 Assessment of the beneficial and adverse
changes in environment resources or values
resulting from a proposed project.
 Essential Elements
1. Identification of possible positive or negative
impacts of the project.
2. Quantifying impacts with respect to common base.
3. Preparation of mitigation plan to offset the negative
impacts.
 (a) Commercial and Service
Facilities
 (+) The thana roads provide benefit of
fast communication, transport facilities
etc.
 (e) Industrial Activities
 (+) Road communication promotes
industrial activities.
 (f) Irrigation Facilities
 (+) Borrow-pits by the side of the roads
provide facility for small scale irrigation.
 (g) Landscape
 (-) Scattered borrow pits, unauthorized
growth around road , erosion result in
marred landscape.
communication
Borrow-pit Irrigation
 1. Action:
 Loss of breading, nursery and
feeding ground in flood plain.
 1. Impact:
 Reduction in Fish protein
consumption.
 Unemployment of fisherman.
 1. Mitigation Measures:
 Allow controlled flooding.
 Compensate the loss by fish
culture.
Fish farm
Fish breeding
 2. Action:
 Obstruction to mitigation of
fish.
 2. Impact:
 Same as 1.
 2. Mitigation Measures:
 Provide adequate opening in
roads and embankments along
routes of fish migration.
Fish ladder
Fish pass
 3. Action:
 Reproduction failure and
destruction of fish by
uncontrolled use of pesticide.
 3. Impact:
 Same as 1.
 3. Mitigation Measures:
 Adopt Integrated Pest
Management (IPM) for pest
control.
 Prevent drainage from
agriculture land from
reaching water bodies.
Bugs used in IPM
Applying Pesticide
 4. Action:
 Drying up of the wetlands
for agriculture purpose and
destruction of habitat for
fish, birds, amphibians etc.
 4. Impact:
 Reduction in Fishery.
 Elimination of species of
fish, birds, amphibians etc.
 Disruption of wetland
ecology.
 4. Mitigation Measures:
 Avoid complete drying up
of wetlands and swamp
land.
 Restore alternative habitat
for endangered species.
wetland
 5. Action:
 Reaching residues of
pesticides in surface and
groundwater from
agricultural lands.
 5. Impact:
 Cause water pollution.
 Contaminates sources of
water supply.
 Pesticides residues
accumulate in bio-mass.
 5. Mitigation Measures:
 Reduce use of pesticides
through IPM.
 Prevent agricultural land
drainage from reaching
surface water.
Agriculture runoff
 6. Action:
 Disruption of regional hydrology
through obstruction of flood
flow.
 Back water effect due to
constructions across flood plains.
 6. Impact:
 Increase duration, severity and
frequency of flood.
 Changes flooding pattern and
ground water recharge.
 6. Mitigation Measures:
 Avoid road construction across
the flood plain in the direction
perpendicular to flood flow.
 Provide adequate opening for
flood flow.
Road across flow direction
 7. Action:
 Dust blowing from unpaved roads
during construction and
movement of vehicles.
 7. Impact:
 Health hazards due to dust
pollution.
 Damage to vegetation and trees
along the road.
 7. Mitigation Measures:
 Control moisture content during
construction by watering.
 Stabilize road surface with a
suitable stabilizer.
 Increase vegetation cover on road
surface and slopes.
Dust blowing
Compaction
 Loss of agricultural land.
 8. Impact:
 Deprives a group of farmers of their
means of living.
 Increases landlessness in the area.
 Reduces employment in agriculture.
 Affects agricultural production.
 8. Mitigation Measures:
 Plan the project to avoid fertile
agricultural land.
 Rehabilitate the affected people.
 Generate employment opportunities in
other activities.
Agricultural land
Loss of land due to road
 9. Action:
 Inadequate considerations to
land use and landscape.
 9. Impact:
 Landscape disfiguration by
irregular borrowpits, deep cuts,
fills, unplanned growth of
shops, and other services.
 9. Mitigation Measures:
 Replant disfigured surfaces.
 Use a design to blend with
landscape.
 Prevent unplanned
construction and unauthorized
uses of roads and
embankments.
Borrow pits
Blend landscape due
to construction
 10. Action:
 Obstruction to navigation and
plying of boat.
 10. Impact:
 Disruption of cheap mode of
transportation.
 Adverse effects on communication.
 10. Mitigation Measures:
 Provide openings at major routes
and construct road structures
leaving adequate clearance above
high flood level for plying of
boats.
Opening for navigation
Should be above HFL
Box culvert bridge
 11. Action:
 Use of irrigation water with high iron
content.
 11. Impact:
 Impart reddish color to top soil.
 Changes soil texture and Permeability.
 11. Mitigation Measures:
 Look for an alternative water source,
the right strata producing water with
low iron content.
 Detain the aerated water in a
reservoir, canal before application in
the field.
Contaminated water
Clear water for irrigation

