SITE SURVEYING (QSB 1813)
SEMESTER 2
FIELDWORK REPORT 1
NAME

STUDENT ID

LIEW CHEE HOW

0314758

FELIX LAU CIUN

0301789

WOO
TEO JUN TANG

0314667

YAP HUE ENG

0314857

YAP ZHI XIN

0314542

SUBMISSION DATE: 4 DECEMBER 2013
CONTENTS
NO. COTENTS

PAGE NO.

1

OBJECTIVE

1

2

INTRODUCTION

2

3

EQUIPMENT

3

4

RESULT

5

5

DISCUSSION

6

6

CONCLUSION

8
Objective:
The objectives of this field work are:
- To have a better understanding of the procedure for leveling.
- To have experiences to the actual working environment on the site including
uncertainty weather condition.
- To have witness the usage of leveling equipment and apparatus on site.
- To understand more about how to see the backsight (BS) and foresight (FS) of
the field work
- To have the ability to setting up the tripod and adjusting the staff bubble.
- To understand how to see the reading in the leveling rods.
- To have the knowledge of the rules of levelling
- To have skills in using the auto meter level for correct reading
- To increase the team working skills among group members.
- To have the ability in recording data of the reading
- To understand the type of error would occur when taking the reading.
- To have skills in applying formulae in calculation.
Introduction:
Site Surveying is one of the subjects that one required to study to become a
Professional Quantity Surveyor. We have been assigned to carry out a fieldwork on the
20th of November in Taylor’s University Lakeside Campus at selected area. Our fieldwork
is about leveling. Fieldwork is basically a practice that allows us to merge theory and
skills learned in the lectures into the reality site. By having the chance of doing fieldwork,
it will helps to gain better understanding on collecting and analyzing data. Other than that,
it will also help us to develop observational and investigation skills and also teamwork
and problem solving skills.
Moreover, leveling is all about measuring the height of each station using the
proper instruments and to have number scaled in the selected survey area. Leveling is a
very simple and accurate method of measuring the height of each pinpoint and the site
level which is commonly used in any other construction sites.
Besides, the equipment that are needed in order to make a complete leveling
involved the auto level meter or the theodolite, tripod and leveling staff aluminum. The
accuracy of the leveling are all depending the setup of the instrument and also the reading
on the theodolite. It is very important to setup the instrument appropriately so that there
will be no errors. Each of the instrument shall be kept safely, correctly calibrated and be
used and stored with care.
In the nutshell, any horizontal line can be chosen as a datum for heights and for
leveling. The height of a point is measured along the vertical above or below the chosen
datum. The height of a point relative to a datum is known as its reduced level. Differential
of leveling provides a means of measuring the height differences between the points
accurately. A level is set up on a tripod and leveled so that the line of sight is
horizontal.Level or horizontal lines are always at right angles to the direction of gravity.
Last but not least, we were given a benchmark as a starting point at the basement
car park of the university. Then, we started to our task at the selected area and at the end
of the survey we will go back to the same benchmark as an end. After completing and
collecting all the reading during our survey, we are required to analyze and do the
correction and adjust to the accurate reduced level from what we have got with the data
that we have collected.
Apparatus:
Basically, we were doing leveling work in our 1st site surveying fieldwork. In
order to finish this fieldwork, we need a tripod, a dumpy level, and some leveling staffs
with a staff bubble attached on it in order to finish the leveling work.
Tripod: A tripod is a portable three-legged frame, used as a platform for supporting the
weight and maintaining the stability of some other object. A tripod provides stability
against downward forces and horizontal forces and movements about horizontal axes.
Automatic level: An automatic level, auto level meter, leveling instrument, or dumpy
level is an optical instrument used to establish or check points in the same horizontal
plane. It is used in surveying and building to transfer, measure, or set horizontal levels.
The automatic level is set up on a tripod and set to a leveled condition using foot screws
(leveling screws).
Leveling staff with staff bubble: A level staff, also called leveling rod, is a graduated
wooden or aluminum rod, which measure vertical distances with reference to a horizontal
plane or surface. Leveling rods can be one piece, but many are sectional and can be
shortened for storage and transport or lengthened for use. The staff bubble is to ensure
that the staff is held vertically.

