Overhead and Gantry Cranes safe
operating procedures
Overhead and Gantry Cranes safe
operating procedures
• One , should be carefully checked before driving machinery and equipment, electrical parts and protective safety device is intact and reliable. If the primary attachment controller ,
brakes, stopper , bells , emergency switches and other failures , is prohibited hoists .
• Second, members must obey the command signal , but the emergency stop signal given to anyone , should immediately stop.
• Third, the driver must be able to conduct operations after confirmation command signal , preceded by car -ringing .
• Fourth, when approaching hoist limit switch, the size of the car near the terminal or meet with the neighboring lane , the speed to slow. Allowed to use instead of reversing brake limiter
instead of parking switch, emergency switch instead of an ordinary switch.
• Fifth, should walk up and down the aisle on security , dedicated site or escalator provisions . Carts on both sides of the track are not allowed to walk outside in addition to maintenance .
Forbidden to walk on the trolley tracks. Not allowed to cross from one gantry crane to another crane.
• Sixth, stop work shall not be lifting objects hanging in the air to stay. Operation, the ground put someone or hanging off the warning bells should sound . Prohibited substance in a
person's head hanging cross . Lifting objects from the ground may not be too high.
• Seven , two crane while lifting an object, to obey the command , in unison .
• Eight runs, to maintain a certain distance between the crane and the crane .
• Nine , maintenance 150 ton crawler crane against a safe place to be , cut off the power , hang " prohibition and gates ," the warning signs . Ground to set up fences and hanging " closed
to traffic " sign.
• Ten, when lifting heavy objects tonnages should first try hanging slightly off the ground , hanging confirm stable braking is good, then rise slowly to run. Allowed simultaneous operation
of three control handle .
• XI, crane operation, prohibited people from top to bottom . Also allowed for maintenance and adjustments at runtime.
• XII running a sudden power failure occurs , the switch handle must be placed "0 " bit. Lifting parts or not put locks are not decoupled , not allowed to leave the cab.
• XIII runtime failure caused due to sudden decline when hanging pieces must take urgent measures to no place to land.
• XIV, open-air crane in case the storm , lightning or high winds more than six should stop working, turn off the power , the front and rear wheels should be firmly card game pad .
• Fifteen , night work should have adequate lighting.
• Sixteen , gantry cranes in addition to the implementation of these provisions should also pay attention to whether the obstacle when driving on the track ; sides should set up special
surveillance and command and tall when lifting objects obstruct the line of sight .
• Seventeen , the driver must be carefully done "Ten is not hanging ."
• 1 , does not exceed the rated load hanging ;
• 2, the command signal is unknown, weight unknown , dim light does not hang ;
• 3 , slings and accessories tied strong, does not comply with the safety rules are not suspended ;
• 4 , crane hanging heavy lifting is not processed directly ,
• 5 , pull Xiegua not hanging crooked ;
• 6 , stand on the workpiece or workpiece floating crane stood there live animals are not ;
• 7 , oxygen bottles, acetylene generators and other explosive items are not hanging ;
• 8, with notched edges are not really hanging mats ;
• 9 , the buried object is not suspended ;
• 10 , liquid or fluid costumes are not hanging too full .
• Eighteen , work completed, crane should be stopped at a predetermined position , raised hook, trolley tracks open to both ends , and the control handle to place a "0 " bit , cut off the
power .
15 items assembled crane operations
should be noted
• 1 , when lifting heavy objects , hook wire rope should remain vertical , oblique allowed to drag the object to be hung .
• 2 , the heavy lifting should identify the center of gravity , and tied securely . There are acute application skids pad.
• 3 , the heavy lifting off the ground is not in front of the crane is not doing rotary motion .
• 4 , when lifting or lowering heavy , steady speed should be uniform to avoid drastic changes in speed , causing heavy in the air, swinging , dangerous.
When falling weight , speed, not too fast, so as not to break heavy landing .
• 5 , crane hoists in the case , 25 ton crane for sale try to avoid the ups and downs arm . In the case must hoist arm when landing , from 50% by weight
shall not exceed the specified weight.
• 6 , when the crane lifting heavy rotation in the case , should pay close attention to whether there are obstacles around , if it should try to avoid or
remove obstructions .
• 7 , under the crane boom may not have staff to stay , and try to avoid people through .
• 8 , two cranes operating on the same track , the distance between the two planes should be more than 3m.
• 9 , two cranes lifting an object when combined , can not exceed two from the weight of the total from 75% by weight of the two cranes walk the line
, dipping the action to be consistent .
• 10 , lifting, luffing rope need to check once a week , and make records , according to the specific requirements of the implementation of the relevant
provisions of the lifting rope .
• 11 , walk the line or turning when empty hook to more than 2m from the ground .
• 12 , when the wind more than six , should immediately stop work . TMK arm should go off downwind and appropriately low , the hook hanging in
prison. Gantry shall lay iron wedge ( only rail ) , and rose to ceiling hook . Meanwhile shut doors and windows , turn off the power , pull good wind
cable ropes. Usually after work should also do the same .
• 13 prohibited the stacking ladle crane platform miscellaneous objects even prevent fall injuries in the operation , frequently used tools should be
placed in the operating room dedicated toolbox.
• 14 , running, allowed a sudden shift or turn the clock back , to avoid heavy swing in the air , are not allowed to operate simultaneously over two
items ( including auxiliary hook ) operating mechanism .
• 15 , while driving , hand operator shall not leave the controller , when a sudden failure of the operation , measures should be taken to a safe landing
weight , then cut off the power for repairs. Repair and maintenance in operation is prohibited .

