The Strategic Implementation of SharePoint © Hank Edwards 1
SharePoint is a strategic business oriented platform withpre-built sets of functionality that enable faster and less expensive creation of business solutions © Hank Edwards 2 The goal is to implement SharePoint not as a tool, but as a Strategic platform to enable faster realization of business improvement.
Broad and Deep © Hank Edwards 3 Some are intimidated by the depth and breadth of SharePoint and therefore do not know where to begin.
Successful, Measurable, Sustainable  © Hank Edwards 4 We want the implementation to be Successful,  the benefits measurable and the results sustainable.
Four Steps to Success © Hank Edwards 5 We will go over four steps to ensure that you have a strategic implementation of SharePoint.
Four Steps to Success 6 © Hank Edwards Align Strategically Where is the pain? Bang for the Buck Flawless Execution
Align Strategically © Hank Edwards 7 The project and the platform must be aligned strategically and be managed as such.
Business Strategy Align Strategically © Hank Edwards 8 Determine how the project and platform will positively impact the business strategy.
IT Strategic Fit Align Strategically © Hank Edwards 9 Is SharePoint a project or a pillar of the IT strategy?  Many organizations make SharePoint as a pillar along with ERP and CRM.
Measureable Business Impact Align Strategically © Hank Edwards 10 You must be able to define the measurable business impact and benefit.
Where Is The Pain? © Hank Edwards 11 Where do you start?  Start with the greatest pain.
Where Are You Falling Short? Where is the pain? © Hank Edwards 12 Which business processes are falling short of their potential and can be immediately improved through SharePoint?
If Only I Could??? Where is the pain? © Hank Edwards 13 How many times have you heard from the user community “If Only I Could…”?.
Shadow IT Where is the pain? © Hank Edwards 14 Many of the “Shadow IT” projects can be implemented by the businesses within the SharePoint platform.
It Takes Too Much Time Where is the pain? © Hank Edwards 15 Identify the processes that now take too much time and can be improved.
Bang For The Buck © Hank Edwards 16 Now that the opportunities have been defined, how do we pick the best one?  Obviously, go for the biggest Bank for the Buck.
Low Hanging Fruit Bang For The Buck © Hank Edwards 17 Pick those opportunities that can be easily implemented in SharePoint and that provide the biggest business benefit.
Focus Bang For The Buck © Hank Edwards 18 Stay focused and do not try to do too many things.  Get something up and running within 90 days!
Bang For The Buck © Hank Edwards 19 The Plan Prioritize, Prioritize, Prioritize.
Flawless Execution © Hank Edwards 20 The best planned project does not provide the best business benefits unless it is flawlessly executed.
Change Management Flawless Execution © Hank Edwards 21 Change management is more important in a SharePoint implementation because the way people do their work can be dramatically changed.
Phases © Hank Edwards 22 Flawless Execution Implement in phases to showcase the functionality and manage the scope.
Cultural Infusion Flawless Execution © Hank Edwards 23 Once others see the benefits, they will want to implement SharePoint for their function as well.
User Involvement Is Paramount Flawless Execution © Hank Edwards 24 Keep users involved at every step of the project.  Acceptance increases with increasing user involvement.  A= x(UI).
Governance Flawless Execution © Hank Edwards 25 Governance is critical in defining how SharePoint will be used, deployed, secured and managed.
Validate The Success Flawless Execution © Hank Edwards 26 Make sure you document and communicate the successes and business benefits.
Recap © Hank Edwards 27 So to recap….
Four Steps to Success Align Strategically Where is the pain? Bang for the Buck Flawless Execution 28 © Hank Edwards These are the four steps to a successful and strategic implementation of SharePoint.
In The End © Hank Edwards 29 When all four steps are done properly, then the puzzle comes together with measurable and sustainable business benefits.
30 © Hank Edwards
References 31 © Hank Edwards ,[object Object]
 Atkinson, C (2008) “beyond bullet points”
 Currey, B (2008) “Microsoft Office SharePoint Server Best Practices”

Contenu connexe

Tendances

Digital Project Management for Digital Humanities
Digital Project Management for Digital HumanitiesDigital Project Management for Digital Humanities
Digital Project Management for Digital Humanities
Shawn Day
 

Tendances (20)

Participatory Design: Bringing Users Into Your Process
Participatory Design: Bringing Users Into Your ProcessParticipatory Design: Bringing Users Into Your Process
Participatory Design: Bringing Users Into Your Process
 
Importance of agile manifesto.
Importance of agile manifesto.Importance of agile manifesto.
Importance of agile manifesto.
 
