SlideShare une entreprise Scribd logo
1  sur  7
BIOEUPARKS
Kick-off Meeting
Berlin - 23rd
and 24th
April 2013
Financial Management
Diego Mattioli
Article 5 PROJECT STEERING COMMITTEE – Composition
Project Steering Committee is composed of one representative of each of
the Parties.
Each representative of the Project Steering Committee shall have one
vote.
Minutes of the meetings of the Project Steering Committee shall be drafted
by the Coordinator's representative and transmitted to the other Parties.
The minutes shall be considered as accepted by the other Parties if, within
fifteen (15) days from receipt, no other Party has objected in writing to the
Coordinator.
Article 5 PROJECT STEERING COMMITTEE- Decision Making
The Project Partner Committee shall be in charge of:
(a) Monitoring the progress of the Project;
(d) Laying down and reviewing or amending procedures for publications and press releases with regard to the Project;
(h) Approving a proposal from a Party for the substitution of key personnel in the project
Decisions shall be taken by a simple majority of the votes of the Parties present or represented by proxy. If no majority is reached to find a
decision, the vote of the Coordinator shall decide.
(b) Reviewing and/or amending the Work Programme defined in Annex I together with the allocation between the Parties of the contribution provided by
the EACI under the Grant Agreement, and the reallocation between the Parties on the basis of the approved amended Work Programme;
(c) Making proposals to the Parties for the review and/or amendment of:
(i) the terms of the Grant Agreement;
(ii) the costs or time schedules under the Grant Agreement; or
(iii) the termination date of the Grant Agreement;
Decisions shall be taken by a qualified majority representing at least the 2/3 of the votes of the Parties present or represented by proxy.
(e) Making proposals to the Parties (other than a Defaulting Party) for the service of notices requiring remedy of breach and terminating this Consortium
Agreement with respect to the Defaulting Party taking account of the corresponding provisions of the EC Contact and of the amendments connected
therewith;
(f) Submission of proposals to the Parties concerning the further procedure owing to an application by a Party to withdraw from the project;
(g) Submission of proposals to the Parties for the acceptance of a new Party or a number of new Parties to take over the work of a Party which has
withdrawn. Acceptance of a new Party or a number of new Parties shall be possible only if this Party/these Parties state(s) that it/they agree(s) to comply
with the provisions of the Grant Agreement and this Consortium Agreement and if one or more of the remaining Parties does/do not take over the work of
the Party which has withdrawn. This selection of the new Party is only possible when the selected candidate is approved by the EACI;
decisions shall be taken unanimously by all of the Parties with the exception of the Defaulting Party or the withdrawing Party.
Article 6 – WORK PACKAGE / Task Leaders
The Work Package and task leaders are the Parties defined as such in Annex I of the
Grant Agreement.
The Work Package or task leader supervises the activities of the Project’s day-to-day
management within the corresponding Work Package or task, respectively. He can
interact as necessary with the Project Partner Committee. In particular he is
responsible for the active Project planning and progress monitoring in conjunction with
the Coordinator.
Each Work Package/task leader can invite other Parties to exchange information. All
recommendations concerning the overall Project will be handled in the Project Partner
Committee.
Each Work Package/task leader reports to the Coordinator regularly and upon request
on the status and progress of his Work Package or task.
Article 8 - Obligations of the Parties
 8.1 Each Party undertakes to use all reasonable endeavours
promptly to supply to the Coordinator and the Project Steering Committee all such information or documents as the
Coordinator and the Project Steering Committee may require
to prepare and present the reports and documents to be submitted to the EACI in a period of 10 working days 
to perform on time the tasks and Work Packages assigned
promptly to notify the Coordinator and each of the other Parties of any delay in performance, the reasons for the delay and
the probable duration of the delay;
to inform all Parties regarding the contact points for the different activities.
8.2 The reports provided by the Parties or other documentation intended for the EACI shall be transmitted to the Coordinator
electronically. Each technical deliverable should be peer reviewed and approved by the Project Steering Committee
Each Party shall be obliged to revise the part of a report provided by it or the documentation provided by it at the request of
the EACI, the Project Steering Committee or the Work Package/task leaders concerned. The requests shall be
communicated to the Party concerned directly by the Coordinator, the Project Steering Committee or the Work Package/task
leader. Requested revisions of the reports or documents must be carried out without delay. If the revision cannot be made
within a short time or be completed by a time limit laid down in the individual case, notification of this must be made by the
Party concerned in good time in advance to the Party which requested the revision and to the Coordinator. If this delay is
considered unacceptable by the responsible Party, actions can be taken via the Project Partner Committee.
8.3 In supplying any information or materials to any of the other Parties hereunder or under the Grant Agreement each Party
undertakes to use all reasonable endeavours to ensure the accuracy thereof and (in the event of any error therein) promptly
on being notified to correct the same.
Article 9 - COSTS - COMMON CHARGES - PAYMENTS
9.5 The payments from the EACI received by the Coordinator shall be
transferred directly to the Parties to their accounts as specified in Appendix
A (bank details) of this Consortium Agreement.
In accordance with Article I.3 (h) of the Grant agreement, the only exception to 
this policy is if a particular Party or Subcontractor has defaulted on his tasks 
and  responsibilities  as  indicated  in  Articles  8  and  10  of  this  Consortium 
Agreement. In this case, the Party or Parties will not be paid until the issue is 
resolved to the satisfaction of the Project Partner Committee.
Article 9 - COSTS - COMMON CHARGES - PAYMENTS
9.5 The payments from the EACI received by the Coordinator shall be
transferred directly to the Parties to their accounts as specified in Appendix
A (bank details) of this Consortium Agreement.
In accordance with Article I.3 (h) of the Grant agreement, the only exception to
this policy is if a particular Party or Subcontractor has defaulted on his tasks
and responsibilities as indicated in Articles 8 and 10 of this Consortium
Agreement. In this case, the Party or Parties will not be paid until the issue is
resolved to the satisfaction of the Project Partner Committee.

