FLOOD CONTROL CHALLENGES FOR LARGE
HYDROELECTRIC RESERVOIRS
EXAMPLE FROM NAM THEUN-NAM KADING BASIN IN LAO PDR
Peter R.B. Ward, Timo A. Räsänen, Peter-John Meynell, Tarek Ketelsen, Khamfeuane Sioudom
and Jeremy Carew-Reid




CHALLENGE PROGRAM ON WATER & FOOD IN THE MEKONG: Optimizing the management of hydropower cascades at the catchment level (MK3)
Flood Control for Large Reservoirs:
         Design and Operation
• Climate and Expected Large Flood Events

• Storage for Flood Pulse Modulation

• Spillway Flow Capacity and Operation

• Mechanical Reliability and Servicing
Flood Control for Large Reservoirs:
      Design and Operation
Flood Control for Large Reservoirs:
      Design and Operation
Thailand Examples


                                      UBOL RATANA DAM




SRINAGARIND DAM
Srinagarind Dam, Thailand
Srinagarind Dam, Thailand
Ubol Ratana Dam, Thailand
• 1966 Dam commissioned, primarily for storage for agriculture
• 1978 Disaster narrowly averted when a flood overtopped the core of the
  dam by 24 cm. Average daily peak inflow more than triple the designed
  maximum spillway capacity.

•   Original design flood estimate was insufficient.

• Outcome:

• EGAT began formal dam safety practices, such as comprehensive dam
  safety reviews, emergency preparedness

• 1986-7 Dam was raised by 3.1 m, and spillway capacity was increased by
  40%. Additional work cost $15 million, an outlay of 70% on top of the
  original cost.
Nam Theun River Basin: overview
• Difficult climate: periodic extremely heavy rain events associated
  with tropical cyclone weather: typhoons and tropical storms. Global
  climate change promises more extreme future weather.

• Short number of years for hydrological data set for the basin: design
  risk

• Three projects in operation, and others proposed

• Dams are not owned by one entity, communications question

• Nam Theun 2 flow scheduling and reservoir operation is done from
  another country
Nam Theun River Basin:
hydropower development
Nam Theun River basin:
hydropower development
Table 1. Main characteristics of Theun-Hinboun, Nam Theun 2 and Nam Gnouang
hydropower projects. Data from Then-Hinboun are before the (2012) expansion project

                            Theun-Hinboun             Nam Theun 2*                Nam Gnouan
Dam height [m]              27                        39                          67
Active storage [mcm]        15                        3530                        2260
Flood buffer [mcm]                                    1410                        470
Reservoir drawdown [m]      5                         12.5                        35
Surface area at FSL [km2]   6.3                       450                         107
Average discharge [m3/s]    220 (460 before NT2)      240                         95
Catchment area [km2]        8937                      4013                        2942
Installed capacity [MW]     210 to be enlarged        1090                        60
Head [m]                    230                       348                         47
Turbine discharge [m3/s]    110                       330                         144
Annual production [GWh]     1356 (1645 after NG)      5936                        294
Spillway type               2 radial gates            5 radial gates (1374        5 radial gates
                                    3                   3                                  3
                            (1160m /s/gate); 1 flap   m /s/gate ); 2 flap gates   (3144 m /s/gate)
                                       3                     3
                            gate (50m /s); 4 sand     (192m /s/gate)
                            flushing gates
                            (20m3/s/gate); fixed
                            overflow weir
Spillway capacity [m3/s]    12500                     6870                        15700
* Data are for Nakai Dam on Nam Theun River. Reservoir is also contained by an (earth)
saddle dam, on the south side.
Nam Theun: river flow
      Peak: 18,000 m3/s   Peak: 9,000 m3/s
Nam Theun: peak flow events




  Two largest events in 10 year daily record: Theun Hinboun damsite
Nam Theun: typhoon tracks


                            Typhoon tracks
                            2002 (left) and
                            2011 (right)
                            Sept and Oct
Nam Theun: Water balance
• We used simple model for NT2 reservoir, with computed
  inflows based on flow data before and during the 2002
  extreme flood event, to check on reservoir water surface
  heights. Peak inflow on 22nd Sept was 12,000 m3/s.

