Basics of Biomass  Project Implementation
         Ecobuild – March 2011
              Jude Hassall
1. Use a robust project process
1  Use a robust project process
2. Use available information
    2  Use available information

•   www.forestry.gov.uk/england‐woodfuel
•   www.carbontrust.co.uk/biomass
•   www.biomassenergycentre.org.uk
•   www.southwestwoodshed.co.uk
•   www.northwoods.org.uk
•   www.r‐e‐a.net
3. Understand the critical issues
 3  Understand the critical issues

Three considerations to maximise chances of 
implementing a cost effective and successfully 
operating system.
operating system
1. Sizing
2. Fuel storage
3
3. Fuel to equipment matching
            q p               g
Capacity factor

• Biomass systems have a 200‐300% price 
  p
  premium compared to FF systems ‐
                p             y
  consequently good CF’s are essential to make 
  best use of that capital premium and 
  therefore improve payback.
Boiler utilisation –
Boiler utilisation  capacity factor

• Th   ft  f ll di
  They often fall disappointingly below expectations:
                         i ti l  b l         t ti
   –   Poor site selection
   –   Inappropriate sizing of biomass boiler
   –   Inappropriate sizing and use of thermal stores
   –   Poor integration with fossil fuel stand‐by plant
                 g                              yp
   –   Mismatch of fuel and boiler unit
   –   Poor overall system design and lack of acceptance
   –   Poor installation and commissioning
       P  i       ll i   d          i i i
   –   Poor fuel quality and management thereof
   –   Irregular maintenance and attention
4. Carry out an initial assessment
4  Carry out an initial assessment
Basic economic analysis

•     Use Carbon Trust initial assessment tool for basic 
      economic analysis. Some preliminary work 
      required:
      required

1. Site annual heating consumption
2. Costs associated with fossil fuel use
3. Proposed boiler size
Basic site suitability

•     Spatial constraints
     – Consider access in boiler room for operation and 
         maintenance
     – Fuel deliveries
•     Site access
     – Size of delivery trucks
     – Height clearance
•     Planning constraints
     – Vehicle movements
     – Emissions
     – Area designations
Follow CT guide

•   Collect additional data
•   Site visit checklist
•   Prepare feasibility template
•   Involve fuel supplier and biomass 
    boiler installers – pre 
                        p
    qualification
5. Carry out detailed feasibility
5  Carry out detailed feasibility
1. Heat demand profile
1  Heat demand profile

Options for estimating heat demand profile:
1.
1 Existing records
2. On‐site measurements
3. Steam systems – steam flow rates 
4. Process heat 
4 Process heat – pattern of equipment use
5. Building modelling software
6. Benchmarks
1. Capacity factor
1  Capacity factor
2. Determine plant size
2  Determine plant size

•   Rule of thumb
•   Tender process and supplier expertise
•   Boiler sizing tool
•   Dynamic modelling

Important and complex task!
2. Ensure a value engineered solution
2  Ensure a value engineered solution

•   Value engineering reconciliation of:
    V l      i    i         ili i   f
    –   Biomass plant capex
    –   Fossil fuel, heat storage and fuel storage capex
    –   Unit cost of fossil fuel and biomass fuel
    –   Organisation drivers to maximise carbon 
        savings and minimise capex
             g                     p
•   Factors influencing sizing and integration:
    1.
    1 Which loads are to be supplied
    2. When will biomass plant be operated
3. Engage woodfuel suppliers early
3  Engage woodfuel suppliers early
3.What to investigate with your supplier
3 What to investigate with your supplier

• Factors that will affect plant specification and 
  operation
   p
• Factors that will affect fuel store design and 
  fuel delivery
• Factors that will affect cost
3. Fuel Characteristics and impact on boiler design
3  Fuel Characteristics and impact on boiler design

• Particle size – affects grate and feeding design
        l          ff             df d d
   – Pellets and small chip – underfed hearth
   – Large chip – moving grate
      Large chip 
• Moisture content (MC) – affects choice of grate and temperature
   – Low MC – underfed,
   – High MC – moving grate
• Ash content and melt temperature – affects combustion temperature and 
  removal process 
   – Wood has low ash content with high melt point
• Contamination – affects residence time and materials
   – Waste Incineration Directive requires boiler to meet certain 
      conditions of temperature and residence time
3. Fuel quality assurance
3  Fuel quality assurance

• Solid biomass assurance scheme: 
  www.hetas.co.uk
3. Factors affecting price
3  Factors affecting price

