1. INTRODUCTION
2
The report intends to draw necessary attention towards the construction details for the chosen site
located at Church Fields Garston L19 8NG. The details will encompass site investigation report,
the insight to the construction aspects of the site including the ground works, foundations,
external walls, floors and roofs.
1.1.Introduction to the Site
The location of site is approximately five miles to the South-East of Liverpool, close to the river
Mersey and Garston Docks at Church Fields. The area is crowded with mostly 2 story houses.
The report is also intended for construction of a house at the aforesaid location.
2. Site Investigation & Ground Works
The site investigation is the preliminary phase for analyzing the architectural and urban design of
a site while considering the geographical, climatic, and infrastructural and safety context of a
specific site. It will assist in the selection of the foundations laid down beneath the superstructure
of the building along with the overall design of the site under construction scrutiny.
Before designing a foundation, there must be a reasonably accurate conception regarding the
physical properties and arrangements for the subject materials. The fields investigations is the
process by which the hazards present in the ground beneath the site are explored and reported.
2.1. Site Investigation
On the basis of location of the chosen site, the below mentioned information is crucial for
consideration while execution of the construction project.
3
- The type of structure to be built: Since, the site is intended to be utilized for
construction of two story house. Therefore, among the forms of low rise construction
including timber frame, steel frame, concrete frame, load bearing, single story the most
preferable is the timber frame as it seems to be cost effective as well light and provide
considerable strength to the structure.
- Characteristics of the structure: The decision about structure of the building is
followed by the understanding the design of the foundation to be laid underneath the
ground.
- Soil Investigation: The geo technical or aerial analysis of the soil condition at the site is
essential which is covered in the important points highlighted in the subsurface
investigation.
o Subsurface Investigation
✓ The sequence and nature of strata.
✓ The conditions of ground water at the site.
✓ The assessment of physical properties of rock and soil of the concerned site.
✓ The characteristics of foundation of adjacent structure and the chemical
composition of ground water.
- Foundation Design: The foundation structures include deep foundation and shallow
foundations. The deep foundations are used for heavy buildings, while the shallow ones
4
are used for light buildings like in this case houses. The shallow foundations are also
called spread footings or open footings. Each footing takes the concentrated load and
spread it over larger area to not let the weight exerted on the soil to exceed the capacity of
safe bearing of soil.
2.2. Ground Works
The methods of investigations of ground conditions include trial pits and boreholes. The trial
pits entails shallow excavations going down to a maximum depth of 6m. The trial pit excavation
methods includes by hand with depth of up to 2 m, wheeled back hoe till 4m and finally
hydraulic excavator with up to 4-6 m depth. The trial pit requires information pertaining to
location, size of pit, depth scale, root structure, water level and seepage. The weather conditions
also do impact the soil conditions which need to be under consideration. The process of
grounding must follow some necessary safety precautions w.r.t. health safety as well as ensuring
strength of the future foundations and designs. This requires water elimination and ground
improvement. The safety considerations while laying down foundations must consider the
freezing weather as it should be built below the frost line which is the level in the ground above
where the freezing occurs.
3. Foundations
The shallow foundation includes strip footings which entails a strip of concrete that supports the
weight of an entire wall. Such striping’s are used where the building load is carried by entire wall
compared to the isolated columns. The project will use deep strip foundations considering the
reach to the soil is at lower level with suitable bearing capacity. The deeper trench is dug and
5
strip foundations are poured at a lower level which holds the weight of walls built at the ground
level.
3.1. Method Statement Activities for construction of Trench Fill Strip Foundation
1) First, the excavation lines are setup.
2) Scanning of area will be carried out using Cable Avoidance tool.
3) The excavation of trench will be carried out with constant monitoring for excavation
level until the desired depth is achieved.
4) Concrete will be discharged on the trench from the concerned equipment or source.
5) The vibration of concrete at constant level will be assessed to ensure attainment at
appropriate level,
6) A level surface is ensured by tamping of concrete.
7) Post pour checks are taken to assess that line and level are within contract tolerances.
4. External Walls