• We wanted to see what would happen during a “Normal”
  procedure, and a “Too little too late” procedure for
  operating the spillway gates.

• We assumed that at the start of the extreme runoff event
  the reservoir was full to the FSL, and that there was still
  available the (large) flood buffer storage above this level.
Nam Theun:
         simulated reservoir storage




NT2 reservoir water surface during typhoon induced major runoff event
All gates at Nakai dam working, and timely response
Nam Theun:
              simulated reservoir storage




Too-little-too-late operation. One spillway gate not functioning, and delayed
maximum opening of other gates. Dangerously high water level in reservoir.
Nam Theun: conclusions
• We concluded that a great deal of care and a very
  tight requirement for timely response is needed
  at NT2 dam, even for management of a flood
  event (10 year event?) that is not extreme.

• Not clear how future exceptional flood events will
  be managed successfully.

• Need for a variety of
  management/governance/co-ordination
  activities.
Nam Theun: Recommendations
1.   Adherence to a well conceived rule curve for reservoir surface
     levels in the flood season, with periodic updating of the rule curve
     to reflect improved knowledge of the basin, and long term shifts
     from climate change
2.   Ready access to long term and short term weather predictions,
     particularly for heavy rain expected from typhoon events.
3.   Responsiveness to daily and hourly developments during major
     floods
4.   Periodic comprehensive dam safety reviews, by an independent
     team that should include engineering experts, with backgrounds
     in hydrology, geotechnology, mechanical engineering and
     electrical engineering.
Nam Theun: Recommendations
Suggestions are made for
• the establishment of a strengthened capacity for the
  NT-NK River Basin Committee Secretariat

• emergency communications capability between
  stakeholders, e.g. dam operators and downstream
  stakeholders

• periodic, long-term requirements for engineering
  assessment concerning safe operations at the dams.
• Ongoing research work on climate periodicities in
  the Mekong region is encouraging, as it promises
  to offer ways of achieving advance notice of the
  likelihood of an extreme weather season.

• Links between the WNPM, ENSO and PDO events
  is being established, and this understanding will
  provide extremely helpful with advanced warning
  and preparedness.
Flood Control for Large Reservoirs:   Design and Operation




    Thank you for your attention




                      Thank you for your attention
Columbia River Treaty
• 11 years of discussions post 1948.

• Ratified in 1964 for 60 year period. 10 year prior notification before
  expiry

• Basic idea was to construct and operate four projects (3 in Canada)
  that would achieve hydropower generation and flood control.

• Several downstream projects in the US benefit from the upstream
  Treaty projects with the ongoing benefit of generating more HP
  energy

• Treaty covers Canadian entitlement “one half of the estimated
  increase in US downstream power benefits”
Srinagarind Dam, Thailand
• Periodic extremely heavy rain events, determined by monsoon
  conditions, and weather associated with tropical cyclone activity

• Short data set available when design was undertaken (early 1970s).
• Design flood selected, and spillway size with operating procedures
  determined. Construction was delayed, and dam finally completed
  in 1980.

• 18 years later, review of hydrological conditions, spillway capacity
  shown to be less than desirable.

• Decision made to operate the reservoir with a different set of RULE
  CURVES, for dam safety reasons.
Flood Control for Large Reservoirs:
      Design and Operation

Contenu connexe

Tendances

DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - Elmilady
DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - ElmiladyDSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - Elmilady
DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - ElmiladyDeltares
 
Introduction to Hydrology, Stream Gauging
Introduction to Hydrology, Stream GaugingIntroduction to Hydrology, Stream Gauging
Introduction to Hydrology, Stream GaugingAmol Inamdar
 
Coastal engineering introduction
Coastal engineering introductionCoastal engineering introduction
Coastal engineering introductionJorge C. Palma
 
