SlideShare une entreprise Scribd logo
1  sur  21
INDIAN RAILWAY
" Lifeline Of The Nation "

PRESENTATION

ON
RAILWAY SHASHIKANT CHOUDHARY
BY- COACHES
10ERIME053


INTRODUCTION



MAINTENANCE SCHEDULES



WHEEL PROFILE & DEFECTS



TYPE OF COACH



AXLE , BRAKE DISC & BRAKE SHOES



AIR BRAKE SYSTEM



BOGIE FRAME



BODY SHELL & WINDOW UNIT



WATER TANKS



CDTS
-: INDIAN RAILWAY :www.indianrailways.gov.in

First passenger train introduced in India on 16 April 1853 between Mumbai to
Thane (34 km).
Over 10,000 trains daily, transporting over 8,900 million passengers and over
1050 million tones of freight per year.
Indian Railways is the world's ninth largest organisation, by number of
employees, with over 1.4 million employees.

The number of zones in Indian Railways increased from six to eight in 1951,
nine in 1952 and sixteen in 2003. Presently there are 17 zones & 84 divisions.
As of 31 March 2013, 23,541 km (36%) of the total 65,000 km route length was
electrified.
Name
Central Railway
Eastern Railway
East Central Railway
East Coast Railway
Konkan Railway
Northern Railway
North Central Railway
North Western Railway
North Eastern Railway

Abbr.
CR
ER
ECR
ECoR
KR
NR
NCR
NWR
NER

Headquarters
Mumbai
Kolkata
Hajipur
Bhubaneswar
Panvel
Delhi
Allahabad
Jaipur
Gorakhpur

Northeast Frontier Railway

NFR

Maligaon(Guwahati)

Southern Railway
South Central Railway
South Eastern Railway
South East Central Railway

SR
SCR
SER
SECR

Chennai
Secunderabad
Kolkata
Bilaspur, CG

South Western Railway

SWR

Hubli

Western Railway
West Central Railway
Kolkata Metro

WR
WCR
KMR

Mumbai
Jabalpur
Kolkata
-: Coach Repair Workshop, Harnaut :Foundation stone was laid by A.P.J. Abdul Kalam on
June 30, 2003
Site location

-

Harnaut, Distt- Nalanda (Bihar) ,under ECR

Total Land

-

113 Acres (workshop 76 , staff quarters 37)

Year of sanction

-

2003-04

Sanctioned Cost

-

Rs. 224 Cores.

Revised sanctioned Cost

-

Rs. 337 Cores.

Expenditure

-

Rs 252.03 Cores. (up to 31.03.13 )

Plant Capacity

-

POH of 50 coaches per month

Sanctioned staff

-

1158
-: THE MAINTENANCE SCHEDULES AND THE OVERHAULING PERIODS :1. Trip schedule- After every trip by primary
maintenance depot.
2. Schedule A - Monthly (1 month )
3. Schedule B - Quarterly (3 months )
4. IOH – 9 months
5. POH – 18 months

> POH <

Periodic overhauling is the best available process of maintenance of coaches in India. This
generally operated after 18 months after the manufacturing or the previous periodic
overhauling done in any workshop. This undergoes a huge process of lifting the coach,
isolating the all parts, and changing or replacing the necessary or damaged parts. In other
words this is the process of renewing the coaches.

-It stands for periodic overhauling.
-POH is allowed in nominated workshops only.
-Painting of whole coach is necessary.
-Profiling of wheel is necessary
-: WHEEL
PROFILE :-

-: DEFECTS :Thin Flange :- When the flange thickness reduces from 28.5 mm to 16 mm or less, then the
flange is called thin flange.

Sharp Flange :- When the radius given at the tip of flange is worn out from 14.5mm
to 5 mm or less is called Sharp Flange.
Thin Tyre :- If the remaining thickness of tyre is less than 25 mm, it is called thin tyre.
Hollow Tyre :- If the groove on the wheel tread is up to 5 mm or more, it is called Hollow tyre
Tyre defect gauge

THIN FLANGE

SHARP
FLANGE

THIN TYRE

HOLLOW TYRE
COACH
L.H.B.

