Integrated People-Driven
Reconstruction in Indonesia
POST TSUNAMI ACEH RECONSTRUCTION
Tsunami Aceh in Figures
26 December 2004

635,384 people displaced

07.59 am local time,

127,720 people killed

9.3 on the Richter scale earthquake caused
tsunami wave located 155 kilometres west of
the Indonesian island Sumatra.

93,285 people missing

139,195 houses destroyed
73,869 has of agricultural lands
destroyed
13,828 fishing boats destroyed
1,089 religious facilities destroyed
3,415 schools destroyed
669 government buildings
destroyed
119 bridges destroyed

22 ports destroyed
2,618 kilometers of road destroyed
8 airports or airstrips destroyed
Source: BRR, April 2009
Temporary shelter construction from tsunami debris (wood
blocks, planks, nails, tin sheet)
Participatory mapping: community sketch to identify land
ownership, borders, digitized and used for village planning
and land titling supporting document.
HOUSE CONSTRUCTION METHOD
1. Construction by house owners, or
a group of owners, no contractor
2.

Owners choose house type
among 5 option

3. Owners supervise the
construction, Uplink provides
technical field supervisor
4. House owner may purchase
building materials themselves
except timber, steel, cement, sand,
and rock that Uplink buys in bulk
for economic reason.
5. Uplink applies card system to
distribute building materials

HARD WORK – INTEGRITY - ANTI
CORRUPTION, COLLUSION, &
NEPOTISM – HONESTY –
TRANSPARENCY - GENDER EQUITY
MATERIAL CARD SYSTEM FOR HOUSE
OWNER
PROCEDURE OF MATERIAL REQUEST CARD
HOUSE OWNER/OWNER GROUP

UPLINK INFORMATION & DATA TEAM

Data team issues owner ID
Number & contract

UPLINK PROCUREMENT TEAM

card issued after data team
verified owner’s data

VILLAGE SUPPLIERS/JUB MATERIALS
STOCKIST

UPLINK PROCUREMENT TEAM

UPLINK FINANCE TEAM

Inspector checks incoming
item to location and signs the
card

Procurement team conducts
site check (Monday and
Thursday) to ensure materials
amount and quality

Finance team transfers
money to supplier’s bank
account on Thursdays
New Technologies Introduced to
the Community
Biofil System (Biological
Filter Septic Tank), made
of fiberglass, installed in
villages with high table
water level

Solar Energy for street lamp and
Meunasah in Lamawee and
Lampageu, a collaboratoin with
Green Peace
SELF-MANAGED VILLAGE
INFRASTRUCTURE CONSTRUCTION
FULL SUPPORT FROM COMMUNITY
PROJECT MANAGER TEAM TRUSTED BY THE COMMUNITY
COMMUNITY MONITOR THE WORK
LOCAL LABOUR

VILLAGE ROAD
DRAINAGE
RIVER DYKE
EMBANKMENT
JETTY
WATER SUPPLY
HOUSING SANITATION
VILLAGE PUBLIC FACILITIES
Vegetable growing and selling
introduction of mushroom
farming skill

INTRODUCTION OF ORGANIC
FARMING

ECONOMIC RECOVERY:
Grants for families to start up small business
(proposal based)
Workshop for timber, steel, and compacted soil
cement blocks
Becak motor (motorised tri-cycle)
Encourage the community to use the tsunami
remains timber
Advocacy on land tenure, certification, housing rights
Together with JUB Change of coastal free-zone policy to safety measures policy
(especially for Banda Aceh area)
VILLAGE SOLIDARITY NETWORK (JUB)
Giving inputs for house design (size, rooms arrangement)

•Deciding choice of house model (5 options; 3 stilt houses, 2
grounded houses)
•Involve in Kampung Construction Team (TPK) as supervisor, book
keeper, or head mason on house and road construction.
•Group craft activities in kampung; rattan weaving
•Kampung Economic Team: individual small capital in each
kampung
•Organic Farming Team: Replanting agricultural plants and
(productive) garden plants individually and in group
•Develop paving-block small industry
•Take part as JUB Board members