The execution of foundation laying plan is followed by the development of external masonry
walls. The important materials used for the construction of external walls include solid
concrete masonry blocks, cement, damp proof course, scaffolding platforms, steel masonry
accessories etc. The masonry cavity wall composed of two pieces of masonry separated by an
air space connected by corrosion-resistant metal ties. The inner leaf is solid concrete block
and the outer leaf comprised of bricks. The Earthwool Dri Therm Cavity Slabs are light
6
weight semi rigid slabs of glass mineral wool with water repellent additive to produce a fit
between wall ties at standard vertical spacing. Damp proof courses are installed to ensure that
penetrating water is directed to the outer leaf.
The establishment of external walls initiates from the foundations. The wall starts from
beneath the ground while the cavity wall is established above the ground by creating gap
through cavity insulation. The Damp Proof Membrane is set before the rigid insulation piece
to separate it from the concrete at the ground floor.
!
Source: Chudley & Greeno (2008), pg # 217
Ground Level
1500 m
1000m
7
!
Source: Chudley & Greeno (2008), pg. 402
5. Floors
The construction of upper floor is much simpler as it requires a level smooth surface capable of
supporting required dead and imposed loads. The element of fire construction amid sound
resistance must be safeguarded. The upper floor plays an important role in providing lateral
resistance to external walls. The method for construction of upper floor is not changed drastically
with the traditional practice as still the joists supporting floor covering with finish on the
underside. The floors are formed with wood joists covered above with floor boards and beneath
with wood laths and plaster. The joists have to be trimmed around all fireplaces and for stair
wells and other openings.
8
!
Source: Chudley & Greeno (2008), pg. 416
The timber frame is a modernized construction method which employs standardized
prefabricated timber wall panels and floors. The timber frame design considers the building
regulation requirement for thermal, acoustic and fire proofing ensuring safety measures in the
floor designing process. Key health and safety requirements for timber frame utilization are as
following:
- Construction (Design and Management) Regulations
- Risk Assessments
- Full Scaffolding
- Fall prevention and arrest methodologies
- Control of lifting operations
9
- Site security
- Manual Handling
6. Roofs
The flat roofs traditionally consist of a structural timber deck with water proof covering directly
applied to the top of the deck. The cold deck flat roof does incorporate insulation in the form of
mineral wool which is stuffed in between the timber rafter / joists with a minimum air gap of 50
mm (2inch) left in between the insulation and roof deck. Whereas the warm deck flat roof is
resulted through moving the insulation to the outside of the structure. While, the roof deck is
brought inside. The purpose is the possibility of condensation forming on the underside of the
deck and eliminates damp. This design accommodates for conserving heat thus no need of
ventilation. In the cold roof the good ventilation is essential to allow condensation to escape
particularly where moisture levels are high.
Most roofs are prepared with trussed rafters. In the case of timber frame, the head binder of the
wall panels provides a ready fixed level and straight wall plate where to fix the trussed rafters.
The timber frame provides a secure fixing point for truss clips, straps and bracing. Trussed rafter
roofs can be assembled in sections on the safe working platform of a lower cassette floor. The
part assembled roof can then be lifted off in sections, placed temporarily at ground level (often
on the ground floor slab of an adjacent plot) while the final story of wall panels are erected.
When this stage is complete the roof can be lifted back on again (in sections if necessary), fully
braced, and then fixed with felt and tiling battens. Aside from the obvious advantages in reduced
working at height, this method ensures a perfect fit to the roof.
10
7. Conclusion
The report covers the construction details for the site located at Church Fields Garston L19
8NG.The construction designs have been reported to highlight various construction aspects of
the site including the ground works i.e. foundations, external walls, floors and roofs. Deep strip
foundations have been used to lay the structure of the house bearing its whole weight, The timber
frame is employed for flooring purpose.
11
References List
Chudley, R. and Greeno, R. (2008) “Building Construction Handbook” Seventh Edition, Elsevier
Ltd.
Emmitt, S. & Gorse, C. (2006) 'Barry's Introduction to the Construction of Buildings' 1st Edition
Blackwell 1405110554 ,
http://buildersafety.org/method-statement-for-concrete-foundations/
M. J. Dumbleton and G. West, Transport And Road Research Laboratory Report
LR403, Preliminary Sources of Information for Site Investigation In Britain (Crowthorne, 1971)
Riley, M. & Cotgrave, A. (2008) 'Construction Technology 1: House Construction' 2nd Edition
Palgrave 978023023624

