI)
 
F iso-17025
F iso-17025F iso-17025
F iso-17025Ahmedjet
 
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingPressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingJohn William
 

Tendances (20)

PPTJuyan英文
PPTJuyan英文PPTJuyan英文
PPTJuyan英文
 
Graphenstone Cradle To Cradle Gold Certified
Graphenstone Cradle To Cradle Gold Certified Graphenstone Cradle To Cradle Gold Certified
Graphenstone Cradle To Cradle Gold Certified
 
ISO/IEC 17025
ISO/IEC 17025 ISO/IEC 17025
ISO/IEC 17025
 
Accreditation of Research Laboratories: An Awareness Creation
Accreditation of Research Laboratories: An Awareness CreationAccreditation of Research Laboratories: An Awareness Creation
Accreditation of Research Laboratories: An Awareness Creation
 
Blue tech presentation.pdf
Blue tech presentation.pdfBlue tech presentation.pdf
Blue tech presentation.pdf
 
Jin Huang Plastics medical
Jin Huang Plastics medicalJin Huang Plastics medical
Jin Huang Plastics medical
 
General requirements for the competence of testing and calibration laboratories
General requirements for the competence of testing and calibration laboratories General requirements for the competence of testing and calibration laboratories
General requirements for the competence of testing and calibration laboratories
 
ISO / IEC 17025
ISO / IEC 17025ISO / IEC 17025
ISO / IEC 17025
 
ISO 17025 – technical requirements
ISO 17025 – technical requirementsISO 17025 – technical requirements
ISO 17025 – technical requirements
 
ISO 17025
ISO 17025 ISO 17025
ISO 17025
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
 
Vendor qualification flow chart
Vendor qualification flow chartVendor qualification flow chart
Vendor qualification flow chart
 
Piyalux_Wiwatsripaiboon Resume New
Piyalux_Wiwatsripaiboon Resume NewPiyalux_Wiwatsripaiboon Resume New
Piyalux_Wiwatsripaiboon Resume New
 
Guide25 vs ISO/IEC17025
Guide25 vs ISO/IEC17025Guide25 vs ISO/IEC17025
Guide25 vs ISO/IEC17025
 
Supplier qualification
Supplier qualificationSupplier qualification
Supplier qualification
 
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale
15. l'importance de l'iso cei 17025 pour l'infrastructure technique nationale
 
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing  Coffee Pot Sourcing in China Case Study by Dragon Sourcing
Coffee Pot Sourcing in China Case Study by Dragon Sourcing
 
Pharma quality assurance and control
Pharma quality assurance and controlPharma quality assurance and control
Pharma quality assurance and control
 
F iso-17025
F iso-17025F iso-17025
F iso-17025
 
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon SourcingPressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
 

Similaire à Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing

PCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon SourcingPCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon SourcingJohn William
 
Innovation Presentation - Manufactuers - March 25, 2014
Innovation Presentation - Manufactuers - March 25, 2014Innovation Presentation - Manufactuers - March 25, 2014
Innovation Presentation - Manufactuers - March 25, 2014Lorella Angelini
 
Case Study China RFI/RFQ Report for “Tomato Sauce”
Case Study  China RFI/RFQ Report for “Tomato Sauce” Case Study  China RFI/RFQ Report for “Tomato Sauce”
Case Study China RFI/RFQ Report for “Tomato Sauce” Dragon Sourcing
 
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingStrategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingJohn William
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing John William
 
Ductile Pipes Case Study
Ductile Pipes Case StudyDuctile Pipes Case Study
Ductile Pipes Case StudyDragon Sourcing
 
Iron Cast and Machined Components Case study
Iron Cast and Machined Components Case studyIron Cast and Machined Components Case study
Iron Cast and Machined Components Case studyDragon Sourcing
 
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...John William
 
Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingJohn William
 
Team c powerpoint presentation w6
Team c powerpoint presentation w6Team c powerpoint presentation w6
Team c powerpoint presentation w6Craig Parr
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingJohn William
 