Contenu connexe

Tendances

Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2
Enoch Chang
 

Tendances (20)

GM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, EssexGM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, Essex
 
Jennie Moonan mas 2017
Jennie Moonan mas 2017Jennie Moonan mas 2017
Jennie Moonan mas 2017
 
Watersheds by jenrap14
Watersheds by jenrap14Watersheds by jenrap14
Watersheds by jenrap14
 
GM Symposium - Jon-Eric White
GM Symposium - Jon-Eric WhiteGM Symposium - Jon-Eric White
GM Symposium - Jon-Eric White
 
The se san and nam theun nam kading hydropower dam cascades
The se san and nam theun nam kading hydropower dam cascadesThe se san and nam theun nam kading hydropower dam cascades
The se san and nam theun nam kading hydropower dam cascades
 
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
Andy Freifeld, Temple University, “Landscape Design and Reuse Planning in Min...
 
Scott Horsley, "From Gray to Green Infrastructure"
Scott Horsley, "From Gray to Green Infrastructure"Scott Horsley, "From Gray to Green Infrastructure"
Scott Horsley, "From Gray to Green Infrastructure"
 
K4 banjir
K4 banjirK4 banjir
K4 banjir
 
Kiggo Stone Excavation Scoping Visit
Kiggo Stone Excavation Scoping VisitKiggo Stone Excavation Scoping Visit
Kiggo Stone Excavation Scoping Visit
 
Calbiga River Care
Calbiga River CareCalbiga River Care
Calbiga River Care
 
Kabaka’S Lake
Kabaka’S LakeKabaka’S Lake
Kabaka’S Lake
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Llynclys quarry restoration
Llynclys quarry restorationLlynclys quarry restoration
Llynclys quarry restoration
 
Urban eco-constructs_Port Philip bay ecocenter_presentation_20th may 2007
Urban eco-constructs_Port Philip bay ecocenter_presentation_20th may 2007Urban eco-constructs_Port Philip bay ecocenter_presentation_20th may 2007
Urban eco-constructs_Port Philip bay ecocenter_presentation_20th may 2007
 
Hop and Providence rivers restoration!
Hop and Providence rivers restoration!Hop and Providence rivers restoration!
Hop and Providence rivers restoration!
 
Case study reclaiming-mined-land-in-east-kalimantan
Case study reclaiming-mined-land-in-east-kalimantanCase study reclaiming-mined-land-in-east-kalimantan
Case study reclaiming-mined-land-in-east-kalimantan
 
Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Land Trusts and Water Quality Restoration
Land Trusts and Water Quality RestorationLand Trusts and Water Quality Restoration
Land Trusts and Water Quality Restoration
 

Similaire à Environmental Aspects Of Developing Projects

Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
Md. Mahmudor Rahman
 
final-210505042746.pptx praveen kumar m
final-210505042746.pptx  praveen kumar mfinal-210505042746.pptx  praveen kumar m
final-210505042746.pptx praveen kumar m
PraveenBreaker
 