I.C.F.
Integral coach
factory
140 km/h
Noise level 100 decibels

Linke Holfmann Busch
160 km/h
Noise level 60 decibels

DIMENSIONS OF COACH SHELL

ICF
LHB
Length With Buffer
24000 mm
21336 mm
Width

22296 mm
Length Without Buffer
23540 mm
3245 mm
-: AXLE :-

It is the main long cylindrical bar on which bogie are fixed with the help of bearings. This
is made of steel as above. Each axle contains 2 wheels, the brake cylinders are also
attached to it and in case of LHB coaches, the braking discs are fixed on to the axle.

The axle mounted brake disc consists of a gray cast iron friction
ring and a cast steel hub, connected by means of radially
arranged elastic resilient sleeves which are secured in the hub by
means of hexagon screws. The friction ring is manufactured as a
solid component or in a split version. In the latter case, the two
halves are held together by two tight –fit screws.

DISC
-: AIR BRAKE SYSTEM

: The brake system in which compressed air is used in the brake
cylinder for the application of brakes is called air brake system.

MAIN COMPONENTS :Control Reservoir 9 liter, 5 kg/cm2
Brake pipe – Dia. 32 mm

Auxiliary Reservoir 200 liter, 6 kg/cm2
Feed Pipe – Dia. 25 mm
-: Working Principle :The different processes involved in working :a) Charging
b) Application
c) Release
 Under normal conditions the Brake pipe is charged with 5kg/cm2 from the
loco. The control reservoir and the Auxiliary reservoir are charged with 5
kg/cm2 and 6 kg/cm2 respectively from BP through Distributor valve.

 When the brake pipe is charged at 5 kg/cm2 the brake cylinder is connected
to exhaust through distributor valve in order to keep the brake in released
position fully.
 Whenever the brake pipe pressure is reduced below the CR pressure, the
DV connects the auxiliary reservoir with the brake cylinder and the air from
AR is sent into the brake cylinder to apply the brake.
 Whenever the brake pipe pressure is equal to CR pressure the DV
disconnects the BC from AR and in turn connects the BC with Exhaust for the
release of brakes fully.
-: BRAKE SHOE :The brake shoe is provided with a brake
pad holder carrying replaceable pads.
The brake shoe consists of the brake pad
holder, the vertical pins and the brake pad.
Due to BC pressure, the piston moves
forward and strikes against the brake caliper.
The lever arm of the brake caliper presses
onto the disc brake through the brake shoe.
The disc brakes are mounted on the wheel
axle and so rotate along with the wheels.
Due to application of brake shoes, the discs
begin to lose their angular speed.
As a result the axle also begins to slow down
since the two are connected.
Ultimately, the wheels stop rotating as they
are mounted on the same axle.

SHOES
-: BOGIE FRAME :1.Bogie frame longitudinal component
2. Cross-beam

The frame is made up of two
longitudinal
components
(1)
connected by two cross-beams (2)
which also support the brake units.
The various supports which connect
the different bogie components are
welded to the frame.
-: BODY SHELL :The body shell is of integral light weight
construction consisting of separate
assembly group for under frame, side
wall, roof and end wall. The individual
assemblies are joint to each other by
welding. Three types of steel are used for
manufacture of body shell.

Steels used
shell
and their
Assemblies compositions
Side wall,
End wall
and Roof
structure
Roof sheet
and Trough
floor

X2 Cr8 Ferritic Steel
(SS 409M)
( C< .03%, Cr 1012%, Si 1%, Mn
1.5%)

X5 CrNi 18 10
Austenitic Steel (SS
304)

UTS

N/mm2

Yield
Stress
N/mm2

450600

320

700850

235

440480

320

( C< .07%, Cr 18%,
Ni 10 % Si 1%, Mn
2%)

Under frame
IRS M-41 / Corten
Steel
( C < .01%, Cr .35 .6%, Ni .2 - .4%
Cu .3 - .6% Si .3 .7%, Mn .25%)
-: WINDOW UNITS :-

The sealed window units consist of 8.4 mm outer glass
and 4 mm inner glass with 6 mm Argon gas filled.