Contenu connexe

Tendances

M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
Est
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
KHUSHBU SHAH
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
visaga vel
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining walls
Ritesh Chinchawade
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise building
Chiam Jiane
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
Anne Allan
 

Tendances (20)

Calculation of dead load
Calculation of dead loadCalculation of dead load
Calculation of dead load
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Study of rebars in construction
Study of rebars in constructionStudy of rebars in construction
Study of rebars in construction
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
Barbed Wire | Barbed Wire Fencing | Barbed Wire Manufacturers in Coimbatore, ...
 
What is cladding
What is claddingWhat is cladding
What is cladding
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
waterproofing
waterproofingwaterproofing
waterproofing
 
Building materials and construction technlogoy- FALSE CEILING & FLOORING
Building materials and construction technlogoy- FALSE CEILING & FLOORINGBuilding materials and construction technlogoy- FALSE CEILING & FLOORING
Building materials and construction technlogoy- FALSE CEILING & FLOORING
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining walls
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 
Water proofing for expansion joints
Water proofing for expansion jointsWater proofing for expansion joints
Water proofing for expansion joints
 
Design of column according ACI codes
Design of column according ACI codesDesign of column according ACI codes
Design of column according ACI codes
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
ceiling note
ceiling noteceiling note
ceiling note
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Building services- telecommunications for high rise building
Building services- telecommunications for high rise buildingBuilding services- telecommunications for high rise building
Building services- telecommunications for high rise building
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 

En vedette (7)

Love letter to girlfriend
Love letter to girlfriendLove letter to girlfriend
Love letter to girlfriend
 
Essay about love
Essay about loveEssay about love
Essay about love
 
Political science research paper
Political science research paperPolitical science research paper
Political science research paper
 
Rhetorical analysis essay example
Rhetorical analysis essay exampleRhetorical analysis essay example
Rhetorical analysis essay example
 
Financial essay example
Financial essay exampleFinancial essay example
Financial essay example
 
Floors slideshare
Floors slideshareFloors slideshare
Floors slideshare
 
Sustainability in RV Parks/Campgrounds
Sustainability in RV Parks/Campgrounds Sustainability in RV Parks/Campgrounds
Sustainability in RV Parks/Campgrounds
 

Similaire à Construction Technology Essay Sample Harvard

An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildings
hlksd
 
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
Saleh Ahmed
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptx
sydneyaugust1
 

Similaire à Construction Technology Essay Sample Harvard (20)

basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4am
 
Floors, roofs, shoring and underpinning.pptx
Floors, roofs, shoring and underpinning.pptxFloors, roofs, shoring and underpinning.pptx
Floors, roofs, shoring and underpinning.pptx
 
An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildings
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Types of Foundation and Site Investigation.pdf
Types of Foundation and Site Investigation.pdfTypes of Foundation and Site Investigation.pdf
Types of Foundation and Site Investigation.pdf
 
Tutor cavity wall construction .ppt 1
Tutor cavity wall construction .ppt 1Tutor cavity wall construction .ppt 1
Tutor cavity wall construction .ppt 1
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
Floors
FloorsFloors
Floors
 
