CHAPTER 10:

STRUCTURE
CONSTRUCTION
ENGINEERING TECHNOLOGY
Manufacturing > Communication > Transportation and Power > Construction > Industrial Design
MAIN PAGE

LEARNING
OUTCOMES

STRUCTURE
CONSTRUCTIONPREPARATION
INTRODUCTION
SITE
EARTHWORK

SUPERSTURCTURE
CONSTRUCTION

FOUNDATION
CONSTRUCTION

STRUCTURE COVERING

Click here to
continue
LEARNING OUTCOMES :

Students should be able to:
 List the procedures to construct structure
 List earthwork activities.
 Describe earthwork processes.
 Explain the purpose of using foundation.
 List the types of foundation.
 Describe the types of foundation.
 Plan a flowchart on the process of construction
structure.
 List superstructure construction and method
available.
 List structure covering methods.
 Describe structure covering methods
INTRODUCTION
Structure construction works
are performed by the contractor
and supervised by the project
manager. In structure construction
stage, various type of work are
involved and facilitated by various
construction machineries.
SITE PREPARATION
•

ACQUIRING PERMIT AND PERMISSION

Application for acquiring permission to
construct building is normally dependent
on local regulation enforced by the local
authority. Application for acquiring
permission should be enclosed with the
drawing, specification, site plan, primary
stakeholders and land ownership letter
of the project.
SITE PREPARATION
•CONSTRUCTION SITE CLEARING
a) Cutting and uprooting tree
that obstructing construction
work
Trees on the construction
site which obstruct
construction works need to
be chopped or uprooted to
the dumping area

b) Demolishing old
structures
Structures that are not
required at the
construction site should
be demolished
Cutting and uprooting tree that obstructing construction work
Demolishing old
structures
SITE PREPARATION
•DETERMINING STRUCTURE LOCATION
Pickets and stakes were used in
setting out process to determined
structure or building location.
Accuracy in setting out process helps
to determine the location, shape and
size of building according to the
drawing of the building plan. There
are two methods to determine
structure location;
• Site line method
• Center line method
SITE LINE METHOD
A

A
d

c

e
f

4

a

3

g

b
B

A

a’

b’
SITE LINE METHOD
Steps :
1. Construct AB line as a site line. Border line can
be used as site line too. Site line should be
drawn clearly because it is used as a reference
line when other sign are missing.
2. Measure and mark point a’ and point b’ on the
site line according to building size.
3. Point a and b should be a building line parallel
with the site line.
4. Mark point d where ad line is perpendicular to
line ab. To get a perpendicular angle, pythagoras
4
method is used.
3
CENTRE LINE METHOD
B

d

c

y

e

z

g

A

b
CENTRE LINE METHOD
STEPS:
1. Construct line AB as a centre line. Generally, it is located in
the middle of a building. This centre line should be drawn
clearly because it is used as reference line.
2. Measure and mark point a and point b by taking into account
the distance from line AB. Line AB is perpendicular to line
ab. The method used to accquire perpendicular angle is
similar to the site line method.
3. Measure and mark point c and point d by considering the
distance from line AB. Line cd is perpendicular to line AB.
4. Measure and mark point e on line bc
5. Measure and mark point g on line ab
6. Measure and mark point f on line AB
7. For testing the accuracy of setting out work, measure the
distance of ac and bd. If ac=bd, therefore all angles in abcd
is accurate.
SITE PREPARATION

•CONSTRUCTION SITE ARRANGEMENT
After the location of the construction structure has
been marked, temporary building and facilities has
Construction site should have temporary access road to
to be identified.
ease workers movement and transport construction
Access Road
material

Site Office

Used as a place to manage the operation of all
construction works. Normally near to the main entrance

Accomodation

Needs to be constructed for workers

Utilities(electric,

It is essential in construction area. Eg; electricity is the
source of energy used to operate machines and
construction equipment.

water telephone)

Safety

Safety of workers, construction materials and equipment
is very important. Stores should be built in order to keep
materials and equipment
SITE PREPARATION

An example of structure
arrangement and temporary
facilities on construction site
EARTHWORK
ACTIVITY
Earth loosing

Cutting

Earth filling

Earthwork
activities
DESCRIPTION
Before any excavation activities, soils which
consist of sedimentation rock layer should be
loosen. Bulldozer is used to execute soil. If there
are huge rocks that cant be moved, explosive
substance will be used.
For higher or elevated area it should be
excavated to the required formation level. Soil is
also excavated in constructing system drainage
and building site foundation
Filling is necessary for areas lower than the
construction level required. Filled soil should be
compacted
EARTHWORK
ACTIVITY
Earth
consolidating