Argon is an inexpensive, non-toxic,
odorless gas .
 It
increase
sound
proofing
characteristics of the window.

 Minimizes heat exchange through
the window.
 Argon will not corrode the window
material.
 This type of windows can even
block ultraviolet rays.
-: Controlled Discharge Toilet System (CDTS) :Objective: -The main objective of introducing this type of
lavatories in coaches of Indian Railways to have clean environment
around Railway Track within city limits, station premises and
maintenance sidings. This system works on electro- pneumatic
principle where in, the waste generated from the coach lavatories
during run is collected in a retention tank and is disposed off far
away from the city limits on meeting certain predefined conditions.

-: Working cycle :  On each flushing (Collection):- Simply pressing flush
button, starts the flow of water into the toilet bowl and opens
the flapper valve connecting the toilet bowl to the waste
retention tank. At the end of each flush cycle the wash water
stops and the toilet is sealed off from the retention tank by the
flapper valve, which acts as an effective stench trap,
preventing odor from entering in the toilet room.
The retention tank discharge valve remains open only for a
small period of time (one minute or less) long enough to
The waste is stored in the retention
tank until the following two parameter
are satisfied.

1) The train should be in acceleration &
running above 30kmph and the number
of flushing should be More than five.
2) Train should be in retardation and
reducing speed of 30kmph irrespective
number of flushes.
Water consumption is only 2.5 liters per
flush cycle for the Indian style toilet Bowl
and 1.5 liters for the European style toilet
Bowl.

Programmable Logic Controller
(PLC):-

It is the heart of the system. It
senses the speed of the coach and
no of flushes and gets all the
operations done by actuating
corresponding valves.
-:WATER
3 types of TANKS :- are provided in LHB coach
water tanks

685 liters: -2 stainless steel water tanks of 685 liters capacity
each. These tanks are installed in under frame are fixed with
frames and are secured by safety belts. These tanks constitute
the fresh water reserves in the passenger coaches. Water level
indicator has been provided in these tanks.

30 liters:- 3-stainless steel water tanks of 30 liters
capacity installed one in each lavatory in the roof and are
continuously fresh-water-fed by means of pumps. These
tanks are installed alone and are fixed with 2 supports
which are equipped with belts.
450 liters: -One stainless steel water tanks of 450 liters capacity.
These tanks are installed in under frame, fixed with frames and is
secured by safety belts. This tank installed in the under frame
constitute the fresh water reserves for the generator car.
Thank You For your time
ANY QUERY….

Contenu connexe

Tendances

Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
Rao Khola
 

Tendances (20)

STUDY OF ICF BOGIE
STUDY OF ICF BOGIESTUDY OF ICF BOGIE
STUDY OF ICF BOGIE
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway Coaches
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coaches
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE) SUMMER TRAINING PPTOnCoach Care Centre (SICK LINE)
SUMMER TRAINING PPT On Coach Care Centre (SICK LINE)
 
Railway braking system
Railway braking systemRailway braking system
Railway braking system
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
 
Coach care centre new delhi
Coach care centre new delhiCoach care centre new delhi
Coach care centre new delhi
 
Casnub Bogies
Casnub BogiesCasnub Bogies
Casnub Bogies
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Training report
Training reportTraining report
Training report
 
Railway coaching depot report
Railway coaching depot reportRailway coaching depot report
Railway coaching depot report
 
Fiat bogie
Fiat bogieFiat bogie
Fiat bogie
 
Air brake system in indian railways
Air brake system in indian railwaysAir brake system in indian railways
Air brake system in indian railways
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
G-97 Manual
G-97 ManualG-97 Manual
G-97 Manual
 