Rubber Meets the Road
Rubber Meets the RoadRubber Meets the Road
Rubber Meets the Road
 
Digital Project Management for Digital Humanities
Digital Project Management for Digital HumanitiesDigital Project Management for Digital Humanities
Digital Project Management for Digital Humanities
 
Building Better Products: Creating the "Right" Product Roadmap with Data
Building Better Products: Creating the "Right" Product Roadmap with DataBuilding Better Products: Creating the "Right" Product Roadmap with Data
Building Better Products: Creating the "Right" Product Roadmap with Data
 
Дмитро Горін “From project to product” Kharkiv Project Management Day
Дмитро Горін “From project to product” Kharkiv Project Management DayДмитро Горін “From project to product” Kharkiv Project Management Day
Дмитро Горін “From project to product” Kharkiv Project Management Day
 
Lean Startup in the Enterprise
Lean Startup in the EnterpriseLean Startup in the Enterprise
Lean Startup in the Enterprise
 
Hvorfor er digitale Kanban-tavler blevet så populære blandt projektledere?, M...
Hvorfor er digitale Kanban-tavler blevet så populære blandt projektledere?, M...Hvorfor er digitale Kanban-tavler blevet så populære blandt projektledere?, M...
Hvorfor er digitale Kanban-tavler blevet så populære blandt projektledere?, M...
 
Ritech Solutions - Innovation Furnace Client Paper
Ritech Solutions -  Innovation Furnace Client Paper Ritech Solutions -  Innovation Furnace Client Paper
Ritech Solutions - Innovation Furnace Client Paper
 
Lean Portfolio Management DevOps Helsinki
Lean Portfolio Management DevOps Helsinki Lean Portfolio Management DevOps Helsinki
Lean Portfolio Management DevOps Helsinki
 
Connecting Analytics to Strategy: Keeping Your Corporate Objective in Sight
Connecting Analytics to Strategy: Keeping Your Corporate Objective in SightConnecting Analytics to Strategy: Keeping Your Corporate Objective in Sight
Connecting Analytics to Strategy: Keeping Your Corporate Objective in Sight
 
Digital Project Management
Digital Project ManagementDigital Project Management
Digital Project Management
 
Designers, Developers & Dogs
Designers, Developers & DogsDesigners, Developers & Dogs
Designers, Developers & Dogs
 
Lean startup
Lean startupLean startup
Lean startup
 
Making the leap to Agile within Marketing: A practical success story
Making the leap to Agile within Marketing: A practical success storyMaking the leap to Agile within Marketing: A practical success story
Making the leap to Agile within Marketing: A practical success story
 
Robust Hybrid rather than Agile or Waterfall
Robust Hybrid rather than Agile or WaterfallRobust Hybrid rather than Agile or Waterfall
Robust Hybrid rather than Agile or Waterfall
 
The Dual-Track Agile UX Process at Dell EMC
The Dual-Track Agile UX Process at Dell EMCThe Dual-Track Agile UX Process at Dell EMC
The Dual-Track Agile UX Process at Dell EMC
 
Thinking more product: Moving from Scrum to a dual-track agile approach by Su...
Thinking more product: Moving from Scrum to a dual-track agile approach by Su...Thinking more product: Moving from Scrum to a dual-track agile approach by Su...
Thinking more product: Moving from Scrum to a dual-track agile approach by Su...
 