Contenu connexe

En vedette

Brayan florez dispositivos E-S
Brayan florez dispositivos E-SBrayan florez dispositivos E-S
Brayan florez dispositivos E-Sbrayanfflorez
 
¡Qué frío!
¡Qué frío!¡Qué frío!
¡Qué frío!jluisnr
 
Acórdão possibilidade de conversão de período especial após 1998
Acórdão   possibilidade de conversão de período especial após 1998Acórdão   possibilidade de conversão de período especial após 1998
Acórdão possibilidade de conversão de período especial após 1998Waldemar Ramos Junior
 
Fortalezco, analiso y exploro la lectura con las tic
Fortalezco, analiso y exploro la lectura con las ticFortalezco, analiso y exploro la lectura con las tic
Fortalezco, analiso y exploro la lectura con las ticermelcarano
 
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...friendlycoward279
 
Psychology
PsychologyPsychology
Psychologyucobi
 
Hge saulmiranda-ppt
Hge saulmiranda-pptHge saulmiranda-ppt
Hge saulmiranda-ppthgefcc
 
Most
MostMost
MostIvka
 
23 February 2016 - Media Update - Lessons in PR from celebs
23 February 2016 - Media Update - Lessons in PR from celebs23 February 2016 - Media Update - Lessons in PR from celebs
23 February 2016 - Media Update - Lessons in PR from celebsTamryn Sher
 
Aprobacion nueva tabla de valuacion
Aprobacion nueva tabla de valuacionAprobacion nueva tabla de valuacion
Aprobacion nueva tabla de valuacionDiego Gebil
 
KB 1 - Pengkajian Subyektif Pada Ibu Nifas
KB 1 - Pengkajian Subyektif Pada Ibu NifasKB 1 - Pengkajian Subyektif Pada Ibu Nifas
KB 1 - Pengkajian Subyektif Pada Ibu NifasUwes Chaeruman
 
Шість міських сервісів на базі open source: як відкриває дані Польща
Шість міських сервісів на базі open source: як відкриває дані ПольщаШість міських сервісів на базі open source: як відкриває дані Польща
Шість міських сервісів на базі open source: як відкриває дані ПольщаApps4Cities
 
Resume Clay White
Resume Clay WhiteResume Clay White
Resume Clay WhiteClay White
 
Un zigoto vous deballe ses journees
Un zigoto vous deballe ses journeesUn zigoto vous deballe ses journees
Un zigoto vous deballe ses journeeserectyacht1134
 
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al Tarragonès
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al TarragonèsRius d’informació. Anàlisi de l’aigua dels rius que desemboquen al Tarragonès
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al TarragonèsCRP del Tarragonès
 
Expressões mudas e sons
Expressões mudas e sonsExpressões mudas e sons
Expressões mudas e sonsmarise brandao
 
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valley
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The ValleyEchelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valley
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valleye27
 

En vedette (20)

Brayan florez dispositivos E-S
Brayan florez dispositivos E-SBrayan florez dispositivos E-S
Brayan florez dispositivos E-S
 
¡Qué frío!
¡Qué frío!¡Qué frío!
¡Qué frío!
 
