Mobile crane safety rules
Mobile crane safety rules
• Selection of mobile cranes steps :
• ( 1 ) to determine the position of the crane station car (amplitude ) was suspended in accordance with equipment or components seated position ,
and other site-specific conditions .
• ( 2 ) According to the lifting device or component is seated height, the device size, height and station car sling position ( amplitude ) , Charles Crane
characteristic curve , determine the arm length .
• ( 3 ) has been determined based on the magnitude , arm length , check the 150 ton crawler crane characteristic curve , determine the carrying
capacity of the crane .
• ( 4 ) If the weight is greater than the carrying capacity of the crane hoisting equipment or components , select qualified, or re-election.
•
• Characteristics of mobile cranes curve:
• Reflect mobile cranes lifting capacity varies with arm length , and the variation of the amplitude and mobile cranes with a maximum lifting height and
arm length , the variation of the amplitude change curve , called the crane characteristic curve. At present, some large cranes characteristic curve has
been quantized into tabular form , called the characteristic curve table . It is the basis for selection of mobile cranes .
•
• Mobile cranes use features:
• ( 1 ) Truck mounted crane. When lifting by crane support legs on the ground , with great maneuverability, its walking speed. But not lifting operations
conducted within the 360o range, the lifting area is restricted, the foundation ( or base ) located at the cable car station requirements are higher.
• ( 2 ) crawler crane . Using more general large-tonnage cranes , crane station located on the foundation 's requirements are relatively low , but
walking slower, shift the venue needed flatbed trailer. A large crane , to be demolished , transportation, installation transfer venue.
• ( 3 ) tire cranes . Cranes mounted on special chassis , running gear to support its tires, lifting operations for the legs , which features between the first
two of the question , in recent years, with less.
•
• Ground handling 100 ton mobile crane :
• Must be the foundation ( or base ) and acceptance test prior to lifting, according to the provisions of foundation settlement preload test . Lifting
heavy equipment on the ground complex , designed by professionals dedicated to the foundation , the same should be settling preload the
acceptance test .
Safe operation of lifting machinery
technology
• 1 , crane engine , electric motor and electrical, hydraulic equipment parts, should be performed JGJ33-2001 Section 3.1 , the provisions of Section 3.2
, Section 3.4 and Appendix C of .
• 2 , the operator must work before the job site environment , driving roads , overhead wires, buildings and component weight and distribution of a
comprehensive understanding.
• 3, the person in charge of the construction site should provide sufficient working space for the 100 ton crane for sale operation , remove or avoid the
boom and the rise and fall of the radius of gyration of obstacles.
• 4 , various types of cranes shall be equipped with a clear sound speakers, bells or whistles , such as signaling devices . In the boom , hook,
counterweights and other rotating body shall be marked with a distinctive color logo.
• 5, the lifting of the commanding officers must be certified , the job should closely cooperate with the operator , to implement the provisions of the
command signal. The operator should be operating in accordance with the commanding officers of the signal when the signal is unclear or wrong ,
the operator may refuse to perform .
• 6 , the crane cab off the ground , in the normal difficulty commanding ground and operational level ( altitude ) of walkie-talkies and other
commanding officers should adopt effective communication liaison be commanded .
• 7 , when there are six or more in the open air winds or heavy rain, snow , fog and other inclement weather , should stop lifting operations . After the
rain and snow before the job , you should try hanging, rear brake operation can be carried out to confirm sensitive and reliable .
• 8 , luffing crane indicator , torque limiter and a variety of travel limit switches and other safety devices should be in good condition complete,
sensitive and reliable , can not be adjusted or removed. Prohibited the use of limiters and limit device instead of steering mechanism .
• Before 9 , operating personnel crane slewing, luffing , actions such as walking and lifting hook should be audible signal indicate.
• 10 , when the crane operation , below the boom and heavy prohibited people stay , work or pass. When lifting weights , prohibited people from the
top of the pass. Crane carrying prohibited personnel .
