Material Requirements Plan




DERRICK R. DELA VEGA
MBA
MRP Dynamics

The inputs to MRP (the master schedule.
  BOM, lead times, purchasing, and inventory)
  frequently change. Conveniently, a central
  strength of MRP system is timely and accurate
  re-planning. These occur in two ways: by re
  computing (also known as regenerating) the
  requirement and schedule periodically, often
  weekly or a net change calculation. Net change
  in the MRP system means the MRP system
  creates new requirements in response to
  transactions.
System Nervousness

Frequent Changes in an MRP system
Two tools are particularly helpful when trying to
  reduce MRP system nervousness.
 1. Time Fences- allow a segment of the
  master schedule to be designated as not to
  re-scheduled
     2. Pegging- means tracing upward in the
  BOM from the component to the parent item
MRP and JIT

 MRP does not do detailed scheduling it plans.
 MRP will tell you that a job needs to be
  completed on a certain week or day
 MRP is also a planning technique with fixed
  lead times.
 MRP provides a plan and an accurate picture
  of requirements
 JIT rapidly move material in small
  batches, reducing work in process inventory.
FOUR APPROACHES ININTEGRATING MRP AND JIT


1. Finite Capacity Scheduling
2. Small Buckets
3. Balance Flow
4. Supermarkets
1.Finite Capacity Scheduling
              (FCS)
Provides the precise scheduling
 needed for rapid material
 movement and also considers
 departments and machine
 capacity
2.Small Buckets-Units in a
material requirements system
MRP can be integrated with JIT through the
  following steps.
Step 1: Reduce MRP buckets from weekly to daily
  to perhaps hourly.
Step 2: The planned receipts that are part of a firms
  planned orders in MRP system are
  communicated to the work areas for production
  purposes and use to sequence production.
Step 3: Inventory is moved through the plant on
  a JIT basis.
 Step 4: As products are completed, they are
  moved into inventory(typically finish goods
  inventory) in the normal way
 Step 5: A system known as back flush is used
  to reduce inventory balances.
 Back flushing uses the bill of material to
   deduct component quantities from inventory
   as each unit is completed.
3. Balance Flow Approach
   supports the planning and scheduling necessary
    for repetitive operations, such as the assembly
    line.
  Supermarket
      An inventory area that holds common items that
  are replenish by a kanban system.
Lot-for lot
A lot sizing technique that generates exactly
  what is required to meet the plan.
*With lot-for-lot, we order material only as it
needed. Once we have the ordering (setting up)
the cost of holding each unit for a given time
period, and the production schedule, we can
assign orders to our net requirements plan.
*When supply is reliable and frequent orders
are inexpensive, but holding cost or
obsolescence is high, lot- for-lot ordering can
be very efficient.
 Economic Order Quantity
     Statistical technique using averages(such
as average demand for a year)

Part Period Balancing (PPB)
      Is a more dynamic approach to balance set
up and holding cost. PPB uses additional
information by changing the lot size to reflect
the requirements of the next lot size in the
future.
 Material Requirements Planning II
*A system that allows with MRP in
place, inventory data to be augmented by other
resources variables.
*Most are tied into other computer software
that provide data to the MRP system or receive
data from the MRP system.
*Purchasing, production scheduling, capacity
planning, inventory, and warehouse
management are few examples of this data.
Capacity Planning
• is the process of determining the production
  capacity needed by an organization to meet
  changing demands for its products.
• is the maximum amount of work that an
  organization is capable of completing in a
  given period.
Example
      Kevin Watson, the production planner at
Wiz Products, needs to develop a capacity plan
for a work center. He has the production orders
shown below for the next 5 days. There are 12
hours available in the work cell each day. The
parts being produced require 1 hour each.
Day    1 2 3 4 5
Orders 10 14 13 10 14

Approach- Compute the time available in the
work center and the time necessary to
complete the production requirements.
       Capacity         Capacity       Utilization:
       Units    Required Available     Over/(Under)      Production
        New
   Day Ordered (hours) (hours) (hours) Planners Action   Production
                                                         Schedule
   1    10       10             12                 (2)
                         12
   2     14      14             12                 (2)   Split order: move 1
    unit to                                                         day 1
          12
   3     13      13             12                 (1)   Split order: move 1
                                                          unit to day 6
         13
                                                         or request overtime

