SlideShare une entreprise Scribd logo
1  sur  10
At the end of this presentation, you will be able to:
•Define completion
•Factors influencing completion design.
•List and define the different types of completion
•Describe surface control equipments
•Define subsea completion
Introduction to Well Completions
Agenda
• After exploratory drilling confirms the presence of an oil or natural gas
reservoir, the hydrocarbons are brought to the surface.
• Once the design well depth is reached, the formation is tested and
evaluated to determine whether the well is to be completed for
production, or plugged and abandoned.
• This decision is taken based on the information available on reservoir
characteristics.
• To complete the well production, casing is installed and cemented, and
the drilling rig is dismantled and moved to the next site.
• A service rig is brought in to perforate the production casing and run
production tubing along with down hole equipments.
• The installation of surface safety equipments takes place and
production begins.
30’’ CASING
20’’ CASING
13 3/8’’ CASING
7’’ LINER
RESERVOIR
SEA BED
PLATFORM
Production casing (9 5/8)
Downhole Equipment
Safety Equipment
Completion Process
Completion
It’s a link between drilling the borehole and
the production phase.
Well completion creates a dependable pathway
to the surface for the hydrocarbons.
Once the well is drilled, it has to be made ready
for the safe and efficient production of oil.
The term ‘completion’ describes the assembly of
Down hole tubulars and other safety equipments
that is required to enable the safe and efficient
production of oil or gas from the well after it has
been drilled.
Completion Process
What is Completion?
Completion
FACTORS INFLUENCING COMPLETIONS DESIGN.
• Purpose of the well
• The environment
• Drilling
• The reservoir
• Production
• Completion techniques
Purpose of the well
• Exploration wells: To obtain preliminary data on a reservoir, nature and
characteristics of the fluids on the reservoir, pay zone characteristics (pressure,
temperature, permeability and productivity)
• Appraisal or confirmation: Refine or complete the data from exploration and
determine the off-wellbore characteristics (permeability, reservoir boundaries,
existence of faults/discontinuity)
• Developmental well: This stage brings the wells on the production stream.
Assess well conditions and effectiveness of completions and obtain further info
on the well.
– Production- productivity
– Injection- Optimize reservoir pressure
– Observation-monitor variations in reservoir parameters
Parameters related to the Environment
• Constrains related to country/site/location of well
i.e land or offshore.
• Environmental restrictions involve:
– Difficulty in obtaining supplies
– Available space
– Available utilities
– Safety rules and regulations
– Certain operations that may or may not be possible
 Meteorological and oceanographic conditions must also be taken into
consideration where applicable.
Parameters related to the Drilling
• Types of rigs
(drilling/completions)
• Well profile-
horizontal/directional
• Drilling and casing program
• Drilling in the pay zone(s) and
drilling fluids- formation
damage and fluid
contamination.
• Cementing the production
casing
Parameters related to the Reservoir
• Reservoir pressure and its changes-
need for injection wells?
• Interface between fluids and their
changes- water encroachment
• Number of levels to be produced
• Rock characteristics and fluid types
• Production profile and the number of
wells required.
Parameters related to the Production
• Safety- compliance with various regulations
• Flowing well or artificial lift- a wells flow capability depends on
natural changes in bottom hole pressure versus cumulative
production.
• Operating conditions- space availability, operating fluids-
erosion/corrosion
• Anticipated measurement, maintenance or work over operations-
maintenance and repair operations to ensure the well reaches its
lifetime
Other factors
• Parameters related to completion
techniques: general configuration, pay zone to bore hole
connection, treatment of the formation, equipment installed,
artificial lift
• Synthesis-How completion is designed-
completions should be designed to optimize
productivity/injectivity performance, make sure the well produces
reliably and safely, optimize the implemantation of atrificial lift,
optimize equipment lifetime and make it easy o change all or some
of the equipment in the future without much difficulty.