Environmental remediation project, Pima County Natural Resources, AZ
Environmental remediation project, Pima County Natural Resources, AZEnvironmental remediation project, Pima County Natural Resources, AZ
Environmental remediation project, Pima County Natural Resources, AZ
steven steinberg
 

Similaire à Environmental Aspects Of Developing Projects (20)

EIA & EIV
EIA & EIVEIA & EIV
EIA & EIV
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
BCE UNIT-III WRE.pdf
BCE UNIT-III WRE.pdfBCE UNIT-III WRE.pdf
BCE UNIT-III WRE.pdf
 
final-210505042746.pptx praveen kumar m
final-210505042746.pptx  praveen kumar mfinal-210505042746.pptx  praveen kumar m
final-210505042746.pptx praveen kumar m
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
 
Bacton NTS Table 6.2
Bacton NTS Table 6.2Bacton NTS Table 6.2
Bacton NTS Table 6.2
 
Land Degradation – nature and concerns
Land Degradation – nature and concernsLand Degradation – nature and concerns
Land Degradation – nature and concerns
 
Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...
 
Pgb unit ii a kameswara rao marthi
Pgb unit ii a   kameswara rao marthiPgb unit ii a   kameswara rao marthi
Pgb unit ii a kameswara rao marthi
 
Environmental remediation project, Pima County Natural Resources, AZ
Environmental remediation project, Pima County Natural Resources, AZEnvironmental remediation project, Pima County Natural Resources, AZ
Environmental remediation project, Pima County Natural Resources, AZ
 
Soil conservation & technics by shridhar malkache
Soil conservation & technics by shridhar malkacheSoil conservation & technics by shridhar malkache
Soil conservation & technics by shridhar malkache
 
Soil conservation & technics by shridhar malkache
Soil conservation & technics by shridhar malkacheSoil conservation & technics by shridhar malkache
Soil conservation & technics by shridhar malkache
 
water shed managment (2).pptx
water shed managment (2).pptxwater shed managment (2).pptx
water shed managment (2).pptx
 
Gem ppt-35-sand mining
Gem ppt-35-sand miningGem ppt-35-sand mining
Gem ppt-35-sand mining
 
Green Earth Movement - Sand Mining
Green Earth Movement - Sand MiningGreen Earth Movement - Sand Mining
Green Earth Movement - Sand Mining
 
Land polluction for ES
Land polluction for ESLand polluction for ES
Land polluction for ES
 
watershed_concept_obj-Lec-No.-11-1-converted.pptx
watershed_concept_obj-Lec-No.-11-1-converted.pptxwatershed_concept_obj-Lec-No.-11-1-converted.pptx
watershed_concept_obj-Lec-No.-11-1-converted.pptx
 
Community based Integrated Watershed Management
Community based Integrated Watershed ManagementCommunity based Integrated Watershed Management
Community based Integrated Watershed Management
 
Introduction chapter `1
Introduction chapter `1Introduction chapter `1
Introduction chapter `1
 
4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...
 

Dernier

Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
Monica Sydney
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 

Dernier (20)