Acórdão possibilidade de conversão de período especial após 1998
Acórdão   possibilidade de conversão de período especial após 1998Acórdão   possibilidade de conversão de período especial após 1998
Acórdão possibilidade de conversão de período especial após 1998
 
Fortalezco, analiso y exploro la lectura con las tic
Fortalezco, analiso y exploro la lectura con las ticFortalezco, analiso y exploro la lectura con las tic
Fortalezco, analiso y exploro la lectura con las tic
 
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...
Akron puede dar en el estacionamiento de la coleccion de cuadros de una patad...
 
Psychology
PsychologyPsychology
Psychology
 
Hge saulmiranda-ppt
Hge saulmiranda-pptHge saulmiranda-ppt
Hge saulmiranda-ppt
 
Most
MostMost
Most
 
23 February 2016 - Media Update - Lessons in PR from celebs
23 February 2016 - Media Update - Lessons in PR from celebs23 February 2016 - Media Update - Lessons in PR from celebs
23 February 2016 - Media Update - Lessons in PR from celebs
 
Aprobacion nueva tabla de valuacion
Aprobacion nueva tabla de valuacionAprobacion nueva tabla de valuacion
Aprobacion nueva tabla de valuacion
 
KB 1 - Pengkajian Subyektif Pada Ibu Nifas
KB 1 - Pengkajian Subyektif Pada Ibu NifasKB 1 - Pengkajian Subyektif Pada Ibu Nifas
KB 1 - Pengkajian Subyektif Pada Ibu Nifas
 
Шість міських сервісів на базі open source: як відкриває дані Польща
Шість міських сервісів на базі open source: як відкриває дані ПольщаШість міських сервісів на базі open source: як відкриває дані Польща
Шість міських сервісів на базі open source: як відкриває дані Польща
 
Paginas extras
Paginas extrasPaginas extras
Paginas extras
 
Sustainable English
Sustainable EnglishSustainable English
Sustainable English
 
Resume Clay White
Resume Clay WhiteResume Clay White
Resume Clay White
 
Un zigoto vous deballe ses journees
Un zigoto vous deballe ses journeesUn zigoto vous deballe ses journees
Un zigoto vous deballe ses journees
 
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al Tarragonès
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al TarragonèsRius d’informació. Anàlisi de l’aigua dels rius que desemboquen al Tarragonès
Rius d’informació. Anàlisi de l’aigua dels rius que desemboquen al Tarragonès
 
Meu Deus
Meu DeusMeu Deus
Meu Deus
 
Expressões mudas e sons
Expressões mudas e sonsExpressões mudas e sons
Expressões mudas e sons
 
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valley
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The ValleyEchelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valley
Echelon Asia Summit 2015: Build Your Multi-$B Category Outside of The Valley
 

Similaire à Technical management

Go through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdfGo through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdfarrowvisionoptics
 
Fpa training bangkok day 2
Fpa training bangkok day 2Fpa training bangkok day 2
Fpa training bangkok day 2DIPECHO Nepal
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxGLC
 
152/2008 Formation& Regulating the Work Of Settlements Committees
152/2008 Formation& Regulating the Work Of Settlements Committees152/2008 Formation& Regulating the Work Of Settlements Committees
152/2008 Formation& Regulating the Work Of Settlements Committeestraoman
 
Agreement for CSR Implementation Partner / Agency / NGO | Sana Baqai
Agreement for CSR Implementation Partner / Agency / NGO | Sana BaqaiAgreement for CSR Implementation Partner / Agency / NGO | Sana Baqai
Agreement for CSR Implementation Partner / Agency / NGO | Sana BaqaiSana Baqai
 
Annex ix functions of the jic
Annex ix functions of the jicAnnex ix functions of the jic
Annex ix functions of the jicPHAM THI HAI YEN
 
Buru Energy Contract no 07.2013_5085
Buru Energy Contract no 07.2013_5085Buru Energy Contract no 07.2013_5085
Buru Energy Contract no 07.2013_5085gerard mckay
 
Presentation sidig med-jts
Presentation sidig med-jtsPresentation sidig med-jts
Presentation sidig med-jtsAnna Codazzi
 
