PROJECT REPORT ONVOCATIONAL 
TRAINING 
IN 
INDIAN RAILWAY
ACKNOWLEDGMENT 
I am very much thankful to the concerning officers and 
staff of INDIAN RAILWAY AGRA CANTT for their 
valuable guidance and advice, especially to Mr. Pradeep 
chhabra without their help I would never have 
completed my training. I am also thankful to Sr. 
Divisional Electrical Engineer North Central Railways for 
allowing me for this training.
INTRODUCTION 
 Indian Railway is the world’s fourth largest commercial, by number of 
employees with over million employees. Railways were first introduced 
in India in 1853. Indian Railways operates both long distance and 
suburban rail system on a multi-gauge network of board meter and 
narrow gauges. 
 Form 20th Dec 2010, the railways had developed a 5 digit numbering 
system. This need is required because IR RUNS 10,000 trains daily
AGRA CANTT SUBSTATION
The 2 x 25KV autotransformer system may be 
used on 25 kv lines to reduce energy losses. It 
should not be confused with the 50 kv system. 
The voltage between the overhead line(3) and 
the feeder line (5) is 50 kv but the voltage 
between the overhead line (3) and the running 
rails (4) remains at 25 kv and this is the voltage 
supplied to the train. This system is used by 
Indian Railways
FEEDER 
 The feeders that receives the power form CESC, and 
the power is step down with the help of step down 
transformer and then supplied to various colonies, 
piller box, etc. This process is shown with the help of 
above connection diagram . 
 6kv from CESC goes to HT ocb 400A with the hwlp of 
HT busbar 400A is divided into two 200A and sent to 
two transformer each of 250 kva then sent to various 
parts.
OIL TYPE TRANSFORMER 
Transformer oil or insulating oil is usually a highly-refined mineral oil that is stable 
at high temp and has excellent electrical insulating properties. It is used in oil-filled 
transformers, circuit breakers. Its function are to Insulate, suppress corona 
and arcing, and to serve as a coolant. 
The oil helps cool the transformer because it also provides part if the electrical 
insulation between internal live parts, transformer oil must remain stable at high 
temp for an external radiation through which the oil circulates by natural 
convection. 
The flash point(min) and pour point(max) are 140 c to -6 c respectively. The 
dielectric strength of new untreated oil is MV/m (RMS)and after treatment it 
should be>24 MV/m (RMS)
Testing and oil quality 
Transformer oils are subjects to electrical and mechanical stresses while a transformer is 
in operation. In addition there is contamination caused by chemical interaction with 
windings and other solid insulation, catalysed by high operating temp. As a result the 
original chemical properties of transformer oil change gradually, rendering it ineffective 
for its intended purpose after many years. Hence this oil has to be periodically tested to 
ascertain its basic electrical properties, 
These tests can be divided into 
1. Dissolved gas analysis 
2. Furan analysis 
3. PCB analysis 
4. General electrical and physical tests:- 
colour and appearance 
Breakdown Voltage 
Water content
TRACTION 
In Overhead Electrification System, the supply of electricity is through an 
overhead system of suspended cables known as the catenary. 
The loco uses a Pantograph, to make contact with the overheat contact 
cable and draw electricity from it to power its motors.
The return path for the electricity is through the body of 
the loco and the wheels to the tracks, which are electrically 
grounded. 
Conductivity may be reduced in cases of dirt and debris on 
the rails.
There are 2 types of Electrification system in 
Indian railways- 
 DC System: In DC system with overhead catenary, the basic principle is the 
same, with the catenary being supplied electricity at 1.5kv DC. The current 
from the catenary goes directly to the motor OR convert the DC supply to 
AC internally using inverters or a motor-generator combination which then 
drives AC motors. 
 Single system(AC): The overhead catenary is fed electricity at 25kv 
AC(single-phase) from feeding posts which are positioned at frequent 
intervals alongside the track. 
 A Remote Control Centre, has facilities for controlling the power supply to 
different sections of the catenaries fed by several substations in the area.
VOLTAGE USED FOR ELECTRIC TRACTION IN 
INDIA 
 Voltages used are 1.5kv DC and 25kv AC for mainline trains. 
 The 1.5kv DC overhead system is used around Bombay. 
 The Calcutta metro uses 750V DC traction with a third-rail 
mechanism for delivering the electricity to the EMUs. 
 The Calcutta trams use 55V DC with an overhead catenary 
system with underground return conductors. 
 Delhi metro uses 25KV AC overhead traction.
NO LOAD TESTING SCHEDULE OF A ASSEMBLED 
TRACTION MOTOR 
 The motor is run at 1500 rpm, if running is smooth the motor is run for 30 min. 
 The rotation of the motor is changed and run at 1500 rpm for another 30 min. 
Steady state temp rise, should motor exceed 35 degree centi. 
 The speed is increased to 2000 rpm and run up to 15 min. 
 The speed is increased to about 2725 rpm. 
Temp rise in the zone should not exceed 50 to 60 degree centi.
APPARATUS USED 
 PANTOGRAPH 
 MAIN TRANSFORMER 
 RECTIFIER 
 REVERSER 
 CLR 
 WINDING CHANGE-OVER SWITCH 
 BATTERY & BATTERY CHARGER 
 PROTECTION CIRCUIT AND RELAY 
 SWITCH GROUP 1& 2
PANTOGRAPH CURRENT 
TRANSFORMER 
MAIN 
TRANSFORMER 
TAP 
CHANGER 
SMOOTHING RECTIFIER 
REACTOR 
ADDITIONAL 
SMOOTHING 
REACTOR 
REVERSER MOTOR 
BLOCK DIAGRAM 
DISC JUNCTION
TRACTIVE EFFORT DISTRIBUTION IN E.M.U.