   4    10       10             12                 (2)
                         12
   5     14       14            12                 2     Split order: move 2
    units to day 4       12
         61
Insight- By moving orders, the production
planner is able to utilize capacity more
effectively and still meet the order
requirements, with only 1 order produced on
overtime in day 3.
16




14




12




10



                         Series 3
8
                         Series 2
                         Series 1

6




4




2




0
     1   2   3   4   5
14




12




10




8

                         Series 3
                         Series 2
6                        Series 1




4




2




0
     1   2   3   4   5
Tactics for smoothing the load and minimizing the
impact of change lead time included the following:
 1. Overlapping- which reduces the lead
  time, sends pieces to the second operation
  before the entire lot is completed on the first
  operation.
 2. Operation Splitting sends the lot to different
  machines for the same operation. This involves
  an additional setup, but results in shorter
  throughput times, because only the part of the
  lot is processed on each machine.
 3. Order or, lot splitting, involves breaking up
  the order and running part of it earlier (or later)
  in the schedule.
 Summary
     MRP schedules production and inventory
when demand is dependent. For MRP to
work, management must have a master
schedule, precise requirements for all
components, accurate inventory and purchasing
record, and accurate lead time. Production should
often be lot-for-lot in MRP system. When properly
implemented, MRP can contribute in a major way
to reduction in inventory while improving customer
service level levels. MRP techniques allow
operation manager to schedule and replenish stock
on a need to order basis rather than simply a time-
to-order basis.

Contenu connexe

Tendances

manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
Dinesh Nikam
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
Akash Maurya
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
menonroopesh
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
Amalia Syafitri
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
Haider Alkaisy
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
Mostafa Ewees
 
4. materials requirement planning
4. materials requirement planning4. materials requirement planning
4. materials requirement planning
kunal.kakkad
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
ejalgfer
 

Tendances (20)

manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
 
Class assignment on mrp
Class assignment on mrpClass assignment on mrp
Class assignment on mrp
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
4. materials requirement planning
4. materials requirement planning4. materials requirement planning
4. materials requirement planning
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 

Similaire à Mrp ppt.

Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
varun0610
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.ppt
VELMURUGANM19
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flow
Shehzada Sohail
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
bagotjesusa
 

Similaire à Mrp ppt. (20)

Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
AGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxAGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptx
 
Scheduling
SchedulingScheduling
Scheduling
 
Rccp report
Rccp reportRccp report
Rccp report
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
 
schedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.pptschedulingandsequencing-140424065526-phpapp02__1_.ppt
schedulingandsequencing-140424065526-phpapp02__1_.ppt
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Lect 6.ppt
Lect 6.pptLect 6.ppt
Lect 6.ppt
 
Article final ivan f
Article final ivan fArticle final ivan f
Article final ivan f
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flow
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
End-to-end supply planning and execution with O8 DDMRPII™
End-to-end supply planning and execution with O8 DDMRPII™End-to-end supply planning and execution with O8 DDMRPII™
End-to-end supply planning and execution with O8 DDMRPII™
 
Supply_Chain_PP MOD
Supply_Chain_PP MODSupply_Chain_PP MOD
Supply_Chain_PP MOD
 
SCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docxSCM 304 Supply Chain Management Material Requirements .docx
SCM 304 Supply Chain Management Material Requirements .docx
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 
production scheduling
production schedulingproduction scheduling
production scheduling
 

Dernier

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 

Dernier (20)

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Mrp ppt.