Multilateral instrument (mli) arbitration [articles 18-26]
Multilateral instrument (mli)   arbitration [articles 18-26]Multilateral instrument (mli)   arbitration [articles 18-26]
Multilateral instrument (mli) arbitration [articles 18-26]DVSResearchFoundatio
 
67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulationtraoman
 
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...GLC
 
Lucas Amendment to ORS 465.325
Lucas Amendment to ORS 465.325Lucas Amendment to ORS 465.325
Lucas Amendment to ORS 465.325J. Patrick Lucas
 
FruitBreedomics KOM 303-2011 2 intellectual property issues
FruitBreedomics KOM 303-2011 2 intellectual property issuesFruitBreedomics KOM 303-2011 2 intellectual property issues
FruitBreedomics KOM 303-2011 2 intellectual property issuesfruitbreedomics
 
GTC-WAI.O.BLUE-2022-EN.pdf
GTC-WAI.O.BLUE-2022-EN.pdfGTC-WAI.O.BLUE-2022-EN.pdf
GTC-WAI.O.BLUE-2022-EN.pdfwaioblue
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryjbonvier
 

Similaire à Technical management (20)

Go through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdfGo through two actual contracts of your choice, highlighting key el.pdf
Go through two actual contracts of your choice, highlighting key el.pdf
 
FINANCING AGREEMENT
FINANCING AGREEMENT FINANCING AGREEMENT
FINANCING AGREEMENT
 
Fpa training bangkok day 2
Fpa training bangkok day 2Fpa training bangkok day 2
Fpa training bangkok day 2
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
 
152/2008 Formation& Regulating the Work Of Settlements Committees
152/2008 Formation& Regulating the Work Of Settlements Committees152/2008 Formation& Regulating the Work Of Settlements Committees
152/2008 Formation& Regulating the Work Of Settlements Committees
 
Agreement for CSR Implementation Partner / Agency / NGO | Sana Baqai
Agreement for CSR Implementation Partner / Agency / NGO | Sana BaqaiAgreement for CSR Implementation Partner / Agency / NGO | Sana Baqai
Agreement for CSR Implementation Partner / Agency / NGO | Sana Baqai
 
Annex ix functions of the jic
Annex ix functions of the jicAnnex ix functions of the jic
Annex ix functions of the jic
 
Buru Energy Contract no 07.2013_5085
Buru Energy Contract no 07.2013_5085Buru Energy Contract no 07.2013_5085
Buru Energy Contract no 07.2013_5085
 
Presentation sidig med-jts
Presentation sidig med-jtsPresentation sidig med-jts
Presentation sidig med-jts
 
Annex II
Annex IIAnnex II
Annex II
 
Multilateral instrument (mli) arbitration [articles 18-26]
Multilateral instrument (mli)   arbitration [articles 18-26]Multilateral instrument (mli)   arbitration [articles 18-26]
Multilateral instrument (mli) arbitration [articles 18-26]
 
67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation67/2010 Issuing Service Price Control Regulation
67/2010 Issuing Service Price Control Regulation
 
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
 
Lucas Amendment to ORS 465.325
Lucas Amendment to ORS 465.325Lucas Amendment to ORS 465.325
Lucas Amendment to ORS 465.325
 
FruitBreedomics KOM 303-2011 2 intellectual property issues
FruitBreedomics KOM 303-2011 2 intellectual property issuesFruitBreedomics KOM 303-2011 2 intellectual property issues
FruitBreedomics KOM 303-2011 2 intellectual property issues
 
Annex X
Annex XAnnex X
Annex X
 
GTC-WAI.O.BLUE-2022-EN.pdf
GTC-WAI.O.BLUE-2022-EN.pdfGTC-WAI.O.BLUE-2022-EN.pdf
GTC-WAI.O.BLUE-2022-EN.pdf
 
Eo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industryEo1008 creating arbitration machinery for phil cons.industry
Eo1008 creating arbitration machinery for phil cons.industry
 
BID DOCUMENT.doc
BID DOCUMENT.docBID DOCUMENT.doc
BID DOCUMENT.doc
 
CIPAA Conference - 21 August 2021
CIPAA Conference - 21 August 2021CIPAA Conference - 21 August 2021
CIPAA Conference - 21 August 2021
 