Earthwork
activities
DESCRIPTION

There are types of soil which is soft and easy to
settle such as peat soil. This type of soil should be
excavated and changed with high compacted soil.
Filled area should be compacted with appropriate
roller machines for earth consolidating
Earth dumping Excessive soil from construction area should be
moved to other places. Scrapers and lorries are
used to moved soil.
Clearing
Clearing soil work is executed after all filling works
such as foot foundation and site building have
been completed.
Excess soils should be cleared and dumped to
other location.
Example Of Cut And Fill Work

Cutting soil from high ground will be used to fill
low ground level
FOUNDATION CONSTRUCTION
A building foundation is the lowest level of the
building and known as substructure. Its function
to sustain the entire building load and transfer it
to the lower layer of ground. There are various
types and shapes of foundation which are used in
building construction. Selection criteria of
foundation types are dependent on;
•Type of soil
•Building load
•Design
•Cost
•technology
FOUNDATION CONSTRUCTION
There are four types of foundation

i. Pad foundation

ii. Strip foundation

iii. Slab/ Raft foundation

iv. Pile foundation
FOUNDATION CONSTRUCTION
Pad foundation
•Used to support small and light load.

(Eg; house or

single storey building)

•Appropriate type of soil is the hard soil which
has high bearing capacity
•Constructed in rectangular shape beneath each
stump which support loads
•The thickness and area is dependent upon
imposed loads and its bearing capacity
•The depth is normally up to one meter below
ground level.
•Common proportion of concrete mix used is 1:2:4
•Reinforcement steel bars are used to increase
FOUNDATION CONSTRUCTION
Strip foundation
•Used to support small and light loads
•Width and thickness depend upon the imposed building load
and its bearing capacity
•There are two types of Strip foundation;

i. Wide strip foundation

ii. Deep strip foundation
FOUNDATION CONSTRUCTION
Slab/ Raft foundation
•Suitable for building which is constructed on soils that have
low bearing capacity. (eg; soft soil, high shrinkage soil,
formerly filled swamp soil)
•Its purpose is to prevent from uneven settlement which may
cause cracking to building
•Constructed from reinforced concrete according to surface
area of building floor or until it covers the sidewalk area
•The thickness is normally between 200mm to 300mm.
•The bottom part imposed to walls and columns load is made
thicker
FOUNDATION CONSTRUCTION
Pile foundation
•Suitable or a big and high rise building also used in building
bridges.
•Depth of pile depends on the imposed load
•It can prevent deep excavation, which reduces the cost of
excavation and concrete pouring
•Normally used with other foundation type.
•There are two types of techniques which is;
i. Friction method
ii. End-bearing method
Chapter 10  structure construction

Contenu connexe

Tendances

Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
A Seminar on Building Construction IS Codes
A Seminar on Building Construction IS CodesA Seminar on Building Construction IS Codes
A Seminar on Building Construction IS CodesRishav Agrawal
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleKailash Chander
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Introduction to Types of Foundation
Introduction to Types of FoundationIntroduction to Types of Foundation
Introduction to Types of FoundationPhurba Tamang
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentationSze Ting Kuek
 
Introduction to Building Construction
Introduction to Building Construction Introduction to Building Construction
Introduction to Building Construction Er.Karan Chauhan
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolitionManthan Vaghasiya
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and constructionEyobAlene1
 
Building superstructure
Building superstructureBuilding superstructure
Building superstructurenagnath123
 

Tendances (20)

Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
A Seminar on Building Construction IS Codes
A Seminar on Building Construction IS CodesA Seminar on Building Construction IS Codes
A Seminar on Building Construction IS Codes
 
114 site layout
114 site layout114 site layout
114 site layout
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Introduction to Types of Foundation
Introduction to Types of FoundationIntroduction to Types of Foundation
Introduction to Types of Foundation
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
Deep foundation - pile foundation
Deep foundation - pile foundationDeep foundation - pile foundation
Deep foundation - pile foundation
 
Earthwork and excavation
Earthwork  and  excavationEarthwork  and  excavation
Earthwork and excavation
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Introduction to Building Construction
Introduction to Building Construction Introduction to Building Construction
Introduction to Building Construction
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Formwork
FormworkFormwork
Formwork
 