Contenu connexe

Tendances

33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
Masterhead Jack
 

Tendances (20)

Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Train lighting system
Train lighting systemTrain lighting system
Train lighting system
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
 
ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)ELECTRIC RAILWAY(ELECTRIC TRACTION)
ELECTRIC RAILWAY(ELECTRIC TRACTION)
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
electric traction
electric tractionelectric traction
electric traction
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Electrical traction
Electrical traction Electrical traction
Electrical traction
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
NWR summer training ppt
NWR summer training pptNWR summer training ppt
NWR summer training ppt
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
Main Parts of Electric Locomotive
Main Parts of Electric LocomotiveMain Parts of Electric Locomotive
Main Parts of Electric Locomotive
 

Similaire à Railway summer training report electrical engineering

28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
PrakasBhowmik
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)
Abhishek Karan
 

Similaire à Railway summer training report electrical engineering (20)

Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
 
Electric traction
Electric tractionElectric traction
Electric traction
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 
Electric traction
Electric tractionElectric traction
Electric traction
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
Electric traction
Electric tractionElectric traction
Electric traction
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptx
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drives
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
Intenship in traction motor shed
Intenship in traction motor shedIntenship in traction motor shed
Intenship in traction motor shed
 

Dernier

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Dernier (20)

(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Railway summer training report electrical engineering