Chapter 1 introduction to coastal engineering and management strategies
Chapter  1 introduction to coastal engineering and management strategiesChapter  1 introduction to coastal engineering and management strategies
Chapter 1 introduction to coastal engineering and management strategiesMohsin Siddique
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth DamsAhmed Mansor
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisAnkit Patel
 
Stage measurement
Stage measurementStage measurement
Stage measurementKiran Yadav
 
modeling and analysis of subsea pipeline by fem
modeling and analysis of subsea pipeline by femmodeling and analysis of subsea pipeline by fem
modeling and analysis of subsea pipeline by fem9845097705
 
Rainfall runoff analysis of a compacted area
Rainfall runoff analysis of a compacted areaRainfall runoff analysis of a compacted area
Rainfall runoff analysis of a compacted areawalled ashwah
 
Hydrology, Runoff methods & instruments, Site selection
Hydrology, Runoff methods & instruments, Site selectionHydrology, Runoff methods & instruments, Site selection
Hydrology, Runoff methods & instruments, Site selectionRaveen Ramanan
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwayssaibabu48
 
14 d&i design of surface drainage
14 d&i design of surface drainage14 d&i design of surface drainage
14 d&i design of surface drainageMuhammadImran1202
 

Tendances (20)

DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - Elmilady
DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - ElmiladyDSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - Elmilady
DSD-INT 2016 Salinity and Sediment dynamics in San Francisco Estuary - Elmilady
 
Musings on potential CO2 migration along pre-existing (former) fluid flow pat...
Musings on potential CO2 migration along pre-existing (former) fluid flow pat...Musings on potential CO2 migration along pre-existing (former) fluid flow pat...
Musings on potential CO2 migration along pre-existing (former) fluid flow pat...
 
Introduction to Hydrology, Stream Gauging
Introduction to Hydrology, Stream GaugingIntroduction to Hydrology, Stream Gauging
Introduction to Hydrology, Stream Gauging
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
SLUICE GATE
SLUICE GATESLUICE GATE
SLUICE GATE
 
Coastal engineering introduction
Coastal engineering introductionCoastal engineering introduction
Coastal engineering introduction
 
Chapter 1 introduction to coastal engineering and management strategies
Chapter  1 introduction to coastal engineering and management strategiesChapter  1 introduction to coastal engineering and management strategies
Chapter 1 introduction to coastal engineering and management strategies
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth Dams
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Stage measurement
Stage measurementStage measurement
Stage measurement
 
Hydrology ( Hydro graph )
Hydrology ( Hydro graph )Hydrology ( Hydro graph )
Hydrology ( Hydro graph )
 
modeling and analysis of subsea pipeline by fem
modeling and analysis of subsea pipeline by femmodeling and analysis of subsea pipeline by fem
modeling and analysis of subsea pipeline by fem
 
Rainfall runoff analysis of a compacted area
Rainfall runoff analysis of a compacted areaRainfall runoff analysis of a compacted area
Rainfall runoff analysis of a compacted area
 
Hydrology, Runoff methods & instruments, Site selection
Hydrology, Runoff methods & instruments, Site selectionHydrology, Runoff methods & instruments, Site selection
Hydrology, Runoff methods & instruments, Site selection
 
Coastal engineering
Coastal engineeringCoastal engineering
Coastal engineering
 
Arsaln abid
Arsaln abidArsaln abid
Arsaln abid
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrograph
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
14 d&i design of surface drainage
14 d&i design of surface drainage14 d&i design of surface drainage
14 d&i design of surface drainage
 

En vedette

Beaver Dam/Littlefield Flood December 2010
Beaver Dam/Littlefield Flood December 2010Beaver Dam/Littlefield Flood December 2010
Beaver Dam/Littlefield Flood December 2010Paul Pitts
 
Presentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifPresentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifAdil Latif
 