WOMEN’S PARTICIPATION
RESULTS
One of fastest, most satisfactory results (UN Habitat study, 2006)
One of four world finalist in the UN Habitat 2007 Scroll of Honor
Winner of 2008 the Dubai International Award for Best Practices To
Improve the Living Environment
3335 quake-proof houses (stilt and ground), village infrastructure,
sanitation system
The foundation of JUB (Jaringan Udeep Beusare/Village Solidarity
Network) that links 23 villages in the stretch
Change of coastal free-zone policy to safety measures policy
(especially for Banda Aceh area)
Strong impacts on gender balanced-participation in highly gender
segregated society of Aceh
UPLINK has sown seeds for social movement and change in its
area of work
8 YEARS AFTER
LOOKING BACK AT THE RECONSTRUCTION PROJECT
• Economic challenge: high number of unemployment, low cash flow
• Agricultural activities has been started, it is one of the good sources for living
Research Findings
User Satisfaction
Positive Points
1.
2.

3.

Safety within the home resulted from the
strength of the house
Sense of belongingness within the home
resulted from participatory process in
building the houses
Easy to modify/ to extend

Things could do better
1.
2.
3.

Bigger size to accommodate people’s
need in the future
House design, need more “local touch”
House lay out : pay attention to local
perception/ interpretation to space (eg.
kitchen, bath room)
Beneficiary Targeting
• Large majority of the beneficiaries are still living in the house.
• Few cases of the houses are being abandoned as the owner move to another city.
• Some of the houses are rented or sold since the owners married to another survivors
and later share one of the two properties provided to them.
• Many inhabitants altered the function of houses so as to accommodate their lifestyle
and needs
Replication
•
•

•

•

The structure of the additional building do not follow the Uplink’s standard
due to economic constrain.
Some of the additional buildings used recycled material from the temporary
shelter.
People need more time and facilitation to learn new technologies/
innovation introduced during the project. Some of the innovations (eg. Solar
panel, biofil sanitation system) have not been used.
The organisation collaborated with the Australian Red Cross to provide a
similar participatory approach on Nasi Island, of the coast of Banda Aceh,
following the disaster. They are also implementing similar plans in postearthquake reconstruction in Yogyakarta.
Technical Performance
•
•
•

Good structural performance, easy to extend, easy to maintain
Need special attention on window frame and door
Maintenance : regular repaint, insect spray, applying kerosene on the floor
to keep it clean and shiny, cover the wood wall metal sheeting to avoid
damage caused by rain water.
Livelihood
• Some of the economic recovery program during the project are still
run by the community ex. pedicab driver and workshop, duck and
chicken farming
• Skills acquired during the reconstruction phase are used to earn
income as small contractors
• Positive impact on women’s position and power within society
Lesson Learned
Reconstruction is not only about rebuilding physical aspect such but
also reconstructing the life. The concept of people's driven,
participatory, and holistic approach is a must.
Some of lesson learned from the project are:

•Sensitivity to Local Culture
•Involving Survivors in Every Stage of Reconstruction
•Post-Disaster Livelihood Programme
•Allocate more time to facilitate the learning process of the
community after the reconstruction phase

Contenu connexe

Tendances

2do. ejemplo de predimensionamiento
2do. ejemplo de predimensionamiento2do. ejemplo de predimensionamiento
2do. ejemplo de predimensionamientopatrick_amb
 
Formulario vigas
Formulario vigasFormulario vigas
Formulario vigaspaulccana
 
Análisis estructural i
Análisis estructural iAnálisis estructural i
Análisis estructural iJuan Bruno
 