  • 1. PROJECT REPORT ONVOCATIONAL TRAINING IN INDIAN RAILWAY
  • 2. ACKNOWLEDGMENT I am very much thankful to the concerning officers and staff of INDIAN RAILWAY AGRA CANTT for their valuable guidance and advice, especially to Mr. Pradeep chhabra without their help I would never have completed my training. I am also thankful to Sr. Divisional Electrical Engineer North Central Railways for allowing me for this training.
  • 3. INTRODUCTION  Indian Railway is the world’s fourth largest commercial, by number of employees with over million employees. Railways were first introduced in India in 1853. Indian Railways operates both long distance and suburban rail system on a multi-gauge network of board meter and narrow gauges.  Form 20th Dec 2010, the railways had developed a 5 digit numbering system. This need is required because IR RUNS 10,000 trains daily
  • 5. The 2 x 25KV autotransformer system may be used on 25 kv lines to reduce energy losses. It should not be confused with the 50 kv system. The voltage between the overhead line(3) and the feeder line (5) is 50 kv but the voltage between the overhead line (3) and the running rails (4) remains at 25 kv and this is the voltage supplied to the train. This system is used by Indian Railways
  • 6. FEEDER  The feeders that receives the power form CESC, and the power is step down with the help of step down transformer and then supplied to various colonies, piller box, etc. This process is shown with the help of above connection diagram .  6kv from CESC goes to HT ocb 400A with the hwlp of HT busbar 400A is divided into two 200A and sent to two transformer each of 250 kva then sent to various parts.
  • 7. OIL TYPE TRANSFORMER Transformer oil or insulating oil is usually a highly-refined mineral oil that is stable at high temp and has excellent electrical insulating properties. It is used in oil-filled transformers, circuit breakers. Its function are to Insulate, suppress corona and arcing, and to serve as a coolant. The oil helps cool the transformer because it also provides part if the electrical insulation between internal live parts, transformer oil must remain stable at high temp for an external radiation through which the oil circulates by natural convection. The flash point(min) and pour point(max) are 140 c to -6 c respectively. The dielectric strength of new untreated oil is MV/m (RMS)and after treatment it should be>24 MV/m (RMS)
  • 8. Testing and oil quality Transformer oils are subjects to electrical and mechanical stresses while a transformer is in operation. In addition there is contamination caused by chemical interaction with windings and other solid insulation, catalysed by high operating temp. As a result the original chemical properties of transformer oil change gradually, rendering it ineffective for its intended purpose after many years. Hence this oil has to be periodically tested to ascertain its basic electrical properties, These tests can be divided into 1. Dissolved gas analysis 2. Furan analysis 3. PCB analysis 4. General electrical and physical tests:- colour and appearance Breakdown Voltage Water content
  • 9. TRACTION In Overhead Electrification System, the supply of electricity is through an overhead system of suspended cables known as the catenary. The loco uses a Pantograph, to make contact with the overheat contact cable and draw electricity from it to power its motors.
  • 10. The return path for the electricity is through the body of the loco and the wheels to the tracks, which are electrically grounded. Conductivity may be reduced in cases of dirt and debris on the rails.
  • 11. There are 2 types of Electrification system in Indian railways-  DC System: In DC system with overhead catenary, the basic principle is the same, with the catenary being supplied electricity at 1.5kv DC. The current from the catenary goes directly to the motor OR convert the DC supply to AC internally using inverters or a motor-generator combination which then drives AC motors.  Single system(AC): The overhead catenary is fed electricity at 25kv AC(single-phase) from feeding posts which are positioned at frequent intervals alongside the track.  A Remote Control Centre, has facilities for controlling the power supply to different sections of the catenaries fed by several substations in the area.
  • 12. VOLTAGE USED FOR ELECTRIC TRACTION IN INDIA  Voltages used are 1.5kv DC and 25kv AC for mainline trains.  The 1.5kv DC overhead system is used around Bombay.  The Calcutta metro uses 750V DC traction with a third-rail mechanism for delivering the electricity to the EMUs.  The Calcutta trams use 55V DC with an overhead catenary system with underground return conductors.  Delhi metro uses 25KV AC overhead traction.
  • 13. NO LOAD TESTING SCHEDULE OF A ASSEMBLED TRACTION MOTOR  The motor is run at 1500 rpm, if running is smooth the motor is run for 30 min.  The rotation of the motor is changed and run at 1500 rpm for another 30 min. Steady state temp rise, should motor exceed 35 degree centi.  The speed is increased to 2000 rpm and run up to 15 min.  The speed is increased to about 2725 rpm. Temp rise in the zone should not exceed 50 to 60 degree centi.
  • 14. APPARATUS USED  PANTOGRAPH  MAIN TRANSFORMER  RECTIFIER  REVERSER  CLR  WINDING CHANGE-OVER SWITCH  BATTERY & BATTERY CHARGER  PROTECTION CIRCUIT AND RELAY  SWITCH GROUP 1& 2
  • 15. PANTOGRAPH CURRENT TRANSFORMER MAIN TRANSFORMER TAP CHANGER SMOOTHING RECTIFIER REACTOR ADDITIONAL SMOOTHING REACTOR REVERSER MOTOR BLOCK DIAGRAM DISC JUNCTION