High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 

Environmental Aspects Of Developing Projects

  • 1.
  • 2.  Assessment of the beneficial and adverse changes in environment resources or values resulting from a proposed project.  Essential Elements 1. Identification of possible positive or negative impacts of the project. 2. Quantifying impacts with respect to common base. 3. Preparation of mitigation plan to offset the negative impacts.
  • 3.  (a) Commercial and Service Facilities  (+) The thana roads provide benefit of fast communication, transport facilities etc.  (e) Industrial Activities  (+) Road communication promotes industrial activities.  (f) Irrigation Facilities  (+) Borrow-pits by the side of the roads provide facility for small scale irrigation.  (g) Landscape  (-) Scattered borrow pits, unauthorized growth around road , erosion result in marred landscape. communication Borrow-pit Irrigation
  • 4.  1. Action:  Loss of breading, nursery and feeding ground in flood plain.  1. Impact:  Reduction in Fish protein consumption.  Unemployment of fisherman.  1. Mitigation Measures:  Allow controlled flooding.  Compensate the loss by fish culture. Fish farm Fish breeding
  • 5.  2. Action:  Obstruction to mitigation of fish.  2. Impact:  Same as 1.  2. Mitigation Measures:  Provide adequate opening in roads and embankments along routes of fish migration. Fish ladder Fish pass
  • 6.  3. Action:  Reproduction failure and destruction of fish by uncontrolled use of pesticide.  3. Impact:  Same as 1.  3. Mitigation Measures:  Adopt Integrated Pest Management (IPM) for pest control.  Prevent drainage from agriculture land from reaching water bodies. Bugs used in IPM Applying Pesticide
  • 7.  4. Action:  Drying up of the wetlands for agriculture purpose and destruction of habitat for fish, birds, amphibians etc.  4. Impact:  Reduction in Fishery.  Elimination of species of fish, birds, amphibians etc.  Disruption of wetland ecology.  4. Mitigation Measures:  Avoid complete drying up of wetlands and swamp land.  Restore alternative habitat for endangered species. wetland
  • 8.  5. Action:  Reaching residues of pesticides in surface and groundwater from agricultural lands.  5. Impact:  Cause water pollution.  Contaminates sources of water supply.  Pesticides residues accumulate in bio-mass.  5. Mitigation Measures:  Reduce use of pesticides through IPM.  Prevent agricultural land drainage from reaching surface water. Agriculture runoff
  • 9.  6. Action:  Disruption of regional hydrology through obstruction of flood flow.  Back water effect due to constructions across flood plains.  6. Impact:  Increase duration, severity and frequency of flood.  Changes flooding pattern and ground water recharge.  6. Mitigation Measures:  Avoid road construction across the flood plain in the direction perpendicular to flood flow.  Provide adequate opening for flood flow. Road across flow direction
  • 10.  7. Action:  Dust blowing from unpaved roads during construction and movement of vehicles.  7. Impact:  Health hazards due to dust pollution.  Damage to vegetation and trees along the road.  7. Mitigation Measures:  Control moisture content during construction by watering.  Stabilize road surface with a suitable stabilizer.  Increase vegetation cover on road surface and slopes. Dust blowing Compaction
  • 11.  Loss of agricultural land.  8. Impact:  Deprives a group of farmers of their means of living.  Increases landlessness in the area.  Reduces employment in agriculture.  Affects agricultural production.  8. Mitigation Measures:  Plan the project to avoid fertile agricultural land.  Rehabilitate the affected people.  Generate employment opportunities in other activities. Agricultural land Loss of land due to road
  • 12.  9. Action:  Inadequate considerations to land use and landscape.  9. Impact:  Landscape disfiguration by irregular borrowpits, deep cuts, fills, unplanned growth of shops, and other services.  9. Mitigation Measures:  Replant disfigured surfaces.  Use a design to blend with landscape.  Prevent unplanned construction and unauthorized uses of roads and embankments. Borrow pits Blend landscape due to construction
  • 13.  10. Action:  Obstruction to navigation and plying of boat.  10. Impact:  Disruption of cheap mode of transportation.  Adverse effects on communication.  10. Mitigation Measures:  Provide openings at major routes and construct road structures leaving adequate clearance above high flood level for plying of boats. Opening for navigation Should be above HFL Box culvert bridge
  • 14.  11. Action:  Use of irrigation water with high iron content.  11. Impact:  Impart reddish color to top soil.  Changes soil texture and Permeability.  11. Mitigation Measures:  Look for an alternative water source, the right strata producing water with low iron content.  Detain the aerated water in a reservoir, canal before application in the field. Contaminated water Clear water for irrigation