Ejercicios de procedimientos de construccion ing. genaro delgado
Ejercicios de procedimientos de construccion ing. genaro delgadoEjercicios de procedimientos de construccion ing. genaro delgado
Ejercicios de procedimientos de construccion ing. genaro delgadodenis_juan
 
Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)Md. Shahadat Hossain
 
Diseño de Zapata Aislada Ing. César Jesús Díaz Coronel
Diseño de Zapata Aislada Ing. César Jesús Díaz CoronelDiseño de Zapata Aislada Ing. César Jesús Díaz Coronel
Diseño de Zapata Aislada Ing. César Jesús Díaz CoronelCÉSAR JESÚS DÍAZ CORONEL
 
Memoria de calculo. estructura de concreto armado
Memoria de calculo. estructura de concreto  armadoMemoria de calculo. estructura de concreto  armado
Memoria de calculo. estructura de concreto armadoIng. Ruben J. Gonzalez P.
 
Zapatas medianeras, lindero y esquina
Zapatas medianeras, lindero y esquinaZapatas medianeras, lindero y esquina
Zapatas medianeras, lindero y esquinaMauricio Moran
 
Trabajo de estructuras - método de nodos y matricial
Trabajo de estructuras - método de nodos y matricialTrabajo de estructuras - método de nodos y matricial
Trabajo de estructuras - método de nodos y matricialAntony R O Q U E
 
Diagrama momento curvatura aproximado
Diagrama momento   curvatura aproximadoDiagrama momento   curvatura aproximado
Diagrama momento curvatura aproximadoErly Enriquez Quispe
 
Metdod de-castigliano-docx
Metdod de-castigliano-docxMetdod de-castigliano-docx
Metdod de-castigliano-docxaraujo_ing
 

Tendances (20)

Memoria de cálculo vivienda piura
Memoria de cálculo   vivienda piuraMemoria de cálculo   vivienda piura
Memoria de cálculo vivienda piura
 
2do. ejemplo de predimensionamiento
2do. ejemplo de predimensionamiento2do. ejemplo de predimensionamiento
2do. ejemplo de predimensionamiento
 
Formulario vigas
Formulario vigasFormulario vigas
Formulario vigas
 
Análisis estructural i
Análisis estructural iAnálisis estructural i
Análisis estructural i
 
Estructuras en concreto vii 1070264
Estructuras en concreto vii   1070264Estructuras en concreto vii   1070264
Estructuras en concreto vii 1070264
 
Concreto armado 1
Concreto armado 1Concreto armado 1
Concreto armado 1
 
Ejercicios de procedimientos de construccion ing. genaro delgado
Ejercicios de procedimientos de construccion ing. genaro delgadoEjercicios de procedimientos de construccion ing. genaro delgado
Ejercicios de procedimientos de construccion ing. genaro delgado
 
Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)Rcc structure design by etabs (acecoms)
Rcc structure design by etabs (acecoms)
 
Etabs multistory-steel
Etabs multistory-steelEtabs multistory-steel
Etabs multistory-steel
 
Diseño de Zapata Aislada Ing. César Jesús Díaz Coronel
Diseño de Zapata Aislada Ing. César Jesús Díaz CoronelDiseño de Zapata Aislada Ing. César Jesús Díaz Coronel
Diseño de Zapata Aislada Ing. César Jesús Díaz Coronel
 
Lateral loads manual
Lateral loads manualLateral loads manual
Lateral loads manual
 
Memoria de calculo. estructura de concreto armado
Memoria de calculo. estructura de concreto  armadoMemoria de calculo. estructura de concreto  armado
Memoria de calculo. estructura de concreto armado
 
Zapatas medianeras, lindero y esquina
Zapatas medianeras, lindero y esquinaZapatas medianeras, lindero y esquina
Zapatas medianeras, lindero y esquina
 
Formulario vigas
Formulario vigasFormulario vigas
Formulario vigas
 
Trabajo de estructuras - método de nodos y matricial
Trabajo de estructuras - método de nodos y matricialTrabajo de estructuras - método de nodos y matricial
Trabajo de estructuras - método de nodos y matricial
 