• 11 , lifting the performance of the operator should be required of the job may not be overloaded. In exceptional circumstances when the need to
overload must undergo checking, there are technical measures to ensure the safety and write a special report approved by the person in charge of
enterprise technology , there is someone at the scene custody before operation.
• 12 , prohibited the use of cable-stayed crane , crane and lifting ramp buried underground or solidified on the ground as well asother unidentified
heavy weight objects. Cast in situ concrete structures or template, you must all be lifted after loose.
• 13 , lifting heavy objects should be banding smooth , firm, shall not be stacked or hung on a sporadic heavy objects . Easy scattered objects should be
used only after lifting hoists fence fixed . Location of an object marked with lashing after lashing lifting should be labeled . Sling angle should be used
with an object 45 ° ~ 60 °, and not less than 30 °, should be added between the sling and objects pad edges .
• 14 , lifting the load reaches the crane rated capacity of 90 % or more , lifting weights should first 200 ~ 500mm from the ground , the stability of the
crane inspection , reliability brakes , the weight of stability, firmness of lashing , in order to continue lifting after confirmation . Easy to shake for
weight should be tied rope .
• 15 , weight lifting and lowering speeds should be smooth , uniform, not a sudden braking. Turning around to be stable, while the former can not do
the reverse rotation is not completely stopped the action . Non- gravity drop cranes not load free fall .
• 16 , prohibited lifting weights for a long time hanging in the air , in the case of sudden failure of the job , you should take steps to place heavy objects
fall to a safe place and turn off the engine or overhaul after cutting the power. When a sudden power outage , you should immediately put all
controllers appropriated zero , disconnect the power switch, and take measures to make the weight down to the ground.
• 17 , the crane is not near overhead transmission line operations. Safe distance from any part of the crane and overhead transmission lines shall not
be less than specified in Table 1 .
• 18 , wire rope crane used documents technical performance and quality wire rope manufacturer should be issued . When there is no supporting
documents must be using after passing the test .
• 19 , the use of wire rope hoist , its structure , size and strength should be consistent with the type of 1 ton crane manual requirements. Rope and reel
should be firmly connected , when releasing the rope , the reel should be retained for at least three times, when the retractable rope to prevent the
rope hit the ring , kink , bend and chaos rope kink may not be used , deformation of the wire rope . Use rope braiding , plaiting their part in the
operation shall be by roll and pulleys.
• 20 , when knotted rope using a solid pick , plaited length of the portion of not less than 20 times the rope diameter should not be less than 300mm,
tying their part should be fine knotted wire . When using Shengka solid pick when matched with the rope diameter Shengka specifications, quantities
should comply with the requirements of Table 2. Finally, a length of rope from Shengka not less than 140mm. Shengka side saddle ( plywood ) should
carry the force when the rope , "U" bolts should be the end of the rope shall pros staggered . After the initial Shengka fixed rope should be tightened
again after the force , and should be tightened to make two highly flattened rope diameter of 1/ 3 . Operations should always check fastening .
• 21 , before the job class , joints should be checked rope and rope . When broken wire rope root reaches or exceeds the number in Table 3 in a pitch
should be scrapped . When the rope surface rust or wear make a significant reduction in rope diameter should be scrapped according to Table 3,
Table 4 reduction , according to the number of broken wires after retirement reduction .
• 22 , when the winding rope to the rotation of the reel , shall be guided by hand pull or foot rope . Lubricate the rope must be carried out after the
stop.
• 23 , crane hooks and rings welding is prohibited . When one of the following situations occur should be replaced :
• ⑴ surface crack, break ;
• ⑵ dangerous section and hook neck permanent deformation ;
• ⑶ lanyard worn over the height of the cross-section of 10% ;
• ⑷ hook bushing wear more than 50 % of the original thickness ;
• ⑸ mandrel ( pin ) worn more than 3 % to 5 % of its diameter.
• 24 , when the crane brake drum brake wear surface of 1.5 ~ 2.0mm ( small diameter take a small value , large diameter whichever is greater ) ,
replace the brake drum ; Similarly, when the crane brake wear than the thickness of the brake band 50 when % , replace the brake band .

