Aroosa shazadi
Mbaf13m047
Presented to:
Sir Hamza Aziz Noori
Project Human resource
management
 Is the processes that organize, manage, and lead
the project team.
 The project team is comprised of the people with
assigned roles and responsibilities for completing
the project.
Overview of the chapter
Plan Human Resource
Management
is the process of identifying and
documenting project roles,
responsibilities, required skills,
reporting relationships, and creating a
staffing management plan.
Key benefits of this process
 establishes project roles and
responsibilities,
 project organization charts,
 and the staffing management plan
including the timetable for staff
acquisition and release.
Project Management Plan
 provides guidance on how project human
resources should be defined, staffed,
managed, and eventually released.
 The information used for the development of
the human resource management plan
includes
 The project life cycle and the processes that
will be applied to each phase,
 How work will be executed to accomplish the
project objectives,
 A change management plan that documents
how changes will be monitored and controlled
 Needs and methods of communication
among stakeholders.
Activity Resource Requirements
 identify the types and quantities of
resources required for each activity in
a work package.
 Aggregated to determine
estimated resources for each work
package
each work period.
Enterprise Environmental
Factors
 enterprise environmental factors that
can influence the Plan Human
Resource management process
Organizational culture and structure,
Existing human resources,
Geographical dispersion of team
members,
Personnel administration policies, and
Marketplace conditions.
Organizational Process Assets
 are the plans, processes, policies,
procedures, and knowledge bases
specific to and used by the performing
organization.
Tools &
Techniques
Organization Charts and Position
Descriptions
Networking
 formal and informal interaction with
others in an organization, industry, or
professional environment.
Expert Judgment
 required skills;
 standardized role descriptions
 Number of resources needed
 reporting relationships
 guidelines on lead time required for
staffing
 Identify risks associated with staff
acquisition, retention, and release
plans
Organizational Theory
 provides information regarding the
way in which people, teams, and
organizational units behave.
Outputs
Human Resource Management Plan
 Roles and responsibilities
 Role.
 Authority.
 Responsibility.
 Competency
 Project organization charts.
 Staffing management plan.
Acquire Project Team
The process of conforming human
resource availability and obtaining the
team necessary to complete project
activities.
Inputs
Human Resource Management
Plan
Provides guidance on how project
human resources should be identified,
staffed, managed, and eventually
released.
Enterprise Environmental
Factors
 Existing information on human
resources
 Personal administration policies
 Organizational structure
 Colocation or multiple locations
Organization process assets
 Organization standard policies,
processes, and procedures.
Tools and Techniques
 Specific people being identified.
 According to the project proposal
 Depend on expertise defined in project
charter.
Pre-assignment
Negotiation:
Staff assignment are negotiated on
many projects.
 Functional manager
 Other project management team
 External organizations, vendors,
suppliers, contractors etc.
Acquisition :
Performing organization is unable to
provide human resource.
 Acquire services from outside
providers where expertise is not
available internally.
 Contract employees, consultants,
outsourcing to other organizations.
Virtual teams:
 Groups possessing shared goals and
fulfilling responsibilities with little or no
face-to-face contact.
 Enabled by electronic communication
technologies.
Individuals geographically dispersed
Differences in shifts and work hours
 Minimizes travel expenses .
Multi-Criteria Decision Analysis:
Selection criteria are often used as
apart of acquiring the project team.
Some examples of selection criteria
that can be used to score team
members are given below:
 Availability
 Cost
 Knowledge
 Ability
 Experience
Outputs
Project Staff Assignments:
 Staffs project by assigning specific
individuals to project roles and
responsibilities.
 Documentation often include:
Project team directory
Specific names inserted into revised
organization charts and schedules
Resource Calendars:
 Documents time periods each member
can work on project
 Creating a reliable scheduling of each
person availability, scheduling conflicts,
time zone, work hours, and commitment
to other projects
 Enable to building out the final human
resource budgets
Project Management Plan Updates:
 Elements of project management
plan that may be updated
 Human resource plan updated
 Continuing updates should reflect
promotions, retirements,
performance issues and changing
workloads
Develop project team
The process of improving competencies
,team member interaction, and overall
team environment to enhance project
performance
Inputs
1) Human resource management plan
2) Project staff assignments
3) Resource calendars
Tools and techniques
1) Interpersonal skills
2) Training
3) Team –building activities
4) Ground rules
5) Colocation
6) Recognition and rewards
7) Personal assessment tools
Out put
 Team performance assessments
 Enterprise environmental factors
updates.
Manage project team
 Tracking of team performance
 Providing feedback
 Resolving issues
 Resource allocation
Benefits of manage project team
 Influencing team Behavior
 Conflict management
 Performance appraises
Manage project team: Inputs
 HR plan
 Requirement of job
Manage project team: tool and
techniques
 Observations
 Communication
Manage project team: output
 Project team
For managing a project team
skills are required
 Communication
 Conflict management
 Negotiation
 Leadership
 Interpersonal skill
 Project manager assign task, provide
recognition to high performance.
Factor influencing team
decisions
 change request
 PM plan update
 Project documentation
 External factor
 Organizational process assets
project human resource managment

