Congestion Management
Workshop organized at SRPC
28th May 2013
Bengaluru
Outline
• Congestion definitions
• Congestion Management in different time horizons
– Long term
– Medium term
– Operational Planning
– Real time
• CERC procedure on congestion charges in real time
Pillars of Market Design
Sally Hunt – ‘ Making Competition Work in Electricity’
Congestion in Power System
“Congestion is a situation where the demand
for transmission capacity exceeds the
transmission network capabilities, which
might lead to violation of network security
limits, being thermal, voltage stability limits or
a (N-1) contingency condition.”
CIGRE_WG_C5.04_TB_301
4
Indian Electricity Grid Code 2010
• ‘Congestion’ means a situation where the
demand for transmission capacity exceeds the
Available Transfer Capability;
First formal definition of congestion in power
system in our statute wef 3rd May 2010!!!
6
Visibility of congestion
• Visible to the market players
– “If for a given interconnection, there is more demand for
cross border capacity than commercially available, the
interconnection is also treated as congested, meaning no
additional power can be transferred. This congestion is
visible for market players as a limit on their cross-border
transactions.”- CIGRE_WG_C5.04_TB_301
• Invisible to the market players
– “It is possible that even though the available commercial
interconnection capacity is not fully allocated to market
players, some lines, being internal or cross-border, become
overloaded. This physical congestion is a problem of the
System Operator and has to be dealt with by this entity.”
CIGRE_WG_C5.04_TB_301
7
To be handled before-the fact
To be handled in real-time
Congestion visible to the market
• “The more transactions and the more meshed
the network, the higher the chance for
mismatch between commercial exchange and
physical flows.” CIGRE_WG_C5.04_TB_301
 Congestion
 Sign of growth and vibrant market
 Natural corollary to Open Access
 Existing transmission system was not planned with
short-term open access in mind
 Security margins have been squeezed
 ‘Pseudo congestion’ needs to be checked
8
Real-time Congestion types
• Internal congestion (Intra-zonal)
– Within a single System Operator’s control area
• Cross-border (Inter zonal)
– Also called seams issue
– Several System Operators involved
Was not experienced
-Regional grids were small
-Trades were limited
9
Experienced occasionally under
- Grid Contingencies
- Skewed conditions in grid
Aggressive Open Access trades
Open Access Theory & Practice
Forum of Regulators report, Nov-08
“For successful implementation of OA,
the assessment of available transfer
capability (ATC) is very important. A
pessimistic approach in assessing the
ATC will lead to under utilisation of the
transmission system. Similarly, over
assessment of ATC will place the grid
security in danger.”
10
Declaration of Security Limits
• “In order to prevent the violation of security
limits, System Operator SO must define the
limits on commercially available transfer
capacity between zones.” CIGRE_WG_C5.04_TB_301
• “System Operators try to avoid such
unforeseen congestion by carefully assessing
the commercially available capacities and
reliability margins.” CIGRE_WG_C5.04_TB_301
11
Cross border capacity available for trade
• “Physical capacity connecting zones A and B is
sum of 1-3 and 2-3 physical line capacities.
However, the cross border capacity available
for commercial trade would be less or at most
equal to the sum of capacities of cross border
lines individually.” CIGRE_WG_5.04_TB_301
1
2
3
A B
12
13
Intra-day STOA
Day-ahead STOA
Collective (PX) STOA
First Come First Served STOA
Advance Short Term Open Access (STOA)
Medium Term Open Access (MTOA)
Long Term Open Access (LTOA)
Reliability Margin (RM)
Available Transfer Capability is
Total Transfer Capability less Reliability Margin
TTC ATC
RM
Diagram- Europe
POWERGRID 14
NTC map for season:
Winter 2008/2009
Gross Transmission Capacity (GTC) vis a vis
Net Transmission Capacity (NTC) in Europe
Corridor GTC NTC Difference NTC/GTC (%)
France to United Kingdom 2000 2000 0 100%
United Kingdom to France 2000 0 2000 0%
Denmark (East) to Sweden 2010 1700 310 85%
Sweden to Denmark (East) 2010 1300 710 65%
Italy to Slovenia 2017 480 1537 24%
Slovenia to Italy 2017 380 1637 19%
Austria to Hungary 2124 500 1624 24%
Hungary to Austria 2124 200 1924 9%
Sweden to Finland 2230 1800 430 81%
Finland to Sweden 2230 1600 630 72%
Czech Republic to Austria 2249 600 1649 27%
Austria to Czech Republic 2249 0 2249 0%
Italy to Austria + Slovenia 2274 0 2274 0%
Lituania to Kaliningrad 2287 700 1587 31%
Slovakia to Hungary 2492 1100 1392 44%
Hungary to Slovakia 2492 200 2292 8%
Poland to Slovakia 2504 750 1754 30%
Slovakia to Poland 2504 750 1754 30%
Courtesy:
ENTSOE 15
NTC Vs GTC Among EU Countries
For Corridors Up to 1000 MW
NTC Vs GTC Among EU Countries
For Corridors Up to 5000 MW
NTC Vs GTC Among EU Countries
For Corridors Up to 16000 MW
Gross Total Capacity & Net Transfer Capability Among EU Countries
y= 0.21x
0
2000
4000
6000
8000
10000
12000
14000
16000
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000
Gross Total Capacity(MW)
NetTransferCapability(MW)
~ 21%
NTC As % of GTC Among EU Countries
Transmission Capacity ( TC ) vis-à-vis
Available Transfer Capability ( ATC ) in Brazil
TRUNK
TC
( MW )
ATC
( MW )
ATC/TC
(%)
North - Southeast/Midwest
Interconnection
( from North to Southeast)
4200
n-1 3400 81
n-2 1700 40
WITH SPS 4100 98
North - Southeast/Midwest
Interconnection
( from Southeast to North )
n-1 3000 71
Foz do Iguaçu – Ivaiporã
765 kV trunk
6450
n-2 3600 56
WITH SPS 5300 82
Southeast/Midwest - South
Interconnection
17180 n-2 9500 55
440 kV trunk
feeding São Paulo
14500
n-2 9600 66
WITH SPS 10200 70
20Courtesy: ONS Brazil
Handling congestion in different time horizons
• Long term planning……….3-5 years time frame
– Several scenarios and uncertainties to be factored
– Probabilistic vs deterministic
– High Impact Low probability events
– Operational feedback by NLDC/RLDCs as per
section 4j of NLDC Rules 2005.
http://www.posoco.in/documents/operational-
feedback
Handling congestion in different time horizons
• Medium term planning……….0-3 years time
frame
– Network augmentation difficult