Logistics              Quality
                          li                       Market
                                                      k
• Location in 
    relation to raw    •   Moisture content        • Source type: virgin 
    material supply;       ( );
                           (%);                      timber, reclaimed 
                                                     timber  reclaimed 
• Delivery duration    •   Calorific Value;          wood, arboriculture 
    & distance;        •   Form of delivered         arisings, waste, etc.;
• Delivery volume;         fuel e.g. slabwood < 
                           fuel e g  slabwood <    • C
                                                     Contracting type: 
                                                               i         
    (capacity &            woodchip < pellet 
    contract                                         buying fuel by 
                           (influences 
    volume);               processing labour);       weight, volume, or 
• Delivery vehicle;                                  energy;
                       •   Quality of 
• Delivery                 woodchip / pellet       • Local demand 
    frequency                                        compared to 
                           (influences 
• Seasonal factors         processing                competing markets. 
                           technology).
4. Optimise woodfuel storage
    4  Optimise woodfuel storage

•        The successful operation of any woodfuel system 
         relies on a well designed fuel store, handling and 
         reception area
•        Optimise fuel store volume
•        Flexible fuel store reception
•          p                    g
         Optimise fuel discharge rates
     –     Tipped – fastest (1t/min)
     –     Blower 
           Blower – slower, noisier but more flexible (1t/8min)
•        Once quantity of fuel is known, estimate volume
4. Woodfuel –
    4  Woodfuel  fuel store sizing

•     Dead space 15‐20% of total volume
      Dead space 15 20% of total volume
•     Good to size fuel store for full delivery load – partial 
      load may impact fuel price
      l d         i       f l  i
•     If there is back‐up and or aux plant it may be 
      possible to reduce number of days of storage
•     Various fuel storage designs – discuss with fuel 
                          g      g
      supplier, installer and site owner for best option
4. Assess spatial constraints
4  Assess spatial constraints

• Space in boiler house
• Space for fuel storage facilities
• Vehicle access
4. Spatial constraints
    4  Spatial constraints
•     Access for maintenance
•     Space for backup systems
•     Proximity to fuel storage
•     Vehicle access for fuel deliveries (turning circles and 
      height)
•     Space for buffer tank / thermal storage
•     Location and height of flue (taller and wider than 
      gas/oil flues)
•     For existing buildings access for installation
•     Conservation areas, listed buildings
      – increases cost
4. Boiler house considerations
4  Boiler house considerations

• Boilers physically larger than fossil fuel equivalents
        g                       q
• Much greater headroom required if access to the top    p
  of the boiler is required for flueway cleaning on 
  vertical tube boilers
• Floor space required for:
   – Flueway cleaning on horizontal tube boilers
   – Feed auger and ash auger removal
   – Ash bin(s)  cyclone  buffer vessel  thermal store  
     Ash bin(s), cyclone, buffer vessel, thermal store, 
     expansion vessels or spillset
5. Assess necessary permits and consents
    5  Assess necessary permits and consents

•     Planning consent –
      Planning consent  contact the LPA as early in the 
      process as possible
•     Building regulations – conservation of fuel & power
      B ildi       l i                i   f f l & 
•     Waste & Pollution
•     Health & Safety
6. Cost effective solutions
6  Cost effective solutions

• Appropriate design and application of lean 
  design / value engineering principles with 
      g            g       gp      p
  regard to:
  –   System sizing;
  –   Integration works;
  –   System housing and installation works;
  –   Appropriate fuel store design;
  –   Mechanical handling;
  –   Driven by project criteria
Tips for procurement and 
Ti  f              t  d 
 implementation stage.
 implementation stage
Good tendering

• Market competition and good tendering practice
  – Clear specification to allow cross comparison;
  – Comprehensive specification to reduce perceived risk and 
    associated price loading;
  – Site information;
  – Appropriate tendering;
  – Thorough tender evaluation and CAPEX build‐up;
  – Clear identification of CAPEX risk and management 
    thereof.
     h     f
Tendering & specification

• Prepare good specification – use CT RFP 
  template
      p
• Conclusions of feasibility inform RFP
  –   Pre‐qualification
      P       lifi ti
  –   Tenderers should state variations
  –   State lead times
  –   Time of year
Tips for woodfuel procurement

• Th  i    
  There is a need to check both client and supplier are 
                d    h k b h  li   d           li    
  insured  appropriately: 
   –   T&Cs are compatible throughout the supply chain? 
       T&C              tibl  th    h t th        l   h i ? 
   –   Levels of insurance is compatible with risks?
   –   Dust and boiler explosions  
   –   Does the sale of heat and/or power affect clients 
       commercial status?
• Can inform client of general principles but do not 
  advise on small‐print and/or policy purchases (FSA 
                   p       / p yp                (
  regulated activity) 
Woodfuel procurement ‐
Woodfuel procurement  insurance

• D  
  Does supplier/ supplier’s insurers indemnify client 
            li /     li ’  i         i d   if   li t 
  against: 
   – Damage to the installed equipment due to supply 
     substandard fuel?
   – Prompt removal of substandard fuel?
   – Loss of earnings as a result of down‐time due to 
           f                       f
     substandard fuel?