Plus de Zoltan Kun

08_green cities
08_green cities08_green cities
08_green citiesZoltan Kun
 
Landscape protection and nature conservation
Landscape protection and nature conservationLandscape protection and nature conservation
Landscape protection and nature conservationZoltan Kun
 
The future of Wild Policy in Europe
The future of Wild Policy in EuropeThe future of Wild Policy in Europe
The future of Wild Policy in EuropeZoltan Kun
 
καλύτερα από Sopron
καλύτερα από Sopronκαλύτερα από Sopron
καλύτερα από SopronZoltan Kun
 
The European Wilderness Convention
The European Wilderness ConventionThe European Wilderness Convention
The European Wilderness ConventionZoltan Kun
 
The approach to protecting and enhancing wild places
The approach to protecting and enhancing wild placesThe approach to protecting and enhancing wild places
The approach to protecting and enhancing wild placesZoltan Kun
 
Mapping wilderness in Europe with special focus on wilderness register
Mapping wilderness in Europe with special focus on wilderness registerMapping wilderness in Europe with special focus on wilderness register
Mapping wilderness in Europe with special focus on wilderness registerZoltan Kun
 
Protecting wilderness and UNESCO World Heritage through public engagement
Protecting wilderness and UNESCO World Heritage through public engagementProtecting wilderness and UNESCO World Heritage through public engagement
Protecting wilderness and UNESCO World Heritage through public engagementZoltan Kun
 
Natura 2000 and wilderness - the link to European policy
Natura 2000 and wilderness - the link to European policyNatura 2000 and wilderness - the link to European policy
Natura 2000 and wilderness - the link to European policyZoltan Kun
 
Wilderness Academy: Opening keynote speech by Victoria Hasler
Wilderness Academy: Opening keynote speech by Victoria HaslerWilderness Academy: Opening keynote speech by Victoria Hasler
Wilderness Academy: Opening keynote speech by Victoria HaslerZoltan Kun
 
Presentation at Natura 2000 biogeographical seminar
Presentation at Natura 2000 biogeographical seminarPresentation at Natura 2000 biogeographical seminar
Presentation at Natura 2000 biogeographical seminarZoltan Kun
 
Introduction to the work and MANTRA of the European Wilderness Society
Introduction to the work and MANTRA of the European Wilderness SocietyIntroduction to the work and MANTRA of the European Wilderness Society
Introduction to the work and MANTRA of the European Wilderness SocietyZoltan Kun
 
2014 World Parks Congress information
2014 World Parks Congress information2014 World Parks Congress information
2014 World Parks Congress informationZoltan Kun
 
Introduction to European Wilderness Society
Introduction to European Wilderness SocietyIntroduction to European Wilderness Society
Introduction to European Wilderness SocietyZoltan Kun
 
Enlarging the European Wilderness Preservation System
Enlarging the European Wilderness Preservation SystemEnlarging the European Wilderness Preservation System
Enlarging the European Wilderness Preservation SystemZoltan Kun
 
European Wilderness Convention
European Wilderness ConventionEuropean Wilderness Convention
European Wilderness ConventionZoltan Kun
 
Combining wilderness and tourism, is it mission impossible?
Combining wilderness and tourism, is it mission impossible?Combining wilderness and tourism, is it mission impossible?
Combining wilderness and tourism, is it mission impossible?Zoltan Kun
 
PAN Parks, the European Wilderness Watchdog
PAN Parks, the European Wilderness WatchdogPAN Parks, the European Wilderness Watchdog
PAN Parks, the European Wilderness WatchdogZoltan Kun
 
What makes a good conservation writer? The view of an editor
What makes a good conservation writer? The view of an editorWhat makes a good conservation writer? The view of an editor
What makes a good conservation writer? The view of an editorZoltan Kun
 
Implementing a WILD Dream
Implementing a WILD DreamImplementing a WILD Dream
Implementing a WILD DreamZoltan Kun
 

Plus de Zoltan Kun (20)

08_green cities
08_green cities08_green cities
08_green cities
 
Landscape protection and nature conservation
Landscape protection and nature conservationLandscape protection and nature conservation
Landscape protection and nature conservation
 
The future of Wild Policy in Europe
The future of Wild Policy in EuropeThe future of Wild Policy in Europe
The future of Wild Policy in Europe
 
καλύτερα από Sopron
καλύτερα από Sopronκαλύτερα από Sopron
καλύτερα από Sopron
 
The European Wilderness Convention
The European Wilderness ConventionThe European Wilderness Convention
The European Wilderness Convention
 
