BUILDING MAINTENANCE UNITS
(a.k.a. Façade Access Equipment)
Introduction & Planning considerations
Presented by:
Samson Rajan Babu MCIBSE
Façade Access Consultant & Project Manager
Dubai, UAE
Important Note:
This document is released to the public for the purpose
of knowledge sharing only. This document shall not be
used by 3rd parties with commercial interests.
The user of this document is responsible to identify the
latest amendments for any regulations referred herein.
Some of the images included in this document represent the work of other professionals. They are cited in the document for the express purpose of communicating ideas and are not for
commercial use. Credit to the appropriate professionals is available upon request.
© Copyright Samson Rajan Babu Thangiah, Tamil Nadu, India
Description:
Permanently installed on a specific building or structure for the
inspection, cleaning and maintenance of the façades.
Other Names:
Façade Access Equipment
Window Washing Equipment
Permanent Access Suspended Platform
Cleaning cradle system
Other possible use:
Glass panel replacement
TYPES OF BMU:
• Manual (removable & relocatable) Roof Systems
• External Monorail Systems – Manual & Motorised
• Motorised Roof systems
• Specially designed BMUs.
Davit systems
Counterweighted Beams
Internal Monorail
Parapet Clamps
STANDARD EXTERNAL MONORAIL
CLIMBING TYPE EXTERNAL MONORAIL
ROOF MOUNTED
MOTORISED MACHINES
SPECIALLY DESIGNED
ACCESS SYSTEMS
SPECIALLY DESIG
ACCESS SYSTEMS
And, The Most Complex BMU!A basic BMU!
MANUFACTURERS (International with Worldwide projects):
• SECALT – LUXEMBOURG
• MANNTECH – GERMANY
• COX GOMYL – AUSTRALIA, SPAIN
• FARRA ENGINEERING – NEW ZEALAND
• FAÇADE HOISTS – UK
• SKYGONDOLA – SPAIN
• AESA – SPAIN
• GEDA - GERMANY
Governing Codes:
BSEN 1808, AS 1418
BS 6037
CSI Specification Division:
11 - Equipment
ESSENTIALS OF A BMU MANUFACTURER:
• Compliance to governing codes
• CE Certified Prototype Designs, Lifting and Safety components
• Years of experience, Design versatility & Capability
• Qualified structural design engineers & local certification
of design calculations.
• Type tested & proven components from reputed sub-contractors
• High-tech fabrication facility
• Special consideration for surface treatment and protection
• QA/QC procedures
• Trained installers
• Spare parts availability
While designing BMU systems:
Reduce the level of risk in the final design to “As Low As Reasonably
Practicable” (A.L.A.R.P)
Façade Design should allow for a BMU design that is:
• Installed safely
• Accessed safely
• Used, inspected and maintained safely
Problem façades include:
• Stepped façades, Ribbed façades
• Curved elevations – Concave/Convex
• Localised steps in the façade, eg. sun shading, ledges, canopies, fins
Projecting balcony / Mashrabiya
• Sloped façade (inwards/outwards)
• Local attachments to the façade, which protrude: CCTV cameras,
signage
• Recessed windows.
Typical information required for planning a BMU:
• Perspectives / 3D sketches / Model pictures
• Roof plan both architectural and structural.
• Elevations.
• Floor plans – Ground, each typical floor type
• Roof equipment layout: Clear spaces on roof
• Exterior wall sections of the façade: Show recess/projection
Data to be reviewed:
• Multiple roofs/terraces
• Façade types
• Roof layout: Clear space for moving around & parking area
• Parapet line Vs Façade line: Walk through
• Parapet heights
• Roof/Parapet structural detail
• Ground conditions: Clear space for moving around
Solution depends on:
• Combination of Roof / Parapet / Ground conditions
• Budget
• Frequency of cleaning (cleaning cycle analysis)
• Aesthetics: While working & when parked
• Parking requirements
• Availability of structural support for the solution
Solutions can be:
• Single/multiple manual systems with common/dedicated platforms.
• Single/multiple monorail systems with common/dedicated
platforms.
• Single/multiple roof trolleys with common/dedicated platforms.
FAÇADE TYPES
CHALLENGING
FAÇADE TYPES
Various roof conditions
Sloped roof
Mashrabiya
Parapet conditions Ground conditions
Cradle Drop Layout
&
Cleaning cycle analysis
2 Basic types of BMUs:
• Hoisting mechanism within carriage at roof level
• Hoisting mechanism within suspended platform
Hoist Here
Powered Access Platform
Hoist Here
Not a powered
access platform
Motorised platform:
• Heavy – difficult to handle
• Platform space not roomy.
• Cleaner must check proper
operation of various devices
• Use if lifting below 40mtrs.
• Can be shared with other roof
systems.