Contenu connexe

Tendances

Human resource management
Human resource managementHuman resource management
Human resource managementSeta Wicaksana
 
BBA Human Resource Management
BBA Human Resource ManagementBBA Human Resource Management
BBA Human Resource ManagementVandan Kashyap
 
Human resource mangagement process
Human resource mangagement processHuman resource mangagement process
Human resource mangagement processNadia_Nazeer
 
HRM Basics Er. S Sood
HRM Basics Er. S SoodHRM Basics Er. S Sood
HRM Basics Er. S Soodshart sood
 
Human resource management basics
Human resource management basics Human resource management basics
Human resource management basics Sandeep Gupta
 
Introduction to human resource management
Introduction to human resource managementIntroduction to human resource management
Introduction to human resource managementTanuj Poddar
 
Strategic role of Human Resource Management
Strategic role of Human Resource ManagementStrategic role of Human Resource Management
Strategic role of Human Resource ManagementISAAC Jayant
 
Roadmap for Launching Workforce Planning Successfully
Roadmap for Launching Workforce Planning SuccessfullyRoadmap for Launching Workforce Planning Successfully
Roadmap for Launching Workforce Planning SuccessfullyTanuj Poddar
 
Introduction to Human Resource Management
Introduction to Human Resource ManagementIntroduction to Human Resource Management
Introduction to Human Resource ManagementTrinity Dwarka
 
Human resource management (mba)
Human resource management (mba) Human resource management (mba)
Human resource management (mba) City Union Bank Ltd
 
Human Resource Management - Reported by: Jay Gonzales & Perdie
Human Resource Management - Reported by: Jay Gonzales & PerdieHuman Resource Management - Reported by: Jay Gonzales & Perdie
Human Resource Management - Reported by: Jay Gonzales & PerdieUniversidad de Manila
 
Human resources management framework
Human resources management frameworkHuman resources management framework
Human resources management frameworkAngele Abi Khalil
 
Fundamentals of Human Resource Management
Fundamentals of Human Resource ManagementFundamentals of Human Resource Management
Fundamentals of Human Resource ManagementAmare_Abebe
 
Human Resource Management For Line Managers
Human Resource Management  For Line ManagersHuman Resource Management  For Line Managers
Human Resource Management For Line ManagersMahendra K SHUKLA
 

Tendances (20)

Human resource management
Human resource managementHuman resource management
Human resource management
 
BBA Human Resource Management
BBA Human Resource ManagementBBA Human Resource Management
BBA Human Resource Management
 
Human resource mangagement process
Human resource mangagement processHuman resource mangagement process
Human resource mangagement process
 
HRM Basics Er. S Sood
HRM Basics Er. S SoodHRM Basics Er. S Sood
HRM Basics Er. S Sood
 
Human resource management basics
Human resource management basics Human resource management basics
Human resource management basics
 
Introduction to human resource management
Introduction to human resource managementIntroduction to human resource management
Introduction to human resource management
 