Lesson 13 case study of a dam & reservoir
Lesson 13   case study of a dam & reservoirLesson 13   case study of a dam & reservoir
Lesson 13 case study of a dam & reservoirlesliehome
 
Hoover Dam2
Hoover  Dam2Hoover  Dam2
Hoover Dam2lstevens
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of damsnibeditachakraborty
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseYourAlberta
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSA Y V CHENULU
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control Systemgrandestrategy
 
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODReservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODStephen Flood
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control HNurton
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodmadhura92
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control WorksGAURAV. H .TANDON
 

En vedette (14)

Beaver Dam/Littlefield Flood December 2010
Beaver Dam/Littlefield Flood December 2010Beaver Dam/Littlefield Flood December 2010
Beaver Dam/Littlefield Flood December 2010
 
Presentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifPresentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil Latif
 
Lesson 13 case study of a dam & reservoir
Lesson 13   case study of a dam & reservoirLesson 13   case study of a dam & reservoir
Lesson 13 case study of a dam & reservoir
 
Dam It
Dam ItDam It
Dam It
 
Hoover Dam2
Hoover  Dam2Hoover  Dam2
Hoover Dam2
 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of dams
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONS
 
Pakistan Flood Control System
Pakistan Flood Control SystemPakistan Flood Control System
Pakistan Flood Control System
 
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOODReservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
Reservoir Inundation Mapping, Dam Break and Breach Assessments with MIKE FLOOD
 
Methods Of Flood Control
Methods Of Flood Control Methods Of Flood Control
Methods Of Flood Control
 
Reservoir
ReservoirReservoir
Reservoir
 
Disaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai floodDisaster management- case study on 26 July 2005 Mumbai flood
Disaster management- case study on 26 July 2005 Mumbai flood
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 

Similaire à Flood Control Challenges for Large Hydroelectric Reservoirs

Feasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationFeasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationAwais Marwat
 
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...Deltares
 
IRJET- A Review on Under Water Windmill
IRJET-  A Review on Under Water WindmillIRJET-  A Review on Under Water Windmill
IRJET- A Review on Under Water WindmillIRJET Journal
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.pptMadavanR
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.pptMahadArif2
 
Sustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongSustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongJessicaNagtalon
 
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017Sustainable Severn
 
Rishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.pptRishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.pptNoomanShaikh
 
2209100010 febrianto - plt pasang surut (tidal)
2209100010   febrianto - plt pasang surut (tidal)2209100010   febrianto - plt pasang surut (tidal)
2209100010 febrianto - plt pasang surut (tidal)Febrianto Utomo
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...Joseph Ng'ang'a Thuo
 
Dam Breach Analysis.pptx
Dam Breach Analysis.pptxDam Breach Analysis.pptx
Dam Breach Analysis.pptxAkashPalve7
 
Oceans as a non conventional source of energy
Oceans as a non conventional source of energyOceans as a non conventional source of energy
Oceans as a non conventional source of energyDeepak Devarsetti
 
Tides and Tidal Energy.pptx
Tides and Tidal Energy.pptxTides and Tidal Energy.pptx
Tides and Tidal Energy.pptxSatishAdhikari10
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Tidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCTidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCtheCCCuk
 

Similaire à Flood Control Challenges for Large Hydroelectric Reservoirs (20)

Feasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower StationFeasibility and Economic Design of Pumped Storage Hydropower Station
Feasibility and Economic Design of Pumped Storage Hydropower Station
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - 2D hydrodyna...
 