Similaire à PPT on Indian railway (LHB coaches)

abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
Palash Awasthi
 
amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
AryanYadav924184
 

Similaire à PPT on Indian railway (LHB coaches) (20)

Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
Presentation on Coach Care Complex
Presentation on Coach Care ComplexPresentation on Coach Care Complex
Presentation on Coach Care Complex
 
Aniket rathore
Aniket rathoreAniket rathore
Aniket rathore
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur ppt
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
abes engineering college ghaziabad
abes engineering college  ghaziabadabes engineering college  ghaziabad
abes engineering college ghaziabad
 
A project on buffer
A project on bufferA project on buffer
A project on buffer
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
 
Dlw training session
Dlw training sessionDlw training session
Dlw training session
 
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOPINTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
INTERNSHIP REPORT...LOWERPAREL CARRIAGE WORKSHOP
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
amitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptxamitppt_151004200417_lva1_app6891_(1).pptx
amitppt_151004200417_lva1_app6891_(1).pptx
 
L.H.B. Coaches
L.H.B. CoachesL.H.B. Coaches
L.H.B. Coaches
 
summertraining at rdso lucknow
summertraining at rdso lucknowsummertraining at rdso lucknow
summertraining at rdso lucknow
 
IRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking SystemIRJET- Review of Vacuum Braking System
IRJET- Review of Vacuum Braking System
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
Air brake system of railways
Air brake system of railwaysAir brake system of railways
Air brake system of railways
 

Dernier

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Dernier (20)

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 

PPT on Indian railway (LHB coaches)