Contenu connexe

Tendances

Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
kaleem ullah
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo Petroleum
 

Tendances (20)

Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Down hole problem and their prevention
Down hole problem and their preventionDown hole problem and their prevention
Down hole problem and their prevention
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
 
WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802Hwayoo - Wellhead Equipment & Christmass Tree 20160802
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Well planning
Well planningWell planning
Well planning
 
Casing design
Casing designCasing design
Casing design
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Casing of oil well
Casing of oil wellCasing of oil well
Casing of oil well
 

Similaire à Well completion d.pptx

Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
Pranesh Kumar
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
naiyar yazdani
 
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Abhinav Bisht
 

Similaire à Well completion d.pptx (20)

Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
A Sattar CWI Engrs
A Sattar CWI EngrsA Sattar CWI Engrs
A Sattar CWI Engrs
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Well completion
Well completionWell completion
Well completion
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well Technology
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 

Plus de AihamAltayeh1 (6)

Microsoft Word Basics2.ppt
Microsoft Word Basics2.pptMicrosoft Word Basics2.ppt
Microsoft Word Basics2.ppt
 
powerpoint.pptx
powerpoint.pptxpowerpoint.pptx
powerpoint.pptx
 
WBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptxWBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptx
 
pump units.ppt
pump units.pptpump units.ppt
pump units.ppt
 
ESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptxESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptx
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 

Dernier

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Dernier (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 

Well completion d.pptx

  • 1. At the end of this presentation, you will be able to: •Define completion •Factors influencing completion design. •List and define the different types of completion •Describe surface control equipments •Define subsea completion Introduction to Well Completions Agenda
  • 2. • After exploratory drilling confirms the presence of an oil or natural gas reservoir, the hydrocarbons are brought to the surface. • Once the design well depth is reached, the formation is tested and evaluated to determine whether the well is to be completed for production, or plugged and abandoned. • This decision is taken based on the information available on reservoir characteristics. • To complete the well production, casing is installed and cemented, and the drilling rig is dismantled and moved to the next site. • A service rig is brought in to perforate the production casing and run production tubing along with down hole equipments. • The installation of surface safety equipments takes place and production begins. 30’’ CASING 20’’ CASING 13 3/8’’ CASING 7’’ LINER RESERVOIR SEA BED PLATFORM Production casing (9 5/8) Downhole Equipment Safety Equipment Completion Process Completion
  • 3. It’s a link between drilling the borehole and the production phase. Well completion creates a dependable pathway to the surface for the hydrocarbons. Once the well is drilled, it has to be made ready for the safe and efficient production of oil. The term ‘completion’ describes the assembly of Down hole tubulars and other safety equipments that is required to enable the safe and efficient production of oil or gas from the well after it has been drilled. Completion Process What is Completion? Completion
  • 4. FACTORS INFLUENCING COMPLETIONS DESIGN. • Purpose of the well • The environment • Drilling • The reservoir • Production • Completion techniques
  • 5. Purpose of the well • Exploration wells: To obtain preliminary data on a reservoir, nature and characteristics of the fluids on the reservoir, pay zone characteristics (pressure, temperature, permeability and productivity) • Appraisal or confirmation: Refine or complete the data from exploration and determine the off-wellbore characteristics (permeability, reservoir boundaries, existence of faults/discontinuity) • Developmental well: This stage brings the wells on the production stream. Assess well conditions and effectiveness of completions and obtain further info on the well. – Production- productivity – Injection- Optimize reservoir pressure – Observation-monitor variations in reservoir parameters
  • 6. Parameters related to the Environment • Constrains related to country/site/location of well i.e land or offshore. • Environmental restrictions involve: – Difficulty in obtaining supplies – Available space – Available utilities – Safety rules and regulations – Certain operations that may or may not be possible  Meteorological and oceanographic conditions must also be taken into consideration where applicable.
  • 7. Parameters related to the Drilling • Types of rigs (drilling/completions) • Well profile- horizontal/directional • Drilling and casing program • Drilling in the pay zone(s) and drilling fluids- formation damage and fluid contamination. • Cementing the production casing
  • 8. Parameters related to the Reservoir • Reservoir pressure and its changes- need for injection wells? • Interface between fluids and their changes- water encroachment • Number of levels to be produced • Rock characteristics and fluid types • Production profile and the number of wells required.
  • 9. Parameters related to the Production • Safety- compliance with various regulations • Flowing well or artificial lift- a wells flow capability depends on natural changes in bottom hole pressure versus cumulative production. • Operating conditions- space availability, operating fluids- erosion/corrosion • Anticipated measurement, maintenance or work over operations- maintenance and repair operations to ensure the well reaches its lifetime
  • 10. Other factors • Parameters related to completion techniques: general configuration, pay zone to bore hole connection, treatment of the formation, equipment installed, artificial lift • Synthesis-How completion is designed- completions should be designed to optimize productivity/injectivity performance, make sure the well produces reliably and safely, optimize the implemantation of atrificial lift, optimize equipment lifetime and make it easy o change all or some of the equipment in the future without much difficulty.