– Temporary re-configuration of network possible
– Pro-rata still the main method in Medium Term
Open Access (MTOA)
• Auctions another possibility
Lanco Amarkantak (2 x 300 MW)
400 kV Lanco to Sipat section used to constraint West to East TTC
Lanco Amarkantak (2 x 300 MW)
Contingency
Arrangement
Implemented
in May 2010
Contingency arrangement at CGPL Mundra in 2011
Single line sketch showing proposed bunching arrangement for Bhachau to Vadavi & Chorania D/C TL
D/C
CGPL
Mundra
400 kV
Bhachau S/S
PGCIL
S/C S/C
400 kV 25 km 400 kV
Chorania S/S D/C Bunching point D/C Vadavi S/S
GETCO 192 kms 257 kms GETCO
400 kV Maithon-Koderma arrangement
• Final arrangement
– 400 kV Maithon- Gaya D/C (Quad)
– 400 kV Koderma-Gaya D/C (Quad)
– Forest clearance and ROW problem near Gaya
• Interim arrangement
– 400 kV Maithon-Koderma D/C
Benefit
• Reduction in flow of 400 kV Kahalgaon-
Biharsariff D/C and Kahalgaon–Banka-
Biharshariff D/C, which is a constraint for ER-
NR TTC
• Enhancement of ER-NR TTC.
Congestion in Operational Planning horizon
• Priority based rules
• Pro-rata rationing
• Auctioning
– Explicit Auction…………e-bidding under STOA
– Implicit Auction…………Power Exchange Day Ahead
– Hybrid
• Market splitting
• Market coupling
29
Congestion Management
Lessons learnt in Indian context
• Firmness in STOA schedules
– “Use it or Lose it”
• Valuing transmission instead of pro rata
• Market splitting
30
Congestion Management in real time
– Classical
– Compliance to Standards and Grid Code
– Topology change
– Re-dispatch
– Curtailment
– Market based
– Commercial signals (Congestion Charge)
– Ancillary Market
• Out of merit generation scheduled to pool
• Reactive power charge- synchronous condenser operation
31
Congestion Management in real time
• Counter trading
• Re-dispatching (Out of merit generation)
• Locational Marginal Pricing (LMP)
λnode = λ deviation price + λcongestion charge + λlosses
• Transmission Loading Relief (TLR)
All these methods would result in significant rise in
total cost.
“Price for system security”
32
Regulatory initiatives
• Modifications in Grid Code & other regulations
– Frequency band tightening
– Cap on UI volume, Additional UI charge
– Inclusion of new definitions (TTC, ATC, Congestion)
• Congestion Charge Regulation
– Congestion Charge Value, Geographical
discrimination
– Procedure for Assessment of Transfer Capability
– Procedure for Implementation of Congestion Charge
33
Congestion charges in real time……..CERC orders
• Order dated 7th Nov 2007 in petition no 116/2007
– Congestion charges @300 paise/kWh for Northern region
– Flexibility given to NRLDC
– Irrespective of frequency
– Applied on two occasions in NR.
• Regulations dated 22nd Dec 2009 on congestion charges
in real time
– Procedure approved by CERC vide order dated 11th June 2010
– Modified procedure ordered on 22nd April 2013
Imposition of Congestion Charge in NR on 31st Jan-08
1400 hrs0945 hrs 1930 hrs
Antecedent condition
31st Jan-08
Morning hours
Congestion Charge
1400 hrs0945 hrs 2000 hrs
Improvement in voltage profile
subsequent to imposition of
congestion charge
31st Jan-08, 1400 hrs- 1830 hrs
Imposition of Congestion charge in NR
15th September 2008, 0300 hrs to 0800 hrs
Exactly a week later, NTPC Dadri complex plus HVDC Rihand Dadri bipole tripped
During night hours. Low load conditions in NR averted a major blackout.
Comments on congestion charge
procedure submitted to CERC in
Jan/Feb 2010
Congestion alleviation
Gen: G2
Load: P2
Gen: G1
Load: P1
Downstream system
Upstream system
Line flow = (G1 – P1) OR (P2 – G2)
For congestion alleviation
viz. reducing flow
on the lines connecting the two systems
both upstream and downstream actions
are required for maximum benefit
considering the
frequency dependence on load
Congestion alleviation –only upstream actions
Gen: G2
Load: P2
Gen: G1
Load: P1
Downstream system
Upstream system
Line flow = (G1 – P1) OR (P2 – G2)
For a reduction of generation ∆ P
in upstream system,
the line flow would reduce by
∆ P ( P2 )
(P1 + P2)
Congestion alleviation – only downstream
actions
Gen: G2
Load: P2
Gen: G1
Load: P1
Downstream system
Upstream system
Line flow = (G1 – P1) OR (P2 – G2)
For a reduction of load ∆ P
in downstream system,
the line flow would reduce by
∆ P ( P1 )
(P1 + P2)
Congestion alleviation – both upstream and
downstream actions
Gen: G2
Load: P2
Gen: G1
Load: P1
Downstream system
Upstream system
Line flow = (G1 – P1) OR (P2 – G2)
For a reduction of generation and load ∆ P
each in upstream and downstream system,
the line flow would reduce by
∆ P
Relative size of systems
Downstream system
Upstream system
If upstream system is very small
compared to the downstream system
maximum benefit accrues from
generation reduction upstream
viz. actions in the smaller sub-system
Relative size of systems
Downstream system
Upstream system
If downstream system is very small
compared to the upstream system
maximum benefit accrues from
load reduction downstream
viz. actions in the smaller sub-system
CONGESTION MANAGEMENT
PROCEDURES ::
-REV-1 DTD.22/04/13
• Deviations w.r.t Procedure:
-Rev-0 Dtd.05/04/10
• Congestion charge procedure:
- Declaration
- Applicability
Areas under which modifications have been carried out
• Methodology for assessment of TTC/TRM/ATC
• Declaration of congestion in real time
• Applicability of congestion charge
Declaration of Congestion in real time-Procedures
• 5.1. SLDCs/ RLDCs/ NLDC shall have a display available in their web-sites
showing TTC, TRM, ATC declared in advance. Real time power flow in the
corridor for which TTC has been declared shall be displayed alongside for
comparison. The voltage of the important nodes in the grid
downstream/ upstream of the corridor shall also be displayed(Format II)
• 5.2. A corridor shall be considered congested under the following
circumstances:
• 5.2.1. Grid voltage in the important nodes downstream/ upstream of the
corridor is beyond the operating range specified in the IEGC and/or
• 5.2.2. The real time power flow along a corridor is such that n-1 criteria
may not be satisfied.
• 5.2.3. One or more transmission lines in the corridor are loaded beyond
the normal limit specified in CEA Manual on Transmission Planning
Criteria.
Declaration of Congestion in real time-Procedures