Technical compliance requirement PPT.
Technical compliance requirement PPT.Technical compliance requirement PPT.
Technical compliance requirement PPT.md.najmul huda hemel
 
Subcontracting Quality: Extending Your Quality System to the Supply Chain
Subcontracting Quality: Extending Your Quality System to the Supply ChainSubcontracting Quality: Extending Your Quality System to the Supply Chain
Subcontracting Quality: Extending Your Quality System to the Supply Chaintimwrodgers
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingJohn William
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingJohn William
 
Coffee Machine Case Study
Coffee Machine Case StudyCoffee Machine Case Study
Coffee Machine Case StudyDragon Sourcing
 
Case Study-Sourcing of Automatic Coffee Machine
Case Study-Sourcing of Automatic Coffee MachineCase Study-Sourcing of Automatic Coffee Machine
Case Study-Sourcing of Automatic Coffee MachineJohn William
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingJohn William
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.John William
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case StudyJohn William
 

Similaire à Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing (20)

PCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon SourcingPCBA Sourcing Case Study by Dragon Sourcing
PCBA Sourcing Case Study by Dragon Sourcing
 
Innovation Presentation - Manufactuers - March 25, 2014
Innovation Presentation - Manufactuers - March 25, 2014Innovation Presentation - Manufactuers - March 25, 2014
Innovation Presentation - Manufactuers - March 25, 2014
 
Case Study China RFI/RFQ Report for “Tomato Sauce”
Case Study  China RFI/RFQ Report for “Tomato Sauce” Case Study  China RFI/RFQ Report for “Tomato Sauce”
Case Study China RFI/RFQ Report for “Tomato Sauce”
 
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon SourcingStrategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 
Ductile Pipes Case Study
Ductile Pipes Case StudyDuctile Pipes Case Study
Ductile Pipes Case Study
 
Iron Cast and Machined Components Case study
Iron Cast and Machined Components Case studyIron Cast and Machined Components Case study
Iron Cast and Machined Components Case study
 
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...Overview on Textile Sourcing in Vietnam, Thailand, China, Costa  Rica, Guatem...
Overview on Textile Sourcing in Vietnam, Thailand, China, Costa Rica, Guatem...
 
Door Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon SourcingDoor Hardware Sourcing Case Study by Dragon Sourcing
Door Hardware Sourcing Case Study by Dragon Sourcing
 
Team c powerpoint presentation w6
Team c powerpoint presentation w6Team c powerpoint presentation w6
Team c powerpoint presentation w6
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
Technical compliance requirement PPT.
Technical compliance requirement PPT.Technical compliance requirement PPT.
Technical compliance requirement PPT.
 
Subcontracting Quality: Extending Your Quality System to the Supply Chain
Subcontracting Quality: Extending Your Quality System to the Supply ChainSubcontracting Quality: Extending Your Quality System to the Supply Chain
Subcontracting Quality: Extending Your Quality System to the Supply Chain
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coating
 
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
Coffee Machine Case Study
Coffee Machine Case StudyCoffee Machine Case Study
Coffee Machine Case Study
 
Case Study-Sourcing of Automatic Coffee Machine
Case Study-Sourcing of Automatic Coffee MachineCase Study-Sourcing of Automatic Coffee Machine
Case Study-Sourcing of Automatic Coffee Machine
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon Sourcing
 
Know the various facts in hat sourcing.
Know the various facts in hat sourcing.Know the various facts in hat sourcing.
Know the various facts in hat sourcing.
 