Overview of Lean Startup and FastWorks
Overview of Lean Startup and FastWorksOverview of Lean Startup and FastWorks
Overview of Lean Startup and FastWorks
 
Agile PMO - PM
Agile PMO - PMAgile PMO - PM
Agile PMO - PM
 

En vedette

Strategy Implementation
Strategy ImplementationStrategy Implementation
Strategy Implementation
Matt McClendon
 
Sharepoint 2010 implementation
Sharepoint 2010 implementationSharepoint 2010 implementation
Sharepoint 2010 implementation
Capgemini
 

En vedette (20)

Strategy Implementation
Strategy ImplementationStrategy Implementation
Strategy Implementation
 
Strategic Implementation
Strategic ImplementationStrategic Implementation
Strategic Implementation
 
Guiding a Successful SharePoint Implementation
Guiding a Successful SharePoint ImplementationGuiding a Successful SharePoint Implementation
Guiding a Successful SharePoint Implementation
 
Strategy implementation
Strategy implementationStrategy implementation
Strategy implementation
 
Sharepoint 2010 implementation
Sharepoint 2010 implementationSharepoint 2010 implementation
Sharepoint 2010 implementation
 
Strategic leadership - strategic implementation
Strategic leadership -  strategic implementationStrategic leadership -  strategic implementation
Strategic leadership - strategic implementation
 
NOW I Get It... What SharePoint Is, and Why My Business Needs It by Mark Rack...
NOW I Get It... What SharePoint Is, and Why My Business Needs It by Mark Rack...NOW I Get It... What SharePoint Is, and Why My Business Needs It by Mark Rack...
NOW I Get It... What SharePoint Is, and Why My Business Needs It by Mark Rack...
 
Lecture strategic management control
Lecture strategic management controlLecture strategic management control
Lecture strategic management control
 
Running SharePoint on Small Business Server: Pros and Cons - 100 Level
Running SharePoint on Small Business Server: Pros and Cons - 100 LevelRunning SharePoint on Small Business Server: Pros and Cons - 100 Level
Running SharePoint on Small Business Server: Pros and Cons - 100 Level
 
Winning Markets Through Strategic Planning, Implementation, and Control
Winning Markets Through Strategic Planning, Implementation,  and ControlWinning Markets Through Strategic Planning, Implementation,  and Control
Winning Markets Through Strategic Planning, Implementation, and Control
 
Sharepoint 2013 Overview
Sharepoint 2013 OverviewSharepoint 2013 Overview
Sharepoint 2013 Overview
 
Top 8 things you didn’t know SharePoint could do: Turbocharging your SharePoi...
Top 8 things you didn’t know SharePoint could do: Turbocharging your SharePoi...Top 8 things you didn’t know SharePoint could do: Turbocharging your SharePoi...
Top 8 things you didn’t know SharePoint could do: Turbocharging your SharePoi...
 
Clockwork 2013 - SharePoint overview
Clockwork 2013 - SharePoint overviewClockwork 2013 - SharePoint overview
Clockwork 2013 - SharePoint overview
 
Strategic implementation - strategic management - Manu Melwin Joy
Strategic implementation -  strategic management - Manu Melwin JoyStrategic implementation -  strategic management - Manu Melwin Joy
Strategic implementation - strategic management - Manu Melwin Joy
 
SharePoint 2013 Insights
SharePoint 2013 InsightsSharePoint 2013 Insights
SharePoint 2013 Insights
 
SharePoint Governance - No one should carry the burden alone
SharePoint Governance - No one should carry the burden aloneSharePoint Governance - No one should carry the burden alone
SharePoint Governance - No one should carry the burden alone
 
Sharepoint Overview
Sharepoint OverviewSharepoint Overview
Sharepoint Overview
 
Strategic implementation (chapter 9) pp
Strategic implementation (chapter 9) ppStrategic implementation (chapter 9) pp
Strategic implementation (chapter 9) pp
 
Strategic implementation
Strategic implementationStrategic implementation
Strategic implementation
 
Maximize business productivity with Microsoft Dynamics CRM and Office 365
Maximize business productivity with Microsoft Dynamics CRM and Office 365 Maximize business productivity with Microsoft Dynamics CRM and Office 365
Maximize business productivity with Microsoft Dynamics CRM and Office 365
 