Non-motorised platform:
• Light weight – easy to handle
• Platform is spacious
• Cleaner can concentrate in cleaning
• Use if lifting more than 40mtrs.
• Cannot be shared – used only on roo
trolleys
Typical spacing
Typical spacing
Davit base not
in use
• Davit bases are laid out on the roof slab
• Along the parapet
• At typical spacing suitable for platform length
Components of Davit systems
Fixed boom
- cannot bring cradle onto roof
Rotating boom
- can bring cradle onto roof
Permanent base
At many locations
Removable
mast (shared)
Davit system,
fully installed
Removable
boom (shared)
Through bolt fixing Cast-in U bolt fixing
REQUIREMENTS OF BMU SYSTEMS:
Manual systems: (Davits, Roof anchors, Roof beams, Clamps)
• Floor mount (or) parapet mount
• Structurally sound roof slab & parapets (RCC or steel) – Verify loads!
• RCC pedestals – Verify height & waterproofing
• Advisable to use through-bolting or cast-in bolts inside concrete. (Drill in place
or chemical bolts not recommended due to high pullout loads.)
• When relocating, the suspended load must be removed (need landing space
directly below suspension point.) Keep ground floor clear!
• Usually in natural aluminium or galvanised steel finish
Disadvantages:
• Heavy, laborious & time-consuming to use.
• Platform stays at ground floor most of the time.
• Hooking & unhooking of ropes need extra care.
• Important components/fasteners are lost & replaced with local means.
Components of Monorail:
Monorail Track
Support bracket
Traversing trolley
-Manual pull
-Rope driven
-Motorised
• Monorail brackets are anchored on
parapet wall (straight brackets) or on
floor slab (L-shape brackets)
• At typical spacing of 2000mm
• Typical overhang is 700mm for
smooth façade types.
700mm
L shape bracket
Straight
bracket
REQUIREMENTS OF BMU SYSTEMS:
Monorail systems:
• Floor mount (or) parapet mount
• Structurally sound roof slab & parapets (RCC or steel) – Verify loads!
• RCC pedestals – Verify height & waterproofing
• Advisable to use through-bolting or cast-in bolts inside concrete. (Drill in place
or chemical bolts not recommended due to high pullout loads.)
• When sharing cradle with another monorail, need landing space directly below
suspension point. Keep ground floor clear at the point of cradle transfer.
• Park at the rear of building (with ropes hanging) Not recommended.
• Provide access door at monorail level to remove ropes for clean storage &
sharing cradle.
• In variety of finishes: natural aluminium, anodized, powdercoated to RAL color
Disadvantages:
• Cradle sharing is laborious & time-consuming.
• Platform stays at ground floor most of the time.
• Hooking & unhooking of ropes need extra care & access doors.
Types of roof trolleys:
* With motorised platform * With non-motorised platform
Design variations:
• Trolleys running on RCC runway / Steel plate runway (with tiller)
• Trolleys running on RCC runway / Steel plate runway with continuous
guide angle track.
• Trolleys running on Steel beam tracks on floor slab
• Trolleys running on Steel beam tracks on parapet wall
• Pedestal type (do not run around the roof.)
• Trolleys climbing on a sloped roof / parapet
Standard machine
on I beam tracks
Climbing slopes-
Self powered
Machine with rail
tracks on parapet wall Climbing slopes-
Remote powered
Standard machine
on RCC runway
Basic components of a roof trolley BMU:
Suspended
platform
Cross Bar/
Spreader Bar
Jib
Motorised
sub-frame
Turret
Counterweight
Hoist
Hydraulic
luffing piston
Lifting &
Safety Ropes
MOVEMENTS OF A BMU CW/CCW
Cross bar
slewing
Up/Down
Jib Luffing
CW/CCW
Turret slewing
Left/Right Traversing
Up/Down
Hoisting
Cradle
Forward luffing
Traversing
Spreader bar
slewing Slewing
Luffing
Horizontal elbow
Movements of
BMU components
Mast rise/lower
Jib telescoping
Vertical elbow
Movements of
BMU components
• Wheel gauge, Wheel base
• Outreach, Tail swing
• Jib inclination
• Jib luffing angle (From… to…)
• Machine Height
Jib length (Extended / Retracted)
Slew (rotation) angles
Mast Height
Platform width
Platform length
Important terminologies relating to the BMU:
REQUIREMENTS OF BMU SYSTEMS:
Roof trolley systems:
• Structurally sound roof slab & parapets (RCC or steel) – Verify wheel loads!
• RCC pedestals – Verify height & waterproofing
• Dead weight of machine
• Parked at the rear of building or at designated parking garage on roof.
• Can be hidden inside the building when façade doors are provided for
moving out.
• In variety of finishes: Galvanised steel / powder coated to RAL color
• Safest solution to access complicated façades