Contenu connexe

Tendances

Rules for a safe lifting_operations
Rules for a safe lifting_operationsRules for a safe lifting_operations
Rules for a safe lifting_operationsWei Chiao Kuo
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladderbronzecs
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging SafetyNickHawkins19
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentationJulianElbu
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IAtlantic Training, LLC.
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbooknhivan
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 

Tendances (20)

Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Mewp training
Mewp training Mewp training
Mewp training
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
Rules for a safe lifting_operations
Rules for a safe lifting_operationsRules for a safe lifting_operations
Rules for a safe lifting_operations
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladder
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Overhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&IOverhead Crane Safety by Pennslyvania L&I
Overhead Crane Safety by Pennslyvania L&I
 
Forklift training
Forklift training Forklift training
Forklift training
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Fork lift Slides
Fork lift  Slides Fork lift  Slides
Fork lift Slides
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
Forklift Safety Tips: Do's and Don'ts
Forklift Safety Tips: Do's and Don'tsForklift Safety Tips: Do's and Don'ts
Forklift Safety Tips: Do's and Don'ts
 
FORKLIFT SAFETY
FORKLIFT SAFETYFORKLIFT SAFETY
FORKLIFT SAFETY
 

En vedette

Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
EOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionEOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionBimal Chandra Das
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead craneWina Indah
 
10 Facts Of Hose Reel Safety
10 Facts Of Hose Reel Safety10 Facts Of Hose Reel Safety
10 Facts Of Hose Reel SafetyStuart Morgan
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manualscojetinc
 
Operate machinery and equipment
Operate machinery and equipmentOperate machinery and equipment
Operate machinery and equipmentkathryngraham
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist Rahmat Mohamed
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes
 
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah PencegahanAsas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah PencegahanNorrazman Zaiha Zainol
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hranshse2
 
Moments and forces shoulder elbow
Moments and forces shoulder elbowMoments and forces shoulder elbow
Moments and forces shoulder elbowLennard Funk
 

En vedette (20)

Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
EOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionEOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspection
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Proyecto puentes grua MV
Proyecto puentes grua MVProyecto puentes grua MV
Proyecto puentes grua MV
 
10 Facts Of Hose Reel Safety
10 Facts Of Hose Reel Safety10 Facts Of Hose Reel Safety
10 Facts Of Hose Reel Safety
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Overhead Crane Manual
Overhead Crane ManualOverhead Crane Manual
Overhead Crane Manual
 
Operate machinery and equipment
Operate machinery and equipmentOperate machinery and equipment
Operate machinery and equipment
 
Weekly welding machine checklist
Weekly welding machine checklistWeekly welding machine checklist
Weekly welding machine checklist
 
Weekly air compressor check list
Weekly air compressor check listWeekly air compressor check list
Weekly air compressor check list
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
conveyor belt
conveyor beltconveyor belt
conveyor belt
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
 
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah PencegahanAsas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
Asas Keselamatan dalam Kerja Elektrik: Modul 4 - Langkah Pencegahan
 
Overhead Crane Safety by FHM
Overhead Crane Safety by FHMOverhead Crane Safety by FHM
Overhead Crane Safety by FHM
 
Contractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hrContractor camp inspection check list rev 9 12 16.00hr
Contractor camp inspection check list rev 9 12 16.00hr
 
Moments and forces shoulder elbow
Moments and forces shoulder elbowMoments and forces shoulder elbow
Moments and forces shoulder elbow
 