Cavity wall
Cavity wall Cavity wall
Cavity wall
 
Deep excavation report
Deep excavation reportDeep excavation report
Deep excavation report
 
Lec. 04 (cad)
Lec. 04 (cad)Lec. 04 (cad)
Lec. 04 (cad)
 
Site report
Site reportSite report
Site report
 
Ct3 presentation slides
Ct3 presentation slides Ct3 presentation slides
Ct3 presentation slides
 
Latest ct3
Latest ct3Latest ct3
Latest ct3
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundation
 
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
 
Retaining walls
Retaining walls Retaining walls
Retaining walls
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptx
 

Plus de Writers Per Hour

Curriculum Design
Curriculum DesignCurriculum Design
Curriculum Design
Writers Per Hour
 

Plus de Writers Per Hour (20)

Gas Process
Gas ProcessGas Process
Gas Process
 
Religious Studies and Literacy
Religious Studies and LiteracyReligious Studies and Literacy
Religious Studies and Literacy
 
Differential Application of Utilitarian and Deontological Ethical Theories in...
Differential Application of Utilitarian and Deontological Ethical Theories in...Differential Application of Utilitarian and Deontological Ethical Theories in...
Differential Application of Utilitarian and Deontological Ethical Theories in...
 
Religion
ReligionReligion
Religion
 
News Article
News ArticleNews Article
News Article
 
American Government
American GovernmentAmerican Government
American Government
 
Religion
ReligionReligion
Religion
 
Discussion Post
Discussion PostDiscussion Post
Discussion Post
 
Multicultural History of Lowell Assignment
Multicultural History of Lowell AssignmentMulticultural History of Lowell Assignment
Multicultural History of Lowell Assignment
 
how one company penaterated into the korean seasoning market back in 90s and ...
how one company penaterated into the korean seasoning market back in 90s and ...how one company penaterated into the korean seasoning market back in 90s and ...
how one company penaterated into the korean seasoning market back in 90s and ...
 
Curriculum Design
Curriculum DesignCurriculum Design
Curriculum Design
 
Personal Theory Paper
Personal Theory PaperPersonal Theory Paper
Personal Theory Paper
 
T-shirt company
T-shirt companyT-shirt company
T-shirt company
 
Legacy of the Progressive
Legacy of the ProgressiveLegacy of the Progressive
Legacy of the Progressive
 
Legacy of the Progressive Era
Legacy of the Progressive EraLegacy of the Progressive Era
Legacy of the Progressive Era
 
Theory of Knowledge
Theory of KnowledgeTheory of Knowledge
Theory of Knowledge
 
Learning Module
Learning ModuleLearning Module
Learning Module
 
History Essay
History EssayHistory Essay
History Essay
 
Psych Essay
Psych EssayPsych Essay
Psych Essay
 
Psych Essay
Psych EssayPsych Essay
Psych Essay
 

Dernier

ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DrGurudutt
 

Dernier (20)

ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptxROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
How to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdfHow to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdf
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 

