PRESENTED BY – KRISHNA HEDA Finding the Waste The 8 Waste
What is Value? A measurement of the worth of a product, or service, by a customer based on it’s usefulness in satisfying a customer need An activity, process or operation that changes the product from one form to another in order to get it closer to the customer’s specifications It is something that the customer is willing to pay for
What is Waste? Any activity that adds costs or time but does not add value Consuming more resources (time, money, space, etc) than are necessary to produce the goods, or services, that the customer wants Pure Waste: Actions that could be stopped without effecting the customer  Incidental Waste: Actions that need to be done based on how the current system operates but do not add value
The 8 Types of Waste ,[object Object]
Inventory
Transportation
Motion (Operations)
Processing
Defects / Quality
Waiting
People’s Skills,[object Object]
Inventory Requires people, processes and time to count, Process, execute, store and maintain it If we do not get orders the items processed will not be useful and would be waste of time and effort. Inventory is often used to help hide other wastes Common causes: Overproduction/ over processing Long changeover times b/ween processes Defective, or questionable items Mismatched production speeds
Inventory Hides Waste Machine Downtime Supplier issues Quality Problems Poor  Scheduling Line Imbalance Long Setups House Keeping Employee Availability Communication Problems Long  Transportation Raw Materials Finished Goods Sea of Inventory Employee Availability
Reducing Inventory Uncovers Opportunities to Improve,Opportunities That Must Be Addressed! Machine Downtime Supplier issues Quality Problems Poor  Scheduling Line Imbalance Long Setups House Keeping Employee Availability Communication Problems Long  Transportation Employee Availability
Transportation Double or triple handling, of documents. It adds no value and is often used to get the extra inventory out of the way  Common causes: Extra Inventory Retention points before and after operations Excessive distance between operations (layout) Single skill focused operations
Motion (Operators) Walking without working (away from workstation)  Searching for documents, tools, materials or information Reaching, bending or unnecessary motion due to poor housekeeping or workplace layout Process is not designed with employees in mind Common causes: Poor workstation layout Isolated operations Shared tools Fatigue Workstation congestion
Processing Doing more than is necessary to produce an effectively output Extra setup steps, over-specification of the process, extra processing steps Common causes: Lack of standard work or processes Equipment over designed Process not updated with technology changes Lack of effective problem solving
Defects / Quality Defective or Defects Cost of inspecting defects Responding to customer complaints Rework or re-inspection of questionable matter Common causes: Emphasis on downstream inspection; questionable matter passed on Lack of standard work Info/docs handling (transportation) Process design/Procedures
Waiting Associates waiting for the work to come in.. process waiting for completion of a certain activity Waiting for Docs, instructions, approval, information, maintenance, decisions… Common causes: Mismatched production rates Poor layout, co-ordination Lack of coordination between processes Ours or upstream Insufficiently staffed
People’s Skills Employees are seen as a source of labor only, not seen as true process experts People are told what to do, and asked not to think Employees are not involved in finding solutions, opportunities to improve our process are missed Common causes: Management does not involve employees in problem solving Narrowly defined jobs and expectations Old school management, worker relationships
How Does Waste Get There?  Forget to change solutions when we change the process Fail to understand why we do something a certain way, so we continue doing that way even if the limitation has been removed Build it into our processes Root cause of problems is not addressed or a band aid solution is implemented

Contenu connexe

Tendances

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
Flevy.com Best Practices
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
manijayjay
 

Tendances (20)

The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Ian's 7 wastes of production
Ian's 7 wastes of productionIan's 7 wastes of production
Ian's 7 wastes of production
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
7 Wastes
7 Wastes7 Wastes
7 Wastes
 
7 Types of Muda
7 Types of Muda7 Types of Muda
7 Types of Muda
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
8 Lean Wastes PowerPoint Presentation Slides
8 Lean Wastes PowerPoint Presentation Slides 8 Lean Wastes PowerPoint Presentation Slides
8 Lean Wastes PowerPoint Presentation Slides
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
Mistake proofing smpl_1
Mistake proofing smpl_1Mistake proofing smpl_1
Mistake proofing smpl_1
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 

Similaire à Types of waste - lean Concept Krishna Heda

Optimizing Sterile Processing Workflow
Optimizing Sterile Processing WorkflowOptimizing Sterile Processing Workflow
Optimizing Sterile Processing Workflow
dpjphx
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
Omnex Inc.
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
Guillermo (Bill/Gil) Echeverria
 
Think before we automate
Think before we automateThink before we automate
Think before we automate
Cristina Vidu
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
Ron Drew
 
M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
DMR Panda
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
Jamie Voster
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
laukoamy
 
Lean Thinking Baljit
Lean Thinking  BaljitLean Thinking  Baljit
Lean Thinking Baljit
baljit1
 

Similaire à Types of waste - lean Concept Krishna Heda (20)

Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean Introduction
 
Perceiving Muda
Perceiving MudaPerceiving Muda
Perceiving Muda
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
 
The 8 wastes - Luciana Paulise
The 8 wastes - Luciana PauliseThe 8 wastes - Luciana Paulise
The 8 wastes - Luciana Paulise
 