Hat Sourcing - Case Study
Hat Sourcing - Case StudyHat Sourcing - Case Study
Hat Sourcing - Case Study
 

Plus de John William

Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudyJohn William
 
Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudyJohn William
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​John William
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUJohn William
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamJohn William
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilJohn William
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaJohn William
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaJohn William
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanJohn William
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaJohn William
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarJohn William
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaJohn William
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingJohn William
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingJohn William
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingJohn William
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudyJohn William
 
Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study John William
 
Cotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyCotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyJohn William
 

Plus de John William (20)

Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case Study
 
Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief Study
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
 
Newsletter on PPE
Newsletter on PPENewsletter on PPE
Newsletter on PPE
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in Vietnam
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in Brazil
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in Ethiopia
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in Malaysia
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in Pakistan
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South Africa
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in Myanmar
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in Indonesia
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon Sourcing
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon Sourcing
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
 
Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study Glass Bottles and Glass Jars Sourcing Project Case Study
Glass Bottles and Glass Jars Sourcing Project Case Study
 
Cotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case StudyCotton Bags for Luxury Retail Brand Case Study
Cotton Bags for Luxury Retail Brand Case Study
 

Dernier

AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...tanu pandey
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...tanu pandey
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanurdharasingh5698
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024TeckResourcesLtd
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...SUHANI PANDEY
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 

Dernier (20)

AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts PodanurTop Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
Top Rated Call Girls In Podanur 📱 {7001035870} VIP Escorts Podanur
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 

Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing

  • 1. Bottle Sourcing Project – Case study report Dragon Sourcing - 龙 源 Delivering sustainable sourcing value from emerging markets
  • 2. 2 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 3. 3 DS launched sourcing activities RFI and RFQ for Food Double wall Glass Bottle in China Product & Country China Double Wall Glass Bottle
  • 4. New thread design received 4
  • 5. 5 Specification of the product Product Specifications Information Picture & Documents Project Deadline Drawing asap / present product Feb Target sourcing market China Material Data Glass must be arsenic and heavy metals free Glass must pass the LFGB and FDA test Current price (FOB US$), Target price Target price XXX USD Annual Volume & P Frequency 15.000 pcs/year – First order: 5000 NDA needed (Y/N) No NDA Suppliers NOT be included (Y/N) None, but contact of current contacted supplier was passed Require a Sample Not discussed yet Mention Client ? (Y/N) No, since it is delivery in China from China, not mention client name and keep local delivery Technical information Product specifications document Suppliers capabilities - Certifications - Production equipment/Process - Final Testing requirement Pass FDA tests (SGS) Bottle needs to be clean, no heavy metal content, transparent (no arsenic use) Packaging requirements Not discussed yet 4-5 criteria for phone pre-screening Not discussed yet
  • 6. 6 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 7. 7 The project is scheduled on 8 weeks. Not started Started Completed Phase Process Steps Weeks November December Jan 17 24 1 8 15 22 29 5 1 Demand & Analysis Collect information from client 1 Questions clarification with DS & Client 1 Supplier identification Identify list of potential suppliers in China 1 Launch supplier phone screening 2 Develop the RFI doc jointly with Client 2 RFI/RFQ process RFI to finalize & approve by Client 1 RFI send out & follow-up 2 Develop the score card doc jointly with Client 2 Analyze responses & rank suppliers 2 Supplier selection Recommend suppliers to be audited / samples ordering / drawing confirmation 1 Sampling Collect and send supplier’s samples 3 2 Supplier Audit Client confirms what are the suppliers to audit 2 Suppliers visit preparation 2 Suppliers audit 1 Final scoring report for audited suppliers 2
  • 8. 42 38 25 18 12 0 5 10 15 20 25 30 35 40 45 # Suppliers identifed # RFI/RFQ sent # Confirmed ITR # Quotes received # RFI received Scully project - supplier follow-up 8 Over 42 suppliers in China, 38 RFI/RFQ were sent, 24 suppliers intend to respond, 18 sent RFI and/or Quotation # of Suppliers Suppliers identified 42 Suppliers contacted 38 RFI/RFQ sent 38 Intend to respond 24 Sent RFI&RFQ completed 12 (18 only quote) 14 Suppliers gave up - No reply, only focused on steel or plastic products, Traders, not interested - Don’t make this product • 4 suppliers not reachable 6 suppliers did not sent RFI 7 suppliers gave up
  • 9. 9 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 10. Among 18 quotations received, 13 suppliers quoted according to Client’s drawing (DS RFQ). 10 It was verified that all quotes exclude lid Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11 Supplier 12 Supplier 13
  • 11. 5 other suppliers quoted their current products only. Considering the short project timeline and that supplier don’t fill in RFI/RFQ we’d suggest to exclude those suppliers for the next steps Supplier Price (ex. Works) Production information Supplier 14 16.2 RMB/ pcs • sample received quality of the thread not so good Supplier 15 1.65 USD/ pcs • Trader • 410ml similar bottl Supplier 16 2.72 USD/ pcs • 300 ML, it is coated, suitable for sublimation printing Supplier 17 3.74 USD/ pcs (incl. lid) • 330ML Lid, 462g: Lid PP/PC • Body: glass(food grade high borosilicate glass/HBG) Supplier 18 4.40 USD/pcs (incl. lid) • 320ML 11
  • 12. 12 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 13. For the 9 suppliers who provided filled in RFI/RFQ, each 8 sections of the RFI/RFQ were scored and weighted 13 Section Weight Business information 20% CSR 5% Process and Technology 5% Production Capability 5% Quality control and equipment 15% Certifications 20% Cooperation 5% Quotation 25% Total 100%