Contenu connexe

Tendances

Crane safety by abidnadeemkhan
Crane safety by abidnadeemkhanCrane safety by abidnadeemkhan
Crane safety by abidnadeemkhanguest3d4fa4
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha classBill Brown
 
Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonAtlantic Training, LLC.
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introductionBhushan Goyal
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLift Events
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IAtlantic Training, LLC.
 
Forklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsForklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsAtlantic Training, LLC.
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Riggingfcarlson
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesSimon Faulkner-Duke
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safetyaliashraf mohammady
 

Tendances (20)

Crane safety by abidnadeemkhan
Crane safety by abidnadeemkhanCrane safety by abidnadeemkhan
Crane safety by abidnadeemkhan
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Crane Incident Handbook
Crane Incident Handbook Crane Incident Handbook
Crane Incident Handbook
 
Crane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas ArlingtonCrane Safety Awareness by University of Texas Arlington
Crane Safety Awareness by University of Texas Arlington
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Rigging
RiggingRigging
Rigging
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
2015 CRW - Setting Up for Success
2015 CRW - Setting Up for Success2015 CRW - Setting Up for Success
2015 CRW - Setting Up for Success
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
Crane Safety
Crane SafetyCrane Safety
Crane Safety
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
Forklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public SchoolsForklift Operator Safety Training by Platteville Public Schools
Forklift Operator Safety Training by Platteville Public Schools
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 
Lifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sitesLifting plans for non-crane lifts on small construction sites
Lifting plans for non-crane lifts on small construction sites
 
Electrical overhead crane safety
Electrical overhead crane safetyElectrical overhead crane safety
Electrical overhead crane safety
 

En vedette

Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionProtection
 
Top 16 Construction Hazards
Top 16 Construction HazardsTop 16 Construction Hazards
Top 16 Construction HazardsProtection
 
Elements of a Safe Scaffold
Elements of a Safe ScaffoldElements of a Safe Scaffold
Elements of a Safe ScaffoldProtection
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Bimal Chandra Das
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manualscojetinc
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead craneWina Indah
 
Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]ルクマン 福島
 
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271supri yatna
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training BILL Bill Brown
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation SafetyProtection
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYAlex TX
 
Health and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial SectorsHealth and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial SectorsGAURAV. H .TANDON
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedurePavan Noel
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetyAtlantic Training, LLC.
 
Safety checklist
Safety checklistSafety checklist
Safety checklistIIT Madras
 

En vedette (20)

Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
 
Top 16 Construction Hazards
Top 16 Construction HazardsTop 16 Construction Hazards
Top 16 Construction Hazards
 
Elements of a Safe Scaffold
Elements of a Safe ScaffoldElements of a Safe Scaffold
Elements of a Safe Scaffold
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Basic riggingworkbook
Basic riggingworkbookBasic riggingworkbook
Basic riggingworkbook
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manual
 
Crane
CraneCrane
Crane
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]Perancangan pesawat angkat & angkut [autosaved]
Perancangan pesawat angkat & angkut [autosaved]
 
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271PERHITUNGAN CRANE HOIST : By Supriyatna  hp : 081288607271
PERHITUNGAN CRANE HOIST : By Supriyatna hp : 081288607271
 
Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training  Train the trainer overhead Cranes operation training
Train the trainer overhead Cranes operation training
 
Trenching and Excavation Safety
Trenching and Excavation SafetyTrenching and Excavation Safety
Trenching and Excavation Safety
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
Health and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial SectorsHealth and Safety in Selected Industrial Sectors
Health and Safety in Selected Industrial Sectors
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedure
 
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan SafetySafe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
Safe Operations of Cranes, Hoists and Truck Hoists by Reagan Safety
 
Safety checklist
Safety checklistSafety checklist
Safety checklist
 

Similaire à Mobile crane safety rules

Overhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresOverhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresytcrane
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted craneAxay Sharma
 
Forklift Operator Qualification Program Training by Reagan Equipment Company
Forklift Operator Qualification Program  Training by Reagan Equipment CompanyForklift Operator Qualification Program  Training by Reagan Equipment Company
Forklift Operator Qualification Program Training by Reagan Equipment CompanyAtlantic Training, LLC.
 
Sequence of activities to operate monorail and davits systems as fae & ...
Sequence of activities to operate   monorail and davits systems as fae & ...Sequence of activities to operate   monorail and davits systems as fae & ...
Sequence of activities to operate monorail and davits systems as fae & ...Rajesh Virdi
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au Ghazanfar Ali
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptLeandroGonzlezDeCecc
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...swaroop k s
 
Scaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAScaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAAtlantic Training, LLC.
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging SafetyNickHawkins19
 
Lift and grow 2019
Lift and grow 2019Lift and grow 2019
Lift and grow 2019Emma Street
 
Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxKartikSodha
 
کنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریکنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریmansour abolghasemi
 

Similaire à Mobile crane safety rules (20)

Overhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresOverhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating procedures
 
Failure analysis mtn526
Failure analysis mtn526Failure analysis mtn526
Failure analysis mtn526
 
Crawler Mounted crane
Crawler Mounted craneCrawler Mounted crane
Crawler Mounted crane
 