• Client needs to be aware of potential I&I issues at 
  the FS stage but detailed investigations usually 
            g                      g
  made  during project development/ negotiations 
  with suppliers    
Woodfuel procurement ‐
Woodfuel procurement  HSE

• By statute the site owner and/or operator is 
  responsible for all HSE issues on the site. 
• The site management have to put in place SOPs and 
  conduct risk assessments on all operations 
  conducted on‐site 
     o c e t o pote t a S ssues e ue
• Inform client of potential HSE issues re: fuel 
  deliveries early in process  
• Reputable fuel suppliers should be able to supply 
  their own SOPs and associated risk assessments
Woodfuel procurement ‐
Woodfuel procurement  documentation

• Term sheet very useful
  Fuel specification (inc. variances and details of supplier QA systems) 
  Tonnage p.a.
  Delivery vehicle type(s) and sizes (inc. turning circle and e.g. tipping 
  clearances) )
  Maximum delivery frequency (e.g. loads/week)
  Price/ unit (e.g. p/kWh boiler output, £/T)
  Duration of contract
  Indexing 
  Conditions of sale (append example contract) 
  Insurers/ indemnity limit
  Recourse for delivery of out of spec. fuel
  Earliest date they can start contract
Woodfuel procurement ‐
Woodfuel procurement  contracts

• Use Carbon Trust example contract
Woodfuel procurement –
Woodfuel procurement  delivery docs

• All d li i  D li
  All deliveries: Delivery note
                            t

Plus (if not bought by boiler heat output)

• Copy of weighbridge ticket with tare, gross and net weights 
Or
• Estimation of volume (if not full load)

Plus (if not bought by boiler heat output)

• Moisture content analysis/ estimate (may be sent after 
  delivery) 
Tips for commissioning & training

• Manual in English
• Train end users:
  –   Plant operation
  –   Performance monitoring
      P f              i i
  –   Troubleshooting
  –   Daily, weekly, monthly maintenance
Tips for operation and maintenance

•     Standard O&M contract with installer is common
•     Automated systems can reduce attendance time
•     Use of high quality fuel, regular checks, avoiding 
      short‐cycling
•     Establish daily, weekly, monthly, 3‐monthly, 6‐
      monthly and annual maintenance regime
              y                             g
•     Ongoing performance monitoring using heat 
      meters
Maintenance requirement

• Higher specification = lower maintenance cost
  –   Automatic ash removal
  –   Cooled grate designs
  –   Robust wood feeding
  –   Boiler tube cleaning
• Low specification can lead to lower system 
  availability
• Complex systems for fuel feed can also 
  present reliability issues  
         t  li bilit  i       
Conclusions

• Follow a clear process
• Don’t skip steps
  Don t skip steps
• Involve relevant parties at the earliest 
  opportunity
            i
• Use available resources to helpp

Contenu connexe

En vedette

Emory university2
Emory university2Emory university2
Emory university2
thubbard83
 
Emory university2
Emory university2Emory university2
Emory university2
thubbard83
 
Assistive technology
Assistive technologyAssistive technology
Assistive technology
thubbard83
 
Student affairs2
Student affairs2Student affairs2
Student affairs2
thubbard83
 
Assistive technology Webquest
Assistive technology Webquest Assistive technology Webquest
Assistive technology Webquest
thubbard83
 
Bibliotecas nacionales en Social media
Bibliotecas nacionales en Social mediaBibliotecas nacionales en Social media
Bibliotecas nacionales en Social media
Ana Carrillo Pozas
 
Final project tomeco_hubbard
Final project tomeco_hubbardFinal project tomeco_hubbard
Final project tomeco_hubbard
thubbard83
 
Student affairs2
Student affairs2Student affairs2
Student affairs2
thubbard83
 
Waves review
Waves reviewWaves review
Waves review
slingard
 
Physics slides
Physics slidesPhysics slides
Physics slides
slingard
 

En vedette (19)

Emory university2
Emory university2Emory university2
Emory university2
 
Emory university2
Emory university2Emory university2
Emory university2
 
Assistive technology
Assistive technologyAssistive technology
Assistive technology
 
Exceda Mobile Value Proposition
Exceda Mobile Value PropositionExceda Mobile Value Proposition
Exceda Mobile Value Proposition
 
Chang hyeok
Chang hyeokChang hyeok
Chang hyeok
 
One Planet Sutton
One Planet SuttonOne Planet Sutton
One Planet Sutton
 
Student affairs2
Student affairs2Student affairs2
Student affairs2
 
Assistive technology Webquest
Assistive technology Webquest Assistive technology Webquest
Assistive technology Webquest
 
Bibliotecas nacionales en Social media
Bibliotecas nacionales en Social mediaBibliotecas nacionales en Social media
Bibliotecas nacionales en Social media
 