Picture above shows a tripod.
Picture above shows a automatic level.

Picture above shows some leveling staffs.
Results:
BS
130.00
164.80
139.60
288.00
143.50
144.90
159.60
133.90
141.70
138.70
1584.70

FS

Rise

146.30
159.50
117.70
197.40
144.50
141.00
89.00
328.40
137.60
122.80
1584.20
(0.50)

Fall
16.30

5.30
21.90
90.60
1.00
3.90
70.60
194.50
4.10
15.90
212.30

211.80
(-0.50)

R.L
100.00
83.70
89.00
110.90
201.50
200.50
204.40
275.00
80.50
84.60
100.50
(0.50)

Remarks
BM1
TP1
TP2
TP3
TP4
TP5
TP6
TP7
TP8
TP9
BM1
∑
∆

Misclosure = Measured height – Known height
= 100.50 – 100.00
= 0.50

Reduce Level Adjustment:
Measured R.L
100.00
83.70
89.00
110.90
201.50
200.50
204.40
275.00
80.50
84.60
100.50

Point
BM1
TP1
TP2
TP3
TP4
TP5
TP6
TP7
TP8
TP9
BM1

Adjustment
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0.450
0.500

Adjusted R.L
100.00
83.65
88.90
110.75
201.30
200.25
204.10
274.65
80.10
84.15
100.00
Discussion:
In a group of five members, we are assigned to conduct auto-leveling around the
campus. The place chosen is a point starting from Taylor’s basement car park which is
near to a fire extinguisher hose and it continues to form a loop around the basement car
park. The reduced level of the Bench-mark 100.00m is given to us by our lecturer, Sir
Wong JeeKhai.
As our group members consist of five persons, three persons are to confirm the
reading from the auto level meter and moving the instruments together, one person
collecting the data and one person is assigned to move the leveling staff to decided points.
The procedures include observation, booking and reduction. The equipment we did not
use here is the staff bubble and the measuring tape.
First, we need to set up our tripod and the auto level meter. The height of the tripod
can be adjusted to suit the height of the person taking the reading. We do not have a staff
bubble as there is already one attached together to the auto level meter. All we had to do
next is to adjust the auto level meter so that the air bubble can be situated inside the circle
which indicates the level we are taking the reading is a flat surface. The person carrying
the leveling staff will then situate the leveling staff at the fixed point which is the benchmark and first reading is taken. Consequently, the leveling staffs moved to another point
and the reading which is the foresight is taken. Now, the tripod will be moved to another
point and being set up at another point again to take the second back sight and foresight.
This process is being repeated till the end of the loop when we get back to the first point,
our bench-mark.
Taking the first few reading was quite simple to us but as we went further our group
faced some problems. We get confused when reading the data collected and get mixed up
with the back sight and the foresight. Actually, these problems will be much easier if we
had used a table to collect our data right from the first place. However, our group still
managed to get things cleared up after a discussion which took us much time during this
fieldwork. At first, our group was the first group but due to this confusion our group turns
out to be the last group to end this fieldwork. Nevertheless, the great thing is that we still
managed to finish this fieldwork successfully.
Throughout this fieldwork, we had no intermediate sight. The readings we took are
the back sight and the foresight. In order to minimize error, the length between the back
sight and foresight to the leveling staff is encouraged to be as equal as possible. So, we
try to keep it this way. This might be the reason why we have many set ups. We also
choose to set up our instruments at safe and convenient places such as corners at the car
park and side of the road. Here, this is important so that we can not only get stable
readings as we will not have to move our instruments away and set up again due to the
cars passing by but also prevent traffic congestion.
After the fieldwork, we go through our data together and assign each other’s work
regarding our fieldwork report. During the process of arranging and calculating our data
records, we had some discussion relating our data and of course there is presence of error.
Based on our data, we found the loop disclosure regarding the reduced level which is
calculated by deducting the known height from the measured height. So, the solution is to
carry out the level loop adjustment so that the bench-mark of the closing agrees and it is a
way of even error distribution. Each of the set ups have different adjustment as the
disclosure is linearly distributed according to the number of set ups. After we did the level
loop adjustment, we finally got our adjusted reduced level which agrees our known
reduced level.
Below are the formulae we used in calculation:
1. Loop Disclosure = Measured height – Known height
2. Adjustment per set up =
3. Adjusted RL = Measured RL – Adjustments
Conclusion:
From this field work we have learnt quite a few skills and have better understanding on
how to do levelling. By doing the field work, we start to have better understanding on
how to carry out the procedure for levelling and how to avoid or reduce the human
error.Besides that, we are exposed to the actual working environment on the site such as
the uncertainty of the weather which will enhance our experience and also witnessing the
usage of levelling as well as the apparatus on site which allow us to be exposed regarding
the apparatus used which makes our understanding better besides learning the theory in
the lectures. Moreover, this field work also gave us a chance to use the knowledge from
what we learnt in class and put into practice, such as use an automatic level to get the
reading from a levelling staff. We also learnt how to carry a task out as a team by using
more systematic way. In conclusion, this is one of a lifetime experience because as a
quantity surveyor student this is rare occasion that we can learnt how land surveyor do
and have better understanding on how they carry out their task.