  • 1. INDIAN RAILWAY " Lifeline Of The Nation " PRESENTATION ON RAILWAY SHASHIKANT CHOUDHARY BY- COACHES 10ERIME053
  • 2.  INTRODUCTION  MAINTENANCE SCHEDULES  WHEEL PROFILE & DEFECTS  TYPE OF COACH  AXLE , BRAKE DISC & BRAKE SHOES  AIR BRAKE SYSTEM  BOGIE FRAME  BODY SHELL & WINDOW UNIT  WATER TANKS  CDTS
  • 3. -: INDIAN RAILWAY :www.indianrailways.gov.in First passenger train introduced in India on 16 April 1853 between Mumbai to Thane (34 km). Over 10,000 trains daily, transporting over 8,900 million passengers and over 1050 million tones of freight per year. Indian Railways is the world's ninth largest organisation, by number of employees, with over 1.4 million employees. The number of zones in Indian Railways increased from six to eight in 1951, nine in 1952 and sixteen in 2003. Presently there are 17 zones & 84 divisions. As of 31 March 2013, 23,541 km (36%) of the total 65,000 km route length was electrified.
  • 4. Name Central Railway Eastern Railway East Central Railway East Coast Railway Konkan Railway Northern Railway North Central Railway North Western Railway North Eastern Railway Abbr. CR ER ECR ECoR KR NR NCR NWR NER Headquarters Mumbai Kolkata Hajipur Bhubaneswar Panvel Delhi Allahabad Jaipur Gorakhpur Northeast Frontier Railway NFR Maligaon(Guwahati) Southern Railway South Central Railway South Eastern Railway South East Central Railway SR SCR SER SECR Chennai Secunderabad Kolkata Bilaspur, CG South Western Railway SWR Hubli Western Railway West Central Railway Kolkata Metro WR WCR KMR Mumbai Jabalpur Kolkata
  • 5. -: Coach Repair Workshop, Harnaut :Foundation stone was laid by A.P.J. Abdul Kalam on June 30, 2003 Site location - Harnaut, Distt- Nalanda (Bihar) ,under ECR Total Land - 113 Acres (workshop 76 , staff quarters 37) Year of sanction - 2003-04 Sanctioned Cost - Rs. 224 Cores. Revised sanctioned Cost - Rs. 337 Cores. Expenditure - Rs 252.03 Cores. (up to 31.03.13 ) Plant Capacity - POH of 50 coaches per month Sanctioned staff - 1158
  • 6. -: THE MAINTENANCE SCHEDULES AND THE OVERHAULING PERIODS :1. Trip schedule- After every trip by primary maintenance depot. 2. Schedule A - Monthly (1 month ) 3. Schedule B - Quarterly (3 months ) 4. IOH – 9 months 5. POH – 18 months > POH < Periodic overhauling is the best available process of maintenance of coaches in India. This generally operated after 18 months after the manufacturing or the previous periodic overhauling done in any workshop. This undergoes a huge process of lifting the coach, isolating the all parts, and changing or replacing the necessary or damaged parts. In other words this is the process of renewing the coaches. -It stands for periodic overhauling. -POH is allowed in nominated workshops only. -Painting of whole coach is necessary. -Profiling of wheel is necessary
  • 7. -: WHEEL PROFILE :- -: DEFECTS :Thin Flange :- When the flange thickness reduces from 28.5 mm to 16 mm or less, then the flange is called thin flange. Sharp Flange :- When the radius given at the tip of flange is worn out from 14.5mm to 5 mm or less is called Sharp Flange. Thin Tyre :- If the remaining thickness of tyre is less than 25 mm, it is called thin tyre. Hollow Tyre :- If the groove on the wheel tread is up to 5 mm or more, it is called Hollow tyre
  • 8. Tyre defect gauge THIN FLANGE SHARP FLANGE THIN TYRE HOLLOW TYRE
  • 9. COACH L.H.B. I.C.F. Integral coach factory 140 km/h Noise level 100 decibels Linke Holfmann Busch 160 km/h Noise level 60 decibels DIMENSIONS OF COACH SHELL ICF LHB Length With Buffer 24000 mm 21336 mm Width 22296 mm Length Without Buffer 23540 mm 3245 mm
  • 10. -: AXLE :- It is the main long cylindrical bar on which bogie are fixed with the help of bearings. This is made of steel as above. Each axle contains 2 wheels, the brake cylinders are also attached to it and in case of LHB coaches, the braking discs are fixed on to the axle. The axle mounted brake disc consists of a gray cast iron friction ring and a cast steel hub, connected by means of radially arranged elastic resilient sleeves which are secured in the hub by means of hexagon screws. The friction ring is manufactured as a solid component or in a split version. In the latter case, the two halves are held together by two tight –fit screws. DISC
  • 11. -: AIR BRAKE SYSTEM : The brake system in which compressed air is used in the brake cylinder for the application of brakes is called air brake system. MAIN COMPONENTS :Control Reservoir 9 liter, 5 kg/cm2 Brake pipe – Dia. 32 mm Auxiliary Reservoir 200 liter, 6 kg/cm2 Feed Pipe – Dia. 25 mm
  • 12. -: Working Principle :The different processes involved in working :a) Charging b) Application c) Release  Under normal conditions the Brake pipe is charged with 5kg/cm2 from the loco. The control reservoir and the Auxiliary reservoir are charged with 5 kg/cm2 and 6 kg/cm2 respectively from BP through Distributor valve.  When the brake pipe is charged at 5 kg/cm2 the brake cylinder is connected to exhaust through distributor valve in order to keep the brake in released position fully.  Whenever the brake pipe pressure is reduced below the CR pressure, the DV connects the auxiliary reservoir with the brake cylinder and the air from AR is sent into the brake cylinder to apply the brake.  Whenever the brake pipe pressure is equal to CR pressure the DV disconnects the BC from AR and in turn connects the BC with Exhaust for the release of brakes fully.