Construction Technology Essay Sample Harvard

  • 1.
  • 2.
  • 3. 1 Table of Contents 1. Introduction 2 1.1.Introduction to the site 2 2. Site investigation and ground reports 2 2.1.Site Investigation 3 2.2.Ground Works 4 3. Foundations 4 4. External Walls 5 5. Floors 6 6. Roofs 8 7. Conclusion 9 1. INTRODUCTION
  • 4. 2 The report intends to draw necessary attention towards the construction details for the chosen site located at Church Fields Garston L19 8NG. The details will encompass site investigation report, the insight to the construction aspects of the site including the ground works, foundations, external walls, floors and roofs. 1.1.Introduction to the Site The location of site is approximately five miles to the South-East of Liverpool, close to the river Mersey and Garston Docks at Church Fields. The area is crowded with mostly 2 story houses. The report is also intended for construction of a house at the aforesaid location. 2. Site Investigation & Ground Works The site investigation is the preliminary phase for analyzing the architectural and urban design of a site while considering the geographical, climatic, and infrastructural and safety context of a specific site. It will assist in the selection of the foundations laid down beneath the superstructure of the building along with the overall design of the site under construction scrutiny. Before designing a foundation, there must be a reasonably accurate conception regarding the physical properties and arrangements for the subject materials. The fields investigations is the process by which the hazards present in the ground beneath the site are explored and reported. 2.1. Site Investigation On the basis of location of the chosen site, the below mentioned information is crucial for consideration while execution of the construction project.
  • 5. 3 - The type of structure to be built: Since, the site is intended to be utilized for construction of two story house. Therefore, among the forms of low rise construction including timber frame, steel frame, concrete frame, load bearing, single story the most preferable is the timber frame as it seems to be cost effective as well light and provide considerable strength to the structure. - Characteristics of the structure: The decision about structure of the building is followed by the understanding the design of the foundation to be laid underneath the ground. - Soil Investigation: The geo technical or aerial analysis of the soil condition at the site is essential which is covered in the important points highlighted in the subsurface investigation. o Subsurface Investigation ✓ The sequence and nature of strata. ✓ The conditions of ground water at the site. ✓ The assessment of physical properties of rock and soil of the concerned site. ✓ The characteristics of foundation of adjacent structure and the chemical composition of ground water. - Foundation Design: The foundation structures include deep foundation and shallow foundations. The deep foundations are used for heavy buildings, while the shallow ones
  • 6. 4 are used for light buildings like in this case houses. The shallow foundations are also called spread footings or open footings. Each footing takes the concentrated load and spread it over larger area to not let the weight exerted on the soil to exceed the capacity of safe bearing of soil. 2.2. Ground Works The methods of investigations of ground conditions include trial pits and boreholes. The trial pits entails shallow excavations going down to a maximum depth of 6m. The trial pit excavation methods includes by hand with depth of up to 2 m, wheeled back hoe till 4m and finally hydraulic excavator with up to 4-6 m depth. The trial pit requires information pertaining to location, size of pit, depth scale, root structure, water level and seepage. The weather conditions also do impact the soil conditions which need to be under consideration. The process of grounding must follow some necessary safety precautions w.r.t. health safety as well as ensuring strength of the future foundations and designs. This requires water elimination and ground improvement. The safety considerations while laying down foundations must consider the freezing weather as it should be built below the frost line which is the level in the ground above where the freezing occurs. 3. Foundations The shallow foundation includes strip footings which entails a strip of concrete that supports the weight of an entire wall. Such striping’s are used where the building load is carried by entire wall compared to the isolated columns. The project will use deep strip foundations considering the reach to the soil is at lower level with suitable bearing capacity. The deeper trench is dug and