Strategic role of Human Resource Management
Strategic role of Human Resource ManagementStrategic role of Human Resource Management
Strategic role of Human Resource Management
 
Roadmap for Launching Workforce Planning Successfully
Roadmap for Launching Workforce Planning SuccessfullyRoadmap for Launching Workforce Planning Successfully
Roadmap for Launching Workforce Planning Successfully
 
Human Resource
Human ResourceHuman Resource
Human Resource
 
Introduction to Human Resource Management
Introduction to Human Resource ManagementIntroduction to Human Resource Management
Introduction to Human Resource Management
 
Human resource management (mba)
Human resource management (mba) Human resource management (mba)
Human resource management (mba)
 
HR Functions and activities
HR Functions and activitiesHR Functions and activities
HR Functions and activities
 
Human Resource Management - Reported by: Jay Gonzales & Perdie
Human Resource Management - Reported by: Jay Gonzales & PerdieHuman Resource Management - Reported by: Jay Gonzales & Perdie
Human Resource Management - Reported by: Jay Gonzales & Perdie
 
Introduction to HRM
Introduction to HRMIntroduction to HRM
Introduction to HRM
 
Human resources management framework
Human resources management frameworkHuman resources management framework
Human resources management framework
 
Overview of hr processes
Overview of hr processesOverview of hr processes
Overview of hr processes
 
Fundamentals of Human Resource Management
Fundamentals of Human Resource ManagementFundamentals of Human Resource Management
Fundamentals of Human Resource Management
 
Human Resource Management For Line Managers
Human Resource Management  For Line ManagersHuman Resource Management  For Line Managers
Human Resource Management For Line Managers
 
Hr Management
Hr ManagementHr Management
Hr Management
 
The 8 rs of hr
The 8 rs of hrThe 8 rs of hr
The 8 rs of hr
 

En vedette

Mc donalds human resource managment plan -shubham-bba-2012
Mc donalds human resource managment plan -shubham-bba-2012Mc donalds human resource managment plan -shubham-bba-2012
Mc donalds human resource managment plan -shubham-bba-2012Shubham Parsekar
 
HRM (Human Resource Managment)
HRM (Human Resource Managment)HRM (Human Resource Managment)
HRM (Human Resource Managment)Ghulam Hasnain
 
Human resource managment
Human resource managmentHuman resource managment
Human resource managmentZahid Hossain
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5pankajsh10
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementParth Krishna
 
Human Resource Managment
Human Resource ManagmentHuman Resource Managment
Human Resource ManagmentParth Patel
 
Strategic hrm lecture 2
Strategic hrm   lecture 2Strategic hrm   lecture 2
Strategic hrm lecture 2Oneikafrancis
 
HR Solutions from Bonsai Consulting Inc
HR Solutions from Bonsai Consulting IncHR Solutions from Bonsai Consulting Inc
HR Solutions from Bonsai Consulting IncBonsai Consulting
 
Project human Resource Management by Muzaffar Ansari
Project human Resource Management by Muzaffar AnsariProject human Resource Management by Muzaffar Ansari
Project human Resource Management by Muzaffar AnsariM Ansari
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementJahangeer Shams
 
Procurement process Atlas Honda Ltd
Procurement process Atlas Honda LtdProcurement process Atlas Honda Ltd
Procurement process Atlas Honda LtdMudassar Iqbal
 
CIM Implementation in Atlas Honda
CIM Implementation in Atlas HondaCIM Implementation in Atlas Honda
CIM Implementation in Atlas HondaSara
 
Agriculture Resource Management
Agriculture Resource ManagementAgriculture Resource Management
Agriculture Resource Managementplantdex
 
Welcome to our presentation
Welcome to our presentationWelcome to our presentation
Welcome to our presentationsohag sikder
 
Performance Managment and Appraisal systems
Performance Managment and Appraisal systemsPerformance Managment and Appraisal systems
Performance Managment and Appraisal systemsRajeeta Rajit
 
Project human resources manangement
Project human resources manangementProject human resources manangement
Project human resources manangementRahmat Taufiq Sigit
 