  • 13. -: BRAKE SHOE :The brake shoe is provided with a brake pad holder carrying replaceable pads. The brake shoe consists of the brake pad holder, the vertical pins and the brake pad. Due to BC pressure, the piston moves forward and strikes against the brake caliper. The lever arm of the brake caliper presses onto the disc brake through the brake shoe. The disc brakes are mounted on the wheel axle and so rotate along with the wheels. Due to application of brake shoes, the discs begin to lose their angular speed. As a result the axle also begins to slow down since the two are connected. Ultimately, the wheels stop rotating as they are mounted on the same axle. SHOES
  • 14. -: BOGIE FRAME :1.Bogie frame longitudinal component 2. Cross-beam The frame is made up of two longitudinal components (1) connected by two cross-beams (2) which also support the brake units. The various supports which connect the different bogie components are welded to the frame.
  • 15. -: BODY SHELL :The body shell is of integral light weight construction consisting of separate assembly group for under frame, side wall, roof and end wall. The individual assemblies are joint to each other by welding. Three types of steel are used for manufacture of body shell. Steels used shell and their Assemblies compositions Side wall, End wall and Roof structure Roof sheet and Trough floor X2 Cr8 Ferritic Steel (SS 409M) ( C< .03%, Cr 1012%, Si 1%, Mn 1.5%) X5 CrNi 18 10 Austenitic Steel (SS 304) UTS N/mm2 Yield Stress N/mm2 450600 320 700850 235 440480 320 ( C< .07%, Cr 18%, Ni 10 % Si 1%, Mn 2%) Under frame IRS M-41 / Corten Steel ( C < .01%, Cr .35 .6%, Ni .2 - .4% Cu .3 - .6% Si .3 .7%, Mn .25%)
  • 16. -: WINDOW UNITS :- The sealed window units consist of 8.4 mm outer glass and 4 mm inner glass with 6 mm Argon gas filled.   Argon is an inexpensive, non-toxic, odorless gas .  It increase sound proofing characteristics of the window.  Minimizes heat exchange through the window.  Argon will not corrode the window material.  This type of windows can even block ultraviolet rays.
  • 17. -: Controlled Discharge Toilet System (CDTS) :Objective: -The main objective of introducing this type of lavatories in coaches of Indian Railways to have clean environment around Railway Track within city limits, station premises and maintenance sidings. This system works on electro- pneumatic principle where in, the waste generated from the coach lavatories during run is collected in a retention tank and is disposed off far away from the city limits on meeting certain predefined conditions. -: Working cycle :  On each flushing (Collection):- Simply pressing flush button, starts the flow of water into the toilet bowl and opens the flapper valve connecting the toilet bowl to the waste retention tank. At the end of each flush cycle the wash water stops and the toilet is sealed off from the retention tank by the flapper valve, which acts as an effective stench trap, preventing odor from entering in the toilet room. The retention tank discharge valve remains open only for a small period of time (one minute or less) long enough to
  • 18. The waste is stored in the retention tank until the following two parameter are satisfied. 1) The train should be in acceleration & running above 30kmph and the number of flushing should be More than five. 2) Train should be in retardation and reducing speed of 30kmph irrespective number of flushes. Water consumption is only 2.5 liters per flush cycle for the Indian style toilet Bowl and 1.5 liters for the European style toilet Bowl. Programmable Logic Controller (PLC):- It is the heart of the system. It senses the speed of the coach and no of flushes and gets all the operations done by actuating corresponding valves.
  • 19. -:WATER 3 types of TANKS :- are provided in LHB coach water tanks 685 liters: -2 stainless steel water tanks of 685 liters capacity each. These tanks are installed in under frame are fixed with frames and are secured by safety belts. These tanks constitute the fresh water reserves in the passenger coaches. Water level indicator has been provided in these tanks. 30 liters:- 3-stainless steel water tanks of 30 liters capacity installed one in each lavatory in the roof and are continuously fresh-water-fed by means of pumps. These tanks are installed alone and are fixed with 2 supports which are equipped with belts. 450 liters: -One stainless steel water tanks of 450 liters capacity. These tanks are installed in under frame, fixed with frames and is secured by safety belts. This tank installed in the under frame constitute the fresh water reserves for the generator car.
  • 20. Thank You For your time