Metodo completo de kani
Metodo completo de kaniMetodo completo de kani
Metodo completo de kani
 
Diagrama momento curvatura aproximado
Diagrama momento   curvatura aproximadoDiagrama momento   curvatura aproximado
Diagrama momento curvatura aproximado
 
Metdod de-castigliano-docx
Metdod de-castigliano-docxMetdod de-castigliano-docx
Metdod de-castigliano-docx
 
1. predi y estructuracion
1. predi y estructuracion1. predi y estructuracion
1. predi y estructuracion
 
Diseño y elaboración de cerchas
Diseño y elaboración de cerchasDiseño y elaboración de cerchas
Diseño y elaboración de cerchas
 

En vedette (6)

Bencana tsunami
Bencana tsunamiBencana tsunami
Bencana tsunami
 
Tsunami
TsunamiTsunami
Tsunami
 
Manual de power point 2010
Manual de power point 2010Manual de power point 2010
Manual de power point 2010
 
Tsunami powerpoint
Tsunami powerpointTsunami powerpoint
Tsunami powerpoint
 
Tsunami powerpoint
Tsunami powerpointTsunami powerpoint
Tsunami powerpoint
 
Aranya Low Cost Housing
Aranya Low Cost HousingAranya Low Cost Housing
Aranya Low Cost Housing
 

Similaire à UPLINK - Aceh, Indonesia post-tsunami reconstruction

Affordable Housing Prototypes for Sub-saharan Africa
Affordable Housing Prototypes for Sub-saharan AfricaAffordable Housing Prototypes for Sub-saharan Africa
Affordable Housing Prototypes for Sub-saharan AfricaKevin Kyeong-il CHOI
 
Woodless construction-1
Woodless construction-1Woodless construction-1
Woodless construction-1Palani Appan
 
CRAterre_Philippines shelter project summery_2014
CRAterre_Philippines shelter project summery_2014CRAterre_Philippines shelter project summery_2014
CRAterre_Philippines shelter project summery_2014Annalisa Caimi
 
Rebuilding After Disaster - Elizabeth Hausler
Rebuilding After Disaster -  Elizabeth HauslerRebuilding After Disaster -  Elizabeth Hausler
Rebuilding After Disaster - Elizabeth Hauslerswissnex San Francisco
 
newah-fwb-challenge-design-brief-small.pdf.docx
newah-fwb-challenge-design-brief-small.pdf.docxnewah-fwb-challenge-design-brief-small.pdf.docx
newah-fwb-challenge-design-brief-small.pdf.docxhenrymartin15260
 
Ar6017 urban housing unit 02 no copy
Ar6017 urban housing unit 02 no copyAr6017 urban housing unit 02 no copy
Ar6017 urban housing unit 02 no copySiva Raman
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYMahak Gupta
 
Kuching | Jan-15 | Cambodia Millennium Village
Kuching | Jan-15 | Cambodia Millennium VillageKuching | Jan-15 | Cambodia Millennium Village
Kuching | Jan-15 | Cambodia Millennium VillageSmart Villages
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongWater, Land and Ecosystems (WLE)
 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21noorizzah
 
Presentation building science. Noise pollution and
Presentation building science. Noise pollution and Presentation building science. Noise pollution and
Presentation building science. Noise pollution and Braham Diehard
 
NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science
 NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science
NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building scienceBraham Diehard
 
HOUSING-PPT (1).pptx
HOUSING-PPT (1).pptxHOUSING-PPT (1).pptx
HOUSING-PPT (1).pptxGHSAdmin1
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 

Similaire à UPLINK - Aceh, Indonesia post-tsunami reconstruction (20)

construction presentation
construction presentationconstruction presentation
construction presentation
 