The approach to protecting and enhancing wild places
The approach to protecting and enhancing wild placesThe approach to protecting and enhancing wild places
The approach to protecting and enhancing wild places
 
Mapping wilderness in Europe with special focus on wilderness register
Mapping wilderness in Europe with special focus on wilderness registerMapping wilderness in Europe with special focus on wilderness register
Mapping wilderness in Europe with special focus on wilderness register
 
Protecting wilderness and UNESCO World Heritage through public engagement
Protecting wilderness and UNESCO World Heritage through public engagementProtecting wilderness and UNESCO World Heritage through public engagement
Protecting wilderness and UNESCO World Heritage through public engagement
 
Natura 2000 and wilderness - the link to European policy
Natura 2000 and wilderness - the link to European policyNatura 2000 and wilderness - the link to European policy
Natura 2000 and wilderness - the link to European policy
 
Wilderness Academy: Opening keynote speech by Victoria Hasler
Wilderness Academy: Opening keynote speech by Victoria HaslerWilderness Academy: Opening keynote speech by Victoria Hasler
Wilderness Academy: Opening keynote speech by Victoria Hasler
 
Presentation at Natura 2000 biogeographical seminar
Presentation at Natura 2000 biogeographical seminarPresentation at Natura 2000 biogeographical seminar
Presentation at Natura 2000 biogeographical seminar
 
Introduction to the work and MANTRA of the European Wilderness Society
Introduction to the work and MANTRA of the European Wilderness SocietyIntroduction to the work and MANTRA of the European Wilderness Society
Introduction to the work and MANTRA of the European Wilderness Society
 
2014 World Parks Congress information
2014 World Parks Congress information2014 World Parks Congress information
2014 World Parks Congress information
 
Introduction to European Wilderness Society
Introduction to European Wilderness SocietyIntroduction to European Wilderness Society
Introduction to European Wilderness Society
 
Enlarging the European Wilderness Preservation System
Enlarging the European Wilderness Preservation SystemEnlarging the European Wilderness Preservation System
Enlarging the European Wilderness Preservation System
 
European Wilderness Convention
European Wilderness ConventionEuropean Wilderness Convention
European Wilderness Convention
 
Combining wilderness and tourism, is it mission impossible?
Combining wilderness and tourism, is it mission impossible?Combining wilderness and tourism, is it mission impossible?
Combining wilderness and tourism, is it mission impossible?
 
PAN Parks, the European Wilderness Watchdog
PAN Parks, the European Wilderness WatchdogPAN Parks, the European Wilderness Watchdog
PAN Parks, the European Wilderness Watchdog
 
What makes a good conservation writer? The view of an editor
What makes a good conservation writer? The view of an editorWhat makes a good conservation writer? The view of an editor
What makes a good conservation writer? The view of an editor
 
Implementing a WILD Dream
Implementing a WILD DreamImplementing a WILD Dream
Implementing a WILD Dream
 