Similaire à Strategic Sharepoint Implementation

RITMIQ
RITMIQRITMIQ
RITMIQ
Mesh
 
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case StudyHITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
Edward Gould
 

Similaire à Strategic Sharepoint Implementation (20)

RITMIQ
RITMIQRITMIQ
RITMIQ
 
Benefits of Moving HR to the Cloud
Benefits of Moving HR to the CloudBenefits of Moving HR to the Cloud
Benefits of Moving HR to the Cloud
 
Notes Migrations Don't Have to be Hard
Notes Migrations Don't Have to be HardNotes Migrations Don't Have to be Hard
Notes Migrations Don't Have to be Hard
 
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case StudyHITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
HITACHI DATA SYSTEMS ENHANCES PROJECT PROVISION Acando Case Study
 
Driving User Adoption for SharePoint
Driving User Adoption for SharePointDriving User Adoption for SharePoint
Driving User Adoption for SharePoint
 
2014 strategic execution conference ensuring tangible business outcomes thr...
2014 strategic execution conference   ensuring tangible business outcomes thr...2014 strategic execution conference   ensuring tangible business outcomes thr...
2014 strategic execution conference ensuring tangible business outcomes thr...
 
HPE Software at Discover 2016 London 29 November—1 December
HPE Software at Discover 2016 London 29 November—1 DecemberHPE Software at Discover 2016 London 29 November—1 December
HPE Software at Discover 2016 London 29 November—1 December
 
Power User functionality in SharePoint 2013 - SP Intersection
Power User functionality in SharePoint 2013 - SP IntersectionPower User functionality in SharePoint 2013 - SP Intersection
Power User functionality in SharePoint 2013 - SP Intersection
 
Project Management Nightmares For Startups By Rahul Sudame
Project Management Nightmares For Startups By Rahul SudameProject Management Nightmares For Startups By Rahul Sudame
Project Management Nightmares For Startups By Rahul Sudame
 
Whitepaper: How to Increase User Adoption for SharePoint Sites - Happiest Minds
Whitepaper: How to Increase User Adoption for SharePoint Sites - Happiest MindsWhitepaper: How to Increase User Adoption for SharePoint Sites - Happiest Minds
Whitepaper: How to Increase User Adoption for SharePoint Sites - Happiest Minds
 
Establishing a Collaboration Roadmap - SPFestSeattle
Establishing a Collaboration Roadmap - SPFestSeattleEstablishing a Collaboration Roadmap - SPFestSeattle
Establishing a Collaboration Roadmap - SPFestSeattle
 
Avoid Collapse: Build Your Intranet Foundation The Right Way - ILTACON
Avoid Collapse: Build Your Intranet Foundation The Right Way - ILTACONAvoid Collapse: Build Your Intranet Foundation The Right Way - ILTACON
Avoid Collapse: Build Your Intranet Foundation The Right Way - ILTACON
 
How to Plan and Manage SharePoint Projects #hkspc
How to Plan and Manage SharePoint Projects #hkspcHow to Plan and Manage SharePoint Projects #hkspc
How to Plan and Manage SharePoint Projects #hkspc
 
Lean Development Practices for Enterprise Agile
Lean Development Practices for Enterprise AgileLean Development Practices for Enterprise Agile
Lean Development Practices for Enterprise Agile
 
Cedar Day 2018 - How to Create Business Value from Your PeopleSoft HCM Techno...
Cedar Day 2018 - How to Create Business Value from Your PeopleSoft HCM Techno...Cedar Day 2018 - How to Create Business Value from Your PeopleSoft HCM Techno...
Cedar Day 2018 - How to Create Business Value from Your PeopleSoft HCM Techno...
 
Managing the SharePoint disruption : Ensuring the business gain exceeds the b...
Managing the SharePoint disruption : Ensuring the business gain exceeds the b...Managing the SharePoint disruption : Ensuring the business gain exceeds the b...
Managing the SharePoint disruption : Ensuring the business gain exceeds the b...
 