• 5.3. Whenever actual flow on inter/ intra regional link/ corridor exceeds ATC and
security criteria as mentioned in clause 5.2 above are violated RLDC, NLDC may
issue a warning notice. In case SLDC observes congestion within the intra State
grid it shall inform the respective RLDC which in turn shall inform the NLDC. The
notice for congestion shall be communicated to all the Regional entities
telephonically or through fax/ voice message/ e-mail and through postings on
website and making the same available on the common screen at NLDC/ RLDCs/
SLDCs. The format of the notice is enclosed as Format III.
• 5.4 If the power flow on the corridor is as per the schedule, but the congestion
has been caused by forced outages of a transmission line in the corridor, which
occurs after the drawal schedule has been fixed, then open access transactions
shall be curtailed in the priority given in the Central Electricity Regulatory
Commission (Grant of Connectivity, Long-term Access and Medium-term Open
Access in inter-State Transmission and related matters) Regulations, 2009
followed by revision of TTC, TRM and ATC.
Declaration of Congestion in real time-Procedures
• 5.5 If the power flow on the corridor is as per the schedule and the
corridor is congested due to either of the circumstances mentioned in
clauses 5.2.1 and 5.2.3 of this procedure then TTC, TRM and ATC shall be
revised accordingly.
• 5.6 If violation of TTC limits persists for 2 time-blocks not counting the
time-block in which warning notice was issued by RLDC and no
affirmative action is taken by the defaulting agency, NLDC/ RLDC(s) shall
issue a notice for application of congestion charge. This notice shall be
communicated to all the concerned Regional entities telephonically or
through fax message and through postings on website and the same
shall also be made available at the common screen at NLDC/ RLDCs/
SLDCs. The format is enclosed as Format-IV.
Declaration of Congestion in real time-Relevant Modifications
• 5.2.2:The real-time power flow along a corridor exceeds the ATC for that
corridor for continuously one time block of 15-minute
-deleted under points for consideration of corrridor congestion
• The real time power flow along a corridor is such that n-1 criteria may not be
satisfied.
-modified clause
• 5.6:If congestion persists for 2 time-blocks not counting the time-block in
which warning notice was issued by RLDC and no affirmative action by the
defaulting agency is taken, NLDC/ RLDC(s) shall issue a notice for application
of congestion charge. This notice shall be communicated to all the
concerned
-deleted under applicability of congestion where ATC was meant
• If violation of TTC limits persists for 2 time-blocks not counting the time-
block in which warning notice was issued by RLDC and no affirmative action
is taken by the defaulting agency, NLDC/ RLDC(s) shall issue a notice for
application of congestion charge.
-inserted clause
Applicability of Congestion Charge-Summary
• 6.1. Congestion Charge –Rs.5.45/- per unit(not defined in the procedures)
• 6.2. Congestion charge would be levied for
• a) over drawal or under-injection in the importing control area and
• b) under drawal or over-injection in the exporting control area.
• 6.3. Congestion charges may also become applicable for an intra-regional corridor
of one region, if the congestion is attributable to other regional entities of other
region.
• 6.4. Congestion charge shall be applicable only after two time blocks from the
time of issuing the notice, not counting the time block in which notice is issued.
• 6.5. Congestion charge shall be withdrawn after the power flow on the affected
transmission link/ corridor has come down to the ATC and remains at this level
for one time block. NLDC/ RLDC shall communicate to all concerned Regional
entities telephonically or through fax message/ e-mail and through postings on
website and making available the same on the common screen available at
NLDC/ RLDCs/ SLDCs for lifting of congestion charge. The format of the notice is
enclosed as Format-V.
Applicability of Congestion Charge-Relevant Modifications
• 6.2:At frequency below 50 Hz, congestion charge would be levied for
over drawal or under-injection in the importing control area and at
frequencies above 50 Hz, congestion charge would be levied for under
drawal or over-injection in the exporting control area
-deleted under applicability of congestion charge
• 6.2:Congestion charge would be levied for
a) over drawal or under-injection in the importing control area and
b) under drawal or over-injection in the exporting control area.
-inserted
• Minor changes in format-I
Methodology for TTC/RM/ATC computation-Relevant Modifications
• 3.6.9:Normal operating limit for an Inter connecting transformer shall be 90 % of its
Maximum Continuous Rating (MCR)
-deleted
• 3.6.9Permissible Normal and emergency limits for transmission elements shall be
as defined in the (CEA Manual on Transmission Planning Criteria).
-final clause
• 3.9During assessment of Total Transfer Capability it shall be ensured that:
• 3.9.1. All transmission element loadings in the base case are within normal
operating limits and the voltages remain within operating range defined in the
IEGC.
• 3.9.2. All transmission element loadings after a credible contingency are within
emergency ratings and grid voltage is within the operating range as defined in the
IEGC.
-deleted
• 3.9:During assessment of Total Transfer Capability it shall be ensured that the
conditions specified in CEA Manual on Transmission Planning Criteria are met after
credible n-1 and n-1-1 contingencies.
-final clause
Methodology for TTC/RM/ATC computation-Relevant Modifications
• 3.10.4: Stability under n-1-1 contingency of a temporary single phase to
ground fault on a 765 kV line close to the bus or a permanent single
phase to ground fault on a 400 kV line close to the bus
• 3.10.5:Angular difference of 30 degrees between adjacent buses under
n-1 contingency
-additional insertion
• 3.11.2: Single largest anticipated in feed into the control area/ group of
control area (which could be a combination of States for the purpose of
Power Exchange and for others)/ region.
-deleted under basis of TRM computation
Thank You