En vedette (20)

Mc donalds human resource managment plan -shubham-bba-2012
Mc donalds human resource managment plan -shubham-bba-2012Mc donalds human resource managment plan -shubham-bba-2012
Mc donalds human resource managment plan -shubham-bba-2012
 
HRM (Human Resource Managment)
HRM (Human Resource Managment)HRM (Human Resource Managment)
HRM (Human Resource Managment)
 
Human resource managment
Human resource managmentHuman resource managment
Human resource managment
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5Project Human Resource Management - PMBOK 5
Project Human Resource Management - PMBOK 5
 
PMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource ManagementPMP Preparation - 09 Human Resource Management
PMP Preparation - 09 Human Resource Management
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Human Resource Managment
Human Resource ManagmentHuman Resource Managment
Human Resource Managment
 
Strategic hrm lecture 2
Strategic hrm   lecture 2Strategic hrm   lecture 2
Strategic hrm lecture 2
 
HR Solutions from Bonsai Consulting Inc
HR Solutions from Bonsai Consulting IncHR Solutions from Bonsai Consulting Inc
HR Solutions from Bonsai Consulting Inc
 
Project human Resource Management by Muzaffar Ansari
Project human Resource Management by Muzaffar AnsariProject human Resource Management by Muzaffar Ansari
Project human Resource Management by Muzaffar Ansari
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Procurement process Atlas Honda Ltd
Procurement process Atlas Honda LtdProcurement process Atlas Honda Ltd
Procurement process Atlas Honda Ltd
 
CIM Implementation in Atlas Honda
CIM Implementation in Atlas HondaCIM Implementation in Atlas Honda
CIM Implementation in Atlas Honda
 
Agriculture Resource Management
Agriculture Resource ManagementAgriculture Resource Management
Agriculture Resource Management
 
Welcome to our presentation
Welcome to our presentationWelcome to our presentation
Welcome to our presentation
 
Performance Managment and Appraisal systems
Performance Managment and Appraisal systemsPerformance Managment and Appraisal systems
Performance Managment and Appraisal systems
 
Project human resources manangement
Project human resources manangementProject human resources manangement
Project human resources manangement
 
Honda atlas Cars Pakistan Limited
Honda atlas Cars Pakistan LimitedHonda atlas Cars Pakistan Limited
Honda atlas Cars Pakistan Limited
 

Similaire à project human resource managment

Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource ManagementAzeem Anwar
 
Project Human Resource Management 1.ppt
Project Human Resource Management 1.pptProject Human Resource Management 1.ppt
Project Human Resource Management 1.pptMohammadReza60255
 
Project human resources management
Project human resources managementProject human resources management
Project human resources managementFirmansyah Ashari
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...GlobalSkillup
 
Executing and Managing a Project
Executing and Managing a ProjectExecuting and Managing a Project
Executing and Managing a ProjectNishant Munjal
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1reddvise
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptxIkram192675
 
ResourcesA Guide to the Project Management Body of Knowledge, .docx
ResourcesA Guide to the Project Management Body of Knowledge, .docxResourcesA Guide to the Project Management Body of Knowledge, .docx
ResourcesA Guide to the Project Management Body of Knowledge, .docxmackulaytoni
 
Project human resource management
Project human resource managementProject human resource management
Project human resource managementYogender Singh Rana
 
Human resource project
Human resource projectHuman resource project
Human resource projectRabbia Hussain
 
Human Resource project
Human Resource projectHuman Resource project
Human Resource projectRabbia Hussain
 
Human resource project
Human resource projectHuman resource project
Human resource projectRabbia Hussain
 
Advanced program management resource, content and knowledge management
Advanced program management   resource, content and knowledge managementAdvanced program management   resource, content and knowledge management
Advanced program management resource, content and knowledge managementMarcus Vannini
 

Similaire à project human resource managment (20)

Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Project Human Resource Management 1.ppt
Project Human Resource Management 1.pptProject Human Resource Management 1.ppt
Project Human Resource Management 1.ppt
 