Power to the People! Shifting from Project to Product with Tasktop Viz
Power to the People! Shifting from Project to Product with Tasktop VizPower to the People! Shifting from Project to Product with Tasktop Viz
Power to the People! Shifting from Project to Product with Tasktop Viz
 
Agiles Sales Methodology English March 2015
Agiles Sales Methodology English March 2015Agiles Sales Methodology English March 2015
Agiles Sales Methodology English March 2015
 
Developing a Modernization Strategy: Evaluating the Options by Chris Koppe
Developing a Modernization Strategy: Evaluating the Options by Chris KoppeDeveloping a Modernization Strategy: Evaluating the Options by Chris Koppe
Developing a Modernization Strategy: Evaluating the Options by Chris Koppe
 
SharePoint partnership.
SharePoint partnership.SharePoint partnership.
SharePoint partnership.
 

Strategic Sharepoint Implementation

  • 1. The Strategic Implementation of SharePoint © Hank Edwards 1
  • 2. SharePoint is a strategic business oriented platform withpre-built sets of functionality that enable faster and less expensive creation of business solutions © Hank Edwards 2 The goal is to implement SharePoint not as a tool, but as a Strategic platform to enable faster realization of business improvement.
  • 3. Broad and Deep © Hank Edwards 3 Some are intimidated by the depth and breadth of SharePoint and therefore do not know where to begin.
  • 4. Successful, Measurable, Sustainable © Hank Edwards 4 We want the implementation to be Successful, the benefits measurable and the results sustainable.
  • 5. Four Steps to Success © Hank Edwards 5 We will go over four steps to ensure that you have a strategic implementation of SharePoint.
  • 6. Four Steps to Success 6 © Hank Edwards Align Strategically Where is the pain? Bang for the Buck Flawless Execution
  • 7. Align Strategically © Hank Edwards 7 The project and the platform must be aligned strategically and be managed as such.
  • 8. Business Strategy Align Strategically © Hank Edwards 8 Determine how the project and platform will positively impact the business strategy.
  • 9. IT Strategic Fit Align Strategically © Hank Edwards 9 Is SharePoint a project or a pillar of the IT strategy? Many organizations make SharePoint as a pillar along with ERP and CRM.
  • 10. Measureable Business Impact Align Strategically © Hank Edwards 10 You must be able to define the measurable business impact and benefit.
  • 11. Where Is The Pain? © Hank Edwards 11 Where do you start? Start with the greatest pain.
  • 12. Where Are You Falling Short? Where is the pain? © Hank Edwards 12 Which business processes are falling short of their potential and can be immediately improved through SharePoint?
  • 13. If Only I Could??? Where is the pain? © Hank Edwards 13 How many times have you heard from the user community “If Only I Could…”?.
  • 14. Shadow IT Where is the pain? © Hank Edwards 14 Many of the “Shadow IT” projects can be implemented by the businesses within the SharePoint platform.
  • 15. It Takes Too Much Time Where is the pain? © Hank Edwards 15 Identify the processes that now take too much time and can be improved.
  • 16. Bang For The Buck © Hank Edwards 16 Now that the opportunities have been defined, how do we pick the best one? Obviously, go for the biggest Bank for the Buck.
  • 17. Low Hanging Fruit Bang For The Buck © Hank Edwards 17 Pick those opportunities that can be easily implemented in SharePoint and that provide the biggest business benefit.
  • 18. Focus Bang For The Buck © Hank Edwards 18 Stay focused and do not try to do too many things. Get something up and running within 90 days!
  • 19. Bang For The Buck © Hank Edwards 19 The Plan Prioritize, Prioritize, Prioritize.
  • 20. Flawless Execution © Hank Edwards 20 The best planned project does not provide the best business benefits unless it is flawlessly executed.
  • 21. Change Management Flawless Execution © Hank Edwards 21 Change management is more important in a SharePoint implementation because the way people do their work can be dramatically changed.
  • 22. Phases © Hank Edwards 22 Flawless Execution Implement in phases to showcase the functionality and manage the scope.
  • 23. Cultural Infusion Flawless Execution © Hank Edwards 23 Once others see the benefits, they will want to implement SharePoint for their function as well.
  • 24. User Involvement Is Paramount Flawless Execution © Hank Edwards 24 Keep users involved at every step of the project. Acceptance increases with increasing user involvement. A= x(UI).
  • 25. Governance Flawless Execution © Hank Edwards 25 Governance is critical in defining how SharePoint will be used, deployed, secured and managed.
  • 26. Validate The Success Flawless Execution © Hank Edwards 26 Make sure you document and communicate the successes and business benefits.
  • 27. Recap © Hank Edwards 27 So to recap….
  • 28. Four Steps to Success Align Strategically Where is the pain? Bang for the Buck Flawless Execution 28 © Hank Edwards These are the four steps to a successful and strategic implementation of SharePoint.
  • 29. In The End © Hank Edwards 29 When all four steps are done properly, then the puzzle comes together with measurable and sustainable business benefits.
  • 30. 30 © Hank Edwards
  • 31.
  • 32. Atkinson, C (2008) “beyond bullet points”
  • 33. Currey, B (2008) “Microsoft Office SharePoint Server Best Practices”
  • 34.
  • 35. Hank is a SharePoint strategy consultant with Abel Solutions, Inc.
  • 36. Abel Solutions, Inc. is the premier SharePoint consultancy group in the Atlanta area.hedwards@abelsolutions.com Phone: 678-467-9259 Twitter: @hankedwards
  • 37.
  • 39. Information Worker (IW) and Collaborative Solutions based on Microsoft SharePoint technologies.
  • 40. Business Process Automation Solutions based on Microsoft .NET Framework.