Contenu connexe

Tendances

TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIAArun Muraleedharan
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power SystemP K Agarwal
 
Penetration of PluginHybrid Electric Vehicles via Distribution Network
Penetration of PluginHybrid Electric Vehicles via Distribution NetworkPenetration of PluginHybrid Electric Vehicles via Distribution Network
Penetration of PluginHybrid Electric Vehicles via Distribution NetworkRaja Larik
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch centerddxdharmesh
 
Congestion management
Congestion managementCongestion management
Congestion managementGAURAV KUMAR
 
TTC/ATC Computations and Ancillary Services in the Indian context
TTC/ATC Computations and Ancillary Services in the Indian contextTTC/ATC Computations and Ancillary Services in the Indian context
TTC/ATC Computations and Ancillary Services in the Indian contextPower System Operation
 
chandan gitam 1424
chandan gitam 1424chandan gitam 1424
chandan gitam 1424power system
 
Congestion management in the context of deregulation
Congestion management in the context of deregulationCongestion management in the context of deregulation
Congestion management in the context of deregulationPulakesh k kalita
 
Optimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSOOptimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSOIOSR Journals
 
Advanced Power Electronics based FACTS Controllers: An Overview
Advanced Power Electronics based FACTS Controllers:  An OverviewAdvanced Power Electronics based FACTS Controllers:  An Overview
Advanced Power Electronics based FACTS Controllers: An OverviewDr. Sudhir Kumar Srivastava
 
Comparision of svc and statcom
Comparision of svc and statcomComparision of svc and statcom
Comparision of svc and statcomjawaharramaya
 
A New approach for controlling the power flow in a transmission system using ...
A New approach for controlling the power flow in a transmission system using ...A New approach for controlling the power flow in a transmission system using ...
A New approach for controlling the power flow in a transmission system using ...IJMER
 
Modulation and control of transformer less upfc
Modulation and control of transformer less upfcModulation and control of transformer less upfc
Modulation and control of transformer less upfcI3E Technologies
 

Tendances (20)

TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
 
Managing Power System
Managing Power SystemManaging Power System
Managing Power System
 
Penetration of PluginHybrid Electric Vehicles via Distribution Network
Penetration of PluginHybrid Electric Vehicles via Distribution NetworkPenetration of PluginHybrid Electric Vehicles via Distribution Network
Penetration of PluginHybrid Electric Vehicles via Distribution Network
 
Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
Congestion management
Congestion managementCongestion management
Congestion management
 
TTC/ATC Computations and Ancillary Services in the Indian context
TTC/ATC Computations and Ancillary Services in the Indian contextTTC/ATC Computations and Ancillary Services in the Indian context
TTC/ATC Computations and Ancillary Services in the Indian context
 
chandan gitam 1424
chandan gitam 1424chandan gitam 1424
chandan gitam 1424
 
upfc
upfcupfc
upfc
 
Slide
SlideSlide
Slide
 
Upfc & fact
Upfc & factUpfc & fact
Upfc & fact
 
Congestion management in the context of deregulation
Congestion management in the context of deregulationCongestion management in the context of deregulation
Congestion management in the context of deregulation
 
Optimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSOOptimal Placement of TCSC and SVC Using PSO
Optimal Placement of TCSC and SVC Using PSO
 
project report on IPFC
project report on IPFCproject report on IPFC
project report on IPFC
 
Advanced Power Electronics based FACTS Controllers: An Overview
Advanced Power Electronics based FACTS Controllers:  An OverviewAdvanced Power Electronics based FACTS Controllers:  An Overview
Advanced Power Electronics based FACTS Controllers: An Overview
 
Comparision of svc and statcom
Comparision of svc and statcomComparision of svc and statcom
Comparision of svc and statcom
 
Upfc ppt
Upfc pptUpfc ppt
Upfc ppt
 
A New approach for controlling the power flow in a transmission system using ...
A New approach for controlling the power flow in a transmission system using ...A New approach for controlling the power flow in a transmission system using ...
A New approach for controlling the power flow in a transmission system using ...
 
Ppt
PptPpt
Ppt
 
Modulation and control of transformer less upfc
Modulation and control of transformer less upfcModulation and control of transformer less upfc
Modulation and control of transformer less upfc
 
FACTS Controller.
FACTS Controller.FACTS Controller.
FACTS Controller.
 

En vedette

Deregulation
DeregulationDeregulation
DeregulationAnas Vj
 
Transmission Congestion Management by Using Series Facts Devices and Changing...
Transmission Congestion Management by Using Series Facts Devices and Changing...Transmission Congestion Management by Using Series Facts Devices and Changing...
Transmission Congestion Management by Using Series Facts Devices and Changing...IJMER
 
Congestion Management in Power System by Optimal Location And Sizing of UPFC
Congestion Management in Power System by Optimal Location And Sizing of UPFCCongestion Management in Power System by Optimal Location And Sizing of UPFC
Congestion Management in Power System by Optimal Location And Sizing of UPFCIOSR Journals
 
Group 7 load forecasting&harmonics final ppt
Group   7 load forecasting&harmonics final pptGroup   7 load forecasting&harmonics final ppt
Group 7 load forecasting&harmonics final pptRahul Sharma
 
Contingency analysis
Contingency analysisContingency analysis
Contingency analysisSajan Sahu
 
Electronic Toll Collection System
Electronic Toll Collection SystemElectronic Toll Collection System
Electronic Toll Collection SystemArshad Shareef
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industryjerry patel
 
Load forecasting
Load forecastingLoad forecasting
Load forecastingsushrut p
 

En vedette (17)

Deregulation
DeregulationDeregulation
Deregulation
 
Transmission Congestion Management by Using Series Facts Devices and Changing...
Transmission Congestion Management by Using Series Facts Devices and Changing...Transmission Congestion Management by Using Series Facts Devices and Changing...
Transmission Congestion Management by Using Series Facts Devices and Changing...
 
Congestion Management in Power System by Optimal Location And Sizing of UPFC
Congestion Management in Power System by Optimal Location And Sizing of UPFCCongestion Management in Power System by Optimal Location And Sizing of UPFC
Congestion Management in Power System by Optimal Location And Sizing of UPFC
 
Group 7 load forecasting&harmonics final ppt
Group   7 load forecasting&harmonics final pptGroup   7 load forecasting&harmonics final ppt
Group 7 load forecasting&harmonics final ppt
 
Contingency analysis
Contingency analysisContingency analysis
Contingency analysis
 
Restructuring of power grid
Restructuring of power gridRestructuring of power grid
Restructuring of power grid
 
Power system contingencies
Power system  contingenciesPower system  contingencies
Power system contingencies
 
Loss minimisation in power system
Loss minimisation in power systemLoss minimisation in power system
Loss minimisation in power system
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Electronic Toll Collection System
Electronic Toll Collection SystemElectronic Toll Collection System
Electronic Toll Collection System
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industry
 
P1111351312
P1111351312P1111351312
P1111351312
 
Toll plaza ppt
Toll plaza pptToll plaza ppt
Toll plaza ppt
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 
Load forecasting
Load forecastingLoad forecasting
Load forecasting
 