Similaire à Overhead and gantry cranes safe operating procedures

Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
Forklift Operator Qualification Program Training by Reagan Equipment Company
Forklift Operator Qualification Program  Training by Reagan Equipment CompanyForklift Operator Qualification Program  Training by Reagan Equipment Company
Forklift Operator Qualification Program Training by Reagan Equipment CompanyAtlantic Training, LLC.
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.pptWaqasSidhu4
 
کنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریکنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریmansour abolghasemi
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid LoaderStarkParks
 
22 Material Handling Training and Safety
22 Material Handling Training and Safety22 Material Handling Training and Safety
22 Material Handling Training and SafetyJayaKarthic1
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptNeerajTiwari965955
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptGeneralCommunication1
 
Hydraulic Ramps safety rules
Hydraulic Ramps safety rulesHydraulic Ramps safety rules
Hydraulic Ramps safety rulesRose Ding
 
Osha Quick Card 452
Osha Quick Card 452Osha Quick Card 452
Osha Quick Card 452Craig Ihde
 
Forklift Training power point presentation
Forklift Training power point presentationForklift Training power point presentation
Forklift Training power point presentationShivKumar794683
 
Crane Hoist Operations
Crane Hoist OperationsCrane Hoist Operations
Crane Hoist OperationsKJP Consulting
 
MHTA Forklift Safety PPT.pptx
MHTA Forklift Safety PPT.pptxMHTA Forklift Safety PPT.pptx
MHTA Forklift Safety PPT.pptxManagerTraining3
 

Similaire à Overhead and gantry cranes safe operating procedures (20)

Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Forklift Operator Qualification Program Training by Reagan Equipment Company
Forklift Operator Qualification Program  Training by Reagan Equipment CompanyForklift Operator Qualification Program  Training by Reagan Equipment Company
Forklift Operator Qualification Program Training by Reagan Equipment Company
 
Aerial_Lift_1.ppt
Aerial_Lift_1.pptAerial_Lift_1.ppt
Aerial_Lift_1.ppt
 
کنترل تجهیزات باربرداری
کنترل تجهیزات باربرداریکنترل تجهیزات باربرداری
کنترل تجهیزات باربرداری
 
Crane Operations by EHS Compliance
Crane Operations by EHS ComplianceCrane Operations by EHS Compliance
Crane Operations by EHS Compliance
 
safe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUESsafe lift EMERSON EDUARDO RODRIGUES
safe lift EMERSON EDUARDO RODRIGUES
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid Loader
 
Overhead Crane Safety Course
Overhead Crane Safety CourseOverhead Crane Safety Course
Overhead Crane Safety Course
 
22 Material Handling Training and Safety
22 Material Handling Training and Safety22 Material Handling Training and Safety
22 Material Handling Training and Safety
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Overhead Crane by F&T Inc.
Overhead Crane by F&T Inc.Overhead Crane by F&T Inc.
Overhead Crane by F&T Inc.
 
Forklift certification
Forklift certificationForklift certification
Forklift certification
 
Hydraulic Ramps safety rules
Hydraulic Ramps safety rulesHydraulic Ramps safety rules
Hydraulic Ramps safety rules
 
Osha Quick Card 452
Osha Quick Card 452Osha Quick Card 452
Osha Quick Card 452
 
Forklift Training power point presentation
Forklift Training power point presentationForklift Training power point presentation
Forklift Training power point presentation
 
English forklift 2011
English forklift 2011English forklift 2011
English forklift 2011
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Crane Hoist Operations
Crane Hoist OperationsCrane Hoist Operations
Crane Hoist Operations
 
MHTA Forklift Safety PPT.pptx
MHTA Forklift Safety PPT.pptxMHTA Forklift Safety PPT.pptx
MHTA Forklift Safety PPT.pptx
 

Dernier

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Dernier (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