Resouces.pdf
Resouces.pdfResouces.pdf
Resouces.pdf
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
Hr in projects
Hr in projectsHr in projects
Hr in projects
 
HR PM T@T
HR PM T@THR PM T@T
HR PM T@T
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
 
Executing and Managing a Project
Executing and Managing a ProjectExecuting and Managing a Project
Executing and Managing a Project
 
PMP_Project Human Resources Management
PMP_Project Human Resources ManagementPMP_Project Human Resources Management
PMP_Project Human Resources Management
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
PMSE_seminar3.pptx
PMSE_seminar3.pptxPMSE_seminar3.pptx
PMSE_seminar3.pptx
 
Hr interventions
Hr interventionsHr interventions
Hr interventions
 
Project Human Resource Management.pptx
Project Human Resource Management.pptxProject Human Resource Management.pptx
Project Human Resource Management.pptx
 
ResourcesA Guide to the Project Management Body of Knowledge, .docx
ResourcesA Guide to the Project Management Body of Knowledge, .docxResourcesA Guide to the Project Management Body of Knowledge, .docx
ResourcesA Guide to the Project Management Body of Knowledge, .docx
 
Project human resource management
Project human resource managementProject human resource management
Project human resource management
 
Human resource project
Human resource projectHuman resource project
Human resource project
 
Human Resource project
Human Resource projectHuman Resource project
Human Resource project
 
Human resource project
Human resource projectHuman resource project
Human resource project
 
Advanced program management resource, content and knowledge management
Advanced program management   resource, content and knowledge managementAdvanced program management   resource, content and knowledge management
Advanced program management resource, content and knowledge management
 

Plus de Aroosa Chodhary

Information Systems Report
Information Systems ReportInformation Systems Report
Information Systems ReportAroosa Chodhary
 
impression management PPT
impression management PPTimpression management PPT
impression management PPTAroosa Chodhary
 
New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)Aroosa Chodhary
 
companies working in pakistan
companies working in pakistancompanies working in pakistan
companies working in pakistanAroosa Chodhary
 
companies working in pakistan
companies working in pakistancompanies working in pakistan
companies working in pakistanAroosa Chodhary
 

Plus de Aroosa Chodhary (10)

imran khan
imran khanimran khan
imran khan
 
SM project on amazone
SM project on amazoneSM project on amazone
SM project on amazone
 
Information Systems Report
Information Systems ReportInformation Systems Report
Information Systems Report
 
entraprenure project
entraprenure projectentraprenure project
entraprenure project
 
impression management PPT
impression management PPTimpression management PPT
impression management PPT
 
leadership vs. manager
leadership vs. managerleadership vs. manager
leadership vs. manager
 
New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)New Microsoft Office PowerPoint Presentation (2)
New Microsoft Office PowerPoint Presentation (2)
 
HRD project
HRD projectHRD project
HRD project
 
companies working in pakistan
companies working in pakistancompanies working in pakistan
companies working in pakistan
 
companies working in pakistan
companies working in pakistancompanies working in pakistan
companies working in pakistan
 

