PREPARED BY :- RAVAL DIVY DINESHKUMAR
INTRODUCTION
 Under reamed piles are made by C.B.R.I.( Central Building Research Institute).
 They are made of R.C.C.
 In the bottom portion of the pile, enlarged portion is given which is called ‘under reamed’
or ‘bulb’.
 If pile has one bulb, it is called single reamed, if the pile has two bulbs then it is called
double reamed, and if there are more than two bulbs, it is called multiple under reamed
piles.
2
SINGLE AND DOUBLE UNDER REAMED PILES
3
FEATURES
 Dia. Of the pile = 20 to 50cm
 Dia. Of the bulb = 2 to 3 times of dia. of pile
 Length of the pile = 3 to 8m
 Spacing between two piles = 2 to 4m
 Spacing between two bulbs = 1.25 to 1.5 times of bulb dia.
 Load carrying capacity = 20 to 40 ton
4
APPLICATIONS
1. Black cotton soil expands as it comes in contact with water and it gets contracted as it is
dried out. Because of this reason, there may be a chance of cracks in the structure. To avoid
such damage, under reamed pile are used in black cotton soil.
2. When the soil doesn’t have much load carrying capacity, under reamed piles are used to
increase the capacity.
3. It is used when the water level in sandy soil is high.
4. When there are lifting forces acting, it should be used.
5
INCREASING LOAD CARRYING
CAPACITY
1. By putting more bulbs
2. By increasing the dia. of bulb
3. By increasing the length of pile
4. By providing proper reinforcement
6
Construction of under reamed pile
 Under reamed piles are mostly constructed by manual work.
 The machine for the construction of pile is made by C.B.R.I. Rurki.
 The machine is easy to use and it is light weighted.
 It consists of three tools :
1. Spiral Auger
2. Under – reamer
3. Boring guide
7
 Spiral auger is used to make a hole in the land for the under reamed pile.
 The auger contains special cutter at the bottom to dig the land.
 The soil that is dug is taken out by the bucket.
8
SPIRAL AUGER INSERTED THROUGH TRIPOD IN VERTICAL DIRECTION
9
BUCKET PROVIDED TO TAKE OUT THE SOIL
10
REINFORCEMENT
11
CONTRUCTED UNDER REAMED PILE
12
 Special cutter is used for making the bulb. By putting enough pressure, we can increase the
dia. of bulb.
 The auger is kept through the tripod and after than the digging is done. So the digging is
done in the vertical direction.
 After digging the desired depth, the auger is pulled out. The reinforcement is then inserted
in the hole. Concreting is done. If more than one pile, beam is constructed which connect
the piles and make them act like a single unit. The wall is than constructed on the beam.
13
PILE CAP CONNECTING ALL THE PILES
14
ADVANTAGES
1. It is 15 to 20% cheaper than the strip footing.
2. Less material required.
3. Digging is normal so the work is carried out for anytime of the year.
4. No back filling is required.
5. Shoring is not required.
6. Dewatering is not necessary.
15
Reference
 ADVENCED CONSTRUCTION TECHNOLOGY, DR. R.P.RETHALIYA..
16
THANK YOU
17

Contenu connexe

Tendances (20)

Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 
IS Classification of Soils
IS Classification of SoilsIS Classification of Soils
IS Classification of Soils
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniques
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Workability of Concrete
Workability  of ConcreteWorkability  of Concrete
Workability of Concrete
 
Earth pressure( soil mechanics)
Earth pressure( soil mechanics)Earth pressure( soil mechanics)
Earth pressure( soil mechanics)
 
Plate load test
Plate load testPlate load test
Plate load test
 
Grouting in Soils
Grouting in SoilsGrouting in Soils
Grouting in Soils
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
Dynamic Pile Formulae
Dynamic Pile FormulaeDynamic Pile Formulae
Dynamic Pile Formulae
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Reinforced soil
Reinforced soilReinforced soil
Reinforced soil
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 

Similaire à Under reamed piles

Under-Rreamed Piles
Under-Rreamed PilesUnder-Rreamed Piles
Under-Rreamed Pilesssuser579b1e
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsNagma Modi
 
Percussion drilling
Percussion drillingPercussion drilling
Percussion drillingshaxee ali
 
Tube-Wells and their Designs
Tube-Wells and their DesignsTube-Wells and their Designs
Tube-Wells and their DesignsAnand Kumar
 
Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Denish Jangid
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxNisthaPathak2
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their compositionMdDiluarHossain1
 
Unit 3 ground water lect-2
Unit 3 ground water lect-2Unit 3 ground water lect-2
Unit 3 ground water lect-2DIPESH RAJPUT
 
TYPES OF SOIL SAMPLE AND SAMPLERS .
TYPES OF SOIL SAMPLE AND SAMPLERS .TYPES OF SOIL SAMPLE AND SAMPLERS .
TYPES OF SOIL SAMPLE AND SAMPLERS .Prajakta Lade
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design pptBala Balaji
 
Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1DYPCET
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptxAnshuBarmase
 

Similaire à Under reamed piles (20)

Underreamedpiles
UnderreamedpilesUnderreamedpiles
Underreamedpiles
 
Under-Rreamed Piles
Under-Rreamed PilesUnder-Rreamed Piles
Under-Rreamed Piles
 
Under reamed piles
Under reamed pilesUnder reamed piles
Under reamed piles
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
 
Chapter 09
Chapter 09Chapter 09
Chapter 09
 
Percussion drilling
Percussion drillingPercussion drilling
Percussion drilling
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Tube-Wells and their Designs
Tube-Wells and their DesignsTube-Wells and their Designs
Tube-Wells and their Designs
 
Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...Water Resources Engineering types of wells with figures Denish Jangid Open we...
Water Resources Engineering types of wells with figures Denish Jangid Open we...
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
BC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptxBC-II lec 6 pierand deep fdn.pptx
BC-II lec 6 pierand deep fdn.pptx
 
pire and well.pptx
pire and  well.pptxpire and  well.pptx
pire and well.pptx
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
 
Unit 3 ground water lect-2
Unit 3 ground water lect-2Unit 3 ground water lect-2
Unit 3 ground water lect-2
 
TYPES OF SOIL SAMPLE AND SAMPLERS .
TYPES OF SOIL SAMPLE AND SAMPLERS .TYPES OF SOIL SAMPLE AND SAMPLERS .
TYPES OF SOIL SAMPLE AND SAMPLERS .
 
19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt19021 d2004 well foundation design ppt
19021 d2004 well foundation design ppt
 
Chapter 15
Chapter 15Chapter 15
Chapter 15
 
Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1
 
Methods of boring ppt
Methods of boring  pptMethods of boring  ppt
Methods of boring ppt
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptx
 

Dernier

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Dernier (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Under reamed piles

  • 1. UNDER REAMED PILES PREPARED BY :- RAVAL DIVY DINESHKUMAR
  • 2. INTRODUCTION  Under reamed piles are made by C.B.R.I.( Central Building Research Institute).  They are made of R.C.C.  In the bottom portion of the pile, enlarged portion is given which is called ‘under reamed’ or ‘bulb’.  If pile has one bulb, it is called single reamed, if the pile has two bulbs then it is called double reamed, and if there are more than two bulbs, it is called multiple under reamed piles. 2
  • 3. SINGLE AND DOUBLE UNDER REAMED PILES 3
  • 4. FEATURES  Dia. Of the pile = 20 to 50cm  Dia. Of the bulb = 2 to 3 times of dia. of pile  Length of the pile = 3 to 8m  Spacing between two piles = 2 to 4m  Spacing between two bulbs = 1.25 to 1.5 times of bulb dia.  Load carrying capacity = 20 to 40 ton 4
  • 5. APPLICATIONS 1. Black cotton soil expands as it comes in contact with water and it gets contracted as it is dried out. Because of this reason, there may be a chance of cracks in the structure. To avoid such damage, under reamed pile are used in black cotton soil. 2. When the soil doesn’t have much load carrying capacity, under reamed piles are used to increase the capacity. 3. It is used when the water level in sandy soil is high. 4. When there are lifting forces acting, it should be used. 5
  • 6. INCREASING LOAD CARRYING CAPACITY 1. By putting more bulbs 2. By increasing the dia. of bulb 3. By increasing the length of pile 4. By providing proper reinforcement 6
  • 7. Construction of under reamed pile  Under reamed piles are mostly constructed by manual work.  The machine for the construction of pile is made by C.B.R.I. Rurki.  The machine is easy to use and it is light weighted.  It consists of three tools : 1. Spiral Auger 2. Under – reamer 3. Boring guide 7
  • 8.  Spiral auger is used to make a hole in the land for the under reamed pile.  The auger contains special cutter at the bottom to dig the land.  The soil that is dug is taken out by the bucket. 8
  • 9. SPIRAL AUGER INSERTED THROUGH TRIPOD IN VERTICAL DIRECTION 9
  • 10. BUCKET PROVIDED TO TAKE OUT THE SOIL 10
  • 13.  Special cutter is used for making the bulb. By putting enough pressure, we can increase the dia. of bulb.  The auger is kept through the tripod and after than the digging is done. So the digging is done in the vertical direction.  After digging the desired depth, the auger is pulled out. The reinforcement is then inserted in the hole. Concreting is done. If more than one pile, beam is constructed which connect the piles and make them act like a single unit. The wall is than constructed on the beam. 13
  • 14. PILE CAP CONNECTING ALL THE PILES 14
  • 15. ADVANTAGES 1. It is 15 to 20% cheaper than the strip footing. 2. Less material required. 3. Digging is normal so the work is carried out for anytime of the year. 4. No back filling is required. 5. Shoring is not required. 6. Dewatering is not necessary. 15
  • 16. Reference  ADVENCED CONSTRUCTION TECHNOLOGY, DR. R.P.RETHALIYA.. 16