Affordable Housing Prototypes for Sub-saharan Africa
Affordable Housing Prototypes for Sub-saharan AfricaAffordable Housing Prototypes for Sub-saharan Africa
Affordable Housing Prototypes for Sub-saharan Africa
 
Woodless construction-1
Woodless construction-1Woodless construction-1
Woodless construction-1
 
vxc
vxcvxc
vxc
 
CRAterre_Philippines shelter project summery_2014
CRAterre_Philippines shelter project summery_2014CRAterre_Philippines shelter project summery_2014
CRAterre_Philippines shelter project summery_2014
 
Matrix
MatrixMatrix
Matrix
 
Green building
Green buildingGreen building
Green building
 
Rebuilding After Disaster - Elizabeth Hausler
Rebuilding After Disaster -  Elizabeth HauslerRebuilding After Disaster -  Elizabeth Hausler
Rebuilding After Disaster - Elizabeth Hausler
 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
 
newah-fwb-challenge-design-brief-small.pdf.docx
newah-fwb-challenge-design-brief-small.pdf.docxnewah-fwb-challenge-design-brief-small.pdf.docx
newah-fwb-challenge-design-brief-small.pdf.docx
 
Ar6017 urban housing unit 02 no copy
Ar6017 urban housing unit 02 no copyAr6017 urban housing unit 02 no copy
Ar6017 urban housing unit 02 no copy
 
ARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDYARANYA HOUSING CASE STUDY
ARANYA HOUSING CASE STUDY
 
Kuching | Jan-15 | Cambodia Millennium Village
Kuching | Jan-15 | Cambodia Millennium VillageKuching | Jan-15 | Cambodia Millennium Village
Kuching | Jan-15 | Cambodia Millennium Village
 
Green infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience MekongGreen infrastructure foundation for climate resilience Mekong
Green infrastructure foundation for climate resilience Mekong
 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 
Presentation building science. Noise pollution and
Presentation building science. Noise pollution and Presentation building science. Noise pollution and
Presentation building science. Noise pollution and
 
NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science
 NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science
NOISE POLLUTION AND SUNLIGHT ENERGYPresentation building science
 
HOUSING-PPT (1).pptx
HOUSING-PPT (1).pptxHOUSING-PPT (1).pptx
HOUSING-PPT (1).pptx
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 

Plus de Building and Social Housing Foundation (BSHF) (10)

Post- earthquake reconstruction in Gandhi Nu Gam, Ludiya (Gujarat)
Post- earthquake reconstruction in Gandhi Nu Gam, Ludiya (Gujarat)Post- earthquake reconstruction in Gandhi Nu Gam, Ludiya (Gujarat)
Post- earthquake reconstruction in Gandhi Nu Gam, Ludiya (Gujarat)
 
Habitat for Humanity Indian Ocean post-tsunami reconstruction
Habitat for Humanity Indian Ocean post-tsunami reconstructionHabitat for Humanity Indian Ocean post-tsunami reconstruction
Habitat for Humanity Indian Ocean post-tsunami reconstruction
 
BSHF Literature review on impact of reconstruction
BSHF Literature review on impact of reconstructionBSHF Literature review on impact of reconstruction
BSHF Literature review on impact of reconstruction
 
Practical Action Peru post-earthquake reconstruction
Practical Action Peru post-earthquake reconstructionPractical Action Peru post-earthquake reconstruction
Practical Action Peru post-earthquake reconstruction
 
BACIP Pakistan disaster mitigation
BACIP Pakistan disaster mitigationBACIP Pakistan disaster mitigation
BACIP Pakistan disaster mitigation
 
EcoSur Honduras and Nicaragua post-Mitch
EcoSur Honduras and Nicaragua post-MitchEcoSur Honduras and Nicaragua post-Mitch
EcoSur Honduras and Nicaragua post-Mitch
 