  • 14. Business information, CST, Process & Technology, Production capability 14 Business information Weight Scoring Year founded 10% 1=After 2010 2=Between 2006 to 2010 3=Between 2000 to 2005 4=Between 1995 and 1999 5=Before 1995 Workfloor size (m²)? 5% 1=Less than 1,000m2 2=1,000m2 -5,000m2 3=5,000m2 -10,000m2 4=Above 10,000m2 Number of production facilities 2% 1=Only 1 facility 2= 2 facilities 3= 3 facilities 4= 4 facilities 5= 5 or more facilities Number of employees 6% 1= Less than 50 employees 2= 50-100 employees 3= 100-300 employees 4= 300-500 employees 5= Above 500 employees Number of employees with good english communication skills 10% 1= 2 people 2= 3-5 people 3= 6-10 people 4= 10-15 people 5= above 15 people Export experience 10% 0= No export, no license 1= Less than 5 years 2= 5-10 years 3= More than 10 years Products specially developped for international market 5% 0= No 1= Yes Supplier has European customers 15% 0= No Only Chinese customers 1= Yes but no detailled provided 2 = Yes, detailled provided, small EU companies 3 = Yes, European /FR customers large corporations Supplier provided e-catalogue 2% 0= No 1= Yes 2013 Turnover in USD 5% 1= Less than 3M 2= Between 4 to 10M 3= Between 10 to 20M 4= More than 20M % of sales share 15% 0= No export 1= Export but not to Europe (<5%) 2= < 15% export to Europe 3= 15% to 30% 4 = 30% to 50% export to Europe 5= > 50% export to EU Top 5 Customers 15% 0=Mainly Asian, small coprorations. 1= Wordwide large corporations 2= EU main customers, large corporations CSR Weight of criteria Scoring Respect Child Labor Regulation 25% 0=No 1=Yes Adhere to China Labor Law (36h) 25% 0=No 1=Yes Adhere to all rules and regulation about environmental issues 25% 0=No 1=Yes Adhere to all rules and regulation on safety issues 20% 0=No 1=Yes Would sign a confidentiality agreement 5% 0=No 1=Yes Process and Technology Weight of criteria Scoring Have stable and long-term partners to supply raw material 30% 0=No 1=Yes Have an equipment list 40% 0=No 1=Yes 2=Yes and provided Production Process description provided 30% 0= Not provided 1= Provided with detais 2 = Provided, majority of processes in-house Production Capability Weight of criteria Scoring Annual supply capacity in 2014 30% 0 = not provided 1 = provided Annual LVE supply capacity in 2013 20% 0 = not provided 1 = provided Increase/decrease in supply capacity 10% 0=Decrease 1=Stable 2=Increase % of Double wall glass bottles products among all the categories you manufacture 40% 1=Below 10% 2=Between 10-25% 3=Between 25-50% 4=Over 50%
  • 15. Quality, Certifications, Cooperation and quotation 15 Quality control and equipment Weight of criteria Scoring Supplier has incoming material inspection and report 5% 0=No 1=Yes Supplier accepts 3rd Party QC 5% 0=No 1=Yes Regularity of in-line quality inspection (Y/N) 5% 0=None 1=Have, rdetails not provided 2=Have, regularity provided 3=Have, several times per dayd & at different points of the production process Type of inspection conducted for finished goods 5% 0=None 1=Sample inspection following AQL 2=100% inspection What is the rate of defect / rejected ? 5% 0=Above 5% 1=Between 2-5% 2=Between 1-2% 3=Below 1% Process for treating defects found 5% 0=Nothing is done, no reply 1=Clear process to separate, discard or rework What is your internal rule regarding reaction time of quality claim? 5% 0 = No reply, no process 1 = Defined process detailled 2= Defined process including problemn solving options provided (reparation, replacement, etc.) For how long are the QC records kept 5% 0=Below 6 months 1=Between 6 and 12 months 2=Between 12 and 24 months 3=Above 24 months Quality Control equipment 5% 0=No details given 1=Between 1-3 equipment listed 2=4-6 equipment equipment listed 3=6-10 equipment listed 4=More then 10 equipment listed Test the products before delivery 5% 0=No 1= Finished products Test listed Can meet all requirements listed from Client ? 50% 0 = Not replied 1 = <2 2 = between 2-4 3 = Can meet 4 4 =Yes can meet all important (not sleeve, lightweight, 5 = Yes, all of them Certifications Weight of criteria Scoring Have ISO 9001 20% 0=No 1=Yes Have ISO 14001 20% 0=No 1=Yes Other International Standards applied 25% 0=No 1=Yes Agree to send product to SGS laboratory for FDA certiification 35% 0=No 1=Yes Cooperation Weight of criteria Scoring Cooperation during RFI 50% 1= Poor 2= Satisfactory 3= Excellent Completeness of RFI 50% 1= Poor 2= Satisfactory 3= Excellent Quotation Weight of criteria Scoring Quotation competitiveness 100% 0 = Quotes highest (20%) 1 = Above average price (20%-50%) 2 = 20%-50% lowest prices 3 = 20% lowest prices Below 1.20 USD Target price
  • 16. The 11 suppliers who submitted RFI reply were scored. Average score is 63 %, 7 suppliers are above the average 16 Average 63% Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11