Tower crane
Tower craneTower crane
Tower crane
 
Forklift Operator Qualification Program Training by Reagan Equipment Company
Forklift Operator Qualification Program  Training by Reagan Equipment CompanyForklift Operator Qualification Program  Training by Reagan Equipment Company
Forklift Operator Qualification Program Training by Reagan Equipment Company
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
Sequence of activities to operate monorail and davits systems as fae & ...
Sequence of activities to operate   monorail and davits systems as fae & ...Sequence of activities to operate   monorail and davits systems as fae & ...
Sequence of activities to operate monorail and davits systems as fae & ...
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Scaffold and Aerial Lift Safety by KTA
Scaffold and Aerial Lift Safety by KTAScaffold and Aerial Lift Safety by KTA
Scaffold and Aerial Lift Safety by KTA
 
Scaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAScaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTA
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Lift and grow 2019
Lift and grow 2019Lift and grow 2019
Lift and grow 2019
 
Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptx
 
کنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریکنترل تجهیزات باربرداری
کنترل تجهیزات باربرداری
 
Crane Operations by EHS Compliance
Crane Operations by EHS ComplianceCrane Operations by EHS Compliance
Crane Operations by EHS Compliance
 
Crane safety
Crane safetyCrane safety
Crane safety
 

Dernier

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsShree Krishna Exports
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 

Dernier (20)