Notes de l'éditeur

  1. Welcome to this session on how to implement SharePoint as a strategic solution.Finally, this is a high level presentation and we will quickly go through the four steps on how to ensure a strategic implementation of SharePoint.Our objective is for you to come away from this session with at least one Ah, Ha, that you can take back and apply. If we are successful, then the session has been worthwhile.One study indicated that > 60% of organizations are implementing SharePoint, but how many do you think will be successful or for that matter strategic.Implementing the deep and broad functionality of SharePoint so that it has a strategic impact is not as simple as throwing up a few SharePoint sites.
  2. The goal is for you to have a strategic implementation and one that is aligned with the business and IT objectives and will continue to be funded.The benefits are measureable.SharePoint is a strategic business oriented platform withpre-built sets of functionality that enables faster and less expensive creation of business solutions.
  3. The challenge that faces many organizations is that they do not know where to start because:SharePoint is broad and deep in its functionality (even more so with 2010)Everybody wants a piece of the functionality NOW!Teams want to implement a bit of all of the functionalityLimited in-house expertise
  4. The goalEverybody wants a successful implementation that produces measureable business benefits and that is sustainable from an ongoing funding perspective.The real question is how to get there.Remember successful means on-time, on-budget and on-spec.Projects can be on-time, on-spec and on-budget, but the project should also provide measurable business benefits.
  5. We will lay out 4 key steps that you can take to ensure a successful strategic implementationOk, so let’s get started
  6. Align Strategically: First, you have to determine how the project fits within the overall business and IT strategic plans. Jumping into a SharePoint project without having an understanding of how it impacts the business drivers is setting the project up to be less than optimal. Management needs to understand the importance of the project and potential positive impact on business processes so that they can champion and support the change management efforts that will be requiredWhere Is The Pain?: What business problems are to be solved. Identification of areas of improvement is key to solving the most painful issues.Bang For The Buck: SharePoint is deep and broad . It is often difficult for organizations to assimilate everything that SharePoint has to offer in one big project. Therefore, focus and prioritization are key.Flawless Execution: The first three steps concern planning and are not worth anything if the execution of the project is flawed. Keep the scope reasonable and implement with zeal, tight project management and complete business involvement.We are next going to go into more detail in each of the four key success factors.
  7. Transition slide to first key point:Align the project with the Business Strategy, and the IT Strategy to achieve the biggest benefit.A project that is not aligned with the business and IT strategy, will have limited impact and therefore limited success and sustainability.In your organization, is SharePoint a pillar of the strategy or just a project?
  8. Do you know your business drivers? What are the key strategies?How can the project impact the business strategy?:For example:Improved product development cycleFacilitate acquisitionsReduce marketing expenseImproved operational efficiency via improvements in business processesImproved internal communication and collaborationImproved business intelligence and reportingExamplesDistribution portal to improve efficiency in distributor relations. This is a business process change enabled by SharePointReplacement of expensive customized system to manage remote locations with SharePoint system with increase functionalitySupport for new product introduction Streamline business processes so that additional acquisitions can be made more easily.Improve global team effectiveness by improving the sharing of knowledge and best practices across a globally disperse organization
  9. How does the project fit within the overall IT strategy.The enlightened organizations places SharePoint alongside their ERP, CRM and Messaging system to create a four legged strategy.If the project does not fit within the IT strategy, then funding will be difficult and the full potential of SharePoint will not be realized. We have seen where SharePoint has been implemented internally by an IT department, however, with limited success.Pillar or Project?