Disadvantages:
• Expensive
• Requires considerable amount of free space at roof for movement.
• Heavy & puts considerable load on structure.
MEP REQUIREMENTS OF BMU SYSTEMS:
• 3-Phase, Neutral, Earth – 5 pin AC power supply
• Sockets at many locations on roof level for roof trolleys –
spaced @15mtrs.
• Sockets at many locations on ground level for monorail /
manual systems – spaced @15mtrs.
• Usually 32Amps. Weatherproof sockets on the building
(socket type to match with plug on BMU.)
• Provide 1 No. 1-Phase, Neutral, Earth – 3 pin AC power
supply for use of maintenance tools.
• Usually 16Amps. Weatherproof sockets on the building.
(Most common type in the local market.)
• Provide water supply mains – for cleaners to carry water
inside the cradle. Provide at platform storage level.
Weatherproof
Power socket
Track systems for Roof Trolley BMU
• To spread machine
load evenly on the
supporting structure.
• Provide means to
climb over sloped roofs
• To facilitate parking
• To change movement
direction without turning
radius
• To hide machine from
general view
RCC Plinths
Baseplate
with isolation
Cast-in bolt tied with
reinforcement
RCC runway
‘L’ angle guiding track
‘L’ angle
guiding track
I beam tracks on elevated steel structure
Gear rack track for
climbing slopes
RCC runway with guiding rail
I beam tracks
on sloped roof
Track systems for Roof Trolley BMU
I Beam Track transfer system
90º branch
Scissor platform to hide
machine from view
Rotating
turn table‘L’ Angle Track transfer system
90º branch
BMU: Platform stabilisation
• Applicable when lifting height is more than 40mtrs.
• Rope with cradle is tied to façade at 20mtr. on
elevation – to prevent cradle swaying with wind
• Horizontal spacing depends on cradle width
(W+300mm)
• Restraint sockets built into façade – flush mount or
projecting bracket type.
• Lashing on structural fins
• Min. 100kgs. Pull out load on façade at any direction
(for standard equipment)
BMU: Platform stabilisation
• Coordination required with façade
supplier – At early stage
• To finalise locations of sockets on façade,
quantity required, dimensions and fixing
details
• 2 components:
1) Restraint socket (built-inside façade) –
usually at mullion joints
2) Restraint plug with lanyard (on the
cradle)
• Ask for Restraint layout drawing (per
elevation), Restraint details drawing –
From BMU supplier.
• BMU supplier supplies the sockets &
Façade supplier installs them on his
façade.
• Sockets quantity: Large depending on
area of façade
• Lanyards quantity: (1 on left, 1 on
right) X Elevation levels
Flush mount Detent-pin
Projecting bracket
Built-in restraint socket
Restraint plug
with lanyard
Continuous
mullion
guides
• Sockets on façade preferred.
• Sockets on structure (behind façade) not
recommended – trouble with dimensions.
• Mullion guides are used on continuously changing
facades.
• Continuous guiding track built inside the mullions.
• Cradle simply follows façade mullion’s path: outward
slopes, inward slopes, projections, twists/ribs
BMU: Platform stabilisation
Mullion Guides
BMU: Special Accessories: FORWARD LUFF/PANTOGRAPH
Cradle Forward
Luff Distance
Centre of ropeCentre of cradle
• Access recessed
façades
• Pantograph
mechanism
• Manual or
motorised
• Standard designs
up to 2.5mtrs.
• Special designs up
to 5.5mtrs.
• Suspended load is
3-5 times more!
• Roof machine
becomes very heavy!
BMU: Special Accessories: Single suspension platforms
Bosun chair (Flying seat)
1-Man cradle
• Advantageous with less
suspended load.
• Easy to handle & carry around
• Use only for lowrise
applications (up to 40mtrs.)
• Single suspension at centre:
Tendency to swivel
• Less stable
• Manual / Motorised versions
BMU on world’s tallest building – BURJ KHALIFA, DUBAI
Upper levels:
• Roof trolleys on roof slab
• Telescopic jib with elbow end
Cross bar
Telescoping
Jib
BMU on world’s tallest building – BURJ KHALIFA, DUBAI
Lower levels:
• Roof trolleys running on wall mounted rail tracks: Externally to
façade.
• Roof trolley with cradle is parked inside the building façade when
not in use. A façade door hides roof trolley from view.
Cross bar
External
rail track
Parking
garage
Door on
façade
Roof trolley with cradle
in working position
Some of the images included in this document represent the work of other professionals. They are cited in the document for the express purpose of communicating ideas and are not for
commercial use. Credit to the appropriate professionals is available upon request.
© Copyright Samson Rajan Babu Thangiah, Tamil Nadu, India