Presentation on high dam
Presentation on high damPresentation on high dam
Presentation on high dam
 
PSE-18.pdf
PSE-18.pdfPSE-18.pdf
PSE-18.pdf
 
IRJET- A Review on Under Water Windmill
IRJET-  A Review on Under Water WindmillIRJET-  A Review on Under Water Windmill
IRJET- A Review on Under Water Windmill
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
canutepresentation.ppt
canutepresentation.pptcanutepresentation.ppt
canutepresentation.ppt
 
Sustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongSustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the Mekong
 
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
Roger Falconer and Chris Binnie - Sustainable Severn Forum 2017
 
Rishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.pptRishi Nair & Kathryn Thomas.ppt
Rishi Nair & Kathryn Thomas.ppt
 
2209100010 febrianto - plt pasang surut (tidal)
2209100010   febrianto - plt pasang surut (tidal)2209100010   febrianto - plt pasang surut (tidal)
2209100010 febrianto - plt pasang surut (tidal)
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...
 
tidal energy
tidal energytidal energy
tidal energy
 
Dam Breach Analysis.pptx
Dam Breach Analysis.pptxDam Breach Analysis.pptx
Dam Breach Analysis.pptx
 
Oceans as a non conventional source of energy
Oceans as a non conventional source of energyOceans as a non conventional source of energy
Oceans as a non conventional source of energy
 
Tailings dams
Tailings damsTailings dams
Tailings dams
 
Tides and Tidal Energy.pptx
Tides and Tidal Energy.pptxTides and Tidal Energy.pptx
Tides and Tidal Energy.pptx
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Tidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCCTidal Lagoon Power - Presentation to CCC
Tidal Lagoon Power - Presentation to CCC
 

Plus de CPWF Mekong

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of ScaleCPWF Mekong
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim gehebCPWF Mekong
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong gangaCPWF Mekong
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsCPWF Mekong
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...CPWF Mekong
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...CPWF Mekong
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelistsCPWF Mekong
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaCPWF Mekong
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrCPWF Mekong
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of damsCPWF Mekong
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision makingCPWF Mekong
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource managementCPWF Mekong
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsCPWF Mekong
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision makingCPWF Mekong
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overviewCPWF Mekong
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentCPWF Mekong
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an optionCPWF Mekong
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...CPWF Mekong
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policyCPWF Mekong
 
Technology review
Technology reviewTechnology review
Technology reviewCPWF Mekong
 

Plus de CPWF Mekong (20)

Mekong: The Challenges of Scale
Mekong: The Challenges of ScaleMekong: The Challenges of Scale
Mekong: The Challenges of Scale
 
Closing remarks dr kim geheb
Closing remarks dr kim gehebClosing remarks dr kim geheb
Closing remarks dr kim geheb
 
Session 20 comparing the nexus along the mekong ganga
Session 20 comparing the nexus along the mekong  gangaSession 20 comparing the nexus along the mekong  ganga
Session 20 comparing the nexus along the mekong ganga
 
Sustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operationsSustainability tools in hydropower development & operations
Sustainability tools in hydropower development & operations
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
 
Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...Advancing sustainability in the mekong region role of assessment tools and st...
Advancing sustainability in the mekong region role of assessment tools and st...
 
Draft agenda session 19 for panelists
Draft agenda session 19 for panelistsDraft agenda session 19 for panelists
Draft agenda session 19 for panelists
 
Lessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodiaLessons learnt about hydropower decision making processes in cambodia
Lessons learnt about hydropower decision making processes in cambodia
 
Decision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdrDecision making on hydropower development in lao pdr
Decision making on hydropower development in lao pdr
 
Chinese studies on impacts of dams
Chinese studies on impacts of damsChinese studies on impacts of dams
Chinese studies on impacts of dams
 
Governance, institutions and decision making
Governance, institutions and decision makingGovernance, institutions and decision making
Governance, institutions and decision making
 
Integrated water resource management
Integrated water resource managementIntegrated water resource management
Integrated water resource management
 
How hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoodsHow hydropower operations can accommodate local livelihoods
How hydropower operations can accommodate local livelihoods
 
Gender, livelihoods & decision making
Gender, livelihoods & decision makingGender, livelihoods & decision making
Gender, livelihoods & decision making
 
Better dams for food and livelihoods overview
Better dams for food and livelihoods overviewBetter dams for food and livelihoods overview
Better dams for food and livelihoods overview
 
Assessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower developmentAssessing livelihood piloting experiences associated with hydropower development
Assessing livelihood piloting experiences associated with hydropower development
 
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
Day 1 session 5.3  direct vs indirect pes could microcredit be an optionDay 1 session 5.3  direct vs indirect pes could microcredit be an option
Day 1 session 5.3 direct vs indirect pes could microcredit be an option
 
Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...Optimising fish friendly criteria for incorporation into the design of mini-h...
Optimising fish friendly criteria for incorporation into the design of mini-h...
 