  • 17. 17 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 18. 10 suppliers were shortlisted as they provided quotation, RFI and mould information. Mould price is stable between 800 to 1,000 RMB, lead time could be decreased to 10-15 days for most suppliers 18 Based on scoring, pricing and mould information, DS recommends to move forward with the 6 following suppliers 1, 6, 7 Others suppliers (2,3,4,5,8,9) could be interesting as well depending on priotiry on price or quality/scoring # Supplier Name RFI received RFQ received Can make Mould Scoring results Scoring % OK Thread 3D ? Mould cost Mould Lead time Existing samples shipment status Excl. lid Incl. Tranport Quotation / bottle (incl. delivery & excl. lid) RMB/pcs 1 Supplier 1 YES YES YES 6 67% TBC 1,000 RMB 15 days Received ok ok 6.16 RMB 2 Supplier 2 YES YES YES 8 63% Can’t open AI No mould Hand made 85USD sample 15 days Client has sample ok ok 8.7 RMB 3 Supplier 3 YES YES YES 7 65% OK 100$ sample 100$ mould 1,300 TOTAL 10 days N/A ok ok 9.8 RMB 4 Supplier 4 YES YES YES 2 71% OK 950 RMB 11 days On the way to DS ok ok 10.47 RMB 5 Supplier 5 YES YES YES 4 68% TBC TBC NA TBC TBC ok 11.8 RMB 6 Supplier 6 YES YES YES 3 70% OK 800 RMB 8 days Received ok ok 12.7 RMB 7 Supplier 7 YES YES YES 1 76% OK 1,000 RMB 7-10 days Received ok ok 13.95 RMB 8 Supplier 8 YES YES YES 9 61% TBC 1,000 RMB 40 days (TBC) Will be sent to DS on Friday ok No 14.5 RMB 9 Supplier 9 YES YES YES 5 68% Ok 800 RMB 15 days TBC ok ok 15.8 RMB 10 Supplier 10 YES YES YES 10 54% Ok 6000 RMB 30 days Received ok No 27.5 RMB Not recommended for next steps (low score, difficult communication, high price, long lead time low reactivity) Recommended for next steps (score, reactivity, price, lead time)
  • 19. 5 Suppliers sent samples of their current product to DS, then sent to client 19
  • 20. 20 Agenda 1. Project scope 2. Project planning & progress 3. Quotation sum up 4. Suppliers scoring 5. Summary and recommendation 6. Relevant QC job for bottles
  • 21. 21 QC job - General information and Sampling standard Product Name Bottle Order quantity (units) 7404 Pcs CTN 1234 cartons Supplier FG Inspection date Mar 30th , 2018 Inspection type Random Inspection Sampling standard MIL-STD-105E Sampling level General Inspection LEVEL II Inspected sample size 200pcs+80 pcs(80 pcs measured dimensions) Approval sample(s) available No Inspection location Yongkang Factory cooperation during the inspection Good Factory Quality organization Good Inspector’s general opinion on the factory Good
  • 22. 22 Product Details: Bottle Dimension in mm (body) Height 213.7 +/- 1.0 mm Diameter outside 71.6 + 0.1 / - 0 mm Height innerpipe 199.7 +/- 0.3 mm Logo Height 13.0+0/-1.0 mm Diameter neck 41.1 + 0 /- 0.3 mm Gauge Liquid content / water level 0.5 l +/- 5% Picture
  • 23. 23 Defects analysis - summary Defect Description CRI MAJ MIN Comments Log printing defect - 1 - Scratch and caved - 1 Push Button lock - 1 Push Button lock system loosen Push button and printing Logo not align - - 1 Polishing defect - - 1 The bottle neck dusty due to polishing defect Non-slip bottom - 1 - Non-slip bottom not in right place # Total of defectives found - 3 3
  • 24. 24 Defect pictures Logo printing defect Scratch and caved
  • 25. 25 Defect pictures Non-slip bottom not in right place. Push button and Logo not align.
  • 26. 26 Defect pictures Push Button lock system loosen .Polishing defect.
  • 27. 27 Packing, storage and shipping marks inspection Storage condition .
  • 28. 28 Packing, storage and shipping marks inspection Master Carton Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Size(cm) 25*18.5*30.5 25*18.3*30.5 24.8*18.4*30.5 25.1*18.1*30.6 24.9*18.3*30.7 G.W(kg) 2.90 2.91 2.90 2.91 2.90
  • 29. 29 Inner Packing, Bar code , Mater carton and inner box product instructions inspection Master carton and inner box bar code are the same.6 inner boxes/carton.
  • 30. 30 Leaking Test, Sampling size: 13 bottles Fill in carbonated Drinks Bottles placed on its side and keeping 60 minutes, Test result: Not found leaking
  • 31. 31 Dropping and leaking Test, Sampling size: 5 bottles From 0.75m height drop bottles to surface 3 times( onetime lid, on time side and one time base), Fill in water and placed on its side 30 minutes After dropping test, Test result: Not found plastic parts separate from bottle, Not found leaking
  • 32. 32 Printing stability test, Sampling size: 5 bottles Printing stability test Test result: Not found printing fade