Contenu connexe

Tendances

Tendances (20)

Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Topic 4 - Curve
Topic 4 - CurveTopic 4 - Curve
Topic 4 - Curve
 
Setting out of works
Setting out of worksSetting out of works
Setting out of works
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
 
Setting out construction works 01
Setting out construction works 01Setting out construction works 01
Setting out construction works 01
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
How to Set Up a Total Station
How to Set Up a Total StationHow to Set Up a Total Station
How to Set Up a Total Station
 
Traverse Calculation
Traverse Calculation Traverse Calculation
Traverse Calculation
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 

En vedette

Survey Fieldwork #1
Survey Fieldwork #1Survey Fieldwork #1
Survey Fieldwork #1dellatora
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manualsavineshgautam
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveyingMohammed_82
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveyingstooty s
 

En vedette (8)

Survey Fieldwork #1
Survey Fieldwork #1Survey Fieldwork #1
Survey Fieldwork #1
 
Avinesh surveying lab manuals
Avinesh surveying lab manualsAvinesh surveying lab manuals
Avinesh surveying lab manuals
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Types of level
Types of levelTypes of level
Types of level
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Levelling
LevellingLevelling
Levelling
 

Similaire à Site Surveying Fieldwork 1

Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Yap Xin
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Doreen Yeo
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
GNSS Localizations for Construction
GNSS Localizations for ConstructionGNSS Localizations for Construction
GNSS Localizations for ConstructionDavid Rowlett
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGpwhite91
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELINGFarah Sham
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversingashleyyeap
 

Similaire à Site Surveying Fieldwork 1 (20)

Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
1 st report
1 st report1 st report
1 st report
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Levelling
LevellingLevelling
Levelling
 
GNSS Localizations for Construction
GNSS Localizations for ConstructionGNSS Localizations for Construction
GNSS Localizations for Construction
 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYING
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Levelling final
Levelling finalLevelling final
Levelling final
 
2 nd report
2 nd report2 nd report
2 nd report
 
Traversing
TraversingTraversing
Traversing
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 

Plus de Yap Xin

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang paradeYap Xin
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang paradeYap Xin
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consructionYap Xin
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel reportYap Xin
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignmentYap Xin
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
CT Part 2
CT Part 2CT Part 2
CT Part 2Yap Xin
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slideYap Xin
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)Yap Xin
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) correctedYap Xin
 

Plus de Yap Xin (12)

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang parade
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang parade
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consruction
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignment
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
CT Part 2
CT Part 2CT Part 2
CT Part 2
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slide
 
CT Presentation (KLCC)
CT Presentation (KLCC)CT Presentation (KLCC)
CT Presentation (KLCC)
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 