project human resource managment

  • 1.
  • 3.
  • 4. Project Human resource management  Is the processes that organize, manage, and lead the project team.  The project team is comprised of the people with assigned roles and responsibilities for completing the project.
  • 5. Overview of the chapter
  • 6. Plan Human Resource Management is the process of identifying and documenting project roles, responsibilities, required skills, reporting relationships, and creating a staffing management plan.
  • 7. Key benefits of this process  establishes project roles and responsibilities,  project organization charts,  and the staffing management plan including the timetable for staff acquisition and release.
  • 8.
  • 9. Project Management Plan  provides guidance on how project human resources should be defined, staffed, managed, and eventually released.  The information used for the development of the human resource management plan includes  The project life cycle and the processes that will be applied to each phase,  How work will be executed to accomplish the project objectives,  A change management plan that documents how changes will be monitored and controlled  Needs and methods of communication among stakeholders.
  • 10. Activity Resource Requirements  identify the types and quantities of resources required for each activity in a work package.  Aggregated to determine estimated resources for each work package each work period.
  • 11. Enterprise Environmental Factors  enterprise environmental factors that can influence the Plan Human Resource management process Organizational culture and structure, Existing human resources, Geographical dispersion of team members, Personnel administration policies, and Marketplace conditions.
  • 12. Organizational Process Assets  are the plans, processes, policies, procedures, and knowledge bases specific to and used by the performing organization.
  • 14. Organization Charts and Position Descriptions
  • 15. Networking  formal and informal interaction with others in an organization, industry, or professional environment.
  • 16. Expert Judgment  required skills;  standardized role descriptions  Number of resources needed  reporting relationships  guidelines on lead time required for staffing  Identify risks associated with staff acquisition, retention, and release plans
  • 17. Organizational Theory  provides information regarding the way in which people, teams, and organizational units behave.
  • 19. Human Resource Management Plan  Roles and responsibilities  Role.  Authority.  Responsibility.  Competency  Project organization charts.  Staffing management plan.
  • 20. Acquire Project Team The process of conforming human resource availability and obtaining the team necessary to complete project activities.
  • 22. Human Resource Management Plan Provides guidance on how project human resources should be identified, staffed, managed, and eventually released.
  • 23. Enterprise Environmental Factors  Existing information on human resources  Personal administration policies  Organizational structure  Colocation or multiple locations
  • 24. Organization process assets  Organization standard policies, processes, and procedures.
  • 26.  Specific people being identified.  According to the project proposal  Depend on expertise defined in project charter. Pre-assignment
  • 27. Negotiation: Staff assignment are negotiated on many projects.  Functional manager  Other project management team  External organizations, vendors, suppliers, contractors etc.
  • 28. Acquisition : Performing organization is unable to provide human resource.  Acquire services from outside providers where expertise is not available internally.  Contract employees, consultants, outsourcing to other organizations.
  • 29. Virtual teams:  Groups possessing shared goals and fulfilling responsibilities with little or no face-to-face contact.  Enabled by electronic communication technologies. Individuals geographically dispersed Differences in shifts and work hours  Minimizes travel expenses .
  • 30. Multi-Criteria Decision Analysis: Selection criteria are often used as apart of acquiring the project team. Some examples of selection criteria that can be used to score team members are given below:  Availability  Cost  Knowledge  Ability  Experience
  • 32. Project Staff Assignments:  Staffs project by assigning specific individuals to project roles and responsibilities.  Documentation often include: Project team directory Specific names inserted into revised organization charts and schedules
  • 33. Resource Calendars:  Documents time periods each member can work on project  Creating a reliable scheduling of each person availability, scheduling conflicts, time zone, work hours, and commitment to other projects  Enable to building out the final human resource budgets
  • 34. Project Management Plan Updates:  Elements of project management plan that may be updated  Human resource plan updated  Continuing updates should reflect promotions, retirements, performance issues and changing workloads
  • 35. Develop project team The process of improving competencies ,team member interaction, and overall team environment to enhance project performance
  • 36. Inputs 1) Human resource management plan 2) Project staff assignments 3) Resource calendars
  • 37. Tools and techniques 1) Interpersonal skills 2) Training 3) Team –building activities 4) Ground rules 5) Colocation 6) Recognition and rewards 7) Personal assessment tools
  • 38. Out put  Team performance assessments  Enterprise environmental factors updates.
  • 39. Manage project team  Tracking of team performance  Providing feedback  Resolving issues  Resource allocation
  • 40. Benefits of manage project team  Influencing team Behavior  Conflict management  Performance appraises
  • 41. Manage project team: Inputs  HR plan  Requirement of job
  • 42. Manage project team: tool and techniques  Observations  Communication
  • 43. Manage project team: output  Project team
  • 44. For managing a project team skills are required  Communication  Conflict management  Negotiation  Leadership  Interpersonal skill  Project manager assign task, provide recognition to high performance.
  • 45. Factor influencing team decisions  change request  PM plan update  Project documentation  External factor  Organizational process assets