Contenu connexe

Tendances

Tendances (20)

Boom lift training
Boom lift trainingBoom lift training
Boom lift training
 
Toolbox Talk-Working at height
Toolbox Talk-Working at height Toolbox Talk-Working at height
Toolbox Talk-Working at height
 
Erection of scaffolding
Erection of scaffoldingErection of scaffolding
Erection of scaffolding
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts Powerpoint
 
Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Site Aerial Lift/Scissor Lift Training
Site Aerial Lift/Scissor Lift TrainingSite Aerial Lift/Scissor Lift Training
Site Aerial Lift/Scissor Lift Training
 
Scaffolding safety at construction site
Scaffolding safety at construction siteScaffolding safety at construction site
Scaffolding safety at construction site
 
Work at Height | Safety during work at hight
Work at Height | Safety during work at hightWork at Height | Safety during work at hight
Work at Height | Safety during work at hight
 
Lifting & Rigging.ppt
Lifting & Rigging.pptLifting & Rigging.ppt
Lifting & Rigging.ppt
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Scaffolds ppt construction
Scaffolds ppt constructionScaffolds ppt construction
Scaffolds ppt construction
 
Work At Height Regulations
Work At Height RegulationsWork At Height Regulations
Work At Height Regulations
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdf
 

En vedette

Cleaning equipments hand_outs
Cleaning equipments hand_outsCleaning equipments hand_outs
Cleaning equipments hand_outs
Dr. Sunil Kumar
 
Presentation on townplanning of irfhaa fathe (1)
Presentation on townplanning of irfhaa fathe (1)Presentation on townplanning of irfhaa fathe (1)
Presentation on townplanning of irfhaa fathe (1)
Shiek Fathe
 
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy PerformanceAppendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
Richard D. Ochotorena
 

En vedette (16)

Vertical Transportation Consultant BMU Facade Access Cradle Systems consultan...
Vertical Transportation Consultant BMU Facade Access Cradle Systems consultan...Vertical Transportation Consultant BMU Facade Access Cradle Systems consultan...
Vertical Transportation Consultant BMU Facade Access Cradle Systems consultan...
 
Facade - presentation
Facade - presentationFacade - presentation
Facade - presentation
 
Ideas Engineering & Architectural Services Pvt.Ltd., Hyderabad, De Signs
 Ideas Engineering & Architectural Services Pvt.Ltd., Hyderabad, De Signs Ideas Engineering & Architectural Services Pvt.Ltd., Hyderabad, De Signs
Ideas Engineering & Architectural Services Pvt.Ltd., Hyderabad, De Signs
 
Design pattern - Facade Pattern
Design pattern - Facade PatternDesign pattern - Facade Pattern
Design pattern - Facade Pattern
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
Curtain Wall Systems
Curtain Wall SystemsCurtain Wall Systems
Curtain Wall Systems
 
Presentation facade design pattern
Presentation facade design patternPresentation facade design pattern
Presentation facade design pattern
 
Cleaning equipments hand_outs
Cleaning equipments hand_outsCleaning equipments hand_outs
Cleaning equipments hand_outs
 
Presentation on townplanning of irfhaa fathe (1)
Presentation on townplanning of irfhaa fathe (1)Presentation on townplanning of irfhaa fathe (1)
Presentation on townplanning of irfhaa fathe (1)
 
Leads facade- Design Develope Deliver
Leads facade- Design Develope DeliverLeads facade- Design Develope Deliver
Leads facade- Design Develope Deliver
 
Cable Tray Installation Sample
Cable Tray Installation SampleCable Tray Installation Sample
Cable Tray Installation Sample
 
Lind Equipment - Static Bonding, Grounding, Earthing & Lighting Equipment
Lind Equipment - Static Bonding, Grounding, Earthing & Lighting EquipmentLind Equipment - Static Bonding, Grounding, Earthing & Lighting Equipment
Lind Equipment - Static Bonding, Grounding, Earthing & Lighting Equipment
 
LinkedPro (US)
LinkedPro (US)LinkedPro (US)
LinkedPro (US)
 
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy PerformanceAppendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
Appendix A5_Summary of Analysis for Okhta Tower Facade Energy Performance
 
Staticus presentation 2012
Staticus presentation 2012Staticus presentation 2012
Staticus presentation 2012
 
work experience
work experiencework experience
work experience
 

Similaire à VTME dubai Rajan Samson Facade access equipment bmu design planning by samson rajan babu

Similaire à VTME dubai Rajan Samson Facade access equipment bmu design planning by samson rajan babu (20)

