pm week 4 assignment.docx
1. pm week 4 assignment
PurposeThis assignment continues building the project planning artifacts by creating the
budget, which supports the cost triple constraint. In this assignment, you will create cost
estimates and a Planned Value (PV) Curve.Assignment InstructionsBased on your duration
estimate, total the skill set labor hours, plug in each skill set labor rate (you set each rate),
and build out a definitive cost estimate using Excel. Use the Generic Excel Workbook
available in the attachments as your guide. Remember to crosscheck yourself against the
grading rubric to ensure you address each and every grading criterion. Deliverable1: Cost
duration estimates by activity, by work package, and overall project, which you should
complete under the Duration Estimate tab. Deliverable2: You should complete the skill set
labor costs under the rate sheet tab.Part Two: Using the example of building a project spend
plan or budget with cumulative cost curve (S-Curve or Project Baseline) from the file
“Building the PV Curve.xls― located in attachments, build a project spend plan or
budget for your project, with a cumulative cost curve or project baseline. The “Building
the PV Curve.xls― requires that you group your costs by four time periods. Time periods
can be hours, days, weeks, or months depending on the length of your project. Remember to
crosscheck yourself against the grading rubric to ensure you address each and every
grading criterion.Assignment RequirementsUse the Generic Excel Workbook to complete
the cost duration estimates and the Building the PV Curve.xls to complete the assignment.
Submit both Excel Workbooks in the Dropbox. No APA requirements for this
assignment.Also review the university policy on plagiarism. If you have any questions,
please contact your professor.See attached Grading Rubric to ensure criteria is met.Also
attached is previous work already don’t that may contribute to this answer.