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 

Mobile crane safety rules

  • 2. Mobile crane safety rules • Selection of mobile cranes steps : • ( 1 ) to determine the position of the crane station car (amplitude ) was suspended in accordance with equipment or components seated position , and other site-specific conditions . • ( 2 ) According to the lifting device or component is seated height, the device size, height and station car sling position ( amplitude ) , Charles Crane characteristic curve , determine the arm length . • ( 3 ) has been determined based on the magnitude , arm length , check the 150 ton crawler crane characteristic curve , determine the carrying capacity of the crane . • ( 4 ) If the weight is greater than the carrying capacity of the crane hoisting equipment or components , select qualified, or re-election. • • Characteristics of mobile cranes curve: • Reflect mobile cranes lifting capacity varies with arm length , and the variation of the amplitude and mobile cranes with a maximum lifting height and arm length , the variation of the amplitude change curve , called the crane characteristic curve. At present, some large cranes characteristic curve has been quantized into tabular form , called the characteristic curve table . It is the basis for selection of mobile cranes . • • Mobile cranes use features: • ( 1 ) Truck mounted crane. When lifting by crane support legs on the ground , with great maneuverability, its walking speed. But not lifting operations conducted within the 360o range, the lifting area is restricted, the foundation ( or base ) located at the cable car station requirements are higher. • ( 2 ) crawler crane . Using more general large-tonnage cranes , crane station located on the foundation 's requirements are relatively low , but walking slower, shift the venue needed flatbed trailer. A large crane , to be demolished , transportation, installation transfer venue. • ( 3 ) tire cranes . Cranes mounted on special chassis , running gear to support its tires, lifting operations for the legs , which features between the first two of the question , in recent years, with less. • • Ground handling 100 ton mobile crane : • Must be the foundation ( or base ) and acceptance test prior to lifting, according to the provisions of foundation settlement preload test . Lifting heavy equipment on the ground complex , designed by professionals dedicated to the foundation , the same should be settling preload the acceptance test .
  • 3. Safe operation of lifting machinery technology • 1 , crane engine , electric motor and electrical, hydraulic equipment parts, should be performed JGJ33-2001 Section 3.1 , the provisions of Section 3.2 , Section 3.4 and Appendix C of . • 2 , the operator must work before the job site environment , driving roads , overhead wires, buildings and component weight and distribution of a comprehensive understanding. • 3, the person in charge of the construction site should provide sufficient working space for the 100 ton crane for sale operation , remove or avoid the boom and the rise and fall of the radius of gyration of obstacles. • 4 , various types of cranes shall be equipped with a clear sound speakers, bells or whistles , such as signaling devices . In the boom , hook, counterweights and other rotating body shall be marked with a distinctive color logo. • 5, the lifting of the commanding officers must be certified , the job should closely cooperate with the operator , to implement the provisions of the command signal. The operator should be operating in accordance with the commanding officers of the signal when the signal is unclear or wrong , the operator may refuse to perform . • 6 , the crane cab off the ground , in the normal difficulty commanding ground and operational level ( altitude ) of walkie-talkies and other commanding officers should adopt effective communication liaison be commanded . • 7 , when there are six or more in the open air winds or heavy rain, snow , fog and other inclement weather , should stop lifting operations . After the rain and snow before the job , you should try hanging, rear brake operation can be carried out to confirm sensitive and reliable . • 8 , luffing crane indicator , torque limiter and a variety of travel limit switches and other safety devices should be in good condition complete, sensitive and reliable , can not be adjusted or removed. Prohibited the use of limiters and limit device instead of steering mechanism . • Before 9 , operating personnel crane slewing, luffing , actions such as walking and lifting hook should be audible signal indicate. • 10 , when the crane operation , below the boom and heavy prohibited people stay , work or pass. When lifting weights , prohibited people from the top of the pass. Crane carrying prohibited personnel . • 11 , lifting the performance of the operator should be required of the job may not be overloaded. In exceptional circumstances when the need to overload must undergo checking, there are technical measures to ensure the safety and write a special report approved by the person in charge of enterprise technology , there is someone at the scene custody before operation. • 12 , prohibited the use of cable-stayed crane , crane and lifting ramp buried underground or solidified on the ground as well asother unidentified heavy weight objects. Cast in situ concrete structures or template, you must all be lifted after loose. • 13 , lifting heavy objects should be banding smooth , firm, shall not be stacked or hung on a sporadic heavy objects . Easy scattered objects should be used only after lifting hoists fence fixed . Location of an object marked with lashing after lashing lifting should be labeled . Sling angle should be used with an object 45 ° ~ 60 °, and not less than 30 °, should be added between the sling and objects pad edges . • 14 , lifting the load reaches the crane rated capacity of 90 % or more , lifting weights should first 200 ~ 500mm from the ground , the stability of the crane inspection , reliability brakes , the weight of stability, firmness of lashing , in order to continue lifting after confirmation . Easy to shake for weight should be tied rope .
  • 4. • 15 , weight lifting and lowering speeds should be smooth , uniform, not a sudden braking. Turning around to be stable, while the former can not do the reverse rotation is not completely stopped the action . Non- gravity drop cranes not load free fall . • 16 , prohibited lifting weights for a long time hanging in the air , in the case of sudden failure of the job , you should take steps to place heavy objects fall to a safe place and turn off the engine or overhaul after cutting the power. When a sudden power outage , you should immediately put all controllers appropriated zero , disconnect the power switch, and take measures to make the weight down to the ground. • 17 , the crane is not near overhead transmission line operations. Safe distance from any part of the crane and overhead transmission lines shall not be less than specified in Table 1 . • 18 , wire rope crane used documents technical performance and quality wire rope manufacturer should be issued . When there is no supporting documents must be using after passing the test . • 19 , the use of wire rope hoist , its structure , size and strength should be consistent with the type of 1 ton crane manual requirements. Rope and reel should be firmly connected , when releasing the rope , the reel should be retained for at least three times, when the retractable rope to prevent the rope hit the ring , kink , bend and chaos rope kink may not be used , deformation of the wire rope . Use rope braiding , plaiting their part in the operation shall be by roll and pulleys. • 20 , when knotted rope using a solid pick , plaited length of the portion of not less than 20 times the rope diameter should not be less than 300mm, tying their part should be fine knotted wire . When using Shengka solid pick when matched with the rope diameter Shengka specifications, quantities should comply with the requirements of Table 2. Finally, a length of rope from Shengka not less than 140mm. Shengka side saddle ( plywood ) should carry the force when the rope , "U" bolts should be the end of the rope shall pros staggered . After the initial Shengka fixed rope should be tightened again after the force , and should be tightened to make two highly flattened rope diameter of 1/ 3 . Operations should always check fastening . • 21 , before the job class , joints should be checked rope and rope . When broken wire rope root reaches or exceeds the number in Table 3 in a pitch should be scrapped . When the rope surface rust or wear make a significant reduction in rope diameter should be scrapped according to Table 3, Table 4 reduction , according to the number of broken wires after retirement reduction . • 22 , when the winding rope to the rotation of the reel , shall be guided by hand pull or foot rope . Lubricate the rope must be carried out after the stop. • 23 , crane hooks and rings welding is prohibited . When one of the following situations occur should be replaced : • ⑴ surface crack, break ; • ⑵ dangerous section and hook neck permanent deformation ; • ⑶ lanyard worn over the height of the cross-section of 10% ; • ⑷ hook bushing wear more than 50 % of the original thickness ; • ⑸ mandrel ( pin ) worn more than 3 % to 5 % of its diameter. • 24 , when the crane brake drum brake wear surface of 1.5 ~ 2.0mm ( small diameter take a small value , large diameter whichever is greater ) , replace the brake drum ; Similarly, when the crane brake wear than the thickness of the brake band 50 when % , replace the brake band .