  10. We keep talking about the business benefit. It is key to ;First define the business metrics, i.e. reduce customer call backs, quicker delivery of projects, less re-design.Then assign a value to what you think the improvement is worthLastly, measure it after implementationFor example:We will reduce the amount of time it takes to hire new consultants and integrate them within the organization by 25% with 50% fewer errors?We will reduce the cycle time on new product development by 10%.We will capture the total cost of quality from customer complaints.If you have identified a business metric and proven that you have significantly and positively impacted that metric, then on-going funding and support for the project will continue.
  11. Transition Slide to next key point: Now that we have talked about alignment, we need to discuss identifying the opportunities. Many organizations just implement the SharePoint environment without doing the proper amount of planning. We need to first identify the pains points so that we can prioritize the implementationIt is good to look at the pain points through the lens of the capabilities of SharePoint. This is even more important with the new functionality and improvements of 2010. For example, knowing the capabilities of out-of-the box workflow, can help you identify an opportunity that could benefit from workflow enable process.How many of you are overwhelmed by opportunities?
  12. What business processes are falling short of being as efficient as they can be?Are there many areas that require multiple layers of approvals and process flow steps.An example : We had one company that needed to implement a customer complaint / quality management system. However, they were not sure that they had a problem big enough to warrant a $50k system. We built a simple pilot using a SharePoint issues tracking list for just a couple of days of effort. The system is now part of their normal business process. It is strategic, because they can now identify the true cost of quality.
  13. Collect anecdotal evidence from departments that say; If I could only share this excel file with multiple people, it would save me loads of time. If I could fill out this form electronically and send it to my boss for approval, that would save me a lifetime. If I could complete this policy and send it out for approval and once it is approved, then it is distributed to everyone automatically, then you would be my hero.However, your may not find these kind of remarks unless people are familiar with the “state of the possible”, so you may have to lead them.
  14. One of they main reasons for implementing SharePoint is to avoid the “one off” solutions that many users are requesting and in some cases provisioning themselves. Often times IT is so constrained with resource limitations, that users create their own solutions.How often have you heard, If I could have an access data base?Once properly implemented with the right amount of governance, then users can create their own solutions within a controlled and secure environment. The benefits are that IT backlog is reduced and business users have their solution.
  15. Identify those processes that seem to take way too much time. For example, it takes too much time for capital expenditures to get approved because the document is stuck in someone’s inbox. Or it takes too much time for me to work with all of the people who need to have input on the policy .Every time we update our marketing collateral, we have to burn CDs and send these our to our sales force and distributors.I do not like pushing technology onto a business solution, however, much of the time, the business people are not even aware that there is a better alternative.Again, you may have to lead them to the “state of the possible” through targeted pilots.
  16. Transition Slide:Now that we have: 1.) Aligned with the business and IT strategy, and 2.) identified all of the opportunities; it is time to sift through those opportunities and prioritize those that generate the largest business benefit for the least amount of effort.
  17. Because with SharePoint, there is so much out of the box functionality, it is easy to identify opportunities that can be solved with very little effort.Examples: Document libraries with simple approval workflows and document versioning. Convert excel files updated across department into SharePoint Lists. Updating policies and procedures manuals. With versioning, only the most recent updated version is available for public consumption. Marketing collateral with properly maintained file properties (metadata) Simple project management with issues and task list
  18. Focus on the key opportunities and do not let scope creep get you off track .Do not try to capture all of the opportunities. Focus on those that drive business value.I t is really hard to stay focused when there are some many opportunities available. I have seen implementations that were not as successful as they could have been, because they wanted to do to much