Post-earthquake Guatemala 36 years later
Post-earthquake Guatemala 36 years laterPost-earthquake Guatemala 36 years later
Post-earthquake Guatemala 36 years later
 
DWF Lessons from Vietnam
DWF Lessons from VietnamDWF Lessons from Vietnam
DWF Lessons from Vietnam
 
A study of reconstruction in India
A study of reconstruction in IndiaA study of reconstruction in India
A study of reconstruction in India
 
Practical Action Sri Lanka post-tsunami reconstruction
Practical Action Sri Lanka post-tsunami reconstructionPractical Action Sri Lanka post-tsunami reconstruction
Practical Action Sri Lanka post-tsunami reconstruction
 

Dernier

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 

Dernier (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 

UPLINK - Aceh, Indonesia post-tsunami reconstruction

  • 1. Integrated People-Driven Reconstruction in Indonesia POST TSUNAMI ACEH RECONSTRUCTION
  • 2. Tsunami Aceh in Figures 26 December 2004 635,384 people displaced 07.59 am local time, 127,720 people killed 9.3 on the Richter scale earthquake caused tsunami wave located 155 kilometres west of the Indonesian island Sumatra. 93,285 people missing 139,195 houses destroyed 73,869 has of agricultural lands destroyed 13,828 fishing boats destroyed 1,089 religious facilities destroyed 3,415 schools destroyed 669 government buildings destroyed 119 bridges destroyed 22 ports destroyed 2,618 kilometers of road destroyed 8 airports or airstrips destroyed Source: BRR, April 2009
  • 3.
  • 4.
  • 5.
  • 6. Temporary shelter construction from tsunami debris (wood blocks, planks, nails, tin sheet)
  • 7. Participatory mapping: community sketch to identify land ownership, borders, digitized and used for village planning and land titling supporting document.
  • 8. HOUSE CONSTRUCTION METHOD 1. Construction by house owners, or a group of owners, no contractor 2. Owners choose house type among 5 option 3. Owners supervise the construction, Uplink provides technical field supervisor 4. House owner may purchase building materials themselves except timber, steel, cement, sand, and rock that Uplink buys in bulk for economic reason. 5. Uplink applies card system to distribute building materials HARD WORK – INTEGRITY - ANTI CORRUPTION, COLLUSION, & NEPOTISM – HONESTY – TRANSPARENCY - GENDER EQUITY
  • 9. MATERIAL CARD SYSTEM FOR HOUSE OWNER PROCEDURE OF MATERIAL REQUEST CARD HOUSE OWNER/OWNER GROUP UPLINK INFORMATION & DATA TEAM Data team issues owner ID Number & contract UPLINK PROCUREMENT TEAM card issued after data team verified owner’s data VILLAGE SUPPLIERS/JUB MATERIALS STOCKIST UPLINK PROCUREMENT TEAM UPLINK FINANCE TEAM Inspector checks incoming item to location and signs the card Procurement team conducts site check (Monday and Thursday) to ensure materials amount and quality Finance team transfers money to supplier’s bank account on Thursdays
  • 10.
  • 11. New Technologies Introduced to the Community Biofil System (Biological Filter Septic Tank), made of fiberglass, installed in villages with high table water level Solar Energy for street lamp and Meunasah in Lamawee and Lampageu, a collaboratoin with Green Peace
  • 12. SELF-MANAGED VILLAGE INFRASTRUCTURE CONSTRUCTION FULL SUPPORT FROM COMMUNITY PROJECT MANAGER TEAM TRUSTED BY THE COMMUNITY COMMUNITY MONITOR THE WORK LOCAL LABOUR VILLAGE ROAD DRAINAGE RIVER DYKE EMBANKMENT JETTY WATER SUPPLY HOUSING SANITATION VILLAGE PUBLIC FACILITIES
  • 13. Vegetable growing and selling introduction of mushroom farming skill INTRODUCTION OF ORGANIC FARMING ECONOMIC RECOVERY: Grants for families to start up small business (proposal based) Workshop for timber, steel, and compacted soil cement blocks Becak motor (motorised tri-cycle) Encourage the community to use the tsunami remains timber
  • 14. Advocacy on land tenure, certification, housing rights Together with JUB Change of coastal free-zone policy to safety measures policy (especially for Banda Aceh area)