Trulift presentation
Trulift presentationTrulift presentation
Trulift presentation
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
MSS presentation (200ppi)
MSS presentation (200ppi)MSS presentation (200ppi)
MSS presentation (200ppi)
 
item North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applicationsitem North America Mechanical Solutions For Dynamic Applications
item North America Mechanical Solutions For Dynamic Applications
 
tall.pptx
tall.pptxtall.pptx
tall.pptx
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
UNIT 1 MACHINERIES
UNIT 1       	MACHINERIES             UNIT 1       	MACHINERIES
UNIT 1 MACHINERIES
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
FT presentation (200ppi)
FT presentation (200ppi)FT presentation (200ppi)
FT presentation (200ppi)
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
2018 CRW: Engineered Lift Plans From A to Z
2018 CRW: Engineered Lift Plans From A to Z2018 CRW: Engineered Lift Plans From A to Z
2018 CRW: Engineered Lift Plans From A to Z
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
Align Production Systems: Innovation in Movement
Align Production Systems: Innovation in MovementAlign Production Systems: Innovation in Movement
Align Production Systems: Innovation in Movement
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
Vip lounge
Vip loungeVip lounge
Vip lounge
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 

Plus de SAMSON BABU MCIBSE

Plus de SAMSON BABU MCIBSE (18)

Vertical transport vtme elevator_escalator_safety improvements to escalators_...
Vertical transport vtme elevator_escalator_safety improvements to escalators_...Vertical transport vtme elevator_escalator_safety improvements to escalators_...
Vertical transport vtme elevator_escalator_safety improvements to escalators_...
 
Vtme rajan samson ew_june18_article lift car cab decoration
Vtme rajan samson ew_june18_article lift car cab decorationVtme rajan samson ew_june18_article lift car cab decoration
Vtme rajan samson ew_june18_article lift car cab decoration
 
VTME Elevator Consultant lift consultant UAE DUBAI FIRE CODE
VTME Elevator Consultant lift consultant UAE DUBAI FIRE CODEVTME Elevator Consultant lift consultant UAE DUBAI FIRE CODE
VTME Elevator Consultant lift consultant UAE DUBAI FIRE CODE
 
VTME ELEVATOR CONSULTANTS DUBAI ELEVATOR SIGNAL FIXTURES
VTME ELEVATOR CONSULTANTS DUBAI ELEVATOR SIGNAL FIXTURESVTME ELEVATOR CONSULTANTS DUBAI ELEVATOR SIGNAL FIXTURES
VTME ELEVATOR CONSULTANTS DUBAI ELEVATOR SIGNAL FIXTURES
 
Elevator Signal Fixtures Elevator World June 2016
Elevator Signal Fixtures Elevator World June 2016Elevator Signal Fixtures Elevator World June 2016
Elevator Signal Fixtures Elevator World June 2016
 
Vtme elevator consultant scope of work
Vtme elevator consultant scope of workVtme elevator consultant scope of work
Vtme elevator consultant scope of work
 
BIM Modeling VTME Elevator Consultants
BIM Modeling VTME Elevator ConsultantsBIM Modeling VTME Elevator Consultants
BIM Modeling VTME Elevator Consultants
 
Vertical transportation card
Vertical transportation cardVertical transportation card
Vertical transportation card
 
VTME DUBAI elevator consultants advise for firefighting evacuation
VTME DUBAI elevator consultants advise for firefighting evacuation VTME DUBAI elevator consultants advise for firefighting evacuation
VTME DUBAI elevator consultants advise for firefighting evacuation
 
VERTICAL TRANSPORTATION
VERTICAL TRANSPORTATIONVERTICAL TRANSPORTATION
VERTICAL TRANSPORTATION
 
Www.ctbuh.org desktop modules_digarticle_print
Www.ctbuh.org desktop modules_digarticle_printWww.ctbuh.org desktop modules_digarticle_print
Www.ctbuh.org desktop modules_digarticle_print
 
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
 
Vtme dubai samson babu article on vertical transportation planning ELEVATOR W...
Vtme dubai samson babu article on vertical transportation planning ELEVATOR W...Vtme dubai samson babu article on vertical transportation planning ELEVATOR W...
Vtme dubai samson babu article on vertical transportation planning ELEVATOR W...
 
vertical transportation consultants dubai VTME dubai escalator safety rajan s...
vertical transportation consultants dubai VTME dubai escalator safety rajan s...vertical transportation consultants dubai VTME dubai escalator safety rajan s...
vertical transportation consultants dubai VTME dubai escalator safety rajan s...
 
VTME dubai Rajan samson coordination of vertical transport systems design for...
VTME dubai Rajan samson coordination of vertical transport systems design for...VTME dubai Rajan samson coordination of vertical transport systems design for...
VTME dubai Rajan samson coordination of vertical transport systems design for...
 