Solar pv in vietnam power sector benefits, costs and policy
Solar pv in vietnam power sector  benefits, costs and policySolar pv in vietnam power sector  benefits, costs and policy
Solar pv in vietnam power sector benefits, costs and policy
 
Technology review
Technology reviewTechnology review
Technology review
 

Flood Control Challenges for Large Hydroelectric Reservoirs

  • 1. FLOOD CONTROL CHALLENGES FOR LARGE HYDROELECTRIC RESERVOIRS EXAMPLE FROM NAM THEUN-NAM KADING BASIN IN LAO PDR Peter R.B. Ward, Timo A. Räsänen, Peter-John Meynell, Tarek Ketelsen, Khamfeuane Sioudom and Jeremy Carew-Reid CHALLENGE PROGRAM ON WATER & FOOD IN THE MEKONG: Optimizing the management of hydropower cascades at the catchment level (MK3)
  • 2. Flood Control for Large Reservoirs: Design and Operation • Climate and Expected Large Flood Events • Storage for Flood Pulse Modulation • Spillway Flow Capacity and Operation • Mechanical Reliability and Servicing
  • 3. Flood Control for Large Reservoirs: Design and Operation
  • 4. Flood Control for Large Reservoirs: Design and Operation
  • 5. Thailand Examples UBOL RATANA DAM SRINAGARIND DAM
  • 8. Ubol Ratana Dam, Thailand • 1966 Dam commissioned, primarily for storage for agriculture • 1978 Disaster narrowly averted when a flood overtopped the core of the dam by 24 cm. Average daily peak inflow more than triple the designed maximum spillway capacity. • Original design flood estimate was insufficient. • Outcome: • EGAT began formal dam safety practices, such as comprehensive dam safety reviews, emergency preparedness • 1986-7 Dam was raised by 3.1 m, and spillway capacity was increased by 40%. Additional work cost $15 million, an outlay of 70% on top of the original cost.
  • 9. Nam Theun River Basin: overview • Difficult climate: periodic extremely heavy rain events associated with tropical cyclone weather: typhoons and tropical storms. Global climate change promises more extreme future weather. • Short number of years for hydrological data set for the basin: design risk • Three projects in operation, and others proposed • Dams are not owned by one entity, communications question • Nam Theun 2 flow scheduling and reservoir operation is done from another country
  • 10. Nam Theun River Basin: hydropower development
  • 11. Nam Theun River basin: hydropower development
  • 12. Table 1. Main characteristics of Theun-Hinboun, Nam Theun 2 and Nam Gnouang hydropower projects. Data from Then-Hinboun are before the (2012) expansion project Theun-Hinboun Nam Theun 2* Nam Gnouan Dam height [m] 27 39 67 Active storage [mcm] 15 3530 2260 Flood buffer [mcm] 1410 470 Reservoir drawdown [m] 5 12.5 35 Surface area at FSL [km2] 6.3 450 107 Average discharge [m3/s] 220 (460 before NT2) 240 95 Catchment area [km2] 8937 4013 2942 Installed capacity [MW] 210 to be enlarged 1090 60 Head [m] 230 348 47 Turbine discharge [m3/s] 110 330 144 Annual production [GWh] 1356 (1645 after NG) 5936 294 Spillway type 2 radial gates 5 radial gates (1374 5 radial gates 3 3 3 (1160m /s/gate); 1 flap m /s/gate ); 2 flap gates (3144 m /s/gate) 3 3 gate (50m /s); 4 sand (192m /s/gate) flushing gates (20m3/s/gate); fixed overflow weir Spillway capacity [m3/s] 12500 6870 15700 * Data are for Nakai Dam on Nam Theun River. Reservoir is also contained by an (earth) saddle dam, on the south side.
  • 13. Nam Theun: river flow Peak: 18,000 m3/s Peak: 9,000 m3/s
  • 14. Nam Theun: peak flow events Two largest events in 10 year daily record: Theun Hinboun damsite
  • 15. Nam Theun: typhoon tracks Typhoon tracks 2002 (left) and 2011 (right) Sept and Oct