Dernier

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 

Dernier (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 

Technical management

  • 1. BIOEUPARKS Kick-off Meeting Berlin - 23rd and 24th April 2013 Financial Management Diego Mattioli
  • 2. Article 5 PROJECT STEERING COMMITTEE – Composition Project Steering Committee is composed of one representative of each of the Parties. Each representative of the Project Steering Committee shall have one vote. Minutes of the meetings of the Project Steering Committee shall be drafted by the Coordinator's representative and transmitted to the other Parties. The minutes shall be considered as accepted by the other Parties if, within fifteen (15) days from receipt, no other Party has objected in writing to the Coordinator.
  • 3. Article 5 PROJECT STEERING COMMITTEE- Decision Making The Project Partner Committee shall be in charge of: (a) Monitoring the progress of the Project; (d) Laying down and reviewing or amending procedures for publications and press releases with regard to the Project; (h) Approving a proposal from a Party for the substitution of key personnel in the project Decisions shall be taken by a simple majority of the votes of the Parties present or represented by proxy. If no majority is reached to find a decision, the vote of the Coordinator shall decide. (b) Reviewing and/or amending the Work Programme defined in Annex I together with the allocation between the Parties of the contribution provided by the EACI under the Grant Agreement, and the reallocation between the Parties on the basis of the approved amended Work Programme; (c) Making proposals to the Parties for the review and/or amendment of: (i) the terms of the Grant Agreement; (ii) the costs or time schedules under the Grant Agreement; or (iii) the termination date of the Grant Agreement; Decisions shall be taken by a qualified majority representing at least the 2/3 of the votes of the Parties present or represented by proxy. (e) Making proposals to the Parties (other than a Defaulting Party) for the service of notices requiring remedy of breach and terminating this Consortium Agreement with respect to the Defaulting Party taking account of the corresponding provisions of the EC Contact and of the amendments connected therewith; (f) Submission of proposals to the Parties concerning the further procedure owing to an application by a Party to withdraw from the project; (g) Submission of proposals to the Parties for the acceptance of a new Party or a number of new Parties to take over the work of a Party which has withdrawn. Acceptance of a new Party or a number of new Parties shall be possible only if this Party/these Parties state(s) that it/they agree(s) to comply with the provisions of the Grant Agreement and this Consortium Agreement and if one or more of the remaining Parties does/do not take over the work of the Party which has withdrawn. This selection of the new Party is only possible when the selected candidate is approved by the EACI; decisions shall be taken unanimously by all of the Parties with the exception of the Defaulting Party or the withdrawing Party.
  • 4. Article 6 – WORK PACKAGE / Task Leaders The Work Package and task leaders are the Parties defined as such in Annex I of the Grant Agreement. The Work Package or task leader supervises the activities of the Project’s day-to-day management within the corresponding Work Package or task, respectively. He can interact as necessary with the Project Partner Committee. In particular he is responsible for the active Project planning and progress monitoring in conjunction with the Coordinator. Each Work Package/task leader can invite other Parties to exchange information. All recommendations concerning the overall Project will be handled in the Project Partner Committee. Each Work Package/task leader reports to the Coordinator regularly and upon request on the status and progress of his Work Package or task.
  • 5. Article 8 - Obligations of the Parties  8.1 Each Party undertakes to use all reasonable endeavours promptly to supply to the Coordinator and the Project Steering Committee all such information or documents as the Coordinator and the Project Steering Committee may require to prepare and present the reports and documents to be submitted to the EACI in a period of 10 working days  to perform on time the tasks and Work Packages assigned promptly to notify the Coordinator and each of the other Parties of any delay in performance, the reasons for the delay and the probable duration of the delay; to inform all Parties regarding the contact points for the different activities. 8.2 The reports provided by the Parties or other documentation intended for the EACI shall be transmitted to the Coordinator electronically. Each technical deliverable should be peer reviewed and approved by the Project Steering Committee Each Party shall be obliged to revise the part of a report provided by it or the documentation provided by it at the request of the EACI, the Project Steering Committee or the Work Package/task leaders concerned. The requests shall be communicated to the Party concerned directly by the Coordinator, the Project Steering Committee or the Work Package/task leader. Requested revisions of the reports or documents must be carried out without delay. If the revision cannot be made within a short time or be completed by a time limit laid down in the individual case, notification of this must be made by the Party concerned in good time in advance to the Party which requested the revision and to the Coordinator. If this delay is considered unacceptable by the responsible Party, actions can be taken via the Project Partner Committee. 8.3 In supplying any information or materials to any of the other Parties hereunder or under the Grant Agreement each Party undertakes to use all reasonable endeavours to ensure the accuracy thereof and (in the event of any error therein) promptly on being notified to correct the same.
  • 6. Article 9 - COSTS - COMMON CHARGES - PAYMENTS 9.5 The payments from the EACI received by the Coordinator shall be transferred directly to the Parties to their accounts as specified in Appendix A (bank details) of this Consortium Agreement. In accordance with Article I.3 (h) of the Grant agreement, the only exception to  this policy is if a particular Party or Subcontractor has defaulted on his tasks  and  responsibilities  as  indicated  in  Articles  8  and  10  of  this  Consortium  Agreement. In this case, the Party or Parties will not be paid until the issue is  resolved to the satisfaction of the Project Partner Committee.
  • 7. Article 9 - COSTS - COMMON CHARGES - PAYMENTS 9.5 The payments from the EACI received by the Coordinator shall be transferred directly to the Parties to their accounts as specified in Appendix A (bank details) of this Consortium Agreement. In accordance with Article I.3 (h) of the Grant agreement, the only exception to this policy is if a particular Party or Subcontractor has defaulted on his tasks and responsibilities as indicated in Articles 8 and 10 of this Consortium Agreement. In this case, the Party or Parties will not be paid until the issue is resolved to the satisfaction of the Project Partner Committee.