  • 16. Giving inputs for house design (size, rooms arrangement) •Deciding choice of house model (5 options; 3 stilt houses, 2 grounded houses) •Involve in Kampung Construction Team (TPK) as supervisor, book keeper, or head mason on house and road construction. •Group craft activities in kampung; rattan weaving •Kampung Economic Team: individual small capital in each kampung •Organic Farming Team: Replanting agricultural plants and (productive) garden plants individually and in group •Develop paving-block small industry •Take part as JUB Board members WOMEN’S PARTICIPATION
  • 17. RESULTS One of fastest, most satisfactory results (UN Habitat study, 2006) One of four world finalist in the UN Habitat 2007 Scroll of Honor Winner of 2008 the Dubai International Award for Best Practices To Improve the Living Environment 3335 quake-proof houses (stilt and ground), village infrastructure, sanitation system The foundation of JUB (Jaringan Udeep Beusare/Village Solidarity Network) that links 23 villages in the stretch Change of coastal free-zone policy to safety measures policy (especially for Banda Aceh area) Strong impacts on gender balanced-participation in highly gender segregated society of Aceh UPLINK has sown seeds for social movement and change in its area of work
  • 18. 8 YEARS AFTER LOOKING BACK AT THE RECONSTRUCTION PROJECT • Economic challenge: high number of unemployment, low cash flow • Agricultural activities has been started, it is one of the good sources for living
  • 19. Research Findings User Satisfaction Positive Points 1. 2. 3. Safety within the home resulted from the strength of the house Sense of belongingness within the home resulted from participatory process in building the houses Easy to modify/ to extend Things could do better 1. 2. 3. Bigger size to accommodate people’s need in the future House design, need more “local touch” House lay out : pay attention to local perception/ interpretation to space (eg. kitchen, bath room)
  • 20. Beneficiary Targeting • Large majority of the beneficiaries are still living in the house. • Few cases of the houses are being abandoned as the owner move to another city. • Some of the houses are rented or sold since the owners married to another survivors and later share one of the two properties provided to them. • Many inhabitants altered the function of houses so as to accommodate their lifestyle and needs
  • 21. Replication • • • • The structure of the additional building do not follow the Uplink’s standard due to economic constrain. Some of the additional buildings used recycled material from the temporary shelter. People need more time and facilitation to learn new technologies/ innovation introduced during the project. Some of the innovations (eg. Solar panel, biofil sanitation system) have not been used. The organisation collaborated with the Australian Red Cross to provide a similar participatory approach on Nasi Island, of the coast of Banda Aceh, following the disaster. They are also implementing similar plans in postearthquake reconstruction in Yogyakarta.
  • 22. Technical Performance • • • Good structural performance, easy to extend, easy to maintain Need special attention on window frame and door Maintenance : regular repaint, insect spray, applying kerosene on the floor to keep it clean and shiny, cover the wood wall metal sheeting to avoid damage caused by rain water.
  • 23. Livelihood • Some of the economic recovery program during the project are still run by the community ex. pedicab driver and workshop, duck and chicken farming • Skills acquired during the reconstruction phase are used to earn income as small contractors • Positive impact on women’s position and power within society
  • 24. Lesson Learned Reconstruction is not only about rebuilding physical aspect such but also reconstructing the life. The concept of people's driven, participatory, and holistic approach is a must. Some of lesson learned from the project are: •Sensitivity to Local Culture •Involving Survivors in Every Stage of Reconstruction •Post-Disaster Livelihood Programme •Allocate more time to facilitate the learning process of the community after the reconstruction phase