VTME dubai Rajan Samson Article on Comparison of dedicated against common ser...
VTME dubai Rajan Samson Article on Comparison of dedicated against common ser...VTME dubai Rajan Samson Article on Comparison of dedicated against common ser...
VTME dubai Rajan Samson Article on Comparison of dedicated against common ser...
 
Vertical Transportation Consultants Dubai VTME Dubai Rajan Samson Article MRL...
Vertical Transportation Consultants Dubai VTME Dubai Rajan Samson Article MRL...Vertical Transportation Consultants Dubai VTME Dubai Rajan Samson Article MRL...
Vertical Transportation Consultants Dubai VTME Dubai Rajan Samson Article MRL...
 
VTME dubai Rajan Samson Article Elevators For Improving Life Safety
VTME dubai Rajan Samson Article Elevators For Improving Life SafetyVTME dubai Rajan Samson Article Elevators For Improving Life Safety
VTME dubai Rajan Samson Article Elevators For Improving Life Safety
 

Dernier

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Dernier (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

VTME dubai Rajan Samson Facade access equipment bmu design planning by samson rajan babu

  • 1. BUILDING MAINTENANCE UNITS (a.k.a. Façade Access Equipment) Introduction & Planning considerations Presented by: Samson Rajan Babu MCIBSE Façade Access Consultant & Project Manager Dubai, UAE
  • 2. Important Note: This document is released to the public for the purpose of knowledge sharing only. This document shall not be used by 3rd parties with commercial interests. The user of this document is responsible to identify the latest amendments for any regulations referred herein. Some of the images included in this document represent the work of other professionals. They are cited in the document for the express purpose of communicating ideas and are not for commercial use. Credit to the appropriate professionals is available upon request. © Copyright Samson Rajan Babu Thangiah, Tamil Nadu, India
  • 3. Description: Permanently installed on a specific building or structure for the inspection, cleaning and maintenance of the façades. Other Names: Façade Access Equipment Window Washing Equipment Permanent Access Suspended Platform Cleaning cradle system Other possible use: Glass panel replacement
  • 4. TYPES OF BMU: • Manual (removable & relocatable) Roof Systems • External Monorail Systems – Manual & Motorised • Motorised Roof systems • Specially designed BMUs.
  • 6. STANDARD EXTERNAL MONORAIL CLIMBING TYPE EXTERNAL MONORAIL
  • 10. And, The Most Complex BMU!A basic BMU!
  • 11. MANUFACTURERS (International with Worldwide projects): • SECALT – LUXEMBOURG • MANNTECH – GERMANY • COX GOMYL – AUSTRALIA, SPAIN • FARRA ENGINEERING – NEW ZEALAND • FAÇADE HOISTS – UK • SKYGONDOLA – SPAIN • AESA – SPAIN • GEDA - GERMANY Governing Codes: BSEN 1808, AS 1418 BS 6037 CSI Specification Division: 11 - Equipment
  • 12. ESSENTIALS OF A BMU MANUFACTURER: • Compliance to governing codes • CE Certified Prototype Designs, Lifting and Safety components • Years of experience, Design versatility & Capability • Qualified structural design engineers & local certification of design calculations. • Type tested & proven components from reputed sub-contractors • High-tech fabrication facility • Special consideration for surface treatment and protection • QA/QC procedures • Trained installers • Spare parts availability
  • 13. While designing BMU systems: Reduce the level of risk in the final design to “As Low As Reasonably Practicable” (A.L.A.R.P) Façade Design should allow for a BMU design that is: • Installed safely • Accessed safely • Used, inspected and maintained safely Problem façades include: • Stepped façades, Ribbed façades • Curved elevations – Concave/Convex • Localised steps in the façade, eg. sun shading, ledges, canopies, fins Projecting balcony / Mashrabiya • Sloped façade (inwards/outwards) • Local attachments to the façade, which protrude: CCTV cameras, signage • Recessed windows.
  • 14. Typical information required for planning a BMU: • Perspectives / 3D sketches / Model pictures • Roof plan both architectural and structural. • Elevations. • Floor plans – Ground, each typical floor type • Roof equipment layout: Clear spaces on roof • Exterior wall sections of the façade: Show recess/projection Data to be reviewed: • Multiple roofs/terraces • Façade types • Roof layout: Clear space for moving around & parking area • Parapet line Vs Façade line: Walk through • Parapet heights • Roof/Parapet structural detail • Ground conditions: Clear space for moving around
  • 15. Solution depends on: • Combination of Roof / Parapet / Ground conditions • Budget • Frequency of cleaning (cleaning cycle analysis) • Aesthetics: While working & when parked • Parking requirements • Availability of structural support for the solution Solutions can be: • Single/multiple manual systems with common/dedicated platforms. • Single/multiple monorail systems with common/dedicated platforms. • Single/multiple roof trolleys with common/dedicated platforms.