Dernier

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 

Dernier (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 

Site Surveying Fieldwork 1

  • 1. ________________________ SITE SURVEYING (QSB 1813) SEMESTER 2 FIELDWORK REPORT 1 NAME STUDENT ID LIEW CHEE HOW 0314758 FELIX LAU CIUN 0301789 WOO TEO JUN TANG 0314667 YAP HUE ENG 0314857 YAP ZHI XIN 0314542 SUBMISSION DATE: 4 DECEMBER 2013
  • 3. Objective: The objectives of this field work are: - To have a better understanding of the procedure for leveling. - To have experiences to the actual working environment on the site including uncertainty weather condition. - To have witness the usage of leveling equipment and apparatus on site. - To understand more about how to see the backsight (BS) and foresight (FS) of the field work - To have the ability to setting up the tripod and adjusting the staff bubble. - To understand how to see the reading in the leveling rods. - To have the knowledge of the rules of levelling - To have skills in using the auto meter level for correct reading - To increase the team working skills among group members. - To have the ability in recording data of the reading - To understand the type of error would occur when taking the reading. - To have skills in applying formulae in calculation.
  • 4. Introduction: Site Surveying is one of the subjects that one required to study to become a Professional Quantity Surveyor. We have been assigned to carry out a fieldwork on the 20th of November in Taylor’s University Lakeside Campus at selected area. Our fieldwork is about leveling. Fieldwork is basically a practice that allows us to merge theory and skills learned in the lectures into the reality site. By having the chance of doing fieldwork, it will helps to gain better understanding on collecting and analyzing data. Other than that, it will also help us to develop observational and investigation skills and also teamwork and problem solving skills. Moreover, leveling is all about measuring the height of each station using the proper instruments and to have number scaled in the selected survey area. Leveling is a very simple and accurate method of measuring the height of each pinpoint and the site level which is commonly used in any other construction sites. Besides, the equipment that are needed in order to make a complete leveling involved the auto level meter or the theodolite, tripod and leveling staff aluminum. The accuracy of the leveling are all depending the setup of the instrument and also the reading on the theodolite. It is very important to setup the instrument appropriately so that there will be no errors. Each of the instrument shall be kept safely, correctly calibrated and be used and stored with care. In the nutshell, any horizontal line can be chosen as a datum for heights and for leveling. The height of a point is measured along the vertical above or below the chosen datum. The height of a point relative to a datum is known as its reduced level. Differential of leveling provides a means of measuring the height differences between the points accurately. A level is set up on a tripod and leveled so that the line of sight is horizontal.Level or horizontal lines are always at right angles to the direction of gravity. Last but not least, we were given a benchmark as a starting point at the basement car park of the university. Then, we started to our task at the selected area and at the end of the survey we will go back to the same benchmark as an end. After completing and collecting all the reading during our survey, we are required to analyze and do the correction and adjust to the accurate reduced level from what we have got with the data that we have collected.
  • 5. Apparatus: Basically, we were doing leveling work in our 1st site surveying fieldwork. In order to finish this fieldwork, we need a tripod, a dumpy level, and some leveling staffs with a staff bubble attached on it in order to finish the leveling work. Tripod: A tripod is a portable three-legged frame, used as a platform for supporting the weight and maintaining the stability of some other object. A tripod provides stability against downward forces and horizontal forces and movements about horizontal axes. Automatic level: An automatic level, auto level meter, leveling instrument, or dumpy level is an optical instrument used to establish or check points in the same horizontal plane. It is used in surveying and building to transfer, measure, or set horizontal levels. The automatic level is set up on a tripod and set to a leveled condition using foot screws (leveling screws). Leveling staff with staff bubble: A level staff, also called leveling rod, is a graduated wooden or aluminum rod, which measure vertical distances with reference to a horizontal plane or surface. Leveling rods can be one piece, but many are sectional and can be shortened for storage and transport or lengthened for use. The staff bubble is to ensure that the staff is held vertically. Picture above shows a tripod.
  • 6. Picture above shows a automatic level. Picture above shows some leveling staffs.
  • 7. Results: BS 130.00 164.80 139.60 288.00 143.50 144.90 159.60 133.90 141.70 138.70 1584.70 FS Rise 146.30 159.50 117.70 197.40 144.50 141.00 89.00 328.40 137.60 122.80 1584.20 (0.50) Fall 16.30 5.30 21.90 90.60 1.00 3.90 70.60 194.50 4.10 15.90 212.30 211.80 (-0.50) R.L 100.00 83.70 89.00 110.90 201.50 200.50 204.40 275.00 80.50 84.60 100.50 (0.50) Remarks BM1 TP1 TP2 TP3 TP4 TP5 TP6 TP7 TP8 TP9 BM1 ∑ ∆ Misclosure = Measured height – Known height = 100.50 – 100.00 = 0.50 Reduce Level Adjustment: Measured R.L 100.00 83.70 89.00 110.90 201.50 200.50 204.40 275.00 80.50 84.60 100.50 Point BM1 TP1 TP2 TP3 TP4 TP5 TP6 TP7 TP8 TP9 BM1 Adjustment 0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400 0.450 0.500 Adjusted R.L 100.00 83.65 88.90 110.75 201.30 200.25 204.10 274.65 80.10 84.15 100.00
