A brief presentation on Karachi Circular Railway for Mass Transit System of Karachi.
It was a part of the class presentation, it has cover topics like Transportation mode of Karachi, mass transit, Karachi Circular Railway history
17. KARACHI CIRCULAR
RAILWAY
KARACHI CIRCULAR RAILWAY
BEGUN IN 1969
KCR EARNED 5 LAC RUPEES IN THE
FIRST YEAR ALONE
IT USED TO CHARGE MERE 0.25
PAISAS PER TICKET.
18. KARACHI CIRCULAR
RAILWAY
ROUTE WAS FROM DRIGH ROAD
TO KARACHI CITY STATION
134 TAXIS WERE RUNNING IN
KARACHI IN 1969
QUALITY LIFE AND LESS
ACCIDENTS RATE
22. KARACHI CIRCULAR
RAILWAY
45 PER CENT OF ALL EMPLOYMENT
IN KARACHI IS CONCENTRATED IN
SITE, LANDHI-KORANGI
INDUSTRIAL AREAS, THE PORT, THE
CENTRAL BUSINESS DISTRICT AND
SADDAR.
THE KCR AND THE KARACHI
MAIN LINE PASSES THROUGH OR
ADJACENT TO ALL THESE AREAS
According to Karachi Master Plan Study 1987
23. KARACHI CIRCULAR RAILWAY
DURING 70’S - 90’S
THOUSANDS OF PEOPLE WERE
TRAVEL VIA KCR
104 TRAIN RUNS DAILY
80 TRAINS ON MAIN TRACK
AND 24 TRAINS RAN ON LOOP
LINE.
24. KARACHI POPULATION
DURING 1970 - 1990
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
18000000
1970 1980 1990
Population comparison chart
According to Wikipedia figures
25. KARACHI CIRCULAR RAILWAY
DOWNFALL
THE TRANSPORT MAFIA CONTRACTED
THE KCR STAFF AND MADE PAYMENTS
TO FAIL KCR
THE STAFF BECAME LAZY AND
CORRUPT
TICKET LESS TRAVEL BECAME
RAMPANT AS TICKETS WERE NOT
CHECKED
26. KARACHI CIRCULAR RAILWAY
DOWNFALL
KCR TRAINS GOT DISCONTINUED TO A
MINUSCULE NUMBER IN 1994 AFTER
INCURRING HUGE LOSSES
AFTER 1994 ONLY ONE TRAIN RAN
ON LOOP LINE
1999 KCR OPERATIONS WERE
COMPLETELY DISCONTINUED
27. FACTORS ACCOUNTING TO
KCR FAILURE
TRAINS DID NOT RUN ACCORDING
TO THE TIME TABLE.
TICKETS WERE NOT CHECKED WHICH
WAS THE MAIN SOURCE OF REVENUE.
TRANSPORT MAFIA
28. AFFECT OF KCR FAILURE IN
KARACHI
MA Jinnah
Road
Liaquataba
d
Baloch
pull
29. AFFECT OF KCR FAILURE IN
KARACHI
Gareebabad KCR Track
30. AFFECT OF KCR FAILURE IN KARACHI
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
1990 2007 2008 2015
Registered cars in karachi
vehicles increase in cars public transport
85%
increase
since 2008
36. According 2015
15.1
18.9
23.1
27.6
29.7
31.6
0
5
10
15
20
25
30
35
2000 2005 2010 2015 2020 2025 2030 2035
Population(Millions)
Year
Current
Population
Projection in
KSDP 2020
Projection
in KTIP
Source : KTIP 2030
An increase of
almost 9 million
people
An increase of
another 4 million
people
KARACHI POPULATION PROJECTION
38. CURRENT SITUATION OF KCR
72% OF THE AREA IS OCCUPIED
ON EITHER SIDE OF THE KCR
REMAINING 28% IS OCCUPIED BY
ILLEGAL LAND GRABBERS KATCHI
ABADI
39. CURRENT SITUATION OF KCR
ALONG THE MAINLINE FROM (CITY
STATION TO LANDHI) AREAS AT A
DISTANCE OF 30 TO 60 FEETS
ALONG THE CIRCULAR TRACK (FROM
DRIGH ROAD TO CITY STATIONS)
AREAS ARE AT A DISTANCE OF 15 TO
40 FEETS
41. GOVERNMENT PLAN OF KCR
REVIVAL
BEGAN IN 2005 AND FORGOTTEN
IN 2006
AGAIN BEGAN IN 2009 WITH A
BUDGET OF 1.5 BILLION RS
FORGOTTEN IN 2010
42. GOVERNMENT PLAN OF KCR
REVIVAL
ONCE AGAIN BEGAN IN 2013 AND
FORGOTTEN IN THE SAME YEAR
THE LAST ESTIMATED BUDGET IN
2013 WAS 2.50 BILLION RUPEES
WITH A FINISHING TIMELINE OF
2017
46. ADVANTAGES KCR OFFER
FOR COMMUTERS
LIAQUATABAD TO TOWER IN
20MINS
LESS WORKING HOURS
REDUCE CONGESTIONS IN KARACHI
47. ADVANTAGES KCR OFFER
FOR COMMUTERS
SAFE & SECURE
COMFORT JOURNEY AGAINST THE
FARE
TIME TO COMMUTE
48. FAST FACTS OF KCR
CAN ACCOMMODATE 700,000 PEOPLE
DAILY
CAN SAVES FUEL UP TO HUNDREDS OF
LITERS
FINISH THE TRANSPORT MAFIA
CAN REDUCE AVG. TRAVEL TIME OF 1HOUR TO
25MINS
INCREASE QUALITY OF LIFE
DEVELOP URBAN INFRASTRUCTURE
49. SOLUTIONS FOR KCR
SETTLEMENT OF ENCROACHERS TO
DUMBA GOTH (AS CLEANED BY PARA
MILITARY AGENCIES RECENTLY)
DEPLOYMENT OF TRAINS ON SMALLER
SCALE FOR TEST RUN
REVIVE THE EXISTING TRACK IN
FIRST PHASE AND MARK R.O.W
50. SOLUTIONS FOR KCR
ROW A/C TO DEVELOPED
COUNTRIES IS 25 TO 30 FEETS.
JAPAN HAS 30 FEET'S ROW WHILE
HAVING FASTEST TRAINS IN THE
WORLD
TEMPORARILY BAN ON NEW PRIVATE
VEHICLES REGISTRATION
51. SOLUTIONS FOR KCR
OR LIMIT THE NUMBER OF VEHICLES
FOR EACH YEAR
TRANSPARENCY IN THE SYSTEM
AWARE THE GENERAL PUBLIC ABOUT
KCR