  • 2. MRP Dynamics The inputs to MRP (the master schedule. BOM, lead times, purchasing, and inventory) frequently change. Conveniently, a central strength of MRP system is timely and accurate re-planning. These occur in two ways: by re computing (also known as regenerating) the requirement and schedule periodically, often weekly or a net change calculation. Net change in the MRP system means the MRP system creates new requirements in response to transactions.
  • 3. System Nervousness Frequent Changes in an MRP system Two tools are particularly helpful when trying to reduce MRP system nervousness.  1. Time Fences- allow a segment of the master schedule to be designated as not to re-scheduled  2. Pegging- means tracing upward in the BOM from the component to the parent item
  • 4. MRP and JIT  MRP does not do detailed scheduling it plans.  MRP will tell you that a job needs to be completed on a certain week or day  MRP is also a planning technique with fixed lead times.  MRP provides a plan and an accurate picture of requirements  JIT rapidly move material in small batches, reducing work in process inventory.
  • 5. FOUR APPROACHES ININTEGRATING MRP AND JIT 1. Finite Capacity Scheduling 2. Small Buckets 3. Balance Flow 4. Supermarkets
  • 6. 1.Finite Capacity Scheduling (FCS) Provides the precise scheduling needed for rapid material movement and also considers departments and machine capacity
  • 7. 2.Small Buckets-Units in a material requirements system MRP can be integrated with JIT through the following steps. Step 1: Reduce MRP buckets from weekly to daily to perhaps hourly. Step 2: The planned receipts that are part of a firms planned orders in MRP system are communicated to the work areas for production purposes and use to sequence production.
  • 8. Step 3: Inventory is moved through the plant on a JIT basis.  Step 4: As products are completed, they are moved into inventory(typically finish goods inventory) in the normal way  Step 5: A system known as back flush is used to reduce inventory balances.
  • 9.  Back flushing uses the bill of material to deduct component quantities from inventory as each unit is completed. 3. Balance Flow Approach  supports the planning and scheduling necessary for repetitive operations, such as the assembly line. Supermarket An inventory area that holds common items that are replenish by a kanban system.
  • 10. Lot-for lot A lot sizing technique that generates exactly what is required to meet the plan. *With lot-for-lot, we order material only as it needed. Once we have the ordering (setting up) the cost of holding each unit for a given time period, and the production schedule, we can assign orders to our net requirements plan. *When supply is reliable and frequent orders are inexpensive, but holding cost or obsolescence is high, lot- for-lot ordering can be very efficient.
  • 11.  Economic Order Quantity Statistical technique using averages(such as average demand for a year) Part Period Balancing (PPB) Is a more dynamic approach to balance set up and holding cost. PPB uses additional information by changing the lot size to reflect the requirements of the next lot size in the future.
  • 12.  Material Requirements Planning II *A system that allows with MRP in place, inventory data to be augmented by other resources variables. *Most are tied into other computer software that provide data to the MRP system or receive data from the MRP system. *Purchasing, production scheduling, capacity planning, inventory, and warehouse management are few examples of this data.
  • 13. Capacity Planning • is the process of determining the production capacity needed by an organization to meet changing demands for its products. • is the maximum amount of work that an organization is capable of completing in a given period.
  • 14. Example Kevin Watson, the production planner at Wiz Products, needs to develop a capacity plan for a work center. He has the production orders shown below for the next 5 days. There are 12 hours available in the work cell each day. The parts being produced require 1 hour each.
  • 15. Day 1 2 3 4 5 Orders 10 14 13 10 14 Approach- Compute the time available in the work center and the time necessary to complete the production requirements.
  • 16. Capacity Capacity Utilization:  Units Required Available Over/(Under) Production New  Day Ordered (hours) (hours) (hours) Planners Action Production  Schedule  1 10 10 12 (2) 12  2 14 14 12 (2) Split order: move 1 unit to day 1 12  3 13 13 12 (1) Split order: move 1 unit to day 6 13  or request overtime  4 10 10 12 (2) 12  5 14 14 12 2 Split order: move 2 units to day 4 12  61
  • 17. Insight- By moving orders, the production planner is able to utilize capacity more effectively and still meet the order requirements, with only 1 order produced on overtime in day 3.
  • 18. 16 14 12 10 Series 3 8 Series 2 Series 1 6 4 2 0 1 2 3 4 5
  • 19. 14 12 10 8 Series 3 Series 2 6 Series 1 4 2 0 1 2 3 4 5
  • 20. Tactics for smoothing the load and minimizing the impact of change lead time included the following:  1. Overlapping- which reduces the lead time, sends pieces to the second operation before the entire lot is completed on the first operation.  2. Operation Splitting sends the lot to different machines for the same operation. This involves an additional setup, but results in shorter throughput times, because only the part of the lot is processed on each machine.  3. Order or, lot splitting, involves breaking up the order and running part of it earlier (or later) in the schedule.
  • 21.  Summary MRP schedules production and inventory when demand is dependent. For MRP to work, management must have a master schedule, precise requirements for all components, accurate inventory and purchasing record, and accurate lead time. Production should often be lot-for-lot in MRP system. When properly implemented, MRP can contribute in a major way to reduction in inventory while improving customer service level levels. MRP techniques allow operation manager to schedule and replenish stock on a need to order basis rather than simply a time- to-order basis.