  • 7. 5 strip foundations are poured at a lower level which holds the weight of walls built at the ground level. 3.1. Method Statement Activities for construction of Trench Fill Strip Foundation 1) First, the excavation lines are setup. 2) Scanning of area will be carried out using Cable Avoidance tool. 3) The excavation of trench will be carried out with constant monitoring for excavation level until the desired depth is achieved. 4) Concrete will be discharged on the trench from the concerned equipment or source. 5) The vibration of concrete at constant level will be assessed to ensure attainment at appropriate level, 6) A level surface is ensured by tamping of concrete. 7) Post pour checks are taken to assess that line and level are within contract tolerances. 4. External Walls The execution of foundation laying plan is followed by the development of external masonry walls. The important materials used for the construction of external walls include solid concrete masonry blocks, cement, damp proof course, scaffolding platforms, steel masonry accessories etc. The masonry cavity wall composed of two pieces of masonry separated by an air space connected by corrosion-resistant metal ties. The inner leaf is solid concrete block and the outer leaf comprised of bricks. The Earthwool Dri Therm Cavity Slabs are light
  • 8. 6 weight semi rigid slabs of glass mineral wool with water repellent additive to produce a fit between wall ties at standard vertical spacing. Damp proof courses are installed to ensure that penetrating water is directed to the outer leaf. The establishment of external walls initiates from the foundations. The wall starts from beneath the ground while the cavity wall is established above the ground by creating gap through cavity insulation. The Damp Proof Membrane is set before the rigid insulation piece to separate it from the concrete at the ground floor. ! Source: Chudley & Greeno (2008), pg # 217 Ground Level 1500 m 1000m
  • 9. 7 ! Source: Chudley & Greeno (2008), pg. 402 5. Floors The construction of upper floor is much simpler as it requires a level smooth surface capable of supporting required dead and imposed loads. The element of fire construction amid sound resistance must be safeguarded. The upper floor plays an important role in providing lateral resistance to external walls. The method for construction of upper floor is not changed drastically with the traditional practice as still the joists supporting floor covering with finish on the underside. The floors are formed with wood joists covered above with floor boards and beneath with wood laths and plaster. The joists have to be trimmed around all fireplaces and for stair wells and other openings.
  • 10. 8 ! Source: Chudley & Greeno (2008), pg. 416 The timber frame is a modernized construction method which employs standardized prefabricated timber wall panels and floors. The timber frame design considers the building regulation requirement for thermal, acoustic and fire proofing ensuring safety measures in the floor designing process. Key health and safety requirements for timber frame utilization are as following: - Construction (Design and Management) Regulations - Risk Assessments - Full Scaffolding - Fall prevention and arrest methodologies - Control of lifting operations
  • 11. 9 - Site security - Manual Handling 6. Roofs The flat roofs traditionally consist of a structural timber deck with water proof covering directly applied to the top of the deck. The cold deck flat roof does incorporate insulation in the form of mineral wool which is stuffed in between the timber rafter / joists with a minimum air gap of 50 mm (2inch) left in between the insulation and roof deck. Whereas the warm deck flat roof is resulted through moving the insulation to the outside of the structure. While, the roof deck is brought inside. The purpose is the possibility of condensation forming on the underside of the deck and eliminates damp. This design accommodates for conserving heat thus no need of ventilation. In the cold roof the good ventilation is essential to allow condensation to escape particularly where moisture levels are high. Most roofs are prepared with trussed rafters. In the case of timber frame, the head binder of the wall panels provides a ready fixed level and straight wall plate where to fix the trussed rafters. The timber frame provides a secure fixing point for truss clips, straps and bracing. Trussed rafter roofs can be assembled in sections on the safe working platform of a lower cassette floor. The part assembled roof can then be lifted off in sections, placed temporarily at ground level (often on the ground floor slab of an adjacent plot) while the final story of wall panels are erected. When this stage is complete the roof can be lifted back on again (in sections if necessary), fully braced, and then fixed with felt and tiling battens. Aside from the obvious advantages in reduced working at height, this method ensures a perfect fit to the roof.
  • 12. 10 7. Conclusion The report covers the construction details for the site located at Church Fields Garston L19 8NG.The construction designs have been reported to highlight various construction aspects of the site including the ground works i.e. foundations, external walls, floors and roofs. Deep strip foundations have been used to lay the structure of the house bearing its whole weight, The timber frame is employed for flooring purpose.
  • 13. 11 References List Chudley, R. and Greeno, R. (2008) “Building Construction Handbook” Seventh Edition, Elsevier Ltd. Emmitt, S. & Gorse, C. (2006) 'Barry's Introduction to the Construction of Buildings' 1st Edition Blackwell 1405110554 , http://buildersafety.org/method-statement-for-concrete-foundations/ M. J. Dumbleton and G. West, Transport And Road Research Laboratory Report LR403, Preliminary Sources of Information for Site Investigation In Britain (Crowthorne, 1971) Riley, M. & Cotgrave, A. (2008) 'Construction Technology 1: House Construction' 2nd Edition Palgrave 978023023624