Congestion control
Congestion controlCongestion control
Congestion control
 

Similaire à Srldc 28 May2013_congestionEnergy & Power Meet

Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challIPPAI
 
Monetising Distributed Energy Resources
Monetising Distributed Energy ResourcesMonetising Distributed Energy Resources
Monetising Distributed Energy ResourcesJustin Hayward
 
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Leonardo ENERGY
 
Defence mechanism in power system
Defence mechanism in power systemDefence mechanism in power system
Defence mechanism in power systemChandan Kumar
 
Thesis PresentationvFinal3
Thesis PresentationvFinal3Thesis PresentationvFinal3
Thesis PresentationvFinal3M Ghorbanzadeh
 
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTUREREDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTUREiQHub
 
Congestion Management in Deregulated Power System by Using FACTS Devices
Congestion Management in Deregulated Power System by Using FACTS DevicesCongestion Management in Deregulated Power System by Using FACTS Devices
Congestion Management in Deregulated Power System by Using FACTS DevicesIRJET Journal
 
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization Exploring New Regulatory Worlds in Era of Digitalization & Decentralization
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization European University Institute
 
Show and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdfShow and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdfSIFOfgem
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in IndiaSandipan Chakraborty
 
Global Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyGlobal Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyPower System Operation
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimetRick Case, PMP, P.E.
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)Ravi Pohani
 

Similaire à Srldc 28 May2013_congestionEnergy & Power Meet (20)

Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans chall
 
ENERGY STORAGE REGULATORY BARRIERS
ENERGY STORAGE REGULATORY BARRIERSENERGY STORAGE REGULATORY BARRIERS
ENERGY STORAGE REGULATORY BARRIERS
 
Monetising Distributed Energy Resources
Monetising Distributed Energy ResourcesMonetising Distributed Energy Resources
Monetising Distributed Energy Resources
 
Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
 
IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
Overview of the FlexPlan project. Focus on EU regulatory analysis and TSO-DSO...
 
Defence mechanism in power system
Defence mechanism in power systemDefence mechanism in power system
Defence mechanism in power system
 
Thesis PresentationvFinal3
Thesis PresentationvFinal3Thesis PresentationvFinal3
Thesis PresentationvFinal3
 
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTUREREDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
REDUCING BARRIERS TO NEW TECHNOLOGIES AND PROMOTING THE GRID OF FUTURE
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.ppt
 
Electricity transparency requirements
Electricity transparency requirementsElectricity transparency requirements
Electricity transparency requirements
 
Congestion Management in Deregulated Power System by Using FACTS Devices
Congestion Management in Deregulated Power System by Using FACTS DevicesCongestion Management in Deregulated Power System by Using FACTS Devices
Congestion Management in Deregulated Power System by Using FACTS Devices
 
Grid code
Grid codeGrid code
Grid code
 
Power related issues requiring SmartGrids solutions
Power related issues requiring SmartGrids solutionsPower related issues requiring SmartGrids solutions
Power related issues requiring SmartGrids solutions
 
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization Exploring New Regulatory Worlds in Era of Digitalization & Decentralization
Exploring New Regulatory Worlds in Era of Digitalization & Decentralization
 
Show and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdfShow and Tell - Flexibility & Hydrogen Integration.pdf
Show and Tell - Flexibility & Hydrogen Integration.pdf
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Global Electricity Network Feasibility Study
Global Electricity Network Feasibility StudyGlobal Electricity Network Feasibility Study
Global Electricity Network Feasibility Study
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimet
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 

Plus de PRIYANK JAIN

Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014PRIYANK JAIN
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power PolicyPRIYANK JAIN
 
Hydro Power Harnessing priyank
Hydro Power Harnessing priyankHydro Power Harnessing priyank
Hydro Power Harnessing priyankPRIYANK JAIN
 
Priyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPriyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPRIYANK JAIN
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl finalPRIYANK JAIN
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform PRIYANK JAIN
 
Enterprenure case study
Enterprenure case studyEnterprenure case study
Enterprenure case studyPRIYANK JAIN
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyankPRIYANK JAIN
 
Hydro Power Envirentment interface
Hydro Power Envirentment interfaceHydro Power Envirentment interface
Hydro Power Envirentment interfacePRIYANK JAIN
 
Assumptions: Strategy already defined Strategy not subject to sudden chang...
Assumptions:  Strategy already defined   Strategy not subject to sudden chang...Assumptions:  Strategy already defined   Strategy not subject to sudden chang...
Assumptions: Strategy already defined Strategy not subject to sudden chang...PRIYANK JAIN
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyankPRIYANK JAIN
 
Knowledge management system priyank
Knowledge management system priyankKnowledge management system priyank
Knowledge management system priyankPRIYANK JAIN
 
Kingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainKingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainPRIYANK JAIN
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain PRIYANK JAIN
 
Copyrights priyanksaurabh
Copyrights priyanksaurabhCopyrights priyanksaurabh
Copyrights priyanksaurabhPRIYANK JAIN
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainPRIYANK JAIN
 
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION  priyank pulkit rads praveerPOWER SYSTEM INTRODUCTION  priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION priyank pulkit rads praveerPRIYANK JAIN
 
Indian eco priyank jain
Indian eco priyank jainIndian eco priyank jain
Indian eco priyank jainPRIYANK JAIN
 

Plus de PRIYANK JAIN (20)

Training power exchanges_18-may-2014
Training power exchanges_18-may-2014Training power exchanges_18-may-2014
Training power exchanges_18-may-2014
 
Data collection
Data collectionData collection
Data collection
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
Hydro Power Harnessing priyank
Hydro Power Harnessing priyankHydro Power Harnessing priyank
Hydro Power Harnessing priyank
 
Priyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mwPriyank jain - Wind detailed project report _12 mw
Priyank jain - Wind detailed project report _12 mw
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
 
Enterprenure case study
Enterprenure case studyEnterprenure case study
Enterprenure case study
 
Indian eco Reform
Indian eco ReformIndian eco Reform
Indian eco Reform
 
Fuel gap for Power Sector priyank
Fuel gap for Power Sector  priyankFuel gap for Power Sector  priyank
Fuel gap for Power Sector priyank
 
Hydro Power Envirentment interface
Hydro Power Envirentment interfaceHydro Power Envirentment interface
Hydro Power Envirentment interface
 
Assumptions: Strategy already defined Strategy not subject to sudden chang...
Assumptions:  Strategy already defined   Strategy not subject to sudden chang...Assumptions:  Strategy already defined   Strategy not subject to sudden chang...
Assumptions: Strategy already defined Strategy not subject to sudden chang...
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyank
 