  19. Ultimately, you want to come up with a list of opportunities and then prioritize those opportunities based on those that provide the most business value for the least effort.This slide shows how many organization align their opportunities by looking for those that provide the biggest business impact with the least amount of effort. This chart is similar to “portfolio charts” used in managing a portfolio of projects. That is exactly what we are doing here. Upper right corner are the opportunities to tackle first.Now this can be customized to meet your organization’s strategy. You may have a burning need in one department or maybe you want to focus on a particular cross departmental process.
  20. Transition Slide to last key point:So far, we have talked about : 1.) Alignment, 2.) Identifying the opportunities and 3.) Prioritizing which opportunities can be solve with SharePoint. These are all planning task and help set up a project for success. However, ultimately, the implementation must be flawlessly executed. I can’t tell you how many projects I have seen that had the best alignment and prioritization, but we not well executed.
  21. Change Management: Simple concept but hard to do well.Everybody talks about change management, but few control it properly, and therefore, project success is limited. A lot of time and money can be spent on project implementation. It is sad when the project benefits are not fully realized, due to the simple problem of getting people to change their behavior and to change the way they do their day to day work . Day long courses have been developed for this topic alone. In my opinion, it is the most important aspect of a flawlessly executed project. A good book is Switch by Dan Heath.
  22. Don’t try to boil the ocean. Implement in phases Start off with a small focused project that will provide cross functional benefits and that can showcase the basic capabilities.A phased approach will also help you control the “change management” aspects of convincing people to do something differently, and to control the assimilation of the new functionality. How often have projects failed because it was just too big to be assimilated within the current processes and work load.Get something up and running within 3 months!
  23. This is a little used phrase of building a successful pilot or small focused project and showcasing the functionality and business benefit. Typically, we talk about pilot projects.If done well, other departments will want the same functionality and will be willing to support it for their project.Be sure to have a business partner involved that can help drive the success of the pilot and can expound upon its virtues to their colleagues.
  24. User involvement is paramount especially during implementation. Many times a user thinks that they have done their job once they have described their requirements. They have to be involved in the iterative development so as to ensure their needs are met.I can’t tell you the number of times that users will ask for something, but then will not have time to flesh out a prototype to ensure it meets their needs.Get their commitment up front. This is a partnership!
  25. Governance is like change management. It is one of those words or phrases that everybody talks about , but few do well.Because of the ability for users to have a certain amount of control over their own SharePoint environment , governance is even more important for a SharePoint project than other projects. Governance includes such concepts as:Do we implement MySites or not?How to manage the request for new sites or new functionality?How to manage content approval?How to manage user security?Can users customize their pages?How to handle document libraries that are owned by one department, but need to be shared across departments?How to manage the different metadata or column properties? Are departments, divisions, business etc. units that same across the entire environment? In one implementation we saw the recreation of the same metadata many times, because the team wanted to move fast and not wait on the other departments to agree.How to manage the underlying infrastructure?We have some good government checklist available as SharePoint list to help you manage governance efforts.
  26. Finally, validate that the business benefits mentioned in the first section are realized.One thing that I always wanted to do but never found the time was to generate internal case studies for business/IT projects. You know when you are checking out a new product or supplier, you ask for case studies. Wouldn’t it be great if we did that for internal projects. I know that the more mature organizations may do this within their portfolio management process, however, I think that it would be good to have a success document library in the SharePoint site so that others can learn from your success.
  27. Transition Slide to the RecapWe first started talking about the challenges of how best to implement the breadth and depth of the SharePoint functionality in a manner that has a strategic impact on the organization.
  28. We introduced the Four Key Steps to Success and then went into detail on each one.
  29. And if followed, you will have a completed project that provides the business with the benefits to help them meet their strategic objectives. In other words, a strategic implementation.