  • 21. 2 Basic types of BMUs: • Hoisting mechanism within carriage at roof level • Hoisting mechanism within suspended platform Hoist Here Powered Access Platform Hoist Here Not a powered access platform
  • 22. Motorised platform: • Heavy – difficult to handle • Platform space not roomy. • Cleaner must check proper operation of various devices • Use if lifting below 40mtrs. • Can be shared with other roof systems. Non-motorised platform: • Light weight – easy to handle • Platform is spacious • Cleaner can concentrate in cleaning • Use if lifting more than 40mtrs. • Cannot be shared – used only on roo trolleys
  • 23. Typical spacing Typical spacing Davit base not in use • Davit bases are laid out on the roof slab • Along the parapet • At typical spacing suitable for platform length Components of Davit systems Fixed boom - cannot bring cradle onto roof Rotating boom - can bring cradle onto roof
  • 24. Permanent base At many locations Removable mast (shared) Davit system, fully installed Removable boom (shared)
  • 25. Through bolt fixing Cast-in U bolt fixing
  • 26. REQUIREMENTS OF BMU SYSTEMS: Manual systems: (Davits, Roof anchors, Roof beams, Clamps) • Floor mount (or) parapet mount • Structurally sound roof slab & parapets (RCC or steel) – Verify loads! • RCC pedestals – Verify height & waterproofing • Advisable to use through-bolting or cast-in bolts inside concrete. (Drill in place or chemical bolts not recommended due to high pullout loads.) • When relocating, the suspended load must be removed (need landing space directly below suspension point.) Keep ground floor clear! • Usually in natural aluminium or galvanised steel finish Disadvantages: • Heavy, laborious & time-consuming to use. • Platform stays at ground floor most of the time. • Hooking & unhooking of ropes need extra care. • Important components/fasteners are lost & replaced with local means.
  • 27. Components of Monorail: Monorail Track Support bracket Traversing trolley -Manual pull -Rope driven -Motorised • Monorail brackets are anchored on parapet wall (straight brackets) or on floor slab (L-shape brackets) • At typical spacing of 2000mm • Typical overhang is 700mm for smooth façade types. 700mm L shape bracket Straight bracket
  • 28. REQUIREMENTS OF BMU SYSTEMS: Monorail systems: • Floor mount (or) parapet mount • Structurally sound roof slab & parapets (RCC or steel) – Verify loads! • RCC pedestals – Verify height & waterproofing • Advisable to use through-bolting or cast-in bolts inside concrete. (Drill in place or chemical bolts not recommended due to high pullout loads.) • When sharing cradle with another monorail, need landing space directly below suspension point. Keep ground floor clear at the point of cradle transfer. • Park at the rear of building (with ropes hanging) Not recommended. • Provide access door at monorail level to remove ropes for clean storage & sharing cradle. • In variety of finishes: natural aluminium, anodized, powdercoated to RAL color Disadvantages: • Cradle sharing is laborious & time-consuming. • Platform stays at ground floor most of the time. • Hooking & unhooking of ropes need extra care & access doors.
  • 29. Types of roof trolleys: * With motorised platform * With non-motorised platform Design variations: • Trolleys running on RCC runway / Steel plate runway (with tiller) • Trolleys running on RCC runway / Steel plate runway with continuous guide angle track. • Trolleys running on Steel beam tracks on floor slab • Trolleys running on Steel beam tracks on parapet wall • Pedestal type (do not run around the roof.) • Trolleys climbing on a sloped roof / parapet
  • 30. Standard machine on I beam tracks Climbing slopes- Self powered Machine with rail tracks on parapet wall Climbing slopes- Remote powered Standard machine on RCC runway
  • 31. Basic components of a roof trolley BMU: Suspended platform Cross Bar/ Spreader Bar Jib Motorised sub-frame Turret Counterweight Hoist Hydraulic luffing piston Lifting & Safety Ropes
  • 32. MOVEMENTS OF A BMU CW/CCW Cross bar slewing Up/Down Jib Luffing CW/CCW Turret slewing Left/Right Traversing Up/Down Hoisting Cradle Forward luffing
  • 34. Mast rise/lower Jib telescoping Vertical elbow Movements of BMU components
  • 35.
  • 36. • Wheel gauge, Wheel base • Outreach, Tail swing • Jib inclination • Jib luffing angle (From… to…) • Machine Height Jib length (Extended / Retracted) Slew (rotation) angles Mast Height Platform width Platform length Important terminologies relating to the BMU:
  • 37. REQUIREMENTS OF BMU SYSTEMS: Roof trolley systems: • Structurally sound roof slab & parapets (RCC or steel) – Verify wheel loads! • RCC pedestals – Verify height & waterproofing • Dead weight of machine • Parked at the rear of building or at designated parking garage on roof. • Can be hidden inside the building when façade doors are provided for moving out. • In variety of finishes: Galvanised steel / powder coated to RAL color • Safest solution to access complicated façades Disadvantages: • Expensive • Requires considerable amount of free space at roof for movement. • Heavy & puts considerable load on structure.
  • 38. MEP REQUIREMENTS OF BMU SYSTEMS: • 3-Phase, Neutral, Earth – 5 pin AC power supply • Sockets at many locations on roof level for roof trolleys – spaced @15mtrs. • Sockets at many locations on ground level for monorail / manual systems – spaced @15mtrs. • Usually 32Amps. Weatherproof sockets on the building (socket type to match with plug on BMU.) • Provide 1 No. 1-Phase, Neutral, Earth – 3 pin AC power supply for use of maintenance tools. • Usually 16Amps. Weatherproof sockets on the building. (Most common type in the local market.) • Provide water supply mains – for cleaners to carry water inside the cradle. Provide at platform storage level. Weatherproof Power socket
  • 39. Track systems for Roof Trolley BMU • To spread machine load evenly on the supporting structure. • Provide means to climb over sloped roofs • To facilitate parking • To change movement direction without turning radius • To hide machine from general view RCC Plinths Baseplate with isolation Cast-in bolt tied with reinforcement RCC runway ‘L’ angle guiding track
  • 40. ‘L’ angle guiding track I beam tracks on elevated steel structure Gear rack track for climbing slopes RCC runway with guiding rail I beam tracks on sloped roof
  • 41. Track systems for Roof Trolley BMU I Beam Track transfer system 90º branch Scissor platform to hide machine from view Rotating turn table‘L’ Angle Track transfer system 90º branch
  • 42. BMU: Platform stabilisation • Applicable when lifting height is more than 40mtrs. • Rope with cradle is tied to façade at 20mtr. on elevation – to prevent cradle swaying with wind • Horizontal spacing depends on cradle width (W+300mm) • Restraint sockets built into façade – flush mount or projecting bracket type. • Lashing on structural fins • Min. 100kgs. Pull out load on façade at any direction (for standard equipment)
  • 43. BMU: Platform stabilisation • Coordination required with façade supplier – At early stage • To finalise locations of sockets on façade, quantity required, dimensions and fixing details • 2 components: 1) Restraint socket (built-inside façade) – usually at mullion joints 2) Restraint plug with lanyard (on the cradle) • Ask for Restraint layout drawing (per elevation), Restraint details drawing – From BMU supplier. • BMU supplier supplies the sockets & Façade supplier installs them on his façade. • Sockets quantity: Large depending on area of façade • Lanyards quantity: (1 on left, 1 on right) X Elevation levels Flush mount Detent-pin Projecting bracket
  • 44. Built-in restraint socket Restraint plug with lanyard Continuous mullion guides • Sockets on façade preferred. • Sockets on structure (behind façade) not recommended – trouble with dimensions.
  • 45. • Mullion guides are used on continuously changing facades. • Continuous guiding track built inside the mullions. • Cradle simply follows façade mullion’s path: outward slopes, inward slopes, projections, twists/ribs BMU: Platform stabilisation Mullion Guides
  • 46. BMU: Special Accessories: FORWARD LUFF/PANTOGRAPH Cradle Forward Luff Distance Centre of ropeCentre of cradle • Access recessed façades • Pantograph mechanism • Manual or motorised • Standard designs up to 2.5mtrs. • Special designs up to 5.5mtrs. • Suspended load is 3-5 times more! • Roof machine becomes very heavy!
  • 47. BMU: Special Accessories: Single suspension platforms Bosun chair (Flying seat) 1-Man cradle • Advantageous with less suspended load. • Easy to handle & carry around • Use only for lowrise applications (up to 40mtrs.) • Single suspension at centre: Tendency to swivel • Less stable • Manual / Motorised versions
  • 48. BMU on world’s tallest building – BURJ KHALIFA, DUBAI Upper levels: • Roof trolleys on roof slab • Telescopic jib with elbow end Cross bar Telescoping Jib
  • 49. BMU on world’s tallest building – BURJ KHALIFA, DUBAI Lower levels: • Roof trolleys running on wall mounted rail tracks: Externally to façade. • Roof trolley with cradle is parked inside the building façade when not in use. A façade door hides roof trolley from view. Cross bar External rail track Parking garage Door on façade Roof trolley with cradle in working position
  • 50. Some of the images included in this document represent the work of other professionals. They are cited in the document for the express purpose of communicating ideas and are not for commercial use. Credit to the appropriate professionals is available upon request. © Copyright Samson Rajan Babu Thangiah, Tamil Nadu, India