Knowledge management system priyank
Knowledge management system priyankKnowledge management system priyank
Knowledge management system priyank
 
Kingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank JainKingfisher Airlines Priyank Jain
Kingfisher Airlines Priyank Jain
 
Hydro Priyank jain
Hydro Priyank jain Hydro Priyank jain
Hydro Priyank jain
 
Copyrights priyanksaurabh
Copyrights priyanksaurabhCopyrights priyanksaurabh
Copyrights priyanksaurabh
 
Canada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jainCanada’s electricity sector reform priyank jain
Canada’s electricity sector reform priyank jain
 
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION  priyank pulkit rads praveerPOWER SYSTEM INTRODUCTION  priyank pulkit rads praveer
POWER SYSTEM INTRODUCTION priyank pulkit rads praveer
 
Indian eco priyank jain
Indian eco priyank jainIndian eco priyank jain
Indian eco priyank jain
 

Dernier

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 

Dernier (20)

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Srldc 28 May2013_congestionEnergy & Power Meet

  • 1. Congestion Management Workshop organized at SRPC 28th May 2013 Bengaluru
  • 2. Outline • Congestion definitions • Congestion Management in different time horizons – Long term – Medium term – Operational Planning – Real time • CERC procedure on congestion charges in real time
  • 3. Pillars of Market Design Sally Hunt – ‘ Making Competition Work in Electricity’
  • 4. Congestion in Power System “Congestion is a situation where the demand for transmission capacity exceeds the transmission network capabilities, which might lead to violation of network security limits, being thermal, voltage stability limits or a (N-1) contingency condition.” CIGRE_WG_C5.04_TB_301 4
  • 5. Indian Electricity Grid Code 2010 • ‘Congestion’ means a situation where the demand for transmission capacity exceeds the Available Transfer Capability; First formal definition of congestion in power system in our statute wef 3rd May 2010!!!
  • 6. 6
  • 7. Visibility of congestion • Visible to the market players – “If for a given interconnection, there is more demand for cross border capacity than commercially available, the interconnection is also treated as congested, meaning no additional power can be transferred. This congestion is visible for market players as a limit on their cross-border transactions.”- CIGRE_WG_C5.04_TB_301 • Invisible to the market players – “It is possible that even though the available commercial interconnection capacity is not fully allocated to market players, some lines, being internal or cross-border, become overloaded. This physical congestion is a problem of the System Operator and has to be dealt with by this entity.” CIGRE_WG_C5.04_TB_301 7 To be handled before-the fact To be handled in real-time
  • 8. Congestion visible to the market • “The more transactions and the more meshed the network, the higher the chance for mismatch between commercial exchange and physical flows.” CIGRE_WG_C5.04_TB_301  Congestion  Sign of growth and vibrant market  Natural corollary to Open Access  Existing transmission system was not planned with short-term open access in mind  Security margins have been squeezed  ‘Pseudo congestion’ needs to be checked 8
  • 9. Real-time Congestion types • Internal congestion (Intra-zonal) – Within a single System Operator’s control area • Cross-border (Inter zonal) – Also called seams issue – Several System Operators involved Was not experienced -Regional grids were small -Trades were limited 9 Experienced occasionally under - Grid Contingencies - Skewed conditions in grid Aggressive Open Access trades
  • 10. Open Access Theory & Practice Forum of Regulators report, Nov-08 “For successful implementation of OA, the assessment of available transfer capability (ATC) is very important. A pessimistic approach in assessing the ATC will lead to under utilisation of the transmission system. Similarly, over assessment of ATC will place the grid security in danger.” 10
  • 11. Declaration of Security Limits • “In order to prevent the violation of security limits, System Operator SO must define the limits on commercially available transfer capacity between zones.” CIGRE_WG_C5.04_TB_301 • “System Operators try to avoid such unforeseen congestion by carefully assessing the commercially available capacities and reliability margins.” CIGRE_WG_C5.04_TB_301 11
  • 12. Cross border capacity available for trade • “Physical capacity connecting zones A and B is sum of 1-3 and 2-3 physical line capacities. However, the cross border capacity available for commercial trade would be less or at most equal to the sum of capacities of cross border lines individually.” CIGRE_WG_5.04_TB_301 1 2 3 A B 12
  • 13. 13 Intra-day STOA Day-ahead STOA Collective (PX) STOA First Come First Served STOA Advance Short Term Open Access (STOA) Medium Term Open Access (MTOA) Long Term Open Access (LTOA) Reliability Margin (RM) Available Transfer Capability is Total Transfer Capability less Reliability Margin TTC ATC RM
  • 14. Diagram- Europe POWERGRID 14 NTC map for season: Winter 2008/2009
  • 15. Gross Transmission Capacity (GTC) vis a vis Net Transmission Capacity (NTC) in Europe Corridor GTC NTC Difference NTC/GTC (%) France to United Kingdom 2000 2000 0 100% United Kingdom to France 2000 0 2000 0% Denmark (East) to Sweden 2010 1700 310 85% Sweden to Denmark (East) 2010 1300 710 65% Italy to Slovenia 2017 480 1537 24% Slovenia to Italy 2017 380 1637 19% Austria to Hungary 2124 500 1624 24% Hungary to Austria 2124 200 1924 9% Sweden to Finland 2230 1800 430 81% Finland to Sweden 2230 1600 630 72% Czech Republic to Austria 2249 600 1649 27% Austria to Czech Republic 2249 0 2249 0% Italy to Austria + Slovenia 2274 0 2274 0% Lituania to Kaliningrad 2287 700 1587 31% Slovakia to Hungary 2492 1100 1392 44% Hungary to Slovakia 2492 200 2292 8% Poland to Slovakia 2504 750 1754 30% Slovakia to Poland 2504 750 1754 30% Courtesy: ENTSOE 15
  • 16. NTC Vs GTC Among EU Countries For Corridors Up to 1000 MW
  • 17. NTC Vs GTC Among EU Countries For Corridors Up to 5000 MW
  • 18. NTC Vs GTC Among EU Countries For Corridors Up to 16000 MW Gross Total Capacity & Net Transfer Capability Among EU Countries y= 0.21x 0 2000 4000 6000 8000 10000 12000 14000 16000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 16000 Gross Total Capacity(MW) NetTransferCapability(MW) ~ 21%
  • 19. NTC As % of GTC Among EU Countries