113 site layout design
113 site layout design113 site layout design
113 site layout design
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
 
Building superstructure
Building superstructureBuilding superstructure
Building superstructure
 
blockwork
 blockwork blockwork
blockwork
 

Similaire à Chapter 10 structure construction

Site report
Site reportSite report
Site reportHuiYik
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendraSurendra Sah
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
Summer training report
Summer training reportSummer training report
Summer training reportaki8872233
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Introduction to machine maintinance and installation
Introduction to machine maintinance and installationIntroduction to machine maintinance and installation
Introduction to machine maintinance and installationtechnovic
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteSrikanthReddy345872
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Internship PPT 2022.pptx
Internship PPT 2022.pptxInternship PPT 2022.pptx
Internship PPT 2022.pptxHarshKumarEname
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdfRanadita
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
CONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKSCONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKSJhunelIvanGoyena
 

Similaire à Chapter 10 structure construction (20)

muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
site report
site reportsite report
site report
 
Site report
Site reportSite report
Site report
 
Summer training project by surendra
Summer training project by surendraSummer training project by surendra
Summer training project by surendra
 
Construction site
Construction siteConstruction site
Construction site
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Final Report
Final Report Final Report
Final Report
 
Ez
EzEz
Ez
 
Introduction to machine maintinance and installation
Introduction to machine maintinance and installationIntroduction to machine maintinance and installation
Introduction to machine maintinance and installation
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
internship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering instituteinternship ppt.pptx civil engineering institute
internship ppt.pptx civil engineering institute
 
Shib
ShibShib
Shib
 
Site report 1
Site report 1Site report 1
Site report 1
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Internship PPT 2022.pptx
Internship PPT 2022.pptxInternship PPT 2022.pptx
Internship PPT 2022.pptx
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
CONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKSCONSTRUCTION SPECIFICATION & EARTHWORKS
CONSTRUCTION SPECIFICATION & EARTHWORKS
 

Dernier

Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 

Dernier (20)

Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Chapter 10 structure construction