Overhead and gantry cranes safe operating procedures

  • 1. Overhead and Gantry Cranes safe operating procedures
  • 2. Overhead and Gantry Cranes safe operating procedures • One , should be carefully checked before driving machinery and equipment, electrical parts and protective safety device is intact and reliable. If the primary attachment controller , brakes, stopper , bells , emergency switches and other failures , is prohibited hoists . • Second, members must obey the command signal , but the emergency stop signal given to anyone , should immediately stop. • Third, the driver must be able to conduct operations after confirmation command signal , preceded by car -ringing . • Fourth, when approaching hoist limit switch, the size of the car near the terminal or meet with the neighboring lane , the speed to slow. Allowed to use instead of reversing brake limiter instead of parking switch, emergency switch instead of an ordinary switch. • Fifth, should walk up and down the aisle on security , dedicated site or escalator provisions . Carts on both sides of the track are not allowed to walk outside in addition to maintenance . Forbidden to walk on the trolley tracks. Not allowed to cross from one gantry crane to another crane. • Sixth, stop work shall not be lifting objects hanging in the air to stay. Operation, the ground put someone or hanging off the warning bells should sound . Prohibited substance in a person's head hanging cross . Lifting objects from the ground may not be too high. • Seven , two crane while lifting an object, to obey the command , in unison . • Eight runs, to maintain a certain distance between the crane and the crane . • Nine , maintenance 150 ton crawler crane against a safe place to be , cut off the power , hang " prohibition and gates ," the warning signs . Ground to set up fences and hanging " closed to traffic " sign. • Ten, when lifting heavy objects tonnages should first try hanging slightly off the ground , hanging confirm stable braking is good, then rise slowly to run. Allowed simultaneous operation of three control handle . • XI, crane operation, prohibited people from top to bottom . Also allowed for maintenance and adjustments at runtime. • XII running a sudden power failure occurs , the switch handle must be placed "0 " bit. Lifting parts or not put locks are not decoupled , not allowed to leave the cab. • XIII runtime failure caused due to sudden decline when hanging pieces must take urgent measures to no place to land. • XIV, open-air crane in case the storm , lightning or high winds more than six should stop working, turn off the power , the front and rear wheels should be firmly card game pad . • Fifteen , night work should have adequate lighting. • Sixteen , gantry cranes in addition to the implementation of these provisions should also pay attention to whether the obstacle when driving on the track ; sides should set up special surveillance and command and tall when lifting objects obstruct the line of sight . • Seventeen , the driver must be carefully done "Ten is not hanging ." • 1 , does not exceed the rated load hanging ; • 2, the command signal is unknown, weight unknown , dim light does not hang ; • 3 , slings and accessories tied strong, does not comply with the safety rules are not suspended ; • 4 , crane hanging heavy lifting is not processed directly , • 5 , pull Xiegua not hanging crooked ; • 6 , stand on the workpiece or workpiece floating crane stood there live animals are not ; • 7 , oxygen bottles, acetylene generators and other explosive items are not hanging ; • 8, with notched edges are not really hanging mats ; • 9 , the buried object is not suspended ; • 10 , liquid or fluid costumes are not hanging too full . • Eighteen , work completed, crane should be stopped at a predetermined position , raised hook, trolley tracks open to both ends , and the control handle to place a "0 " bit , cut off the power .
  • 3. 15 items assembled crane operations should be noted • 1 , when lifting heavy objects , hook wire rope should remain vertical , oblique allowed to drag the object to be hung . • 2 , the heavy lifting should identify the center of gravity , and tied securely . There are acute application skids pad. • 3 , the heavy lifting off the ground is not in front of the crane is not doing rotary motion . • 4 , when lifting or lowering heavy , steady speed should be uniform to avoid drastic changes in speed , causing heavy in the air, swinging , dangerous. When falling weight , speed, not too fast, so as not to break heavy landing . • 5 , crane hoists in the case , 25 ton crane for sale try to avoid the ups and downs arm . In the case must hoist arm when landing , from 50% by weight shall not exceed the specified weight. • 6 , when the crane lifting heavy rotation in the case , should pay close attention to whether there are obstacles around , if it should try to avoid or remove obstructions . • 7 , under the crane boom may not have staff to stay , and try to avoid people through . • 8 , two cranes operating on the same track , the distance between the two planes should be more than 3m. • 9 , two cranes lifting an object when combined , can not exceed two from the weight of the total from 75% by weight of the two cranes walk the line , dipping the action to be consistent . • 10 , lifting, luffing rope need to check once a week , and make records , according to the specific requirements of the implementation of the relevant provisions of the lifting rope . • 11 , walk the line or turning when empty hook to more than 2m from the ground . • 12 , when the wind more than six , should immediately stop work . TMK arm should go off downwind and appropriately low , the hook hanging in prison. Gantry shall lay iron wedge ( only rail ) , and rose to ceiling hook . Meanwhile shut doors and windows , turn off the power , pull good wind cable ropes. Usually after work should also do the same . • 13 prohibited the stacking ladle crane platform miscellaneous objects even prevent fall injuries in the operation , frequently used tools should be placed in the operating room dedicated toolbox. • 14 , running, allowed a sudden shift or turn the clock back , to avoid heavy swing in the air , are not allowed to operate simultaneously over two items ( including auxiliary hook ) operating mechanism . • 15 , while driving , hand operator shall not leave the controller , when a sudden failure of the operation , measures should be taken to a safe landing weight , then cut off the power for repairs. Repair and maintenance in operation is prohibited .