  • 20. Transmission Capacity ( TC ) vis-à-vis Available Transfer Capability ( ATC ) in Brazil TRUNK TC ( MW ) ATC ( MW ) ATC/TC (%) North - Southeast/Midwest Interconnection ( from North to Southeast) 4200 n-1 3400 81 n-2 1700 40 WITH SPS 4100 98 North - Southeast/Midwest Interconnection ( from Southeast to North ) n-1 3000 71 Foz do Iguaçu – Ivaiporã 765 kV trunk 6450 n-2 3600 56 WITH SPS 5300 82 Southeast/Midwest - South Interconnection 17180 n-2 9500 55 440 kV trunk feeding São Paulo 14500 n-2 9600 66 WITH SPS 10200 70 20Courtesy: ONS Brazil
  • 21. Handling congestion in different time horizons • Long term planning……….3-5 years time frame – Several scenarios and uncertainties to be factored – Probabilistic vs deterministic – High Impact Low probability events – Operational feedback by NLDC/RLDCs as per section 4j of NLDC Rules 2005. http://www.posoco.in/documents/operational- feedback
  • 22. Handling congestion in different time horizons • Medium term planning……….0-3 years time frame – Network augmentation difficult – Temporary re-configuration of network possible – Pro-rata still the main method in Medium Term Open Access (MTOA) • Auctions another possibility
  • 23. Lanco Amarkantak (2 x 300 MW) 400 kV Lanco to Sipat section used to constraint West to East TTC
  • 24. Lanco Amarkantak (2 x 300 MW) Contingency Arrangement Implemented in May 2010
  • 25. Contingency arrangement at CGPL Mundra in 2011 Single line sketch showing proposed bunching arrangement for Bhachau to Vadavi & Chorania D/C TL D/C CGPL Mundra 400 kV Bhachau S/S PGCIL S/C S/C 400 kV 25 km 400 kV Chorania S/S D/C Bunching point D/C Vadavi S/S GETCO 192 kms 257 kms GETCO
  • 26. 400 kV Maithon-Koderma arrangement • Final arrangement – 400 kV Maithon- Gaya D/C (Quad) – 400 kV Koderma-Gaya D/C (Quad) – Forest clearance and ROW problem near Gaya • Interim arrangement – 400 kV Maithon-Koderma D/C
  • 27.
  • 28. Benefit • Reduction in flow of 400 kV Kahalgaon- Biharsariff D/C and Kahalgaon–Banka- Biharshariff D/C, which is a constraint for ER- NR TTC • Enhancement of ER-NR TTC.
  • 29. Congestion in Operational Planning horizon • Priority based rules • Pro-rata rationing • Auctioning – Explicit Auction…………e-bidding under STOA – Implicit Auction…………Power Exchange Day Ahead – Hybrid • Market splitting • Market coupling 29
  • 30. Congestion Management Lessons learnt in Indian context • Firmness in STOA schedules – “Use it or Lose it” • Valuing transmission instead of pro rata • Market splitting 30
  • 31. Congestion Management in real time – Classical – Compliance to Standards and Grid Code – Topology change – Re-dispatch – Curtailment – Market based – Commercial signals (Congestion Charge) – Ancillary Market • Out of merit generation scheduled to pool • Reactive power charge- synchronous condenser operation 31
  • 32. Congestion Management in real time • Counter trading • Re-dispatching (Out of merit generation) • Locational Marginal Pricing (LMP) λnode = λ deviation price + λcongestion charge + λlosses • Transmission Loading Relief (TLR) All these methods would result in significant rise in total cost. “Price for system security” 32
  • 33. Regulatory initiatives • Modifications in Grid Code & other regulations – Frequency band tightening – Cap on UI volume, Additional UI charge – Inclusion of new definitions (TTC, ATC, Congestion) • Congestion Charge Regulation – Congestion Charge Value, Geographical discrimination – Procedure for Assessment of Transfer Capability – Procedure for Implementation of Congestion Charge 33
  • 34. Congestion charges in real time……..CERC orders • Order dated 7th Nov 2007 in petition no 116/2007 – Congestion charges @300 paise/kWh for Northern region – Flexibility given to NRLDC – Irrespective of frequency – Applied on two occasions in NR. • Regulations dated 22nd Dec 2009 on congestion charges in real time – Procedure approved by CERC vide order dated 11th June 2010 – Modified procedure ordered on 22nd April 2013
  • 35. Imposition of Congestion Charge in NR on 31st Jan-08 1400 hrs0945 hrs 1930 hrs
  • 36. Antecedent condition 31st Jan-08 Morning hours Congestion Charge 1400 hrs0945 hrs 2000 hrs Improvement in voltage profile subsequent to imposition of congestion charge 31st Jan-08, 1400 hrs- 1830 hrs
  • 37. Imposition of Congestion charge in NR 15th September 2008, 0300 hrs to 0800 hrs Exactly a week later, NTPC Dadri complex plus HVDC Rihand Dadri bipole tripped During night hours. Low load conditions in NR averted a major blackout.
  • 38. Comments on congestion charge procedure submitted to CERC in Jan/Feb 2010
  • 39. Congestion alleviation Gen: G2 Load: P2 Gen: G1 Load: P1 Downstream system Upstream system Line flow = (G1 – P1) OR (P2 – G2) For congestion alleviation viz. reducing flow on the lines connecting the two systems both upstream and downstream actions are required for maximum benefit considering the frequency dependence on load
  • 40. Congestion alleviation –only upstream actions Gen: G2 Load: P2 Gen: G1 Load: P1 Downstream system Upstream system Line flow = (G1 – P1) OR (P2 – G2) For a reduction of generation ∆ P in upstream system, the line flow would reduce by ∆ P ( P2 ) (P1 + P2)
  • 41. Congestion alleviation – only downstream actions Gen: G2 Load: P2 Gen: G1 Load: P1 Downstream system Upstream system Line flow = (G1 – P1) OR (P2 – G2) For a reduction of load ∆ P in downstream system, the line flow would reduce by ∆ P ( P1 ) (P1 + P2)
  • 42. Congestion alleviation – both upstream and downstream actions Gen: G2 Load: P2 Gen: G1 Load: P1 Downstream system Upstream system Line flow = (G1 – P1) OR (P2 – G2) For a reduction of generation and load ∆ P each in upstream and downstream system, the line flow would reduce by ∆ P
  • 43. Relative size of systems Downstream system Upstream system If upstream system is very small compared to the downstream system maximum benefit accrues from generation reduction upstream viz. actions in the smaller sub-system
  • 44. Relative size of systems Downstream system Upstream system If downstream system is very small compared to the upstream system maximum benefit accrues from load reduction downstream viz. actions in the smaller sub-system
  • 45. CONGESTION MANAGEMENT PROCEDURES :: -REV-1 DTD.22/04/13 • Deviations w.r.t Procedure: -Rev-0 Dtd.05/04/10 • Congestion charge procedure: - Declaration - Applicability
  • 46. Areas under which modifications have been carried out • Methodology for assessment of TTC/TRM/ATC • Declaration of congestion in real time • Applicability of congestion charge