Búsqueda de información en google: Gobierno abierto
Búsqueda de información en google: Gobierno abiertoBúsqueda de información en google: Gobierno abierto
Búsqueda de información en google: Gobierno abierto
 
Final project tomeco_hubbard
Final project tomeco_hubbardFinal project tomeco_hubbard
Final project tomeco_hubbard
 
Student affairs2
Student affairs2Student affairs2
Student affairs2
 
Beyond BedZED - is it possible to deliver Zero Carbon development cost-effect...
Beyond BedZED - is it possible to deliver Zero Carbon development cost-effect...Beyond BedZED - is it possible to deliver Zero Carbon development cost-effect...
Beyond BedZED - is it possible to deliver Zero Carbon development cost-effect...
 
Waves review
Waves reviewWaves review
Waves review
 
Physics slides
Physics slidesPhysics slides
Physics slides
 
Ecobuild 2011 - Designing for behaviour change
Ecobuild 2011 - Designing for behaviour changeEcobuild 2011 - Designing for behaviour change
Ecobuild 2011 - Designing for behaviour change
 
What does one planet living look like and how can you embed it into your orga...
What does one planet living look like and how can you embed it into your orga...What does one planet living look like and how can you embed it into your orga...
What does one planet living look like and how can you embed it into your orga...
 
What does one planet living look like and how can you embed it into your retr...
What does one planet living look like and how can you embed it into your retr...What does one planet living look like and how can you embed it into your retr...
What does one planet living look like and how can you embed it into your retr...
 
Rasis stragey-web 950126
Rasis stragey-web 950126Rasis stragey-web 950126
Rasis stragey-web 950126
 

Similaire à The basics of biomass for architects and developers

Renewable energy options for leisure centres
Renewable energy options for leisure centresRenewable energy options for leisure centres
Renewable energy options for leisure centres
Tipperary Energy Agency
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
John Glenning
 
Compressed Natural Gas for Area Fleets
Compressed Natural Gas for Area FleetsCompressed Natural Gas for Area Fleets
Compressed Natural Gas for Area Fleets
TNenergy
 
Lafarge Tarmac sustainable products
Lafarge Tarmac sustainable productsLafarge Tarmac sustainable products
Lafarge Tarmac sustainable products
Tarmac
 
RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
RBS Group
 
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).pptISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
WanZahir3
 

Similaire à The basics of biomass for architects and developers (20)

Renewable energy options for leisure centres
Renewable energy options for leisure centresRenewable energy options for leisure centres
Renewable energy options for leisure centres
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
 
Biomass CHP - wood availability, price considerations, and incentives.pdf
Biomass CHP - wood availability, price considerations, and incentives.pdfBiomass CHP - wood availability, price considerations, and incentives.pdf
Biomass CHP - wood availability, price considerations, and incentives.pdf
 
Circulating Fluidized Bed Boiler (cfb) training module
Circulating Fluidized Bed Boiler (cfb) training module Circulating Fluidized Bed Boiler (cfb) training module
Circulating Fluidized Bed Boiler (cfb) training module
 
Compressed Natural Gas for Area Fleets
Compressed Natural Gas for Area FleetsCompressed Natural Gas for Area Fleets
Compressed Natural Gas for Area Fleets
 
Lafarge Tarmac sustainable products
Lafarge Tarmac sustainable productsLafarge Tarmac sustainable products
Lafarge Tarmac sustainable products
 
B4 cost of production
B4 cost of productionB4 cost of production
B4 cost of production
 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
 
Wp biomass
Wp biomassWp biomass
Wp biomass
 
Team Optimus_IIM K
Team Optimus_IIM KTeam Optimus_IIM K
Team Optimus_IIM K
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Project Management- Unit III
Project Management- Unit IIIProject Management- Unit III
Project Management- Unit III
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
RBS Group Introduction
RBS Group IntroductionRBS Group Introduction
RBS Group Introduction
 
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
Primer Taller Gold Standard en Colombia: Nuevos desarrollos sobre protocolos ...
 
Em
EmEm
Em
 
Training storage how much how many-20160907
Training  storage how much how many-20160907Training  storage how much how many-20160907
Training storage how much how many-20160907
 
Farm-Scale Char Production: Affordable 4C Kilns for Biochar
Farm-Scale Char Production: Affordable 4C Kilns for BiocharFarm-Scale Char Production: Affordable 4C Kilns for Biochar
Farm-Scale Char Production: Affordable 4C Kilns for Biochar
 
TPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceTPS Coal Mills and Fan Performance
TPS Coal Mills and Fan Performance
 
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).pptISCC Supply Chain Model  Mass Balance (Presentation Slides for Mills).ppt
ISCC Supply Chain Model Mass Balance (Presentation Slides for Mills).ppt
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 

The basics of biomass for architects and developers