Optimizing Sterile Processing Workflow
Optimizing Sterile Processing WorkflowOptimizing Sterile Processing Workflow
Optimizing Sterile Processing Workflow
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
20150114_Jan 14 Board Work Session Pre-Read -why process improvement_Final
 
Think before we automate
Think before we automateThink before we automate
Think before we automate
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
 
M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc Tools
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11Medical Services Client Vsm 10 10 11
Medical Services Client Vsm 10 10 11
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Kaizen
KaizenKaizen
Kaizen
 
Lean startup
Lean startupLean startup
Lean startup
 
Lean Thinking Baljit
Lean Thinking  BaljitLean Thinking  Baljit
Lean Thinking Baljit
 

Dernier

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 

Types of waste - lean Concept Krishna Heda

  • 1. PRESENTED BY – KRISHNA HEDA Finding the Waste The 8 Waste
  • 2. What is Value? A measurement of the worth of a product, or service, by a customer based on it’s usefulness in satisfying a customer need An activity, process or operation that changes the product from one form to another in order to get it closer to the customer’s specifications It is something that the customer is willing to pay for
  • 3. What is Waste? Any activity that adds costs or time but does not add value Consuming more resources (time, money, space, etc) than are necessary to produce the goods, or services, that the customer wants Pure Waste: Actions that could be stopped without effecting the customer Incidental Waste: Actions that need to be done based on how the current system operates but do not add value
  • 4.
  • 5.
  • 12.
  • 13. Inventory Requires people, processes and time to count, Process, execute, store and maintain it If we do not get orders the items processed will not be useful and would be waste of time and effort. Inventory is often used to help hide other wastes Common causes: Overproduction/ over processing Long changeover times b/ween processes Defective, or questionable items Mismatched production speeds
  • 14. Inventory Hides Waste Machine Downtime Supplier issues Quality Problems Poor Scheduling Line Imbalance Long Setups House Keeping Employee Availability Communication Problems Long Transportation Raw Materials Finished Goods Sea of Inventory Employee Availability
  • 15. Reducing Inventory Uncovers Opportunities to Improve,Opportunities That Must Be Addressed! Machine Downtime Supplier issues Quality Problems Poor Scheduling Line Imbalance Long Setups House Keeping Employee Availability Communication Problems Long Transportation Employee Availability
  • 16. Transportation Double or triple handling, of documents. It adds no value and is often used to get the extra inventory out of the way Common causes: Extra Inventory Retention points before and after operations Excessive distance between operations (layout) Single skill focused operations
  • 17. Motion (Operators) Walking without working (away from workstation) Searching for documents, tools, materials or information Reaching, bending or unnecessary motion due to poor housekeeping or workplace layout Process is not designed with employees in mind Common causes: Poor workstation layout Isolated operations Shared tools Fatigue Workstation congestion
  • 18. Processing Doing more than is necessary to produce an effectively output Extra setup steps, over-specification of the process, extra processing steps Common causes: Lack of standard work or processes Equipment over designed Process not updated with technology changes Lack of effective problem solving
  • 19. Defects / Quality Defective or Defects Cost of inspecting defects Responding to customer complaints Rework or re-inspection of questionable matter Common causes: Emphasis on downstream inspection; questionable matter passed on Lack of standard work Info/docs handling (transportation) Process design/Procedures
  • 20. Waiting Associates waiting for the work to come in.. process waiting for completion of a certain activity Waiting for Docs, instructions, approval, information, maintenance, decisions… Common causes: Mismatched production rates Poor layout, co-ordination Lack of coordination between processes Ours or upstream Insufficiently staffed
  • 21. People’s Skills Employees are seen as a source of labor only, not seen as true process experts People are told what to do, and asked not to think Employees are not involved in finding solutions, opportunities to improve our process are missed Common causes: Management does not involve employees in problem solving Narrowly defined jobs and expectations Old school management, worker relationships
  • 22. How Does Waste Get There? Forget to change solutions when we change the process Fail to understand why we do something a certain way, so we continue doing that way even if the limitation has been removed Build it into our processes Root cause of problems is not addressed or a band aid solution is implemented
  • 23. How Can We Find It? Find the value added work, everything else is waste Go out there and see it Observe our processes as if you do not know it Talk to the operators so you can understand why we do things the way we do What is the operation about? Why is it necessary?
  • 24. How Can We Find It? Introduce it Implement one piece flow into the process and waste will rise to the surface Have the right attitude Waste is hard enough to find when you want to find it, if we don’t want to find waste it will be impossible to root it out and remove it
  • 25. Waste – the simpler part… Being Able to See IT! (once we know what it is) The Real Challenge … knowing how to properly remove it!
  • 26. How Do We Remove It? All of the lean tools are designed to remove and identify waste 5S Standard Work Quick Changeovers Mistake Proofing Kanban One Piece Flow Kaizens
  • 27.
  • 29.
  • 30. No value created but required by current thinking
  • 31. No value created but required by process limitations
  • 32.
  • 33.