  • 2. ENGINEERING TECHNOLOGY Manufacturing > Communication > Transportation and Power > Construction > Industrial Design MAIN PAGE LEARNING OUTCOMES STRUCTURE CONSTRUCTIONPREPARATION INTRODUCTION SITE EARTHWORK SUPERSTURCTURE CONSTRUCTION FOUNDATION CONSTRUCTION STRUCTURE COVERING Click here to continue
  • 3. LEARNING OUTCOMES : Students should be able to:  List the procedures to construct structure  List earthwork activities.  Describe earthwork processes.  Explain the purpose of using foundation.  List the types of foundation.  Describe the types of foundation.  Plan a flowchart on the process of construction structure.  List superstructure construction and method available.  List structure covering methods.  Describe structure covering methods
  • 4. INTRODUCTION Structure construction works are performed by the contractor and supervised by the project manager. In structure construction stage, various type of work are involved and facilitated by various construction machineries.
  • 5. SITE PREPARATION • ACQUIRING PERMIT AND PERMISSION Application for acquiring permission to construct building is normally dependent on local regulation enforced by the local authority. Application for acquiring permission should be enclosed with the drawing, specification, site plan, primary stakeholders and land ownership letter of the project.
  • 6. SITE PREPARATION •CONSTRUCTION SITE CLEARING a) Cutting and uprooting tree that obstructing construction work Trees on the construction site which obstruct construction works need to be chopped or uprooted to the dumping area b) Demolishing old structures Structures that are not required at the construction site should be demolished
  • 7. Cutting and uprooting tree that obstructing construction work
  • 9. SITE PREPARATION •DETERMINING STRUCTURE LOCATION Pickets and stakes were used in setting out process to determined structure or building location. Accuracy in setting out process helps to determine the location, shape and size of building according to the drawing of the building plan. There are two methods to determine structure location; • Site line method • Center line method
  • 11. SITE LINE METHOD Steps : 1. Construct AB line as a site line. Border line can be used as site line too. Site line should be drawn clearly because it is used as a reference line when other sign are missing. 2. Measure and mark point a’ and point b’ on the site line according to building size. 3. Point a and b should be a building line parallel with the site line. 4. Mark point d where ad line is perpendicular to line ab. To get a perpendicular angle, pythagoras 4 method is used. 3
  • 13. CENTRE LINE METHOD STEPS: 1. Construct line AB as a centre line. Generally, it is located in the middle of a building. This centre line should be drawn clearly because it is used as reference line. 2. Measure and mark point a and point b by taking into account the distance from line AB. Line AB is perpendicular to line ab. The method used to accquire perpendicular angle is similar to the site line method. 3. Measure and mark point c and point d by considering the distance from line AB. Line cd is perpendicular to line AB. 4. Measure and mark point e on line bc 5. Measure and mark point g on line ab 6. Measure and mark point f on line AB 7. For testing the accuracy of setting out work, measure the distance of ac and bd. If ac=bd, therefore all angles in abcd is accurate.
  • 14. SITE PREPARATION •CONSTRUCTION SITE ARRANGEMENT After the location of the construction structure has been marked, temporary building and facilities has Construction site should have temporary access road to to be identified. ease workers movement and transport construction Access Road material Site Office Used as a place to manage the operation of all construction works. Normally near to the main entrance Accomodation Needs to be constructed for workers Utilities(electric, It is essential in construction area. Eg; electricity is the source of energy used to operate machines and construction equipment. water telephone) Safety Safety of workers, construction materials and equipment is very important. Stores should be built in order to keep materials and equipment
  • 15. SITE PREPARATION An example of structure arrangement and temporary facilities on construction site
  • 16. EARTHWORK ACTIVITY Earth loosing Cutting Earth filling Earthwork activities DESCRIPTION Before any excavation activities, soils which consist of sedimentation rock layer should be loosen. Bulldozer is used to execute soil. If there are huge rocks that cant be moved, explosive substance will be used. For higher or elevated area it should be excavated to the required formation level. Soil is also excavated in constructing system drainage and building site foundation Filling is necessary for areas lower than the construction level required. Filled soil should be compacted
  • 17. EARTHWORK ACTIVITY Earth consolidating Earthwork activities DESCRIPTION There are types of soil which is soft and easy to settle such as peat soil. This type of soil should be excavated and changed with high compacted soil. Filled area should be compacted with appropriate roller machines for earth consolidating Earth dumping Excessive soil from construction area should be moved to other places. Scrapers and lorries are used to moved soil. Clearing Clearing soil work is executed after all filling works such as foot foundation and site building have been completed. Excess soils should be cleared and dumped to other location.
  • 18. Example Of Cut And Fill Work Cutting soil from high ground will be used to fill low ground level
  • 19. FOUNDATION CONSTRUCTION A building foundation is the lowest level of the building and known as substructure. Its function to sustain the entire building load and transfer it to the lower layer of ground. There are various types and shapes of foundation which are used in building construction. Selection criteria of foundation types are dependent on; •Type of soil •Building load •Design •Cost •technology
  • 20. FOUNDATION CONSTRUCTION There are four types of foundation i. Pad foundation ii. Strip foundation iii. Slab/ Raft foundation iv. Pile foundation
  • 21. FOUNDATION CONSTRUCTION Pad foundation •Used to support small and light load. (Eg; house or single storey building) •Appropriate type of soil is the hard soil which has high bearing capacity •Constructed in rectangular shape beneath each stump which support loads •The thickness and area is dependent upon imposed loads and its bearing capacity •The depth is normally up to one meter below ground level. •Common proportion of concrete mix used is 1:2:4 •Reinforcement steel bars are used to increase
  • 22. FOUNDATION CONSTRUCTION Strip foundation •Used to support small and light loads •Width and thickness depend upon the imposed building load and its bearing capacity •There are two types of Strip foundation; i. Wide strip foundation ii. Deep strip foundation
  • 23. FOUNDATION CONSTRUCTION Slab/ Raft foundation •Suitable for building which is constructed on soils that have low bearing capacity. (eg; soft soil, high shrinkage soil, formerly filled swamp soil) •Its purpose is to prevent from uneven settlement which may cause cracking to building •Constructed from reinforced concrete according to surface area of building floor or until it covers the sidewalk area •The thickness is normally between 200mm to 300mm. •The bottom part imposed to walls and columns load is made thicker
  • 24. FOUNDATION CONSTRUCTION Pile foundation •Suitable or a big and high rise building also used in building bridges. •Depth of pile depends on the imposed load •It can prevent deep excavation, which reduces the cost of excavation and concrete pouring •Normally used with other foundation type. •There are two types of techniques which is; i. Friction method ii. End-bearing method