  • 16. Nam Theun: Water balance • We used simple model for NT2 reservoir, with computed inflows based on flow data before and during the 2002 extreme flood event, to check on reservoir water surface heights. Peak inflow on 22nd Sept was 12,000 m3/s. • We wanted to see what would happen during a “Normal” procedure, and a “Too little too late” procedure for operating the spillway gates. • We assumed that at the start of the extreme runoff event the reservoir was full to the FSL, and that there was still available the (large) flood buffer storage above this level.
  • 17.
  • 18. Nam Theun: simulated reservoir storage NT2 reservoir water surface during typhoon induced major runoff event All gates at Nakai dam working, and timely response
  • 19. Nam Theun: simulated reservoir storage Too-little-too-late operation. One spillway gate not functioning, and delayed maximum opening of other gates. Dangerously high water level in reservoir.
  • 20. Nam Theun: conclusions • We concluded that a great deal of care and a very tight requirement for timely response is needed at NT2 dam, even for management of a flood event (10 year event?) that is not extreme. • Not clear how future exceptional flood events will be managed successfully. • Need for a variety of management/governance/co-ordination activities.
  • 21. Nam Theun: Recommendations 1. Adherence to a well conceived rule curve for reservoir surface levels in the flood season, with periodic updating of the rule curve to reflect improved knowledge of the basin, and long term shifts from climate change 2. Ready access to long term and short term weather predictions, particularly for heavy rain expected from typhoon events. 3. Responsiveness to daily and hourly developments during major floods 4. Periodic comprehensive dam safety reviews, by an independent team that should include engineering experts, with backgrounds in hydrology, geotechnology, mechanical engineering and electrical engineering.
  • 22. Nam Theun: Recommendations Suggestions are made for • the establishment of a strengthened capacity for the NT-NK River Basin Committee Secretariat • emergency communications capability between stakeholders, e.g. dam operators and downstream stakeholders • periodic, long-term requirements for engineering assessment concerning safe operations at the dams.
  • 23. • Ongoing research work on climate periodicities in the Mekong region is encouraging, as it promises to offer ways of achieving advance notice of the likelihood of an extreme weather season. • Links between the WNPM, ENSO and PDO events is being established, and this understanding will provide extremely helpful with advanced warning and preparedness.
  • 24. Flood Control for Large Reservoirs: Design and Operation Thank you for your attention Thank you for your attention
  • 25.
  • 26. Columbia River Treaty • 11 years of discussions post 1948. • Ratified in 1964 for 60 year period. 10 year prior notification before expiry • Basic idea was to construct and operate four projects (3 in Canada) that would achieve hydropower generation and flood control. • Several downstream projects in the US benefit from the upstream Treaty projects with the ongoing benefit of generating more HP energy • Treaty covers Canadian entitlement “one half of the estimated increase in US downstream power benefits”
  • 27. Srinagarind Dam, Thailand • Periodic extremely heavy rain events, determined by monsoon conditions, and weather associated with tropical cyclone activity • Short data set available when design was undertaken (early 1970s). • Design flood selected, and spillway size with operating procedures determined. Construction was delayed, and dam finally completed in 1980. • 18 years later, review of hydrological conditions, spillway capacity shown to be less than desirable. • Decision made to operate the reservoir with a different set of RULE CURVES, for dam safety reasons.
  • 28. Flood Control for Large Reservoirs: Design and Operation