  • 8. Discussion: In a group of five members, we are assigned to conduct auto-leveling around the campus. The place chosen is a point starting from Taylor’s basement car park which is near to a fire extinguisher hose and it continues to form a loop around the basement car park. The reduced level of the Bench-mark 100.00m is given to us by our lecturer, Sir Wong JeeKhai. As our group members consist of five persons, three persons are to confirm the reading from the auto level meter and moving the instruments together, one person collecting the data and one person is assigned to move the leveling staff to decided points. The procedures include observation, booking and reduction. The equipment we did not use here is the staff bubble and the measuring tape. First, we need to set up our tripod and the auto level meter. The height of the tripod can be adjusted to suit the height of the person taking the reading. We do not have a staff bubble as there is already one attached together to the auto level meter. All we had to do next is to adjust the auto level meter so that the air bubble can be situated inside the circle which indicates the level we are taking the reading is a flat surface. The person carrying the leveling staff will then situate the leveling staff at the fixed point which is the benchmark and first reading is taken. Consequently, the leveling staffs moved to another point and the reading which is the foresight is taken. Now, the tripod will be moved to another point and being set up at another point again to take the second back sight and foresight. This process is being repeated till the end of the loop when we get back to the first point, our bench-mark. Taking the first few reading was quite simple to us but as we went further our group faced some problems. We get confused when reading the data collected and get mixed up with the back sight and the foresight. Actually, these problems will be much easier if we had used a table to collect our data right from the first place. However, our group still managed to get things cleared up after a discussion which took us much time during this fieldwork. At first, our group was the first group but due to this confusion our group turns out to be the last group to end this fieldwork. Nevertheless, the great thing is that we still managed to finish this fieldwork successfully. Throughout this fieldwork, we had no intermediate sight. The readings we took are the back sight and the foresight. In order to minimize error, the length between the back sight and foresight to the leveling staff is encouraged to be as equal as possible. So, we try to keep it this way. This might be the reason why we have many set ups. We also choose to set up our instruments at safe and convenient places such as corners at the car park and side of the road. Here, this is important so that we can not only get stable readings as we will not have to move our instruments away and set up again due to the cars passing by but also prevent traffic congestion. After the fieldwork, we go through our data together and assign each other’s work
  • 9. regarding our fieldwork report. During the process of arranging and calculating our data records, we had some discussion relating our data and of course there is presence of error. Based on our data, we found the loop disclosure regarding the reduced level which is calculated by deducting the known height from the measured height. So, the solution is to carry out the level loop adjustment so that the bench-mark of the closing agrees and it is a way of even error distribution. Each of the set ups have different adjustment as the disclosure is linearly distributed according to the number of set ups. After we did the level loop adjustment, we finally got our adjusted reduced level which agrees our known reduced level. Below are the formulae we used in calculation: 1. Loop Disclosure = Measured height – Known height 2. Adjustment per set up = 3. Adjusted RL = Measured RL – Adjustments
  • 10. Conclusion: From this field work we have learnt quite a few skills and have better understanding on how to do levelling. By doing the field work, we start to have better understanding on how to carry out the procedure for levelling and how to avoid or reduce the human error.Besides that, we are exposed to the actual working environment on the site such as the uncertainty of the weather which will enhance our experience and also witnessing the usage of levelling as well as the apparatus on site which allow us to be exposed regarding the apparatus used which makes our understanding better besides learning the theory in the lectures. Moreover, this field work also gave us a chance to use the knowledge from what we learnt in class and put into practice, such as use an automatic level to get the reading from a levelling staff. We also learnt how to carry a task out as a team by using more systematic way. In conclusion, this is one of a lifetime experience because as a quantity surveyor student this is rare occasion that we can learnt how land surveyor do and have better understanding on how they carry out their task.