  • 47. Declaration of Congestion in real time-Procedures • 5.1. SLDCs/ RLDCs/ NLDC shall have a display available in their web-sites showing TTC, TRM, ATC declared in advance. Real time power flow in the corridor for which TTC has been declared shall be displayed alongside for comparison. The voltage of the important nodes in the grid downstream/ upstream of the corridor shall also be displayed(Format II) • 5.2. A corridor shall be considered congested under the following circumstances: • 5.2.1. Grid voltage in the important nodes downstream/ upstream of the corridor is beyond the operating range specified in the IEGC and/or • 5.2.2. The real time power flow along a corridor is such that n-1 criteria may not be satisfied. • 5.2.3. One or more transmission lines in the corridor are loaded beyond the normal limit specified in CEA Manual on Transmission Planning Criteria.
  • 48. Declaration of Congestion in real time-Procedures • 5.3. Whenever actual flow on inter/ intra regional link/ corridor exceeds ATC and security criteria as mentioned in clause 5.2 above are violated RLDC, NLDC may issue a warning notice. In case SLDC observes congestion within the intra State grid it shall inform the respective RLDC which in turn shall inform the NLDC. The notice for congestion shall be communicated to all the Regional entities telephonically or through fax/ voice message/ e-mail and through postings on website and making the same available on the common screen at NLDC/ RLDCs/ SLDCs. The format of the notice is enclosed as Format III. • 5.4 If the power flow on the corridor is as per the schedule, but the congestion has been caused by forced outages of a transmission line in the corridor, which occurs after the drawal schedule has been fixed, then open access transactions shall be curtailed in the priority given in the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 followed by revision of TTC, TRM and ATC.
  • 49. Declaration of Congestion in real time-Procedures • 5.5 If the power flow on the corridor is as per the schedule and the corridor is congested due to either of the circumstances mentioned in clauses 5.2.1 and 5.2.3 of this procedure then TTC, TRM and ATC shall be revised accordingly. • 5.6 If violation of TTC limits persists for 2 time-blocks not counting the time-block in which warning notice was issued by RLDC and no affirmative action is taken by the defaulting agency, NLDC/ RLDC(s) shall issue a notice for application of congestion charge. This notice shall be communicated to all the concerned Regional entities telephonically or through fax message and through postings on website and the same shall also be made available at the common screen at NLDC/ RLDCs/ SLDCs. The format is enclosed as Format-IV.
  • 50. Declaration of Congestion in real time-Relevant Modifications • 5.2.2:The real-time power flow along a corridor exceeds the ATC for that corridor for continuously one time block of 15-minute -deleted under points for consideration of corrridor congestion • The real time power flow along a corridor is such that n-1 criteria may not be satisfied. -modified clause • 5.6:If congestion persists for 2 time-blocks not counting the time-block in which warning notice was issued by RLDC and no affirmative action by the defaulting agency is taken, NLDC/ RLDC(s) shall issue a notice for application of congestion charge. This notice shall be communicated to all the concerned -deleted under applicability of congestion where ATC was meant • If violation of TTC limits persists for 2 time-blocks not counting the time- block in which warning notice was issued by RLDC and no affirmative action is taken by the defaulting agency, NLDC/ RLDC(s) shall issue a notice for application of congestion charge. -inserted clause
  • 51. Applicability of Congestion Charge-Summary • 6.1. Congestion Charge –Rs.5.45/- per unit(not defined in the procedures) • 6.2. Congestion charge would be levied for • a) over drawal or under-injection in the importing control area and • b) under drawal or over-injection in the exporting control area. • 6.3. Congestion charges may also become applicable for an intra-regional corridor of one region, if the congestion is attributable to other regional entities of other region. • 6.4. Congestion charge shall be applicable only after two time blocks from the time of issuing the notice, not counting the time block in which notice is issued. • 6.5. Congestion charge shall be withdrawn after the power flow on the affected transmission link/ corridor has come down to the ATC and remains at this level for one time block. NLDC/ RLDC shall communicate to all concerned Regional entities telephonically or through fax message/ e-mail and through postings on website and making available the same on the common screen available at NLDC/ RLDCs/ SLDCs for lifting of congestion charge. The format of the notice is enclosed as Format-V.
  • 52. Applicability of Congestion Charge-Relevant Modifications • 6.2:At frequency below 50 Hz, congestion charge would be levied for over drawal or under-injection in the importing control area and at frequencies above 50 Hz, congestion charge would be levied for under drawal or over-injection in the exporting control area -deleted under applicability of congestion charge • 6.2:Congestion charge would be levied for a) over drawal or under-injection in the importing control area and b) under drawal or over-injection in the exporting control area. -inserted • Minor changes in format-I
  • 53. Methodology for TTC/RM/ATC computation-Relevant Modifications • 3.6.9:Normal operating limit for an Inter connecting transformer shall be 90 % of its Maximum Continuous Rating (MCR) -deleted • 3.6.9Permissible Normal and emergency limits for transmission elements shall be as defined in the (CEA Manual on Transmission Planning Criteria). -final clause • 3.9During assessment of Total Transfer Capability it shall be ensured that: • 3.9.1. All transmission element loadings in the base case are within normal operating limits and the voltages remain within operating range defined in the IEGC. • 3.9.2. All transmission element loadings after a credible contingency are within emergency ratings and grid voltage is within the operating range as defined in the IEGC. -deleted • 3.9:During assessment of Total Transfer Capability it shall be ensured that the conditions specified in CEA Manual on Transmission Planning Criteria are met after credible n-1 and n-1-1 contingencies. -final clause
  • 54. Methodology for TTC/RM/ATC computation-Relevant Modifications • 3.10.4: Stability under n-1-1 contingency of a temporary single phase to ground fault on a 765 kV line close to the bus or a permanent single phase to ground fault on a 400 kV line close to the bus • 3.10.5:Angular difference of 30 degrees between adjacent buses under n-1 contingency -additional insertion • 3.11.2: Single largest anticipated in feed into the control area/ group of control area (which could be a combination of States for the purpose of Power Exchange and for others)/ region. -deleted under basis of TRM computation